CN103938758A - Method for manufacturing bare concrete concave-convex wood grain decoration wall - Google Patents

Method for manufacturing bare concrete concave-convex wood grain decoration wall Download PDF

Info

Publication number
CN103938758A
CN103938758A CN201410162378.1A CN201410162378A CN103938758A CN 103938758 A CN103938758 A CN 103938758A CN 201410162378 A CN201410162378 A CN 201410162378A CN 103938758 A CN103938758 A CN 103938758A
Authority
CN
China
Prior art keywords
concrete
wall
liner plate
water
clear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410162378.1A
Other languages
Chinese (zh)
Other versions
CN103938758B (en
Inventor
曹应标
蔡敏强
陈烨
沈伟明
朱树波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jujiang?Construction Group Co., Ltd.
Original Assignee
Jujiang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jujiang Construction Group Co Ltd filed Critical Jujiang Construction Group Co Ltd
Priority to CN201410162378.1A priority Critical patent/CN103938758B/en
Publication of CN103938758A publication Critical patent/CN103938758A/en
Application granted granted Critical
Publication of CN103938758B publication Critical patent/CN103938758B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention relates to a method for manufacturing a bare concrete concave-convex wood grain decoration wall. The method comprises formwork engineering, wherein the formwork engineering mainly comprises formwork processing and formwork installing; reinforcing bar engineering, wherein the reinforcing bar engineering mainly comprises the step of installing reinforcing bars in a formwork; concrete engineering, wherein the concrete engineering mainly comprises concrete selecting, concrete casting and compacting and concrete maintaining; defect mending, wherein the defect mending mainly comprises bubble mending, wall root and external corner slurry leaking position mending and large formwork edge joint mending; smearing engineering, wherein the smearing engineering mainly comprises wall cleaning, color adjusting, first coat constructing and surface coat constructing. By means of the technical scheme, the manufactured concave-convex wood grain bare concrete is one kind of decoration bare concrete, the naturally produced log woodiness texture shows purely natural and original ecological environment-friendly concept, the concave-convex wood grain bare concrete is the embodiment of a green building and an ecological building, concrete is formed at a time, no modification is needed, and the quality of makeunder is presented.

Description

The preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete
Technical field
The present invention relates to building field, relate in particular to a kind of preparation method of decorating wall.
Background technology
Clear-water concrete (As-cast Finish Concrete/BareConcrete) claim again ornamental concrete; Because having decorative effect, it gains the name.It belongs to one-time cast-forming; do not make any outer decoration; directly adopt the natural surface effect of cast-in-situ concrete as facing; therefore be different from ordinary concrete; surfacing is smooth, color and luster is even, corner angle are clearly demarcated, without clashing and breaking and pollution; just on surface, be coated with one deck or two-layer transparent protective agent, seem very natural, serious.
Clear-water concrete is five-star expression-form in concrete material, and what its showed is the most essential a kind of aesthetic feeling, embodiment be the grade of " wearing no make-up during an audience with the emperor ".Clear-water concrete has simple and unadorned, naturally sedate outward appearance charm, inherent thick and heavy and elegant be that some modern architecture materials cannot be imitateed and match in excellence or beauty.The soft feeling that material itself has, firm sense, warming sense, cold and detached sense not only exert an influence to people's sense organ and spirit, and can give expression to building emotion.Therefore architects think, this is a kind of simplicity of noble quality, seem simple, the splendid artistic effect that has more of its fullsized.
Summary of the invention
The preparation method that the object of this invention is to provide the concavo-convex graining body of wall of a kind of clear-water concrete, the wooden texture of log that the present invention makes its Nature creating of decorating wall obtain has embodied the environmental protection concept of pure natural, ecosystem, it is a kind of embodiment of green building, ecotecture, it with concrete one-shot forming, do not do any modification, embody the quality of " wearing no make-up during an audience with the emperor ".
In order to realize above-mentioned object, the present invention has adopted following technical scheme:
A preparation method for the concavo-convex graining body of wall of clear-water concrete, the method comprises the following steps:
One, form work engineering
1.1, template adopts the composite shuttering system of panel+liner plate, and panel adopts veneer, and liner plate adopts strip U.S. Songyuan City wood timber;
1.2, template processing: liner plate requires the technological standards of living according to cabinet maker to carry out processing and fabricating, guarantees that plate seam is tight, and liner plate is first selected materials after marching into the arena, pass through again double surfacer material, then rush quasi-mode plate thickness, then with the sanding machine wood texture of polishing, then rush quasi-mode plate width, finally carry out fracture;
1.3, template is installed: location and absolute altitude have been controlled rear beginning installation form, before installation, the water seal of first brushing import of liner plate face Thomson, keeps moisture content within scope of design, prevents liner plate distortion, brushing release agent is twice again, every all over midfeather 10 ~ 14 hours, brushing should be thin and even, without leaking, brushes, after brushing, with clean dry towel, keep straight on and wipe, till making surface can not have the agent of mobile shape mould; 45 ° of cuttings are pressed in liner plate corner, and regulate the width of liner plate and correct liner plate torsion resistance, and liner plate adopts air gun nail to be connected with panel;
Two, reinforced bar engineering:
2.1, thickness of protection tier requires to be no less than 5cm, adopts with intensity the plastic cushion with color, and the dimension deviation of finished product reinforcing bar meets code requirement; To pull hook crotch place, must adopt 135 ° of crotches to process;
2.2, reinforcing bar is without floating rust, and during colligation, tied silk redundance bends inwards; Duo Bang bis-road positioning bars during the colligation of body of wall horizontal bar, high ejecting plate face 400mm;
2.3,, during reinforcement installation, for the electric welding construction of joint, make finished product;
2.4, stainless steel crack guiding groove is shaped as V-shape, is welded on shear force wall reinforcing steel bar, from template distance, is controlled at 8 ~ 12mm;
Three, concrete work:
3.1, concrete is selected: select clear-water concrete;
3.2, casting and compacting of concrete: before concreting, the foreign material in cleaning template, complete the subsurface work acceptance to reinforcing bar, pipeline set aside pre-embedded, constuction joint way; Water and smash layered blanking, every layer concrete is built thickness and is strict controlled in 400mm, and free blanking height must not surpass 2m; Clear-water concrete adopts self-compacting concrete, and in casting process, specific people successively uses waddy tamping incessantly, beats in template outside with rubber hammer simultaneously;
3.3, concrete curing: carry out in time the water seasoning of concrete during curing in the mold, guarantee that concrete surface long term is moistening, curing time must not be less than 14 days;
3.4, form removable: use crowbar, pad a thick veneer of 19mm between crowbar and concrete, for the template that is difficult to especially remove, by after liner plate dabbing, then row is removed;
Four, defect repair
4.1, bubble reparation
For the not serious bubble that affects clear-water concrete perception, do not repair; While needing to repair, first remove laitance and the loosening sand of concrete surface, with with the same producer of concrete, be modulated into cement paste with black, the white cement of intensity, trial test on model wall first, guarantees color and clear-water concrete solid colour after cement slurry sclerosis; Joint filling gently, and in bubble eye position, click gently with onesize wood chip, make it have grained;
4.2, repair at the foot of a wall, external corner spillage position
First the floating ash in cleaning surface, scrapes off the loosening sand in surface gently, with the dilution of 50% volume ratio of interfacial agents, is deployed into and the essentially identical cement plaster of concrete surface color, gets cement plaster smear in need reparation position with scraper; Treat before putty final set, use the original state liner plate of same modulus to stamp, and with instrument, liner plate is fixed in the above 24 hours;
4.3, large form edge joint position is repaired
To exposing stone, first with perching knife, even out, after polishing, need to repair with cement paste smooth, watering maintenance;
4.4, after concrete wall surface reparation completes, require to reach wall surface levelling, color is even, without obvious repairing mark; Apart from metope 5m place, observe, defect is invisible to the naked eye;
Five, smear engineering
Adopt water proofing property clear dope;
5.1, metope cleaning
Before primary coat construction, water cleans whole metope, to local oiliness position, adopts alkaline dilution to clean, and adopts special clip to be taken out to wood chip, and after completing, maintenance body of wall is dry;
5.2, color adjustment
With adjusting material, the obvious position of aberration is adjusted, made integral wall surface concrete color roughly even;
5.3, primary coat construction
Before primary coat construction, should guarantee that metope moisture content is lower than 10%, solution uses Cylinder coating brush uniformly on metope, is divided into twice brushing, the 6-8 hour of being separated by of each time, and each brushing THICKNESS CONTROL is at 30 μ m, and the consumption being coated with according to 0.16kg/m2 every 1 is controlled;
5.4, face is coated with construction
After primary coat completes, should fully be dried and can carry out face and be coated with construction, primary coat construction is carried out face and is coated with construction after 12-14 hour, and face spreads notes cylinder man-hour firmly evenly, and the concrete wall surface darker to color increases brushing pass, and metope texture is reached unanimity as far as possible.
As preferably, the thickness of described panel is 15 ~ 20mm, and liner plate has 1.8 ~ 2.0cm, 2.4 ~ 2.8cm, tri-kinds of thickness of 3.0 ~ 3.2cm.
As preferably, glass fiber screw rod is set and regulates smooth vertical and horizontal position, glass fiber screw rod is connected with plug, and plug and template are adjacent to, and adopt iron screw rod to replace described glass fiber screw rod at frame column and concrete wall corner.
As preferably, according to the difference of shear wall thickness, the glass fiber pull bar lining rod of corresponding length is set, to guarantee the accuracy of thickness.
As preferably, the high constuction joint that arranges of every 1800mm posts two-sided tape at constuction joint place before hypomere construction.
The present invention is owing to having adopted above-mentioned technical scheme, the concavo-convex wood grain clear-water concrete that making obtains is as decorating a kind of of clear-water concrete, the wooden texture of log of its Nature creating has embodied the environmental protection concept of pure natural, ecosystem, it is a kind of embodiment of green building, ecotecture, it is adhered to concrete one-shot forming, is not done any modification, embodies the quality of " wearing no make-up during an audience with the emperor ".
The specific embodiment
Below the preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete of the present invention is described further.
1, form work engineering
Form work engineering determines the most critical factor of wood grain dry concrete wall final effect; form work engineering comprises the selection of form surfacing (liner plate) material; the design verification of template system, template processing, installation, dismounting, maintenance, release agent select and template is stacked protection etc.
1.1, template adopts the composite shuttering system of panel+liner plate, panel adopts the thick veneer of 18mm, liner plate adopts 1.9 cm, the thick strip U.S. of 2.5 cm, 3.2cm Songyuan City wood timber, strip liner plate width is 6cm, 9 cm, tri-kinds of specifications of 15 cm, and the typesetting figure that the typesetting of concrete every wall is provided with design is as the criterion.
1.2, the design verification of template system is as the criterion with in-depth figure and constructure scheme, perpendicular stupefied employing 48 * 90 thicknesser lumps of wood, the wide zinc-plated C shaped steel of horizontal stupefied employing 75 and Φ 48*3.0 steel pipe.
1.3, template processing: require the technological standards of living according to cabinet maker to carry out processing and fabricating, guarantee that plate seam is tight, liner plate is first selected materials after marching into the arena, pass through again double surfacer material, rush again quasi-mode plate thickness, then, with the sanding machine wood texture of polishing, then rush quasi-mode plate width, finally carry out fracture, on-gauge plate length is 1800mm.
1.4, template is installed: location and absolute altitude have been controlled rear beginning installation form, before installation, the water seal of first brushing import of liner plate face Thomson keeps moisture content within scope of design as far as possible, prevents liner plate distortion, brushing release agent is twice again, every all over midfeather 12 hours (brushing again after liner plate is ordered on panel for second time), brushing should be thin and even, without leaking brush, after brushing, with clean dry towel, keep straight on and wipe, till making surface can not have the agent of mobile shape mould.45 ° of cuttings are pressed in grain board corner, and regulate the width of grain board and correct grain board torsion resistance, and liner plate adopts air gun nail to be connected with panel.Notice at any time that in addition the grain board minimal thickness marking on drawing changes, glass fiber screw rod (ecru, color and concrete approach) position accomplishes smooth vertical and horizontal, plug must be adjacent to template, prevent that concrete mortar from entering, wherein frame column and concrete wall corner adopt iron screw rod, in case the mould phenomenon that rises.During installation, strictly control the foreign material such as wood chip, iron nail and enter in shear wall, post and beam forms, if produce rubbish, adopt the instruments such as dust catcher, magnet, special-purpose hawkbill to clear up.According to the difference of shear wall thickness, the glass fiber pull bar lining rod (ecru, color and concrete approach) of corresponding length is set, to guarantee the accuracy of thickness.The high constuction joint that arranges of every 1800mm posts two-sided tape at constuction joint place before hypomere construction, and mortar leakage prevention produces.
1.5, form removable: produce for reducing crack after concreting completes, therefore adopt the curing in the mold maintenance method of at least 14 days, forbid in advance form removal, during form removal, should accomplish gently, forbid barbarous form removal, wherein thin Yu the thickest liner plate thickness differs 1.3cm, use pry bar special for new type, between crowbar and concrete, pad a thick veneer of 19mm, for the template that is difficult to especially remove, to after liner plate dabbing, (use iron cone or sanding machine), then row is removed.In template construction process; must strengthen the protection consciousness of workman to Shimizu concrete template; should prevent the physical damnification that reinforcing bar, steel pipe, scaffold etc. cause template, and the damage to template limit such as rope in the process of lifting template, guarantee the shimizu finish effect of institute's pouring concrete.
2, reinforced bar engineering:
For guaranteeing after concrete removal, without revealing muscle, crossing thin phenomenon without iron rust, topping, to reach shimizu finish effect, need control layer by layer from turning over sample, making, three links of colligation.
2.1, thickness of protection tier requires to be no less than 5cm, adopts with intensity the plastic cushion with color, and the dimension deviation of finished product reinforcing bar meets code requirement.To pull hook crotch, place must adopt 135 ocrotch is processed.
2.2, reinforcing bar, without floating rust, is avoided, because the floating rust of reinforcing bar pollutes template, affect wood grain clear-water concrete decorative effect, to truly have floating should clearing up and be disposed of becoming rusty before formwork, and before not clearing up and being disposed, must not formwork and installation form.During colligation, tied silk redundance bends inwards, in order to avoid cause embroidery spot because exposing.Duo Bang bis-road positioning bars during the colligation of body of wall horizontal bar, high ejecting plate face 400mm, to prevent the displacement of body of wall muscle.
2.3, during reinforcement installation, for the electric welding construction of joint, must make finished product, forbid electric welding or residual welding slag when formwork or after completing, with burnout-proof template and foreign material, fall in template.
2.4, stainless steel crack guiding groove is shaped as V-shape, is welded on shear force wall reinforcing steel bar, to reduce the principle of shear wall cross section, makes the generation in crack regular, from template distance, is controlled at 10mm left and right.
3, concrete work:
3.1, design of concrete: select clear-water concrete; guarantee that concrete workability, color and luster are evenly, meet the demands without steam bubble, the slump, divergence; enter mould divergence and be controlled at 500-600mm left and right; guarantee that concrete has good mobility; reducing crack produces; after test of many times is determined optimum mix proportion, should not change.
3.2, concrete mixing: before blanking, coarse aggregate is screened to cleaning, foreign material in aggregate or heterochromatic stone are picked out to (selecting the uniform cyan rubble of color).Fines is selected medium coarse sand, solid colour, and clean.The whole concrete raw material (comprising Admixture and titanium dioxide) that engineering is used, use product the enough amounts of disposable buying of same manufacturer to be stored in special-purpose place, use special-purpose stirring machine ready-mixed concrete, concrete special transport vehicle transportation concrete.Strict implement concrete entry test system, in check, have range estimation concrete appearance color and luster, have or not bleeding segregation, by car, concrete divergence is sampled to experiment, whether meet technical requirements, and perform clerking, in case of undesirable, forbid to use, concrete by dispatch from the factory to the time of building can not be over 2 hours.
3.3, casting and compacting of concrete: before concreting, the foreign material in cleaning template, complete the subsurface work acceptance to reinforcing bar, pipeline set aside pre-embedded, constuction joint way.Water and smash layered blanking, every layer concrete is built thickness and is strict controlled in 400mm, and free blanking height must not surpass 2m.Wood grain clear-water concrete adopts self-compacting concrete, in casting process, specific people successively uses waddy tamping incessantly, in template outside, with rubber hammer, beat simultaneously, forbid to use vibrating head to vibrate, guarantee that concrete surface color and luster is consistent, make dissipations of fully floating of bubble in concrete, improve concrete density and minimizing interior formwork.During concreting, do not collide various embedded parts, the mortar and the concrete that are bonded on horizontal reinforcement should touch down gently.
3.4, concrete curing: carry out in time the water seasoning of concrete during curing in the mold, guarantee that concrete surface long term is moistening, curing time must not be less than 14 days.
4, defect repair
4.1, bubble reparation
For the not serious bubble that affects clear-water concrete perception, do not repair in principle; While needing to repair, first remove laitance and the loosening sand of concrete surface, with with the same producer of concrete, be modulated into cement paste with black, the white cement of intensity, trial test on model wall first, guarantees color and clear-water concrete solid colour after cement slurry sclerosis.Joint filling gently, and in bubble eye position, click gently with onesize wood chip, make it have grained.
4.2, repair at the foot of a wall, external corner spillage position
First the surperficial floating ash of cleaning, scrapes off the loosening sand in surface gently, with the dilution (approximately 50%) of interfacial agents, is deployed into and the essentially identical cement plaster of concrete surface color, gets cement plaster smear in need reparation position with scraper.Treat before putty final set, use the original state liner plate of same modulus to stamp, and with instrument, liner plate is fixed in the above 24 hours.
4.3, large form edge joint position is repaired
To exposing stone, first with perching knife, even out, after polishing, need to repair with cement paste smooth, watering maintenance.
4.4, after concrete wall surface reparation completes, require to reach wall surface levelling, color is even, without obvious repairing mark; Apart from metope 5m place, observe, defect is invisible to the naked eye.
5, smear engineering
Adopt water proofing property clear dope.
5.1, metope cleaning
Before primary coat construction, water cleans whole metope, to local oiliness position, adopts alkaline dilution to clean, and adopts special clip to be taken out to wood chip, and after completing, maintenance body of wall is dry.
5.2, color adjustment
With adjusting material, the obvious position of aberration is adjusted, made integral wall surface concrete color roughly even.
5.3, primary coat construction
Before primary coat construction, should guarantee that metope moisture content is lower than 10%, solution uses Cylinder coating brush uniformly on metope, is divided into twice brushing, the 6-8 hour of being separated by of each time, and each brushing THICKNESS CONTROL is at 30 μ m, and the consumption being coated with according to 0.16kg/m2 every 1 is controlled.
5.4, face is coated with construction
After primary coat completes, should fully be dried and can carry out face painting construction, general dry weather carried out face and is coated with construction after 12-14 hour, face spreads notes cylinder man-hour firmly evenly, and the concrete wall surface darker to color increases brushing pass, and metope texture is reached unanimity as far as possible.
6, clear-water concrete finished product protection
While 6.1, building concrete, template is subject to concrete lateral pressure to produce trickle distortion can to cause a small amount of stream to starch, cement paste stream pendant pollutes lower floor's exterior wall when preventing that upper strata body of wall from building, first on the metope that completes, in port recess, with transparent adhesive tape, the wide Polypropylence Sheet of 30cm is firmly sticked on metope, on Polypropylence Sheet, paste again sponge bar, install template, build concrete, make pulp-water along Polypropylence Sheet outside wall, while building, send special messenger's all-the-way tracking, the trickling cement paste occurring is once in a while rinsed well immediately.
6.2, to completed clear-water concrete metope external corner, adopt three-ply board to fix, prevent that handling in work progress, installation, form removal etc. are to concrete destruction.

Claims (5)

1. a preparation method for the concavo-convex graining body of wall of clear-water concrete, is characterized in that the method comprises the following steps:
One, form work engineering
1.1, template adopts the composite shuttering system of panel+liner plate, and panel adopts veneer, and liner plate adopts strip U.S. Songyuan City wood timber;
1.2, template processing: liner plate requires the technological standards of living according to cabinet maker to carry out processing and fabricating, guarantees that plate seam is tight, and liner plate is first selected materials after marching into the arena, pass through again double surfacer material, then rush quasi-mode plate thickness, then with the sanding machine wood texture of polishing, then rush quasi-mode plate width, finally carry out fracture;
1.3, template is installed: location and absolute altitude have been controlled rear beginning installation form, before installation, the water seal of first brushing import of liner plate face Thomson, keeps moisture content within scope of design, prevents liner plate distortion, brushing release agent is twice again, every all over midfeather 10 ~ 14 hours, brushing should be thin and even, without leaking, brushes, after brushing, with clean dry towel, keep straight on and wipe, till making surface can not have the agent of mobile shape mould; 45 ° of cuttings are pressed in liner plate corner, and regulate the width of liner plate and correct liner plate torsion resistance, and liner plate adopts air gun nail to be connected with panel;
Two, reinforced bar engineering:
2.1, thickness of protection tier requires to be no less than 5cm, adopts with intensity the plastic cushion with color, and the dimension deviation of finished product reinforcing bar meets code requirement; To pull hook crotch place, adopt 135 ° of crotches to process;
2.2, reinforcing bar is without floating rust, and during colligation, tied silk redundance bends inwards; Duo Bang bis-road positioning bars during the colligation of body of wall horizontal bar, high ejecting plate face 400mm;
2.3,, during reinforcement installation, for the electric welding construction of joint, make finished product;
2.4, stainless steel crack guiding groove is shaped as V-shape, is welded on shear force wall reinforcing steel bar, from template distance, is controlled at 8 ~ 12mm;
Three, concrete work:
3.1, concrete is selected: select clear-water concrete;
3.2, casting and compacting of concrete: before concreting, the foreign material in cleaning template, complete the subsurface work acceptance to reinforcing bar, pipeline set aside pre-embedded, constuction joint way; Water and smash layered blanking, every layer concrete is built thickness and is strict controlled in 400mm, and free blanking height must not surpass 2m; Clear-water concrete adopts self-compacting concrete, and in casting process, specific people successively uses waddy tamping incessantly, beats in template outside with rubber hammer simultaneously;
3.3, concrete curing: carry out in time the water seasoning of concrete during curing in the mold, guarantee that concrete surface long term is moistening, curing time must not be less than 14 days;
3.4, form removable: use crowbar, pad a thick veneer of 19mm between crowbar and concrete, for the template that is difficult to especially remove, by after liner plate dabbing, then row is removed;
Four, defect repair
4.1, bubble reparation
For the not serious bubble that affects clear-water concrete perception, do not repair; While needing to repair, first remove laitance and the loosening sand of concrete surface, with with the same producer of concrete, be modulated into cement paste with black, the white cement of intensity, trial test on model wall first, guarantees color and clear-water concrete solid colour after cement slurry sclerosis; Joint filling gently, and in bubble eye position, click gently with onesize wood chip, make it have grained;
4.2, repair at the foot of a wall, external corner spillage position
First the floating ash in cleaning surface, scrapes off the loosening sand in surface gently, with the dilution of 50% volume ratio of interfacial agents, is deployed into and the essentially identical cement plaster of concrete surface color, gets cement plaster smear in need reparation position with scraper; Treat before putty final set, use the original state liner plate of same modulus to stamp, and with instrument, liner plate is fixed in the above 24 hours;
4.3, large form edge joint position is repaired
To exposing stone, first with perching knife, even out, after polishing, need to repair with cement paste smooth, watering maintenance;
4.4, after concrete wall surface reparation completes, require to reach wall surface levelling, color is even, without obvious repairing mark; Apart from metope 5m place, observe, defect is invisible to the naked eye;
Five, smear engineering
Adopt water proofing property clear dope;
5.1, metope cleaning
Before primary coat construction, water cleans whole metope, to local oiliness position, adopts alkaline dilution to clean, and adopts special clip to be taken out to wood chip, and after completing, maintenance body of wall is dry;
5.2, color adjustment
With adjusting material, the obvious position of aberration is adjusted, made integral wall surface concrete color roughly even;
5.3, primary coat construction
Before primary coat construction, should guarantee that metope moisture content is lower than 10%, solution uses Cylinder coating brush uniformly on metope, is divided into twice brushing, the 6-8 hour of being separated by of each time, and each brushing THICKNESS CONTROL is at 30 μ m, and the consumption being coated with according to 0.16kg/m2 every 1 is controlled;
5.4, face is coated with construction
After primary coat completes, should fully be dried and can carry out face and be coated with construction, primary coat construction is carried out face and is coated with construction after 12-14 hour, and face spreads notes cylinder man-hour firmly evenly, and the concrete wall surface darker to color increases brushing pass, and metope texture is reached unanimity as far as possible.
2. the preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete according to claim 1, is characterized in that: the thickness of panel is 15 ~ 20mm, and liner plate has 1.8 ~ 2.0cm, 2.4 ~ 2.8cm, tri-kinds of thickness of 3.0 ~ 3.2cm.
3. the preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete according to claim 1, it is characterized in that: glass fiber screw rod is set and regulates smooth vertical and horizontal position, glass fiber screw rod is connected with plug, plug and template are adjacent to, and adopt iron screw rod to replace described glass fiber screw rod at frame column and concrete wall corner.
4. the preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete according to claim 1, is characterized in that: according to the difference of shear wall thickness, the glass fiber pull bar lining rod of corresponding length is set, to guarantee the accuracy of thickness.
5. the preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete according to claim 1, is characterized in that: the high constuction joint that arranges of every 1800mm posts two-sided tape at constuction joint place before hypomere construction.
CN201410162378.1A 2014-04-22 2014-04-22 The preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete Active CN103938758B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410162378.1A CN103938758B (en) 2014-04-22 2014-04-22 The preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410162378.1A CN103938758B (en) 2014-04-22 2014-04-22 The preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete

Publications (2)

Publication Number Publication Date
CN103938758A true CN103938758A (en) 2014-07-23
CN103938758B CN103938758B (en) 2015-12-02

Family

ID=51186611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410162378.1A Active CN103938758B (en) 2014-04-22 2014-04-22 The preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete

Country Status (1)

Country Link
CN (1) CN103938758B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256996A (en) * 2015-09-16 2016-01-20 中冶东北建设(沈阳)工程技术有限公司 Construction method of bark texture fair-faced concrete of middle cylinder structure of inclined cone cylinder
CN105275199A (en) * 2015-11-17 2016-01-27 甘肃第七建设集团股份有限公司 As-cast finish concrete decorating construction method through inlaying Yellow River cobble stones
CN106836793A (en) * 2017-04-01 2017-06-13 苏州华造建筑设计有限公司 Template and construction technology for making concavo-convex wood grain clear water concrete wall
CN107386550A (en) * 2017-06-09 2017-11-24 斓图涂装工程(上海)有限公司 A kind of steel construction exposed parts fire prevention, the construction method of anti-corrosion wood grain coating
CN108301613A (en) * 2017-11-23 2018-07-20 宁波建工建乐工程有限公司 A method of manufacture clear-water concrete plank sheathing
CN109112970A (en) * 2018-09-25 2019-01-01 上海公路桥梁(集团)有限公司 The production method and landscape bridge of bridge decorative panel
CN109811978A (en) * 2019-01-29 2019-05-28 广东鹏美森木业科技有限公司 Wall body decoration structure and its construction method
CN111188406A (en) * 2019-12-30 2020-05-22 湖南省第五工程有限公司 Construction method of tree growth ring texture fair-faced concrete
CN114904746A (en) * 2022-06-29 2022-08-16 北京建工集团有限责任公司 Template surface treatment method
CN115401785A (en) * 2022-09-09 2022-11-29 浙江省建材集团建筑产业化有限公司 Preparation method of prefabricated wood-grain-like colorful concrete hanging plate
CN117188709A (en) * 2023-11-07 2023-12-08 北京建工四建工程建设有限公司 Dry-hanging construction method for large-plate-shaped concrete plate

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10138214A (en) * 1996-11-07 1998-05-26 Maxton Kk Coarse particle decorative concrete block, method for molding the block and its molding form
JPH10292624A (en) * 1997-02-20 1998-11-04 Zokei:Kk Rugged pattern with three-dimensional curve, three-dimensional decorative concrete form with holding device embedded to hold concrete side pressure, and forming method thereof
CN101338595A (en) * 2008-08-12 2009-01-07 中建三局第三建设工程有限责任公司 Construction method of haydite dry concrete wall
CN101509318A (en) * 2009-03-23 2009-08-19 浙江省二建建设集团有限公司 Clear water concrete construction method
CN101956463A (en) * 2009-07-16 2011-01-26 上海市建筑装饰工程有限公司 GRC (Glass-fiber Reinforced Composite) plate surface plain finish concrete coating technology
CN102352677A (en) * 2011-07-28 2012-02-15 江苏建筑职业技术学院 Construction method for as-cast finish concrete transparent protective layer
CN102561678A (en) * 2012-01-12 2012-07-11 中国建筑第八工程局有限公司 Construction method of fair-faced concrete wall with wood grain finish

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10138214A (en) * 1996-11-07 1998-05-26 Maxton Kk Coarse particle decorative concrete block, method for molding the block and its molding form
JPH10292624A (en) * 1997-02-20 1998-11-04 Zokei:Kk Rugged pattern with three-dimensional curve, three-dimensional decorative concrete form with holding device embedded to hold concrete side pressure, and forming method thereof
CN101338595A (en) * 2008-08-12 2009-01-07 中建三局第三建设工程有限责任公司 Construction method of haydite dry concrete wall
CN101509318A (en) * 2009-03-23 2009-08-19 浙江省二建建设集团有限公司 Clear water concrete construction method
CN101956463A (en) * 2009-07-16 2011-01-26 上海市建筑装饰工程有限公司 GRC (Glass-fiber Reinforced Composite) plate surface plain finish concrete coating technology
CN102352677A (en) * 2011-07-28 2012-02-15 江苏建筑职业技术学院 Construction method for as-cast finish concrete transparent protective layer
CN102561678A (en) * 2012-01-12 2012-07-11 中国建筑第八工程局有限公司 Construction method of fair-faced concrete wall with wood grain finish

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
冷正华 等: "《复合饰面模板体系在某工程中的应用》", 《施工技术》 *
王凤起: "清水混凝土施工技术", 《混凝土与水泥制品》 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105256996A (en) * 2015-09-16 2016-01-20 中冶东北建设(沈阳)工程技术有限公司 Construction method of bark texture fair-faced concrete of middle cylinder structure of inclined cone cylinder
CN105275199A (en) * 2015-11-17 2016-01-27 甘肃第七建设集团股份有限公司 As-cast finish concrete decorating construction method through inlaying Yellow River cobble stones
CN106836793A (en) * 2017-04-01 2017-06-13 苏州华造建筑设计有限公司 Template and construction technology for making concavo-convex wood grain clear water concrete wall
CN107386550B (en) * 2017-06-09 2019-11-01 斓图涂装工程(上海)有限公司 A kind of fire prevention of steel construction exposed parts, anti-corrosion wood grain coating construction method
CN107386550A (en) * 2017-06-09 2017-11-24 斓图涂装工程(上海)有限公司 A kind of steel construction exposed parts fire prevention, the construction method of anti-corrosion wood grain coating
CN108301613A (en) * 2017-11-23 2018-07-20 宁波建工建乐工程有限公司 A method of manufacture clear-water concrete plank sheathing
CN109112970A (en) * 2018-09-25 2019-01-01 上海公路桥梁(集团)有限公司 The production method and landscape bridge of bridge decorative panel
CN109811978A (en) * 2019-01-29 2019-05-28 广东鹏美森木业科技有限公司 Wall body decoration structure and its construction method
CN109811978B (en) * 2019-01-29 2021-01-08 广东鹏美森木业科技有限公司 Wall decoration structure and construction method thereof
CN111188406A (en) * 2019-12-30 2020-05-22 湖南省第五工程有限公司 Construction method of tree growth ring texture fair-faced concrete
CN114904746A (en) * 2022-06-29 2022-08-16 北京建工集团有限责任公司 Template surface treatment method
CN115401785A (en) * 2022-09-09 2022-11-29 浙江省建材集团建筑产业化有限公司 Preparation method of prefabricated wood-grain-like colorful concrete hanging plate
CN117188709A (en) * 2023-11-07 2023-12-08 北京建工四建工程建设有限公司 Dry-hanging construction method for large-plate-shaped concrete plate
CN117188709B (en) * 2023-11-07 2024-02-27 北京建工四建工程建设有限公司 Dry-hanging construction method for large-plate-shaped concrete plate

Also Published As

Publication number Publication date
CN103938758B (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN103938758B (en) The preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete
CN103938866A (en) Installing method for construction formwork of bare concrete concave-convex wood grain decoration wall
CN103470067B (en) Transformation and construction method used for facing bare concrete of existing building outer wall
CN106150001B (en) A kind of fabricated assembly overall stair construction method
CN104675124A (en) Niche-preformed type construction process of reserved holes of residence household electric boxes
CN103821366A (en) Plain concrete wall surface groove type three-dimensional wood grains decoration construction method
CN109797920A (en) A kind of interior covering with paint construction method
US20100005743A1 (en) Flexible Cement Veneer
CN104314289A (en) Wear-resisting concrete terrace overall molding construction method
CN103174274A (en) Stone material seamless polishing construction method
CN106593001A (en) Clear water concrete wall surface repairing method
CN108071056A (en) A kind of production technology of embossing ground floor
CN111805696A (en) Manufacturing process of building decoration component
US20100005733A1 (en) Fractionable Cement Veneer
CN106278065A (en) Imitative stone decoration element and production method thereof
CN209243999U (en) A kind of sculpture cement exterior wall
CN105216531A (en) Moulded concrete decoration plate with relief sculpture is produced and installation method
CN102587543B (en) Building shading cast-in-place concrete lattice wall and construction method thereof
KR102400785B1 (en) Manufacturing method of carving based sculpture and the sculpture by the same
CN201908415U (en) Wall decorative board layer structure
CN1038117C (en) Making method for colour facing concrete board
CN104591780B (en) A kind of sculpture restorative procedure and repair materials
CN113417417A (en) Old-imitation red brick veneer structure and construction process thereof
CN109763573B (en) Water stop ridge and construction method thereof
CN104164972A (en) Cast-in-place concrete archaistic wall construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 314515 Gaoqiao Town, Zhejiang City, Tongxiang Province

Patentee after: Jujiang?Construction Group Co., Ltd.

Address before: Tongxiang City Qingfeng road Jiaxing City, Zhejiang province 314500 No. 669