CN104314289A - Wear-resisting concrete terrace overall molding construction method - Google Patents

Wear-resisting concrete terrace overall molding construction method Download PDF

Info

Publication number
CN104314289A
CN104314289A CN201410624584.XA CN201410624584A CN104314289A CN 104314289 A CN104314289 A CN 104314289A CN 201410624584 A CN201410624584 A CN 201410624584A CN 104314289 A CN104314289 A CN 104314289A
Authority
CN
China
Prior art keywords
concrete
spreading
time
abrasive material
abrasion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410624584.XA
Other languages
Chinese (zh)
Inventor
邓迪
韦克雪
谢植二
谢茂兵
廖立波
黄兴相
韦元基
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Zhuang Autonomous Region Metallurgical Construction Co
Original Assignee
Guangxi Zhuang Autonomous Region Metallurgical Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Zhuang Autonomous Region Metallurgical Construction Co filed Critical Guangxi Zhuang Autonomous Region Metallurgical Construction Co
Priority to CN201410624584.XA priority Critical patent/CN104314289A/en
Publication of CN104314289A publication Critical patent/CN104314289A/en
Pending legal-status Critical Current

Links

Landscapes

  • Floor Finish (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a wear-resisting concrete terrace overall molding construction method, and the method comprises the steps as follows: casting and compacting the base layer concrete, purifying syrup for the surface, spreading the wear-resisting material for the first time, grinding via machine, spreading the wear-resisting material for the second time, grinding via machine, polishing, curing the wear-resisting concrete and cutting. The wear-resisting concrete terrace prepared by the method has integrated surface layer and concrete base layer for eliminating the crack and empty drum quality defects caused by bad combination.

Description

A kind of construction method of abrasion-proof concrete terrace global formation
Technical field
The present invention relates to a kind of construction method of abrasion-proof concrete terrace global formation, for building field.
Background technology
Current concrete abrasion-resistant terrace is more and more widely used in the engineerings such as factory building, warehouse, large parking lot, showroom, logistics center, have case hardness high, wear-resisting, not easily peel off, economical, the feature such as to be suitable for.But conventional method is wear-resistant coat separates with concrete base layer and construct, easily occur because of in conjunction with bad and cause the common quality defect of crack and hollowing between the two, and the construction period is long.
Summary of the invention
For overcoming the above problems.The object of the invention is to provide a kind of construction method of abrasion-proof concrete terrace global formation.
Technical scheme of the present invention is: a kind of construction method of abrasion-proof concrete terrace global formation, comprise substrate concrete water smash, slurry is carried on surface, first time spreading high-abrasive material, mechanical trowel mill, second time spreading high-abrasive material, mechanical trowel mill, with nothing left and abrasion-proof concrete maintenance, joint-cutting step, concrete operations condition is as follows:
Described substrate concrete waters to be smash, and waters according to a conventional method and has smash substrate concrete, and with steel cylinder, repeatedly roll extrusion is to surfacing repeatedly, and concrete strikes off rear cement paste emersion surface, and at least 3mm is thick; After concreting, rubber tube or vacuum equipment is adopted to secrete unnecessary ponding.
It has been casting and compacting of concrete 0.5 ~ 1.0 hour after a while that slurry is carried on described surface, adds disk to floor leveling and carry slurry with trowelling machine; Manipulator should also be smeared while move back, in case leave footprints.
Described first time spreading high-abrasive material, differentiate that the method for high-abrasive material spreading time is that pin is stepped on it, about during sinking 5mm, can start first time spreading construction, first time dispenses 2/3 consumption, even spreading, uses wood float floating after spreading immediately;
Described mechanical trowel mill treats that the dry material spread absorbs moisture color for the first time evenly to deepen, surface seems whole blackening, and add mill dispersion starching with substrate concrete of disk with trowelling machine and combine, first spreading is first constructed, mill dispersion after carry out thick tarry matter put down, polish 3 ~ 4 times in length and breadth; Manual steel trowel is floating in advance for position, corner.Because place's moisture such as wall, post, door and template disappear very fast, first spreading first to construct, in case reduce effect because of dehydration.
Described second time spreading high-abrasive material is second time spreading amount is 1/3 of consumption, and floating immediately after spreading, spreading amount is strengthened at bleeding position, and defective part third time spreading is repaired;
Described mechanical trowel mill, with nothing left, be, after the dry high-abrasive material spread of second time absorbs moisture blackening, repeat trowelling machine and add disk operation at least twice, should carry out to staggered in length and breadth during operation, uniform sequential, prevent material from assembling, edge steel trowel process; Then use finisher instead and carry out the thick light of large area, after thick light, carry out with nothing left at least twice with finisher; Finisher operation back layer still exists that to smear line more in disorder, for eliminating the artificial press polish of smearing the thin steel trowel of line and carrying out in order, in the same way to surface layer, completes modification operation.
Described abrasion-proof concrete maintenance, joint-cutting are that abrasion-proof terrace completes ordinary concrete maintenance routinely after construction, joint-cutting.
Inventive principle:
Wear-resistant coat and concrete base layer make two bites at a cherry the poor durability of constructing, main cause there is space between wear-resistant coat and concrete base layer, the inside is filled with hydrone, bubble, in frequent use procedure, this position will be caused to occur crack and hollowing common quality defect, the durability of abrasion-proof terrace is deteriorated.The present invention is by high-abrasive material (mixture that, pluronic polymer gluing by hard mineral matter, the hydraulicity in the ratio of design or the description of product is refined) point 2 ~ 3 uniform spreading initial set concrete surfaces, by mechanical polishing sheet repeatedly trowel mill, make it shaping together with substrate concrete, finally form the concrete floor of the wear-resistant coat of ultimate attainment close, the high strength of one deck at concrete surface, well solve above problem.
Outstanding advantages of the present invention is:
1. economical: surface layer adopts machinery to modify, and saves manpower, and speed of application is fast, the reduction of erection time, energy-saving and cost-reducing, the cost of input is considerably less, obtains effect fairly good;
2. durable: once after construction, tone is consistent; Scuff resistance is high; Do not play dirt; Good endurance;
3. simple to operate: simple to operate, be easy to grasp, do not need main equipment.
Accompanying drawing explanation
Fig. 1 is the construction method process chart of abrasion-proof concrete terrace global formation of the present invention.
Detailed description of the invention
Below by way of drawings and Examples, technical scheme of the present invention is further illustrated.
Embodiment 1
The construction method of abrasion-proof concrete terrace global formation of the present invention, comprises the steps:
Subregion segmentation is watered and is smash substrate concrete according to a conventional method, and with the repeatedly roll extrusion repeatedly of steel cylinder after vibrating, strike off rear cement paste emersion surface 4mm thick, unnecessary ponding adopts rubber tube to secrete; Disk is added to floor leveling and carry slurry with trowelling machine after waiting 35 minutes; Wait until after carrying slurry that pin is stepped on it, about during sinking 5mm, start the high-abrasive material of spreading 2/3 consumption, floating with wood float; Deng first time, the material of spreading absorbs moisture color and evenly deepens, and surface seems whole blackening, adds disk and mills and carry out thick tarry matter after dispersion and put down, polish in length and breadth 3 times with trowelling machine; And then the complete high-abrasive material of second time spreading, floating immediately after spreading; Absorb after moisture blackening until high-abrasive material, repeat trowelling machine and add disk operation at least twice, should carry out to staggered in length and breadth during operation, after a while, use finisher instead and carry out the thick light of large area.With nothing left more than twice is carried out with finisher after thick light.Artificial press polish in the same way, completes modification operation; Abrasion-proof terrace after having constructed routinely concrete carried out maintenance, joint-cutting.Mass effect is good.
Embodiment 2
An instantiation of the construction method of abrasion-proof concrete terrace global formation of the present invention, comprises the steps:
On probation in the technological transformation project factory building floor construction of certain workshop engineering, subregion segmentation is watered and is smash substrate concrete according to a conventional method, with the repeatedly roll extrusion repeatedly of special steel cylinder after vibrating, strike off rear cement paste emersion surface 3mm thick, unnecessary ponding adopts rubber tube to secrete; Disk is added to floor leveling and carry slurry with trowelling machine after waiting 40 minutes; Wait until after carrying slurry that pin is stepped on it, about during sinking 5mm, start the high-abrasive material of spreading 2/3 consumption, floating with wood float; Deng first time, the material of spreading absorbs moisture color and evenly deepens, and surface seems whole blackening, adds disk and mills and carry out thick tarry matter after dispersion and put down, polish in length and breadth 3 times with trowelling machine; And then the complete high-abrasive material of second time spreading, floating immediately after spreading; After the blackening of high-abrasive material absorption moisture, repeat trowelling machine and add disk operation at least twice, should carry out to staggered in length and breadth during operation, after a while, use finisher instead and carry out the thick light of large area.With nothing left more than twice is carried out with finisher after thick light.Artificial press polish in the same way, completes modification operation; Abrasion-proof terrace after having constructed routinely concrete carried out maintenance, joint-cutting.Quality obtains the favorable comment of Construction Party.
Embodiment 3
An instantiation of the construction method of abrasion-proof concrete terrace global formation of the present invention, comprises the steps:
Try out at certain Factory Concrete abrasion-proof terrace area 23000 ㎡, subregion segmentation is watered and is smash substrate concrete according to a conventional method, and with the repeatedly roll extrusion repeatedly of special steel cylinder after vibrating, strike off rear cement paste emersion surface 3mm thick, unnecessary ponding adopts rubber tube to secrete; Disk is added to floor leveling and carry slurry with trowelling machine after waiting 45 minutes; Wait until after carrying slurry that pin is stepped on it, about during sinking 5mm, start the high-abrasive material of spreading 2/3 consumption, floating with wood float; Deng first time, the material of spreading absorbs moisture color and evenly deepens, and surface seems whole blackening, adds disk and mills and carry out thick tarry matter after dispersion and put down, polish in length and breadth 4 times with trowelling machine; And then the complete high-abrasive material of second time spreading, floating immediately after spreading; After the blackening of high-abrasive material absorption moisture, repeat trowelling machine and add disk operation at least twice, should carry out to staggered in length and breadth during operation, after a while, use finisher instead and carry out the thick light of large area.With nothing left more than twice is carried out with finisher after thick light.Artificial press polish in the same way, completes modification operation; Abrasion-proof terrace after having constructed routinely concrete carried out maintenance, joint-cutting.45 days used times complete this factory building abrasion-proof terrace construction, save the duration be subsequent technique install create condition in time, ensure that on time go into operation and mass effect is good.

Claims (1)

1. the construction method of an abrasion-proof concrete terrace global formation, it is characterized in that, comprise substrate concrete water smash, slurry is carried on surface, first time spreading high-abrasive material, mechanical trowel mill, second time spreading high-abrasive material, mechanical trowel mill, with nothing left and abrasion-proof concrete maintenance, joint-cutting step, concrete operations condition is as follows:
Described substrate concrete waters to be smash, and waters according to a conventional method and has smash substrate concrete, and with steel cylinder, repeatedly roll extrusion is to surfacing repeatedly, and concrete strikes off rear cement paste emersion surface, and at least 3mm is thick;
It has been casting and compacting of concrete 0.5 ~ 1.0 hour after a while that slurry is carried on described surface, adds disk to floor leveling and carry slurry with trowelling machine;
Described first time spreading high-abrasive material, differentiate that the method for high-abrasive material spreading time is that pin is stepped on it, about during sinking 5mm, can start first time spreading construction, first time dispenses 2/3 consumption, even spreading, uses wood float floating after spreading immediately;
Described mechanical trowel mill treats that the dry material spread absorbs moisture color for the first time evenly to deepen, surface seems whole blackening, and add mill dispersion starch with substrate concrete of disk with trowelling machine and combine, preferential spreading is constructed, mill dispersion after carry out thick tarry matter put down, polish 3 ~ 4 times in length and breadth;
Described second time spreading high-abrasive material is second time spreading amount is 1/3 of consumption, and floating immediately after spreading, spreading amount is strengthened at bleeding position, and defective part third time spreading is repaired;
Described mechanical trowel mill, with nothing left, be, after the dry high-abrasive material spread of second time absorbs moisture blackening, repeat trowelling machine and add disk operation at least twice, should carry out to staggered in length and breadth during operation, uniform sequential, prevent material from assembling; Then use finisher instead and carry out the thick light of large area, after thick light, carry out with nothing left at least twice with finisher;
Described abrasion-proof concrete maintenance, joint-cutting are method maintenance, the joint-cuttings that abrasion-proof terrace completes ordinary concrete routinely after construction.
CN201410624584.XA 2014-11-07 2014-11-07 Wear-resisting concrete terrace overall molding construction method Pending CN104314289A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410624584.XA CN104314289A (en) 2014-11-07 2014-11-07 Wear-resisting concrete terrace overall molding construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410624584.XA CN104314289A (en) 2014-11-07 2014-11-07 Wear-resisting concrete terrace overall molding construction method

Publications (1)

Publication Number Publication Date
CN104314289A true CN104314289A (en) 2015-01-28

Family

ID=52369589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410624584.XA Pending CN104314289A (en) 2014-11-07 2014-11-07 Wear-resisting concrete terrace overall molding construction method

Country Status (1)

Country Link
CN (1) CN104314289A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178564A (en) * 2015-08-14 2015-12-23 福州皇家地坪有限公司 Integrated terrazzo floor and production method thereof
CN106193535A (en) * 2016-09-14 2016-12-07 张子亮 A kind of abrasion-proof terrace
CN106747029A (en) * 2017-03-19 2017-05-31 赵君雄 A kind of crystal waste slag anti-corrosion terrace and its preparation technology
CN107143111A (en) * 2017-06-20 2017-09-08 苏州郡茂营造工程有限公司 A kind of construction method of abrasion-proof terrace
CN107152147A (en) * 2017-06-20 2017-09-12 苏州郡茂营造工程有限公司 A kind of concrete abrasion-resistant terrace construction technique
CN107419877A (en) * 2017-07-29 2017-12-01 安徽扬子生物科技有限公司 A kind of construction technology of corrosion-resistant dustproof solidification agent floor
CN110029798A (en) * 2019-03-06 2019-07-19 中国五冶集团有限公司 A kind of construction method reducing abrasion-proof terrace cracking
CN110685424A (en) * 2019-09-05 2020-01-14 东莞市鲁班装饰工程有限公司 Building floor leveling anti-cracking construction method and building floor leveling anti-cracking structure
CN110835997A (en) * 2019-11-29 2020-02-25 上海宝冶集团有限公司 One-step construction molding construction process for wear-resistant terrace and structural plate
CN111962349A (en) * 2020-07-18 2020-11-20 北京住总第一开发建设有限公司 Wear-resistant concrete ground construction process

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1320575A (en) * 2001-04-20 2001-11-07 宁波大榭开发区荣山装饰有限公司 Hardening agent for antiwear colour ground and its application method
JP2003253841A (en) * 2002-02-28 2003-09-10 Inoue Shokai:Kk Thin soil coat coating method
KR20040034080A (en) * 2002-10-21 2004-04-28 중앙방수기업주식회사 Multi-functional flooring that mixed properly the elastic poly-urethane and the epoxy having abrasion resistance and its construction method
CN101225704A (en) * 2008-02-02 2008-07-23 浙江勤业建工集团有限公司 Abrasion-proof terrace construction technique
JP2008247666A (en) * 2007-03-30 2008-10-16 Ube Ind Ltd Self-leveling hydraulic composition
CN101654951A (en) * 2009-09-15 2010-02-24 魏勇 Cast-type concrete abrasion-resistant ground and construction method thereof
CN103015680A (en) * 2011-09-21 2013-04-03 五冶集团上海有限公司 Manufacturing technology for terrace with wearing layer added with outside steel fiber reinforced concrete

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1320575A (en) * 2001-04-20 2001-11-07 宁波大榭开发区荣山装饰有限公司 Hardening agent for antiwear colour ground and its application method
JP2003253841A (en) * 2002-02-28 2003-09-10 Inoue Shokai:Kk Thin soil coat coating method
KR20040034080A (en) * 2002-10-21 2004-04-28 중앙방수기업주식회사 Multi-functional flooring that mixed properly the elastic poly-urethane and the epoxy having abrasion resistance and its construction method
JP2008247666A (en) * 2007-03-30 2008-10-16 Ube Ind Ltd Self-leveling hydraulic composition
CN101225704A (en) * 2008-02-02 2008-07-23 浙江勤业建工集团有限公司 Abrasion-proof terrace construction technique
CN101654951A (en) * 2009-09-15 2010-02-24 魏勇 Cast-type concrete abrasion-resistant ground and construction method thereof
CN103015680A (en) * 2011-09-21 2013-04-03 五冶集团上海有限公司 Manufacturing technology for terrace with wearing layer added with outside steel fiber reinforced concrete

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
上海建工集团股份有限公司编著: "《混凝土工程施工技术与创新》", 31 January 2012, 上海科学技术出版社 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105178564A (en) * 2015-08-14 2015-12-23 福州皇家地坪有限公司 Integrated terrazzo floor and production method thereof
CN106193535A (en) * 2016-09-14 2016-12-07 张子亮 A kind of abrasion-proof terrace
CN106747029A (en) * 2017-03-19 2017-05-31 赵君雄 A kind of crystal waste slag anti-corrosion terrace and its preparation technology
CN107143111A (en) * 2017-06-20 2017-09-08 苏州郡茂营造工程有限公司 A kind of construction method of abrasion-proof terrace
CN107152147A (en) * 2017-06-20 2017-09-12 苏州郡茂营造工程有限公司 A kind of concrete abrasion-resistant terrace construction technique
CN107419877A (en) * 2017-07-29 2017-12-01 安徽扬子生物科技有限公司 A kind of construction technology of corrosion-resistant dustproof solidification agent floor
CN110029798A (en) * 2019-03-06 2019-07-19 中国五冶集团有限公司 A kind of construction method reducing abrasion-proof terrace cracking
CN110685424A (en) * 2019-09-05 2020-01-14 东莞市鲁班装饰工程有限公司 Building floor leveling anti-cracking construction method and building floor leveling anti-cracking structure
CN110835997A (en) * 2019-11-29 2020-02-25 上海宝冶集团有限公司 One-step construction molding construction process for wear-resistant terrace and structural plate
CN111962349A (en) * 2020-07-18 2020-11-20 北京住总第一开发建设有限公司 Wear-resistant concrete ground construction process

Similar Documents

Publication Publication Date Title
CN104314289A (en) Wear-resisting concrete terrace overall molding construction method
CN101886457B (en) Method for constructing wear-resistant and crack-resistant hardened ground
CN103938758B (en) The preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete
CN109838065A (en) A kind of ground brick flooring paving construction method
CN101457581A (en) Construction method for auto-flowing floor
US8936411B1 (en) Architectural concrete
US20070071551A1 (en) Surface seeded fine aggregate concrete simulating quarried stone
CN105178559A (en) Novel construction method for granite ground
CN107143111A (en) A kind of construction method of abrasion-proof terrace
CN102251455A (en) Vibration-free anti-slip lane and construction method thereof
CN103174274A (en) Stone material seamless polishing construction method
CN105332497A (en) Construction method of using color concrete to cover embossed surface
CN103938866A (en) Installing method for construction formwork of bare concrete concave-convex wood grain decoration wall
CN108625252A (en) Urban road laying construction method
CN113738082A (en) Epoxy terrazzo wet-paving process
CN108071056A (en) A kind of production technology of embossing ground floor
CN105525726A (en) Aerated brick wall plastering construction method
CN107724642A (en) The construction method of color wearing proof terrace
CN100507183C (en) Abrasion-proof terrace construction technique
CN205840248U (en) A kind of cast-type concrete abrasion-resistant ground
CN104120860A (en) Construction method for cement mortar ground leveling
CN102900004A (en) Vibration-free anti-slip lane and construction method thereof
CN111217569A (en) Repair mortar and repair construction method for concrete structure damaged part
WO2020029308A1 (en) Construction method for quickly repairing concrete pavement crack in zipper-manner
CN207761236U (en) The adjustable levelling cement pressure jigsaw of floating screed keel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150128