CN107143111A - A kind of construction method of abrasion-proof terrace - Google Patents

A kind of construction method of abrasion-proof terrace Download PDF

Info

Publication number
CN107143111A
CN107143111A CN201710460170.1A CN201710460170A CN107143111A CN 107143111 A CN107143111 A CN 107143111A CN 201710460170 A CN201710460170 A CN 201710460170A CN 107143111 A CN107143111 A CN 107143111A
Authority
CN
China
Prior art keywords
terrace
concrete
abrasion
reinforcing bar
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710460170.1A
Other languages
Chinese (zh)
Inventor
周宁
宁少波
周茂
潘孝如
陈彩凤
白巧艳
王成章
王强
胡耿
郭正权
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU JUNMAO CREATE ENGINEERING Co Ltd
Original Assignee
SUZHOU JUNMAO CREATE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU JUNMAO CREATE ENGINEERING Co Ltd filed Critical SUZHOU JUNMAO CREATE ENGINEERING Co Ltd
Priority to CN201710460170.1A priority Critical patent/CN107143111A/en
Publication of CN107143111A publication Critical patent/CN107143111A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

A kind of construction method of abrasion-proof terrace, belongs to floor construction technical field, relates generally to the construction method of terrace;If the present invention is in order to solve that terrace area is big, concrete is also easy to produce contraction fissure, structural column and floor structure connecting portion stress and concentrated and is also easy to produce crack, workshop ground backfill layer leakiness, terrace and can produce the problem of differential settlement causes cracking;Comprise the following steps:Base treatment:Carry out absolute altitude construction;Colligation terrace reinforcing bar:Carry out reinforcing bar colligation;Lay horizontal slide:Horizontal slide is set up according to the position of terrace reinforcing bar;Terrace concrete is poured into a mould:Using a point storehouse casting and constructing;It is levelling:Construction is flattened from periphery to center centralized system;Surface modification and maintenance:Conserved in sun straight shot places with special sealing compound, sunlight irradiates not water seasoning everywhere;Joint-cutting, joint filling cleaning;The present invention solve the cracking of concrete floor appearance, hollowing, flake, the flatness quality problems such as not enough, reduce cost, extend the service life of terrace.

Description

A kind of construction method of abrasion-proof terrace
Technical field
A kind of method for constructing terrace belongs to floor construction technical field, relates generally to a kind of construction method of abrasion-proof terrace.
Background technology
As China industrializes iterative method, social fast development, terrace application also gradually increases, applied in numerous terraces In work method, concrete abrasion-resistant terrace with its high-dirt-resistance, high impact-resistant and quick construction, avoid dust, ground intensity with The characteristics of overall performance is good, adds abrasion-proof terrace rich color, has obtained good economic benefit and social benefit.But In floor construction, there are some urgent need to resolve, such as terrace area is big, concrete be also easy to produce contraction fissure, structural column with If floor structure connecting portion stress concentrate be also easy to produce crack, workshop ground backfill layer leakiness, terrace can produce it is uneven The problem of sedimentation causes cracking.
The content of the invention
In order to solve the above problems, the invention discloses a kind of construction method of abrasion-proof terrace, strengthen the toughness of terrace, resist Dirt and high impact-resistant, extend the service life of terrace.
The object of the present invention is achieved like this:
A kind of construction method of abrasion-proof terrace, comprises the following steps:
Step one:Base treatment:Basic unit is handled, absolute altitude construction is carried out;
Step 2:Colligation terrace reinforcing bar:Reinforcing bar colligation is carried out according to concrete point bin location;
Step 3:Lay horizontal slide:Horizontal slide is set up according to the position of terrace reinforcing bar;
Step 4:Terrace concrete is poured into a mould:Using a point storehouse pouring type construction;
Step 5:It is levelling, constructed using being flattened from periphery to center centralized system, concrete surface flatness is met construction will Ask;
Step 6:Surface modification and maintenance, are conserved in sun straight shot places with special sealing compound, do not water foster everywhere in sunlight irradiation Shield;
Step 7:Joint-cutting, joint filling cleaning.
The detailed process of base treatment described in step one includes:Base cleaning is clean, with spirit level in terrace pouring area Concrete is made in domain to make a reservation for pour thickness, sets horizontal elevation to mark and conserved.
The base treatment is according to the building benchmark line of ink marker, and the benchmark line of ink marker is metope+50cm lines.
The detailed process of colligation terrace reinforcing bar includes described in step 2:Colligation terrace reinforcing bar includes lower floor's reinforcing bar, upper strata steel Muscle, stirrup reinforcing bar;Lower floor's cover to reinforcement uses square cushion block, and the distance between adjacent two cushion block and the ratio of cushion block length are 25:1;Top bars protection floor height 20mm;Stirrup reinforcing bar is in quincuncial arrangement.
Horizontal slide described in step 3 is equal angle iron, and slideway is fixed on screw mandrel upper end, screw mandrel bottom and base by nut Layer connection.
Step 4 specifically includes procedure below:Disk is installed on finisher, vibrated using sizing walking beam, it is overall Polishing concrete and from periphery gradually inwardly receive smear, flatness deviation control in 0-3mm, concrete strikes off rear cement mortar emersion table It is thick that face is less than 3mm;Concreting is finished, and removes bleeding.
The concrete daily pour area in 800-1500 ㎡.
The step 5 includes procedure below:When pin is stepped on and fallen into no more than 5mm, first time spreading diamond dust curing agent, Floating warehouse is carried out, it is 0-4mm to make its flatness;Second of spreading diamond dust curing agent is carried out, floating warehouse, flatness reaches 0-4mm;Third time spreading diamond dust curing agent, floating warehouse are carried out, flatness reaches 0-3mm, three corundum curing agent pavings It is 1 to spread ratio:1:2.
Surface modification described in step 6 and maintenance start maintenance after terrace concrete final set, available in sun straight shot places Special sealing compound, waits sunlight irradiation everywhere can not water seasoning, curing time more than 7 days indoors.
Slit width described in step 7 is 3-5mm.
The present invention compared with prior art, has the advantages that, terrace reinforcing bar is uniformly filled in the every of concrete Individual place, is improved terrace toughness, using the terrace high mechanical properties of construction method of the present invention, and terrace hardenability is high, Solve concrete ground criticize occur cracking, hollowing, flake, flatness not enough etc. quality problems, reduce cost, improve The service life of terrace.Speed of application is fast, short time limit, and with better economic benefit, low-carbon environment-friendly economizes on resources.
The specific embodiment of the invention is described in further detail below.
A kind of construction method of abrasion-proof terrace of the present embodiment, comprises the following steps:
The detailed process of base treatment described in step one includes:Base cleaning is clean, with spirit level in terrace casting area Make concrete to make a reservation for pour thickness, set horizontal elevation to mark and conserved.
The base treatment is according to the building benchmark line of ink marker, and the benchmark line of ink marker is metope+50cm lines.
The detailed process of colligation terrace reinforcing bar includes described in step 2:According to cross construction section and ground partitioning slot, after pour Band, expansion joint determine cut-off rule, and cut-off rule is ejected on bed course in order to the colligation of reinforcing bar.Cross construction section width is according to following Formula is rationally determined:W×L×H/I<T, wherein W are cross construction section width(m), L is cross construction section degree length(m), H For basic unit's concrete thickness(m), I is the amount of pouring of unit time(m3/h), T is the presetting period of concrete(h).
Colligation terrace reinforcing bar includes lower floor's reinforcing bar, top bars, stirrup reinforcing bar;Lower floor's cover to reinforcement uses square pad Block, the cushion block size is 40mm × 40mm × 25mm, every 1m one cushion block of arrangement, the distance between adjacent two cushion block and pad The ratio of block length is 25:1;Top bars protection floor height 20mm;Stirrup reinforcing bar uses more than 20 grades of reinforcement fabrication, spacing 1.0m × 1.0m, in quincuncial arrangement.
The terrace reinforcing bar is from HRB400 grades of hot-rolled reinforced bars.
Horizontal slide described in step 3 is 40mm × 40mm equal angle irons, and slideway is fixed on screw mandrel upper end by M10 nuts, Screw mandrel bottom is connected using expansion bolt with basic unit, and guide rail is removed before concrete initial set.
Step 4 specifically includes procedure below:Before concrete pouring construction, basic unit's rubbish is removed with clink or steel wire, it is overnight Watering makes ground be in moisture state, and disk is installed on finisher, is vibrated using sizing walking beam, concrete is once poured Build to absolute altitude, local to be not up at absolute altitude using concrete material polishing and vibrate, unusable mortar repairing.Using chi bar repeatedly Levelling warehouse, the position such as post, corner should vibrate repeatedly, it is ensured that closely knit, then and smear bat slurry with wood.Overall polishing concrete and from week Side is gradually inwardly received and smeared, and flatness deviation is controlled in 0-3mm, and it is thick less than 3mm that concrete strikes off rear cement mortar emersion surface;Aid the border areas Channel steel support during mould, reinforcing bar drilling is fixed, and absolute altitude branch applies template, it is ensured that template edge Zhi Qi, and mould is not run during concreting, Concreting is finished, and bleeding is removed using rubber tube or other equipment.
It is as follows that the concrete strikes off rear cement mortar preparation method:
1. slurry is scraped in first water removal:2 hours after concrete moulding by casting, it can be closed when stepping on capable substantially not sagging on concrete surface with aluminium Golden ruler strikes off, and makes concrete surface tentatively smooth, concentrates the laitance on concrete surface, the laitance of concentration is included with rubber push broach Remove.
2. first ruler includes flat:Concrete surface flatness is checked with 4m long rulers, ruler lies against concrete table during inspection On face, it is qualified to leave concrete largest face less than 1mm when ruler base, otherwise needs to include flat with aluminium alloy ruler.Before striking off, First ruler is placed on concrete topping, stresses on both hands and is placed on ruler near middle position, two hands are put forth one's strength toward end when striking off(Two hands Put forth one's strength uniform), scrape row before and after dragging ruler immediately.During striking off, ruler vertically and horizontally scrapes row respectively.With direction another side When striking off, ruler stretches into previous range distance of scraping more than 0.5m.When local area difference of height is larger, before compared with short ruler Reciprocal rub with the hands is scraped.It is whole strike off during, two hands exert oneself must uniformity, ruler is scraped all the time in a horizontal plane position OK.
3. warehouse is flattened:After concrete surface is preliminary smooth, plate vibrator leveling surface layer can be started.Plate vibrator is whole During flat operation, edge is first flattened, then direction operation leveling in length and breadth respectively.It is continuous in plate vibrator flattening course Constantly travel at the uniform speed, must not somewhere stop and cause layering in order to avoid excessively vibrating.It is difficult to close to corner whole with plate vibrator Place wooden float and pressure trowel leveling, without using soft trowel.
4. ruler includes flat again:Evener it is preliminary it is smooth after, occurrence checks concrete surface flatness with ruler.This strikes off Mainly swept and scraped with fan-shaped direction with aluminium alloy floating rule.When floating rule strikes off operation, in downward direction power be mainly aluminium alloy floating rule from Gravity, left hand makes floating rule one end fixed, left hand control floating rule fan shape moving.This, which strikes off, should not make the flat of whole construction surface Whole degree meets the requirements.
5. warehouse is flattened again:This time leveling mainly moistens concrete surface warehouse, is that spreading creates conditions.Leveling Machine is also first edge when flattening, and then direction is parallel respectively in length and breadth travels at the uniform speed.
The concrete daily pour area in 800-1500 ㎡, concrete cushion thickness is 100mm, and strength grade is C15。
The step 5 includes procedure below:When pin is stepped on and fallen into no more than 5mm, first time spreading diamond dust curing agent material Material, is spread in uniform in concrete surface using step material machine and carries out floating warehouse, it is 0-4mm to make its flatness;Second is carried out to spread Diamond dust curing agent is spread, the floating warehouse of concrete surface is spread in uniform in using step material machine, flatness reaches 0-4mm;Carry out the Three spreading diamond dust curing agents, the floating warehouse of concrete surface is spread in uniform in using step material machine, and flatness reaches 0-3mm, Three corundum curing agent spreading ratios are 1:1:2, now hardenability highest.Spreading should be selected in the concrete initial set stage, Spreading amount per square meter should reach that spreading is uniform by dispensing twice, and spreading amount is more than 6kg/m2
Surface modification described in step 6 and maintenance start maintenance after terrace concrete final set, available in sun straight shot places Special sealing compound, waits sunlight irradiation everywhere can not water seasoning, curing time more than 7 days indoors.After polishing machine operation Surface layer, which is still suffered from, smears that line is more in disorder, smears line to eliminate orderly, in the same direction artificial press polish is carried out to surface layer using thin steel trowel, complete Modify process.I.e. collapsible die, but must not should be noted that and damage terrace edge after abrasion-proof terrace surface construction is completed 24 hours.
Slit width described in step 7 is 3-5mm, can be added water with butadiene-styrene latex and mix and stir the rigidizer material for screening out aggregate preparation Clay Puttying is repaired.Damage zone is cleaned out, fully immersion wetting, then the emulsion that added water with butadiene-styrene latex are brushed.
Brief description of the drawings
Fig. 1 is ground and cylinder intersection schematic diagram.
Fig. 2 is ground and metope junction schematic diagram.
Fig. 3 is that ground joins schematic diagram with wall column.
Fig. 4 is terrace and foundation connection beam connection figure.
Fig. 5 is terrace and cushion cap connection figure.
In figure, 1 is 3Φ12 L=1500;2 be the wide seams of 2mm, inside fills out foam, the embedding sealing compound in surface;3 be 3Φ12 L= 1800;4 be the wide seams of 2mm, inside fills out foam, the embedding sealing compound in surface;5 be 3Φ12 L=1800;6 be the wide seams of 2mm, inside fills out foam, table The embedding sealing compound in face;7 bit architecture terrace plates;8 be double-plastic;Connection beam JLL based on 9;10 be structure terrace plate;11 are The wide movement joints of 5mm;12 be that suspension column floor is wide;13 be 3mm recessed joints, the pitch cementation of fissures;14 be that C2O concrete is wrapped up;15 be the plain concretes of C15 Bed course;16 be cushion cap;17 be stake;18 be double-plastic;19 be structure terrace plate;20 be steel column.
Embodiment
The specific embodiment of the invention is described in further detail below in conjunction with the accompanying drawings.
A kind of construction method of abrasion-proof terrace of the present embodiment, comprises the following steps:
The detailed process of base treatment described in step one includes:Base cleaning is clean, with spirit level in terrace casting area Make concrete to make a reservation for pour thickness, set horizontal elevation to mark and conserved.
The base treatment is according to the building benchmark line of ink marker, and the benchmark line of ink marker is metope+50cm lines.
The detailed process of colligation terrace reinforcing bar includes described in step 2:According to cross construction section and ground partitioning slot, after pour Band, expansion joint determine cut-off rule, and cut-off rule is ejected on bed course in order to the colligation of reinforcing bar.Cross construction section width is according to following Formula is rationally determined:W×L×H/I<T, wherein W are cross construction section width(m), L is cross construction section degree length(m), H For basic unit's concrete thickness(m), I is the amount of pouring of unit time(m3/h), T is the presetting period of concrete(h).
Colligation terrace reinforcing bar includes lower floor's reinforcing bar, top bars, stirrup reinforcing bar;Lower floor's cover to reinforcement uses square pad Block, the cushion block size is 40mm × 40mm × 25mm, every 1m one cushion block of arrangement, the distance between adjacent two cushion block and pad The ratio of block length is 25:1;Top bars protection floor height 20mm;Stirrup reinforcing bar uses more than 20 grades of reinforcement fabrication, spacing 1.0m × 1.0m, in quincuncial arrangement.
The terrace reinforcing bar is from HRB400 grades of hot-rolled reinforced bars.
Horizontal slide described in step 3 is 40mm × 40mm equal angle irons, and slideway is fixed on screw mandrel upper end by M10 nuts, Screw mandrel bottom is connected using expansion bolt with basic unit, and guide rail is removed before concrete initial set.
Step 4 specifically includes procedure below:Before concrete pouring construction, basic unit's rubbish is removed with clink or steel wire, it is overnight Watering makes ground be in moisture state, and disk is installed on finisher, is vibrated using sizing walking beam, concrete is once poured Build to absolute altitude, local to be not up at absolute altitude using concrete material polishing and vibrate, unusable mortar repairing.Using chi bar repeatedly Levelling warehouse, the position such as post, corner should vibrate repeatedly, it is ensured that closely knit, then and smear bat slurry with wood.Overall polishing concrete and from week Side is gradually inwardly received and smeared, and flatness deviation is controlled in 0-3mm, and it is thick less than 3mm that concrete strikes off rear cement mortar emersion surface;Aid the border areas Channel steel support during mould, reinforcing bar drilling is fixed, and absolute altitude branch applies template, it is ensured that template edge Zhi Qi, and mould is not run during concreting, Concreting is finished, and bleeding is removed using rubber tube or other equipment.
It is as follows that the concrete strikes off rear cement mortar preparation method:
1. slurry is scraped in first water removal:2 hours after concrete moulding by casting, it can be closed when stepping on capable substantially not sagging on concrete surface with aluminium Golden ruler strikes off, and makes concrete surface tentatively smooth, concentrates the laitance on concrete surface, the laitance of concentration is included with rubber push broach Remove.
2. first ruler includes flat:Concrete surface flatness is checked with 4m long rulers, ruler lies against concrete table during inspection On face, it is qualified to leave concrete largest face less than 1mm when ruler base, otherwise needs to include flat with aluminium alloy ruler.Before striking off, First ruler is placed on concrete topping, stresses on both hands and is placed on ruler near middle position, two hands are put forth one's strength toward end when striking off(Two hands Put forth one's strength uniform), scrape row before and after dragging ruler immediately.During striking off, ruler vertically and horizontally scrapes row respectively.With direction another side When striking off, ruler stretches into previous range distance of scraping more than 0.5m.When local area difference of height is larger, before compared with short ruler Reciprocal rub with the hands is scraped.It is whole strike off during, two hands exert oneself must uniformity, ruler is scraped all the time in a horizontal plane position OK.
3. warehouse is flattened:After concrete surface is preliminary smooth, plate vibrator leveling surface layer can be started.Plate vibrator is whole During flat operation, edge is first flattened, then direction operation leveling in length and breadth respectively.It is continuous in plate vibrator flattening course Constantly travel at the uniform speed, must not somewhere stop and cause layering in order to avoid excessively vibrating.It is difficult to close to corner whole with plate vibrator Place wooden float and pressure trowel leveling, without using soft trowel.
4. ruler includes flat again:Evener it is preliminary it is smooth after, occurrence checks concrete surface flatness with ruler.This strikes off Mainly swept and scraped with fan-shaped direction with aluminium alloy floating rule.When floating rule strikes off operation, in downward direction power be mainly aluminium alloy floating rule from Gravity, left hand makes floating rule one end fixed, left hand control floating rule fan shape moving.This, which strikes off, should not make the flat of whole construction surface Whole degree meets the requirements.
5. warehouse is flattened again:This time leveling mainly moistens concrete surface warehouse, is that spreading creates conditions.Leveling Machine is also first edge when flattening, and then direction is parallel respectively in length and breadth travels at the uniform speed.
The concrete daily pour area in 800-1500 ㎡.
The step 5 includes procedure below:When pin is stepped on and fallen into no more than 5mm, first time spreading diamond dust curing agent material Material, is spread in uniform in concrete surface using step material machine and carries out floating warehouse, it is 0-4mm to make its flatness;Second is carried out to spread Diamond dust curing agent is spread, the floating warehouse of concrete surface is spread in uniform in using step material machine, flatness reaches 0-4mm;Carry out the Three spreading diamond dust curing agents, the floating warehouse of concrete surface is spread in uniform in using step material machine, and flatness reaches 0-3mm, Three corundum curing agent spreading ratios are 1:1:2, now hardenability highest.Spreading should be selected in the concrete initial set stage, Spreading amount per square meter should reach that spreading is uniform by dispensing twice, and spreading amount is more than 6kg/m2, the flatness of abrasion-proof terrace It is required that being 2m square maximum deviation 2mm, the maximum deviation with the high point of absolute altitude and extremely low point is not more than 15mm.Avoid being cracked, take off Skin or dusting phenomenon.
Surface modification described in step 6 and maintenance start maintenance after terrace concrete final set, available in sun straight shot places Special sealing compound, waits sunlight irradiation everywhere can not water seasoning, curing time more than 7 days indoors.After polishing machine operation Surface layer, which is still suffered from, smears that line is more in disorder, smears line to eliminate orderly, in the same direction artificial press polish is carried out to surface layer using thin steel trowel, complete Modify process.I.e. collapsible die, but must not should be noted that and damage terrace edge after abrasion-proof terrace surface construction is completed 24 hours.
Slit width described in step 7 is 3-5mm, can be added water with butadiene-styrene latex and mix and stir the rigidizer material for screening out aggregate preparation Clay Puttying is repaired.Damage zone is cleaned out, fully immersion wetting, then the emulsion that added water with butadiene-styrene latex are brushed.
The specific materials of the present embodiment are as shown in the table:
Sequence number Sub-project Square meter consumption
1 C30 concrete 0.3㎥
2 Alloy aggregate high-abrasive material ≥6kg
3 Liquid hardening agent 0.2kg
Concrete machinery vibrates, the sand in, forbids to use ultra-fine sand, clay content is not more than 3%.Cement uses low alkali ordinary silicon Acid salt cement, strictly controls concrete water-cement ratio, and preventing the water mixing for convenience of construction, excessively, the ratio of mud is≤0.5, and concrete collapses Degree of falling is controlled between 120 ± 20mm, and concrete disintegration and Qinshui control are in minimum level.
The aridity that concrete surface is controlled before high-abrasive material is dispensed, such as concrete surface has ponding, must cleaned out Dispensed again, otherwise desciccation crack easily occurs in ponding position.The flatness of floor construction is mainly by cement concrete basic unit Flatness control, high-abrasive material is only one of compacted zone of very thin surface, so the preceding surface of control concrete initial set is flat Whole degree is critical process.Flatness when must strictly control the cement concrete to pour into a mould, the present embodiment is shaken using concrete special Dynamic beam construction, can not locally use position using one in front and one in back darby is levelling twice.In addition, in the adjacent construction of two concrete At seam, because close to construction joint reinforcing bar edge, when terrace receives Seterolithography, finisher is difficult to be polished to, so holding at construction joint Easily cause the discrepancy in elevation.Therefore, construction joint cleaning work should be carried out after the completion of terrace, method is to be cut with cutting machine along construction joint snap the line Slice off that 10mm is wide, deep 10mm or so concrete, and pick and chisel out before second pouring concrete, with this ensure it is secondary pour it is mixed To connect raft straight with having poured the concrete of completion for solidifying soil, notes snap the line, cut should be straight.

Claims (10)

1. a kind of construction method of abrasion-proof terrace, it is characterised in that comprise the following steps:
Step one:Base treatment:Basic unit is handled, absolute altitude construction is carried out;
Step 2:Colligation terrace reinforcing bar:Reinforcing bar colligation is carried out according to concrete point bin location;
Step 3:Lay horizontal slide:Horizontal slide is set up according to the position of terrace reinforcing bar;
Step 4:Terrace concrete is poured into a mould:Using a point storehouse pouring type construction;
Step 5:It is levelling, constructed using being flattened from periphery to center centralized system, concrete surface flatness is met construction will Ask;
Step 6:Surface modification and maintenance, are conserved in sun straight shot places with special sealing compound, do not water foster everywhere in sunlight irradiation Shield;
Step 7:Joint-cutting, joint filling cleaning.
2. a kind of construction method of abrasion-proof terrace according to claim 1, it is characterised in that:Base treatment described in step one Detailed process includes:Base cleaning is clean, concrete is made in terrace casting area with spirit level and makes a reservation for pour thickness, if Horizontal elevation is put to mark and conserved.
3. a kind of construction method of abrasion-proof terrace according to claim 2, it is characterised in that:The base treatment is according to building The thing benchmark line of ink marker, the benchmark line of ink marker is metope+50cm lines.
4. a kind of construction method of abrasion-proof terrace according to claim 1, it is characterised in that:Colligation terrace steel described in step 2 The detailed process of muscle includes:Colligation terrace reinforcing bar includes lower floor's reinforcing bar, top bars, stirrup reinforcing bar;Lower floor's cover to reinforcement is adopted With square cushion block, the ratio of the distance between adjacent two cushion block and cushion block length is 25:1;Top bars protection floor height 20mm;Stirrup Reinforcing bar is in quincuncial arrangement.
5. a kind of construction method of abrasion-proof terrace according to claim 1, it is characterised in that:Horizontal slide is described in step 3 Equal angle iron, slideway is fixed on screw mandrel upper end by nut, and screw mandrel bottom is connected with basic unit.
6. a kind of construction method of abrasion-proof terrace according to claim 1, it is characterised in that:Step 4 specifically includes following mistake Journey:Disk is installed on finisher, vibrated using sizing walking beam, overall polishing concrete is simultaneously gradually inwardly received from periphery Smear, flatness deviation is controlled in 0-3mm, it is thick less than 3mm that concrete strikes off rear cement mortar emersion surface;Concreting is finished, Remove bleeding.
7. a kind of construction method of abrasion-proof terrace according to claim 6, it is characterised in that:The concrete pouring daily Area is in 800-1500 ㎡.
8. a kind of construction method of abrasion-proof terrace according to claim 1, it is characterised in that:The step 5 includes following mistake Journey:When pin is stepped on and fallen into no more than 5mm, first time spreading diamond dust curing agent carries out floating warehouse, and it is 0- to make its flatness 4mm;Second of spreading diamond dust curing agent is carried out, floating warehouse, flatness reaches 0-4mm;Carry out third time spreading diamond dust Curing agent, floating warehouse, flatness reaches 0-3mm, and three corundum curing agent spreading ratios are 1:1:2.
9. a kind of construction method of abrasion-proof terrace according to claim 1, it is characterised in that:Surface modification described in step 6 and Maintenance starts maintenance after terrace concrete final set, and in sun straight shot places available dedicated sealing compound, sunlight irradiation is waited indoors Everywhere can not water seasoning, curing time more than 7 days.
10. a kind of construction method of abrasion-proof terrace according to claim 1, it is characterised in that:Slit width described in step 7 is 3- 5mm。
CN201710460170.1A 2017-06-20 2017-06-20 A kind of construction method of abrasion-proof terrace Pending CN107143111A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710460170.1A CN107143111A (en) 2017-06-20 2017-06-20 A kind of construction method of abrasion-proof terrace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710460170.1A CN107143111A (en) 2017-06-20 2017-06-20 A kind of construction method of abrasion-proof terrace

Publications (1)

Publication Number Publication Date
CN107143111A true CN107143111A (en) 2017-09-08

Family

ID=59782613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710460170.1A Pending CN107143111A (en) 2017-06-20 2017-06-20 A kind of construction method of abrasion-proof terrace

Country Status (1)

Country Link
CN (1) CN107143111A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587398A (en) * 2017-09-18 2018-01-16 云南福明建筑装饰工程有限公司 The construction method of diamond dust ground curing agent
CN108166717A (en) * 2018-01-30 2018-06-15 河南胜泽建筑保温工程有限公司 A kind of anti-skidding abrasion resistant terrace processing method
CN110256007A (en) * 2019-06-17 2019-09-20 成都精准混凝土有限公司 A kind of concrete abrasion-resistant terrace and its construction method
CN110565900A (en) * 2019-09-20 2019-12-13 中恒辉建设有限公司 Construction process of wear-resistant terrace
CN112049363A (en) * 2020-09-02 2020-12-08 珠海华章工程管理咨询有限公司 Leveling-free paving method for underground garage
CN113235864A (en) * 2021-05-19 2021-08-10 上海麟瑞建筑工程有限公司 Construction method of free-passing super-flat terrace
CN113235865A (en) * 2021-05-19 2021-08-10 上海麟瑞建筑工程有限公司 Construction method of VNA (VNA) directional passing ultra-flat terrace
CN113445701A (en) * 2021-06-29 2021-09-28 中建八局第四建设有限公司 Construction technology of large-area super-flat wear-resistant terrace for hangar
CN113530148A (en) * 2021-07-31 2021-10-22 中冶建工集团有限公司 Pouring method of concrete terrace
CN113622452A (en) * 2021-08-13 2021-11-09 浙江省建工集团有限责任公司 Construction method of refrigeration house terrace and refrigeration house terrace

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54127130A (en) * 1978-03-25 1979-10-02 Kanebo Ltd Method of executing floor foundation material
US20030091793A1 (en) * 2001-11-09 2003-05-15 Morton Steven E. Wear-resistant reinforcing coating
CN101476382A (en) * 2009-01-21 2009-07-08 中建五局第三建设有限公司 Construction method of angle steel angle bead dividing joint of large-area concrete floor
CN102691401A (en) * 2012-06-15 2012-09-26 北京城建建设工程有限公司 Construction method for large-area concrete weighbridge
CN104314289A (en) * 2014-11-07 2015-01-28 广西壮族自治区冶金建设公司 Wear-resisting concrete terrace overall molding construction method
CN104929365A (en) * 2015-07-08 2015-09-23 山东淄建集团有限公司 Composite surface construction technology for garbage discharging platform of garbage incineration power plant
CN106088530A (en) * 2016-06-29 2016-11-09 中冶建工集团有限公司 Large area method for constructing terrace
CN106401144A (en) * 2016-06-23 2017-02-15 青岛海川建设集团有限公司 Construction technology for addition type wear resisting concrete ground
CN106836815A (en) * 2017-03-08 2017-06-13 杭州二建建设有限公司 Large area diamond dust floor structure plate and surface layer one-off construction method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54127130A (en) * 1978-03-25 1979-10-02 Kanebo Ltd Method of executing floor foundation material
US20030091793A1 (en) * 2001-11-09 2003-05-15 Morton Steven E. Wear-resistant reinforcing coating
CN101476382A (en) * 2009-01-21 2009-07-08 中建五局第三建设有限公司 Construction method of angle steel angle bead dividing joint of large-area concrete floor
CN101476382B (en) * 2009-01-21 2010-07-28 中建五局第三建设有限公司 Construction method of angle steel angle bead dividing joint of large-area concrete floor
CN102691401A (en) * 2012-06-15 2012-09-26 北京城建建设工程有限公司 Construction method for large-area concrete weighbridge
CN104314289A (en) * 2014-11-07 2015-01-28 广西壮族自治区冶金建设公司 Wear-resisting concrete terrace overall molding construction method
CN104929365A (en) * 2015-07-08 2015-09-23 山东淄建集团有限公司 Composite surface construction technology for garbage discharging platform of garbage incineration power plant
CN106401144A (en) * 2016-06-23 2017-02-15 青岛海川建设集团有限公司 Construction technology for addition type wear resisting concrete ground
CN106088530A (en) * 2016-06-29 2016-11-09 中冶建工集团有限公司 Large area method for constructing terrace
CN106836815A (en) * 2017-03-08 2017-06-13 杭州二建建设有限公司 Large area diamond dust floor structure plate and surface layer one-off construction method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587398A (en) * 2017-09-18 2018-01-16 云南福明建筑装饰工程有限公司 The construction method of diamond dust ground curing agent
CN108166717A (en) * 2018-01-30 2018-06-15 河南胜泽建筑保温工程有限公司 A kind of anti-skidding abrasion resistant terrace processing method
CN110256007A (en) * 2019-06-17 2019-09-20 成都精准混凝土有限公司 A kind of concrete abrasion-resistant terrace and its construction method
CN110565900A (en) * 2019-09-20 2019-12-13 中恒辉建设有限公司 Construction process of wear-resistant terrace
CN110565900B (en) * 2019-09-20 2020-12-08 中恒辉建设有限公司 Construction process of wear-resistant terrace
CN112049363A (en) * 2020-09-02 2020-12-08 珠海华章工程管理咨询有限公司 Leveling-free paving method for underground garage
CN113235864A (en) * 2021-05-19 2021-08-10 上海麟瑞建筑工程有限公司 Construction method of free-passing super-flat terrace
CN113235865A (en) * 2021-05-19 2021-08-10 上海麟瑞建筑工程有限公司 Construction method of VNA (VNA) directional passing ultra-flat terrace
CN113445701A (en) * 2021-06-29 2021-09-28 中建八局第四建设有限公司 Construction technology of large-area super-flat wear-resistant terrace for hangar
CN113530148A (en) * 2021-07-31 2021-10-22 中冶建工集团有限公司 Pouring method of concrete terrace
CN113622452A (en) * 2021-08-13 2021-11-09 浙江省建工集团有限责任公司 Construction method of refrigeration house terrace and refrigeration house terrace

Similar Documents

Publication Publication Date Title
CN107143111A (en) A kind of construction method of abrasion-proof terrace
CN108952080A (en) Concrete dense curing agent abrasion-proof terrace monolithic construction method
CN100575642C (en) Ultra-fine sand high-strength high-performance concrete ultra-high pumping construction method
CN102535296B (en) Construction method of superheavy-load reinforcement-free large-area seamless epoxy self-leveling terrace
CN105587102B (en) A kind of wet construction method to the wet type high abrasion terrace that paves
CN106401144A (en) Construction technology for addition type wear resisting concrete ground
CN110905162A (en) Construction method of fiber-reinforced carborundum wear-resistant ground
CN106836815A (en) Large area diamond dust floor structure plate and surface layer one-off construction method
CN104929365B (en) Refuse of refuse burning generating plant discharging platform combined type surface construction technology
CN109797945A (en) Abrasion-proof concrete grinding stone construction method of ground
CN107152147A (en) A kind of concrete abrasion-resistant terrace construction technique
CN110607894A (en) Construction method for floor of constructional engineering
CN102518216A (en) Cantilever type cover plate deformation joint structure of accessible roof and construction method for structure
CN112282294A (en) Construction method of steel fiber wear-resistant terrace
CN106150032A (en) A kind of construction method of the type high-wear-resistant alloy terrace that paves
CN205840248U (en) A kind of cast-type concrete abrasion-resistant ground
CN111962348A (en) Concrete floor construction process
CN114876155A (en) Construction process for polishing ground by using non-ignition fine stone concrete
CN106930506B (en) Large-scale spinning workshop diamond dust abrasion-proof terrace construction method
CN104929012A (en) Construction method for basalt brick road and tile road of skid pad
CN210482706U (en) Anchoring type secondary pouring carborundum wear-resistant ground and construction technology thereof
CN219431262U (en) High-flatness carborundum wear-resistant terrace
CN211200914U (en) Anti-cracking cement artificial stone structure
CN217812413U (en) Flatness control device suitable for diamond sand concrete ultra-flat terrace
CN108532985A (en) Foundation beam board construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170908

RJ01 Rejection of invention patent application after publication