CN105216531A CN201410275556.1A CN201410275556A CN105216531A CN 105216531 A CN105216531 A CN 105216531A CN 201410275556 A CN201410275556 A CN 201410275556A CN 105216531 A CN105216531 A CN 105216531A
Authority
CN
China
Prior art keywords
embossment
unit
concrete
crossbeam
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410275556.1A
Other languages
Chinese (zh)
Inventor
黄晗雯
石攀
Original Assignee
黄晗雯
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 黄晗雯 filed Critical 黄晗雯
Priority to CN201410275556.1A priority Critical patent/CN105216531A/en
Publication of CN105216531A publication Critical patent/CN105216531A/en
Pending legal-status Critical Current

Links

Abstract

<b> the invention discloses a kind of concrete decoration plate with relief sculpture and produces and installation method, its production method comprises setting-out resolving cell embossment body, production unit gypsum convex template, brushing demoulding wax, casting concrete makes concave template, brushing silica gel on concave template, form silica gel separation layer, make steel framework mesh sheet, fixing built-in fitting and Lift hook, build pea gravel concreten, make moulded concrete decoration plate with relief sculpture.Its installation method comprises surveying and locating, the upper and lower crossbeam of building carries out processing, the installation of mending embedded part, completes the installation of connector, steel column and crossbeam, metallic framework is installed fixing concrete decoration plate with relief sculpture, squeeze into fluid sealant, outer surface uses metal fluorocarbon coating to spray.Use method overall investment of the present invention little, construction instant effect, construction costs significantly reduces, and has huge economic benefit and promotion prospect, the decorative engineering that the present invention completes, imposing manner extensive, decorative pattern is exquisite, of a tightly knit structure, perfect in workmanship.</b>

Description

Moulded concrete decoration plate with relief sculpture is produced and installation method
Technical field
The present invention relates to building decoration field, particularly a kind of concrete decoration plate with relief sculpture is produced and installation method.
Background technology
At present, a large amount of theme class building is in order to highlight theme, build unique cultural atmosphere, often adopt a large amount of decorative means in design, wherein exterior wall adopts large area bossage curtain wall to be a kind of Main Means, and this large area bossage curtain wall construction difficulty is large, complex process, long in time limit, construction costs is high, is the difficult point in building decoration engineering.Stone embossed, artificial stone's embossment all will make by piecemeal in advance, and each unit independently makes, and split is embedded on wall face, and costly, cost is large, long construction period; Use concrete for making embossment to be site operation, labour intensity is large, and working environment is comparatively severe, and formwork cost is high, integrated engineering long construction period, and operating expenses remains high.
The patent No. is the patent of invention " method for making cement reliefs groups on building " of ZL96115104.8; a kind of building cement relief construction method is proposed; method step first embossment is resolved into multiple part; then mould is made by every part body; bar line part makes mould Korean pine timber and undercuts bar line prototype; utilize bar line prototype fiber reinforced plastic mold; mould is utilized to turn over bar line parts processed; with cement slurry bar line parts bonding on metope; hole on metope through bar line parts with percussion drill; in hole, clog cement slurry, and hammer into reinforcing bar pin and fix; Make relief die white clay sculpture embossment floriation prototype, brush when chamotte mould does not parch several all over releasing agents, brushing Silastic paste four times after releasing agent is dry, make flexible resilient rubber internal mold and pliable and tough
Elastic caoutchouc module; after to be formed, paste fiberglass cover die thereon, between internal mold and cover die, there is air chamber; fiberglass cover die is utilized to turn over relief flower trim processed; when insert is fixed on metope, metope is holed, in hole, clog cement slurry; hammer into reinforcing bar; by the steel bar end welding that the steel bar end at embossment floriation back and metope lean out, each several part relief features be installed in building exterior wall face and be spliced into overall embossment group, making color protective layer.The method solves building cement relief construction problem preferably, but the method cannot produce embossment unit in batches, and cost of manufacture is high; Install embossment unit must be attached on exterior wall, embossment body component specification is by larger restriction, and make area little, lightweight, resolving cell is many extends construction period virtually; Each list
Unit installs without leakproof, Anti-seeping technology, and the weatherability of engineering is poor, be applied in a word in large area bossage curtain wall construction have that cost is high, complex process, long construction period, antiseepage weatherability is poor, decorative effect is poor problem.
Summary of the invention
The technical problem to be solved in the present invention is: solve large area concrete decorative curtain wall construction difficult problem, overcome weak point of the prior art, provide that a kind of construction costs is low, technique is simple, the concrete decoration plate with relief sculpture of short construction period, antiseepage good weatherability, good decorating effect produces and installation method.
Technical scheme of the present invention is:
A kind of moulded concrete bossage plate producing process, comprise embossed designs pattern by the setting-out of actual design size, embossing pattern decile after setting-out or not decile resolve into a certain number of unit embossment body, unit gypsum convex template is made by each unit embossment body size engraving, and in unit gypsum template even brushing demoulding wax layer, template is installed in unit gypsum relief convex template surrounding, unit gypsum relief convex template surface certain altitude is placed in by having welded steel framework reinforcing bar sheet, build pea gravel concreten and unit concrete embossment concave template is made in maintenance, i.e. unit caster, even repeatedly brushing silica gel on unit concrete embossment concave template, form silica gel separation layer, template is installed in the unit caster surrounding being provided with silica gel separation layer, certain altitude above master mold is placed in by having welded steel framework reinforced mesh, by designing requirement fixing metal built-in fitting and Lift hook, build pea gravel concreten maintenance complete after the demoulding, make moulded concrete decoration plate with relief sculpture.
The decomposition principle of unit embossment is: consider local embossment pattern relative fullness, the local pattern repeated in whole embossing pattern; Unit embossment body size is unsuitable excessive overweight, convenient operation, lifting, carrying, edge abnormity local unit embossment body individual segmentation.
After gypsum convex embossment cell cube has been carved, used clean soft cloth, as cotton, in a rotative pattern by atoleine uniform application in sculpture surface, after 10-15 minute, with clean-cloth will wax surface wipe to light, and leave standstill more than 1 hour; After the demoulding of unit concrete embossment die, embossment molding surface is repaired, be coated with brush glazing, form smooth units concrete embossment die, at the external coating multilayer silica gel of described smooth units concrete embossment die, one deck mould cloth is solidified between layer of silica gel, form silica gel release layer, thickness is 6-8mm, after unit concrete decoration plate with relief sculpture has been built, carry out the watering maintenance being no less than 7 days, can the demoulding when concrete strength reaches 50%, after the demoulding, relief surface cement mortar carries out surface smear polishing.
A kind of moulded concrete raised table installation method, comprising:
The column of the size design fixed installation metallic framework of A, reference moulded concrete raised table and girder space distance; make every block plate surrounding just by consolidating at two root posts and two crossbeam approximate centerline, column and crossbeam position should match with the built-in fitting position of each back simultaneously;
B, by designing requirement; the top building crossbeam of metallic framework and building are being installed bottom on crossbeam; determine that the benefit embedded part of fixing every root post installs metallic plate particular location by setting-out routing; and punching adopts, and fastener is fixing mends embedded part; weld clip gripping member vertical columns on benefit buried plate; between adjacent two root posts; complete slab carcasing by the affixed crossbeam of designing requirement, or build top building crossbeam and building bottom crossbeam time imbed pre-embedded bolt in the position of fixing every root post;
C, will all moulded concrete embossment unit decorative panels of installation in place to carry out examination by the order that hoisted in position is installed assembled; determine errorless rear numbering; after hoisted in position; plate corner means of spot welds is fixed; after checking that error in place is qualified; be welded with fixing, and back built-in fitting and match position column and beam welding are fixed;
Between D, each unit decorative panel and between edge cells decorative panel and adjacent surface decorative panel seam will carry out waterproof, fluid sealant is poured in antiseep process, cushioning expanded plastic material layer at the bottom of injecting glue slot, injecting glue seam two sides paste gear gummed paper.
The column of metallic framework and crossbeam, benefit embedded part connecting bolt adopt preservative treatment, and the crab-bolt that tightens up of mending embedded part adopts chemical anchor bolts, and fluid sealant adopts silicon copper seal gum.
After whole molded embossed decorative panel installs; the patterned surfaces rubbish of relief surface, greasy dirt are cleared up; guarantee surfacing, smooth, carry out flat putty construction, every block plate from top to bottom; from left to right smoothly scrape a putty; one-time-reach-place, steadily carries out midway and does not stop, and putty solidification was polished after 4 hours; carry out second Puttying construction again, step is the same; Bottom closing paint is constructed, with short wool roller, priming paint roller coating is surperficial to embossing pattern, without hanging stream, without holiday, after priming paint drying, adopt thin plucking roller roller coating elastic coating, requirement decorative pattern is consistent, carries out the construction of elastic fluorocarbon intermediate layer paint after to be dried, the construction of elastic fluorocarbon metallic paint and self-clean type elastic fluorocarbon finishing varnish construction method the same, require that enamelled coating roller coating is even, consistency of thickness.
The invention has the beneficial effects as follows:
1, construction costs significantly reduces, remarkable in economical benefits.Construct according to concrete decoration plate with relief sculpture production of the present invention and installation method; save a large amount of construction material; overall investment is little; construction instant effect, compared with large area embossment decorative pattern cast-in-place method, has saved dedicated templates and plank sheathing installs expense; the inventive method deutomerite is adopted to economize template nearly 95%; greatly reduce dedicated templates expense, only dedicated templates expense one saves 5,720,000 yuan, and construction costs declines to a great extent; 36 days reductions of erection time comparatively planned the reduction of erection time 30%, saved labour cost about 280,000 yuan and saved comparatively budget decline 20%; Construction equipment and construction material, be common in architectural engineering, conventional, without the need to special equipment and raw material, greatly reduce equipment and material cost, the inventive method economy
Remarkable benefit, has huge economic benefit and promotion prospect;
2, construction technology is simple, improves efficiency of construction.This method is produced, install decoration plate with relief sculpture, and construction technology is simple, and technology maturity is high, and plate can production line balance, substantially increases production efficiency; Technological process is simple, and it is little that difficulty is implemented in operation, and general experienced operator can complete; Plate is produced, installation can synchronously be carried out as required, the reduction of erection time greatly;
3, job specfication, antiseep, good weatherability.The rigorous specification of this method, in construction, each link, main member all carry out waterproof, anticorrosion, antirust treatment, greatly improve the weatherability of whole engineering;
4, good decorating effect.According to the embossment decorative pattern concrete decorative curtain wall engineering that the inventive method completes, slat production line is produced, and makes specification, steady quality; The ripe specification of mounting technique, split is tight, concrete surface free from flaw, and concrete compaction is clean and tidy, and surface layer is smooth; Decorative pattern lifelike image, of a tightly knit structure, pattern is exquisite, and the overall imposing manner of decorative curtain wall is extensive, decorative pattern is exquisite, of a tightly knit structure, perfect in workmanshiply reach designing requirement completely.
Accompanying drawing explanation
Fig. 1 is that schematic diagram implemented by the inventive method square frame;
Fig. 2 is that moulded concrete decoration plate with relief sculpture faces one of embossment structure schematic diagram;
Fig. 3 is that A-A sound tells TV structure schematic diagram;
Fig. 4 is that moulded concrete decoration plate with relief sculpture faces embossment structure schematic diagram two;
Fig. 5 is B-B sectional structure schematic diagram;
Fig. 6 is concrete decoration plate with relief sculpture scheme of installation.
Detailed description of the invention
The invention process is applied in the construction project in certain museum, in this project, the outer eaves swash plate design of building adopts large area concrete embossment decorative pattern decorative curtain wall, and construction height is high, and gradient is large, first floor setting height(from bottom) reaches 15.7m, about 5200 ㎡ of integral construction area.
See Fig. 1-Fig. 5,1-1-concrete embossment decorative pattern decorative panel 1,1-2 concrete embossment decorative pattern decorative panel 2,2-Lift hook in Fig. 2,3-embedded board, 4-concrete, 5-angle iron frame.
First the production of moulded concrete decoration plate with relief sculpture is carried out, on CAD software, setting-out is carried out according to decorative curtain wall design size, consider local embossment pattern relative fullness, and the local pattern repeated in whole embossing pattern, cutting unit embossment body size is unsuitable excessive overweight, the principles such as convenient operation, lifting, carrying carry out decile to setting-out, form unified standard masterplate type.With plate 1-1,1-2 for example, first in conjunction with CAD setting-out size production standard gypsum version, then carry out the space of a whole page layout of 1:l by design pattern, then carry out convex embossment decorative pattern engraving, thus forming unit gypsum convex template.In unit gypsum template, even brushing demoulding wax layer, is applied in gypsum template surface by atoleine in a rotative pattern equably with clean cotton, over the course of 15 mins, will wax surface wiping to light, and leave standstill 1 and a half hours with clean-cloth, template is installed in unit gypsum relief convex template surrounding, unit gypsum relief convex template surface certain altitude (stay and establish protective layer 40mm) is placed in by having welded steel framework reinforcing bar sheet, build pea gravel concreten and unit concrete embossment concave template is made in maintenance, i.e. unit caster, after the demoulding of unit concrete embossment die, embossment molding surface is repaired, is coated with brush glazing, form smooth units concrete embossment die, repeatedly use can be had enough to meet the need for making matrix template, use layer of silica gel as separation layer, even repeatedly brushing silica gel on unit concrete embossment concave template, brushing three layers of every a layer thickness in this enforcement is 1mm, one deck under brushing after last layer solidification in brushing silica gel process, between layer of silica gel, solidify one deck mould cloth, final formation silica gel release layer, thickness is 4mm, according to setting-out size welding angle iron frame 5, angle steel specification is 63x63x5, and spot welding diameter is the reinforced mesh of 8mm in steel framework, template is installed in the unit caster surrounding being provided with silica gel separation layer, certain altitude above master mold is placed in by having welded steel framework reinforced mesh, require to carry out concreting according to design thickness 13Omm, and in concrete set aside pre-embedded fixing metal built-in fitting 3 and Lift hook 2, after concreting, carry out the watering maintenance of 7 days, the demoulding when concrete strength reaches 50%, and carry out surface smear modification with cement mortar, make moulded concrete decoration plate with relief sculpture 1-I and 1-2, as Figure 2-Figure 5.When needing to make decorative pattern, measure-alike concrete decoration plate with relief sculpture, do not need production unit caster again, repeat brushing silica gel on unit caster and form silica gel separation layer, make steel framework reinforced mesh, build, the demoulding, the steps such as maintenance, namely can be made into decorative pattern, measure-alike concrete decoration plate with relief sculpture, repeatedly repeat to produce in batches.
After concrete raised table is made or during making, start the installation carrying out concrete raised table.Embedded part anchor slab is mended, 7-crab-bolt, 8-fastening bolt, 9-holder, 10-column, 11-crossbeam, end floor beam on 12-building, end floor beam under I3-building see Fig. 6,1-1-concrete raised table 1,1-2-concrete raised table 2,6-.
First; with reference to column 10 and crossbeam 11 spacing distance of the size design fixed installation metallic framework of moulded concrete raised table; make every block plate surrounding just by consolidating at two root posts and two crossbeam approximate centerline, column and crossbeam position should match with embedded board 3 position of each back simultaneously; By designing requirement; the top building crossbeam 12 of metallic framework and building are being installed bottom on crossbeam 13; benefit embedded part anchor slab 6 particular location of fixing every root post is determined by setting-out routing; and punching adopts, and fastener is fixing mends embedded part; mend embedded part and adopt Q235B anchor slab; mend embedded part tighten up crab-bolt 8 can pre-buried or mend bury chemical anchor bolts; holder 9 is weldingly fixed on to be mended on embedded part 6; column la is fixed on holder 9 by fastening bolt 8; between adjacent two root posts, complete slab carcasing by the affixed crossbeam of designing requirement; To the column 1O of metallic framework and crossbeam 11, mend the parts preservative treatment such as embedded part 6, connecting bolt 8.Will all moulded concrete embossment unit decorative panels of installation in place to carry out examination by the order that hoisted in position is installed assembled; complete errorless rear numbering; lift by crane by the mode that hoist engine promotes, truck crane is auxiliary during installation; after hoisted in position; plate corner means of spot welds is fixed on column and crossbeam; after checking that error in place is qualified, be welded with fixing, and back built-in fitting and match position column and beam welding are fixed; Then seal, seam between each unit decorative panel and between edge cells decorative panel and adjacent surface decorative panel carries out waterproof, fluid sealant is poured in antiseep process, silicon copper seal gum selected by fluid sealant, cushioning expanded plastic material layer at the bottom of injecting glue slot, paste gear gummed paper in injecting glue seam two sides, squeeze into fluid sealant.After whole molded embossed decorative panel installation, sealing; the patterned surfaces rubbish of relief surface, greasy dirt are cleared up; guarantee surfacing, smooth, carry out flat putty construction, every block plate from top to bottom; from left to right smoothly scrape a putty; one-time-reach-place, steadily carries out midway and does not stop, and putty solidification was polished after 4 hours; carry out second Puttying construction again, step is the same; Then bottom closing paint construction is carried out, with short wool roller, priming paint roller coating is surperficial to embossing pattern, without hanging stream, without holiday, after priming paint drying, adopt thin plucking roller roller coating elastic coating, requirement decorative pattern is consistent, carries out the construction of elastic fluorocarbon intermediate layer paint after to be dried, the construction of elastic fluorocarbon metallic paint and self-clean type elastic fluorocarbon finishing varnish construction method the same, require that enamelled coating roller coating is even, consistency of thickness.
Method of the present invention is used to construct; save a large amount of construction material; overall investment is little; construction instant effect, decoration plate with relief sculpture is produced can production line balance, substantially increases production efficiency; compared with large area embossment decorative pattern cast-in-place method in former design; saved dedicated templates and plank sheathing installs expense, adopt the inventive method deutomerite to economize the nearly 5180m2 of template, dedicated templates expense one saves 5,720,000 yuan; 36 days reductions of erection time, save labour cost about 280,000 yuan; Technological process of the present invention is simple, and it is little that difficulty is implemented in operation, and general experienced operator can complete; Relate to construction equipment and construction material, be common in architectural engineering, conventional, without the need to special equipment and raw material, greatly reduce equipment and material cost.The present invention is that construction unit saves very considerable cost, has huge economic benefit and promotion prospect.Use the embossment decorative pattern concrete decorative curtain wall engineering that completes of the inventive method, imposing manner is extensive, decorative pattern is exquisite, of a tightly knit structure, perfect in workmanshiply fully meet designing requirement.

Claims (6)

1. a moulded concrete bossage plate producing process, it is characterized in that: comprise embossed designs pattern by the setting-out of actual design size, embossing pattern decile after setting-out or not decile resolve into a certain number of unit embossment body, unit gypsum convex template is made by each unit embossment body size engraving, and in unit gypsum template even brushing demoulding wax layer, template is installed in unit gypsum relief convex template surrounding, unit gypsum relief convex template surface certain altitude is placed in by having welded steel framework reinforcing bar sheet, build pea gravel concreten and unit concrete embossment concave template is made in maintenance, i.e. unit caster, even repeatedly brushing silica gel on unit concrete embossment concave template, form silica gel separation layer, template is installed in the unit caster surrounding being provided with silica gel separation layer, certain altitude above master mold is placed in by having welded steel framework reinforced mesh, by designing requirement fixing metal built-in fitting and Lift hook, build pea gravel concreten maintenance complete after the demoulding, make moulded concrete decoration plate with relief sculpture.
2. plate producing process according to claim 1, is characterized in that: the decomposition principle of unit embossment is: consider local embossment pattern relative fullness, the local pattern repeated in whole embossing pattern; Unit embossment body size is unsuitable excessive overweight, convenient operation, lifting, carrying, edge abnormity local unit embossment body individual segmentation.
3. the plate producing process according to claim I or 2; it is characterized in that: after gypsum convex embossment cell cube has been carved; use clean soft cloth; as cotton; in a rotative pattern by atoleine uniform application in sculpture surface; after 10-15 minute, with clean-cloth will wax surface wipe to light, and leave standstill 1 hour with; After the demoulding of unit concrete embossment die, embossment molding surface is repaired, be coated with brush glazing, form smooth units concrete embossment die, at the external coating multilayer silica gel of described smooth units concrete embossment die, one deck mould cloth is solidified between layer of silica gel, form silica gel release layer, thickness is 6-8mm, after unit concrete decoration plate with relief sculpture has been built, carry out the watering maintenance being no less than 7 days, treat concrete strength
Can the demoulding when reaching 50%, after the demoulding, relief surface cement mortar carries out surface smear polishing.
4. a moulded concrete raised table installation method, is characterized in that:
The column of the size design fixed installation metallic framework of A, reference moulded concrete raised table and girder space distance; make every block plate surrounding just by consolidating at two root posts and two crossbeam approximate centerline, column and crossbeam position should match with the built-in fitting position of each back simultaneously;
B, by designing requirement; the top building crossbeam of metallic framework and building are being installed bottom on crossbeam; determine that the benefit embedded part of fixing every root post installs metallic plate particular location by setting-out routing; and punching adopts, and fastener is fixing mends embedded part; weld clip gripping member vertical columns on benefit buried plate; between adjacent two root posts; complete slab carcasing by the affixed crossbeam of designing requirement, or build top building crossbeam and building bottom crossbeam time imbed pre-embedded bolt in the position of fixing every root post;
C, will all moulded concrete embossment unit decorative panels of installation in place to carry out examination by the order that hoisted in position is installed assembled; determine errorless rear numbering; after hoisted in position; plate corner means of spot welds is fixed; after checking that error in place is qualified; be welded with fixing, and back built-in fitting and match position column and beam welding are fixed;
Between D, each unit decorative panel and between edge cells decorative panel and adjacent surface decorative panel seam will carry out waterproof, fluid sealant is poured in antiseep process, cushioning expanded plastic material layer at the bottom of injecting glue slot, injecting glue seam two sides paste gear gummed paper.
5. installation method according to claim 4, is characterized in that: the column of metallic framework and crossbeam, benefit embedded part connecting bolt adopt preservative treatment, and the crab-bolt that tightens up of mending embedded part adopts chemical anchor bolts, and fluid sealant adopts silicon copper seal gum.
6. the installation method according to claim 4 or 5; it is characterized in that: after whole molded embossed decorative panel installs, the patterned surfaces rubbish of relief surface, greasy dirt are cleared up, guarantee surfacing, smooth; carry out flat putty construction; every block plate from top to bottom, from left to right smoothly scrapes a putty, one-time-reach-place; steadily carry out midway not stop; putty solidification was polished after 4 hours, then carried out second Puttying construction, and step is the same; Bottom closing paint is constructed, with short wool roller, priming paint roller coating is surperficial to embossing pattern, without hanging stream, without holiday, after priming paint drying, adopt thin plucking roller roller coating elastic coating, requirement decorative pattern is consistent, carries out the construction of elastic fluorocarbon intermediate layer paint after to be dried, the construction of elastic fluorocarbon metallic paint and self-clean type elastic fluorocarbon finishing varnish construction method the same, require that enamelled coating roller coating is even, consistency of thickness.
CN201410275556.1A 2014-06-20 2014-06-20 Moulded concrete decoration plate with relief sculpture is produced and installation method Pending CN105216531A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410275556.1A CN105216531A (en) 2014-06-20 2014-06-20 Moulded concrete decoration plate with relief sculpture is produced and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410275556.1A CN105216531A (en) 2014-06-20 2014-06-20 Moulded concrete decoration plate with relief sculpture is produced and installation method

Publications (1)

Publication Number Publication Date
CN105216531A true CN105216531A (en) 2016-01-06

Family

ID=54985955

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410275556.1A Pending CN105216531A (en) 2014-06-20 2014-06-20 Moulded concrete decoration plate with relief sculpture is produced and installation method

Country Status (1)

Country Link
CN (1) CN105216531A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107088955A (en) * 2017-06-12 2017-08-25 施成松 One kind is utilized method on graphic-print to concrete slab
CN111391559A (en) * 2020-04-26 2020-07-10 中电建(洛阳)装配式建筑科技有限公司 Multicolor high-strength concrete relief unit grid and manufacturing method thereof
CN112012380A (en) * 2020-08-17 2020-12-01 贵州建工安顺建筑工程有限公司 Construction method of metal texture spliced dry-hanging slate landscape curtain wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107088955A (en) * 2017-06-12 2017-08-25 施成松 One kind is utilized method on graphic-print to concrete slab
CN111391559A (en) * 2020-04-26 2020-07-10 中电建(洛阳)装配式建筑科技有限公司 Multicolor high-strength concrete relief unit grid and manufacturing method thereof
CN112012380A (en) * 2020-08-17 2020-12-01 贵州建工安顺建筑工程有限公司 Construction method of metal texture spliced dry-hanging slate landscape curtain wall

Similar Documents

Publication Publication Date Title
CN101585205B (en) Method for producing and mounting moulded concrete anaglyph unit plate
CN103470067B (en) Transformation and construction method used for facing bare concrete of existing building outer wall
CN111364754A (en) Construction method of art wood grain veneer fair-faced concrete
CN103938758B (en) The preparation method of the concavo-convex graining body of wall of a kind of clear-water concrete
CN103821366A (en) Plain concrete wall surface groove type three-dimensional wood grains decoration construction method
CN103938866A (en) Installing method for construction formwork of bare concrete concave-convex wood grain decoration wall
CN105216531A (en) Moulded concrete decoration plate with relief sculpture is produced and installation method
CN102561678A (en) Construction method of fair-faced concrete wall with wood grain finish
CN101906858B (en) Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board
CN206328782U (en) A kind of water sealing structure of side wall and base plate handing-over seam
CN208981759U (en) The prefabricated assembled non-dismantling formwork of L-type
CN107718242A (en) A kind of prefabricated panel for concrete prefabricated element production line positions hole tool
CN201908415U (en) Wall decorative board layer structure
TW201710584A (en) Construction method of post-fabricating old building wall surface into exposed concrete without needs of templates and grouting, thereby reducing cost and increasing construction efficiency
CN108081448B (en) Production process of integrally decorated and electromechanical prefabricated GRC formwork structural column
CN206328981U (en) A kind of cement plaster decorative body structure with theme effect
CN102691423B (en) Construction method for duplicating soft mould and installing building granitic plaster floriation member
CN206554360U (en) A kind of assembled porcelain earthenware brick for building and the house built using the porcelain earthenware brick
CN201380706Y (en) Continuous modeling mold material for architectural ornament
CN105986674A (en) Method for casting and forming concrete structure with decorative surface
CN107558604A (en) A kind of method for exempting from form removal raised table building
CN106638939A (en) Historic building timber member imitating method
CN103161280A (en) Decoration brick and manufacture method thereof
CN204876439U (en) GRG wall surface course molding mosaic structure
CN212795331U (en) Cast-in-place concrete negative slow-release exposed aggregate decoration vertical surface supporting die frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160106