CN201908415U - Wall decorative board layer structure - Google Patents

Wall decorative board layer structure Download PDF

Info

Publication number
CN201908415U
CN201908415U CN2010206488425U CN201020648842U CN201908415U CN 201908415 U CN201908415 U CN 201908415U CN 2010206488425 U CN2010206488425 U CN 2010206488425U CN 201020648842 U CN201020648842 U CN 201020648842U CN 201908415 U CN201908415 U CN 201908415U
Authority
CN
China
Prior art keywords
layer
grieshoch
decorative board
ash
paint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010206488425U
Other languages
Chinese (zh)
Inventor
谭泽斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Z&F Culture Construction Co., Ltd.
Original Assignee
SHENZHEN ZHONG FU TAI INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN ZHONG FU TAI INDUSTRY Co Ltd filed Critical SHENZHEN ZHONG FU TAI INDUSTRY Co Ltd
Priority to CN2010206488425U priority Critical patent/CN201908415U/en
Application granted granted Critical
Publication of CN201908415U publication Critical patent/CN201908415U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to a wall decorative board layer structure, which comprises a decorative board layer, a first ash layer, a second ash layer and a paint layer, wherein the decorative board layer is fixedly hung onto a wall body of a building through a suspension piece, the decorative board layer is formed by joining a plurality of decorative boards, a gap is arranged between any two adjacent decorative boards, a gap filler is filled inside the gap, a fiber net layer is arranged at the position of the gap, accordingly, the outer surface of the decorative board layer and the outer surface of the fiber net layer are combined to form a first ash layer attachment surface, the first ash layer is paved on the first ash layer attachment surface, the first ash layer comprises an inner ash layer and a first fiber net layer, the second ash layer is paved onto the first ash layer, the second ash layer comprises an outer ash layer and a putty layer, and the paint layer is arranged on the second ash layer and comprises a priming paint layer and a finishing paint layer.

Description

A kind of decorative board for wall layer structure
Technical field
The utility model relates to a kind of decorative panel surface layer structure, is meant a kind of surperficial layer structure of decorative board for wall especially.
Background technology
People are more and more higher to the requirement of daily life quality now, can promote the work decoration method of dwelling environment of people under such social background more and more has been applied in people's the life, now with regard to indoor decoration, decorate in the unusual ground that is divided into according to the decoration place, metope decoration and furred ceiling decoration, and wherein especially be subjected to most people's attention with the metope decoration, its agent structure generally all is to adopt cement casting or building wall brick to pile up to form for present building, so its metope integral smoothness of body of wall that utilizes this mode to construct to finish and all relatively poor Decoration Design in later stage of must carrying out of aesthetic are to satisfy people's the requirement of moving in.Generally all can lay some dalles promoting whole indoor aesthetic on the metope of building at the present people of above-mentioned situation, present use commonplace has GRG plate or gypsum plank for dalle.But now constructor's its general operation when GRG plate or gypsum plank are carried out surface-treated all is at first to carry on the back cementing on GRG plate or gypsum plank, hanging the operation of fleece, batch ash, the mill of fetching water, spray aqueous fluorine-carbon paint priming paint, spray water-based fluorocarbon lacquer painting lacquer carries out, but this job practices also exists some shortcomings in concrete enforcement, at first utilizes above-mentioned mode to carry out large-area construction and will reserve deformation joint to prevent the sheet material cracking; Secondly base layer structure must be firmly in the process of integral construction; If can have new and old aberration between the part of repairing after when there is damage last generation part and other parts, thus the construction again of face wall must be put in order, so traditional operation and structure exist a lot of shortcomings.
The utility model content
The utility model provides a kind of decorative board for wall layer structure, the aqueous fluorine-carbon paint construction can decorated on the flaggy by the technical solution of the utility model, and this is a main purpose of the present utility model.
Technical solution adopted in the utility model is: a kind of decorative board for wall layer structure, it comprises the decoration flaggy, first grieshoch, second grieshoch and enamelled coating, wherein, this decoration flaggy is fixedly to be suspended on the body of wall of building by suspender, this decoration flaggy is spliced by some decorative panels, the space is arranged between this adjacent arbitrarily decorative panel at interval, be filled with gap filler in this space, this position, space is provided with fiber web layer, is combined to form the first grieshoch attachment surface by the external surface of this decoration flaggy and the external surface of this fiber web layer.
This first grieshoch is laid on this first grieshoch attachment surface, the grieshoch and first fiber web layer in this first grieshoch comprises, wherein, should be arranged on this first grieshoch attachment surface by interior grieshoch, and this first fiber web layer is arranged on this interior grieshoch, this second grieshoch is laid on this first grieshoch, this second grieshoch comprises outer grieshoch and putty layer, wherein, this outer grieshoch is arranged on this first fiber web layer of this first grieshoch, and this putty layer is arranged on this outer grieshoch, this enamelled coating is arranged on this second grieshoch, this enamelled coating comprises prime coat and top coat layer, and this prime coat is arranged on this putty layer of this second grieshoch, and this top coat layer is arranged on this prime coat.
This gap filler is a GRG plate gap filler when this decorative panel is the GRG plate.And this gap filler is the gypsum plank gap filler when this decorative panel is gypsum plank.
This prime coat is an aqueous fluorine-carbon paint priming paint, and this top coat layer is the aqueous fluorine-carbon paint finish paint.
The beneficial effects of the utility model are: the aqueous fluorine-carbon paint construction is generally carried out on metal sheet, pass through the technical solution of the utility model, the constructor can directly be set to aqueous fluorine-carbon paint on GRG plate or the gypsum plank face, can indoor large space metope random make single, hyperbolic moulding facial ornament water-based fluorocarbon lacquer painting effect.And finish paint is subjected to the general available clear water flushing of polluting, and the aqueous fluorine-carbon paint surface is not easy to draw flower more firmly, damages, and whole renovation is more or less freely.Because the metope that this structure is formed does not have the shrinkage joint, can improve artistic effect greatly.
Description of drawings
Fig. 1 is a deck structure schematic diagram of the present utility model;
Fig. 2 is the splicing schematic diagram of decorative panel of the present utility model;
Fig. 3 is a deck structure schematic diagram of the present utility model.
The specific embodiment
As shown in Figures 1 to 3, a kind of decorative board for wall layer structure, it comprises decorates flaggy 10, the first grieshoch 20, second grieshoch 30 and enamelled coating 40.
Wherein, this decoration flaggy 10 is fixedly to be suspended on the body of wall of building by suspender.
This decoration flaggy 10 is spliced by some decorative panels 11, and space 12 is arranged between this adjacent arbitrarily decorative panel 11 at interval.
This decorative panel 11 is GRG plate or gypsum plank.
This space 12 is of a size of 10-15MM in concrete enforcement.
Be filled with gap filler 13 in this space 12.
This gap filler 13 is GRG plate gap filler when this decorative panel 11 is the GRG plate, and this gap filler 13 is the gypsum plank gap filler when this decorative panel 11 is gypsum plank.
These 12 positions, space are provided with fiber web layer 14.
Be combined to form the first grieshoch attachment surface by the external surface of this decoration flaggy 10 and the external surface of this fiber web layer 14.
This first grieshoch 20 is laid on this first grieshoch attachment surface, the grieshoch 21 and first fiber web layer 22 in this first grieshoch 20 comprises, wherein, grieshoch 21 is arranged on this first grieshoch attachment surface in this, and this first fiber web layer 22 is arranged on this interior grieshoch 21.
This second grieshoch 30 is laid on this first grieshoch 20, and this second grieshoch 30 comprises outer grieshoch 31 and putty layer 32, and wherein, this outer grieshoch 31 is arranged on this first fiber web layer 22 of this first grieshoch 20, and this putty layer 32 is arranged on this outer grieshoch 31.
This enamelled coating 40 is arranged on this second grieshoch 30, and this enamelled coating 40 comprises prime coat 41 and top coat layer 42, and this prime coat 41 is arranged on this putty layer 32 of this second grieshoch 30, and this top coat layer 42 is arranged on this prime coat 41.
Wherein, this prime coat 41 is an aqueous fluorine-carbon paint priming paint, and this top coat layer 42 is the aqueous fluorine-carbon paint finish paint.
The utility model is in concrete enforcement, GRG plate or gypsum plank are after just this decoration flaggy 10 installs by mounting means, reserve the slit of 10-15MM, carry out full joint filling with special-purpose GRG gap filler or gypsum gap filler, on the face of GRG plate or gypsum plank, clean out, hang up fleece (about width 100MM), carry out first pass and criticize ash at the seam crossing brush coating, whole brush coating hung fiber for the second time, batch second time ash.Carry out whole for the third time brush coating after having polished and hang fiber, batch the 3rd time ash also polished, and polishing is finished and carried out the water mill construction, checks whether surface layer is smooth, mends grey grinding process if any problem at once.Treat to carry out after ash parches the construction of first pass priming paint, carry out water mill after lacquer parches and handle, second time priming paint construction carried out water mill after lacquer parches and handled; Treat to carry out the first pass surface construction after ash parches, carry out water mill after lacquer parches and handle, second time finish paint construction.
The utility model its concrete construction sequence in concrete enforcement comprises:
The first step, after GRG plate or gypsum plank installation, cleaning earlier, dedusting, showering curing to be to improve the adhesion stress of gypsum plank, fills seam between all plates and the plate with GRG plate gap filler then, inserts must all fill up and not stay any space.Joint filling thickness is not thinner than the GRG plate thickness.
After second step, joint filling are finished, extend the surperficial sticking glass fiber anticracking net of each 10cm to both sides in the middle of stitching, must paste firmly when pasting net.
The 3rd step, joint filling and paste seam net operation finish after with the whole plate faces of land plaster levelling and repair GRG plate defect, completely paste glass fiber anticracking net simultaneously to reach the effect of whole cracking resistance, and then according to each moulding unwrapping wire location and scrape land plaster second time, behind the blade coating if any depression, spatula vestige, coarse turning and phenomenons such as edge, dew net, should scrape the benefit land plaster, until svelteness, sharp outline.
The 4th step, treat that land plaster parches the back with coarse sandpaper polishing and cleaning floating dust two to three times super fine and smooth sons of blade coating (the sub-blade coating of super exquisiteness is wanted smooth smooth and showering curing during this period) again; After super putty parches,, wait and do after 1-2 days blade coating polished putty again to smooth with the sand papering of 280 orders-400 order, polished putty is waited and is done after 2-3 days with the sand papering of 600-800 order to smooth, can spray priming paint after the supervising engineer checks and accepts.
The 5th step, the supporting special-purpose priming paint construction of employing fluorine carbon
A. spray the special-purpose priming paint of fluorine carbon two times, after the construction of the second road priming paint must wait for that the first road coating parches, the water polishing, can descend one priming paint construction after parching, twice engineering time is spaced apart 24 hours, and every time was done after 24 hours, the water polishing, each position is checked in the polishing back comprehensively, and the situation according to each position adjusts accordingly and repairs then.
Will note when B. polishing can not be worn out with priming paint, if any the worn out position priming paint that should fill spray.
The 6th goes on foot, carries out the finish paint construction
A. before the finish paint construction, the priming paint basal plane is checked that spray or inclined to one side light coating are leaked in coating.
B. the finish paint spraying is two to three times, interlayer 4 hours at interval, thickness 35um/ layer.
The last item that should be noted that in the process of carrying out above-mentioned spraying application step has following several:
The first, must confirm that putty layer parches fully before the spray first pass lacquer.More than after each road execution of coating must wait for that one coating parches, can carry out next process, the last paint film of reply cleans up hill and dale before the spraying.
The second, coating thickness must be even, to guarantee no obvious aberration.
Three, paint must strict be allocated use in the ratio of product description.

Claims (4)

1. wall decorative board layer structure; It is characterized in that: it comprises the decoration flaggy; First grieshoch, second grieshoch and enamelled coating; Wherein, This decoration flaggy is fixedly to be suspended on the body of wall of building by suspender; This decoration flaggy is spliced by some decorative panels; There is the space at the interval between this decorative panel of arbitrary neighborhood; Be filled with gap filler in this space; This position, space is provided with fiber web layer; Be combined to form the first grieshoch attachment surface by the outer surface of this decoration flaggy and the outer surface of this fiber web layer
This first grieshoch is laid on this first grieshoch attachment surface, the grieshoch and first fiber web layer in this first grieshoch comprises, wherein, should be arranged on this first grieshoch attachment surface by interior grieshoch, and this first fiber web layer is arranged on this interior grieshoch, this second grieshoch is laid on this first grieshoch, this second grieshoch comprises outer grieshoch and putty layer, wherein, this outer grieshoch is arranged on this first fiber web layer of this first grieshoch, and this putty layer is arranged on this outer grieshoch, this enamelled coating is arranged on this second grieshoch, this enamelled coating comprises prime coat and top coat layer, and this prime coat is arranged on this putty layer of this second grieshoch, and this top coat layer is arranged on this prime coat.
2. a kind of decorative board for wall layer structure as claimed in claim 1 is characterized in that: this decorative panel is the GRG plate, and this gap filler is a GRG plate gap filler.
3. a kind of decorative board for wall layer structure as claimed in claim 1 is characterized in that: this decorative panel is a gypsum plank, and this gap filler is the gypsum plank gap filler.
4. a kind of decorative board for wall layer structure described in claim 2 or 3, it is characterized in that: this prime coat is an aqueous fluorine-carbon paint priming paint, and this top coat layer is the aqueous fluorine-carbon paint finish paint.
CN2010206488425U 2010-12-08 2010-12-08 Wall decorative board layer structure Expired - Lifetime CN201908415U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206488425U CN201908415U (en) 2010-12-08 2010-12-08 Wall decorative board layer structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206488425U CN201908415U (en) 2010-12-08 2010-12-08 Wall decorative board layer structure

Publications (1)

Publication Number Publication Date
CN201908415U true CN201908415U (en) 2011-07-27

Family

ID=44300618

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206488425U Expired - Lifetime CN201908415U (en) 2010-12-08 2010-12-08 Wall decorative board layer structure

Country Status (1)

Country Link
CN (1) CN201908415U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284901A (en) * 2016-08-10 2017-01-04 吕亚荣 A kind of construction technology of integral seamless reflective baking vanish wall decoration
CN106906977A (en) * 2017-04-21 2017-06-30 中建海峡建设发展有限公司 The mounting process and metope of abnormal curved surface GRG surfaces overlying art pottery ceramics
CN113583499A (en) * 2021-08-20 2021-11-02 和湜(上海)建筑科技有限公司 Putty formula and panel based on putty

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284901A (en) * 2016-08-10 2017-01-04 吕亚荣 A kind of construction technology of integral seamless reflective baking vanish wall decoration
CN106906977A (en) * 2017-04-21 2017-06-30 中建海峡建设发展有限公司 The mounting process and metope of abnormal curved surface GRG surfaces overlying art pottery ceramics
CN113583499A (en) * 2021-08-20 2021-11-02 和湜(上海)建筑科技有限公司 Putty formula and panel based on putty

Similar Documents

Publication Publication Date Title
CN103470067B (en) Transformation and construction method used for facing bare concrete of existing building outer wall
CN104533046B (en) Dry-hanging and wet-adhering combined mounting method of cement-based artificial flat stone
CN103375000B (en) A kind of water-soluble metal fluorocarbon coatings is coated with the construction technology on plucking surface in elasticity
CN101363269A (en) Construction method of plastering-free concrete structure wall putty
CN103572845A (en) Insulation mortar reflective insulation coating external wall insulation system and construction process thereof
CN101818573B (en) External heat preservation technology method of wall by means of pouring polyurethane heat preservation layer with disassembly-free mould
CN201908415U (en) Wall decorative board layer structure
CN202672534U (en) Aerated concrete wall surface coating
CN111549997B (en) Preparation process of face brick imitating decorative plate
CN209958651U (en) Ceramic tile outer wall waterproof construction
CN205777208U (en) Flexible texture coating body of wall
CN206110545U (en) Various lining of wall
CN204326275U (en) Polyurethane composite thermal insulation template
CN107558604A (en) A kind of method for exempting from form removal raised table building
CN207988307U (en) Facing is in the plaster tablet suspended ceiling structure of metal effect
CN207110334U (en) A kind of magnetic attracting quick-mounting wall board structure renovated for metope with decorating
CN113062544A (en) Stone-like paint groove construction process
CN202755504U (en) Imitative stone curtain wall
CN206256644U (en) A kind of artificial stone ornament materials
CN113719054B (en) Interior decoration construction method for large building structure
CN202882303U (en) Cement decorative board wall
CN204960213U (en) Decorate intergral template's mounting structure
CN205421793U (en) Integration polyurethane insulation board
CN203905361U (en) Novel wall decorating surface system
CN208981683U (en) A kind of building outer wall green face brick-imitation reconstruction structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHENZHEN Z + F CULTURE CONSTRUCTION CO., LTD.

Free format text: FORMER NAME: SHENZHEN ZHONGFUTAI INDUSTRY CO., LTD.

CP03 Change of name, title or address

Address after: 518000, Guangdong Province, Futian District Shenzhen Bagua Road, Ho Hao building, 8 floor, 13 floor

Patentee after: Shenzhen Z&F Culture Construction Co., Ltd.

Address before: 518111, room fourteen, floor 1401-1406, Chung Hao building, Bagua Road, Futian District, Shenzhen, Guangdong four, China

Patentee before: Shenzhen Zhong Fu Tai Industry Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110727