CN103835505A - Outer wall compound heat preservation board construction method - Google Patents

Outer wall compound heat preservation board construction method Download PDF

Info

Publication number
CN103835505A
CN103835505A CN201210485476.XA CN201210485476A CN103835505A CN 103835505 A CN103835505 A CN 103835505A CN 201210485476 A CN201210485476 A CN 201210485476A CN 103835505 A CN103835505 A CN 103835505A
Authority
CN
China
Prior art keywords
wall
warming plate
construction
heat preservation
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210485476.XA
Other languages
Chinese (zh)
Other versions
CN103835505B (en
Inventor
黄延铮
史少博
陈磊
张煜
李阳
陈致昂
周支军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201210485476.XA priority Critical patent/CN103835505B/en
Publication of CN103835505A publication Critical patent/CN103835505A/en
Application granted granted Critical
Publication of CN103835505B publication Critical patent/CN103835505B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention discloses an outer wall compound heat preservation board construction method which includes the step of heat preservation board manufacturing, the step of reinforcing bar and cement cushion block installation, the step of compound heat preservation board installation, inspection and acceptance, the step of formwork installation, the step of wall penetrating bolt installation, the step of outer-side formwork fixation, the step of wall body concrete cast-in-place, the step of leveling course construction, the step of outer wall exterior wall facing construction and the like. The outer wall compound heat preservation board construction method is standard in technology, high in mechanical degree, and capable of effectively improving the installation construction quality of the heat preservation board, relieving labor intensity, improving construction efficiency and saving cost. An 8 mm inorganic cement fiber board is precast on the surface of the compound heat preservation board in a compound mode, the strength and quality of materials of a construction system and the stability and safety of the overall structure are greatly improved, and the outer wall compound heat preservation board construction method is suitable for the heat preservation engineering outside the outer wall of a high-rise building. The system can bear facing layers with high weight and is suitable for sticking of facing layers such as face bricks and stone. Obvious social benefits and economic benefits are achieved.

Description

Compound heat-insulation board of outer wall construction method
Technical field
The present invention relates to a kind of compound heat-insulation board of outer wall construction method.
Background technology
Solved the heat insulation effect that other exterior-wall heat insulation goods and technology exist poor, effect is single, constructs loaded down with trivial details, and the cycle is long, application life is short, and cost is high the deficiencies such as pollution to environment.
Summary of the invention
The object of this invention is to provide a kind of heat insulating material external surface in advance factory the prefabricated NEW TYPE OF COMPOSITE external-wall heat-insulation material-composite insulation boards that is compounded with thick inorganic cement fiberboard as external-wall heat-insulation material, adopt anchoring piece and warming plate and concrete binding power jointly composite insulation boards to be fixedly secured to the construction method outside shear wall.
The present invention is achieved by the following technical solutions:
A kind of compound heat-insulation board of outer wall construction method, is characterized in that: comprise the following steps:
A, preparation warming plate:
Carry out warming plate preparation, numbering according to layout design wall size and the requirement of confiding a technological secret, when need cutting, warming plate docking site must adopt machinery to cut, the good size of Ying Xianliang, and adopt after ink fountain snap the line and conscientiously cut with bench saw or portable saw, can not arbitrarily cut, with to be used;
Hidden and the spacer of b, reinforcing bar is installed:
Eject sideline, body of wall position by design thickness of wall body, to guarantee that thickness of wall body is accurate; After the complete wall steel bar of colligation outside exterior wall reinforcing bar colligation spacer, and in every warming plate, be no less than 6-7 piece, so that there is the concrete isolation layer that is not less than 15mm between reinforcing bar and warming plate, meet code requirement to guarantee that warming plate and concrete wall surface fully contact with the topping of exterior wall reinforcing bar;
The installation and acceptance of c, composite insulation boards:
(1) composite insulation boards erection sequence: through hang just vertical after assembled warming plate progressively, when as larger in construction section, can or more than two places construct assembled at two places simultaneously;
(2) composite insulation boards assembling method: warming plate is reserved the position of anchoring piece and put into tube on warming plate face before installing, when assembled warming plate, upper, middle and lower three people of entire plate are firmly fitted together warming plate splicing simultaneously, and will fix with galvanized wire and wall steel bar colligation through the tube afterbody of warming plate, and carry out warming plate installation examination after adjustable plate face verticality, piece planeness;
D, template are installed
By ejecting body of wall axial location control line, Template Location reinforcing bar is set, on wall steel bar, is not more than 0.8m by spacing outside cement support is installed, to guarantee body of wall interfacial thickness, template is in place, temporary fixed;
E, installation through-wall bolt:
The spacing requiring according to through-wall bolt, to thermal insulating composite panel boring, coincide the cavity of template and thermal insulating composite panel, and hole should not be too large in order to avoid through-wall bolt is passed hole by spillage;
F, fixing outboard template:
Fastening through-wall bolt, calibration template is vertical, planeness, and connecting must be tight, firm;
G, cast-in-situ wall concrete:
Concreting in lifts, one-time-concreting height should not exceed 1.0m, and concrete discharging should be uniformly dispersed, and carries out continuously, and vibrating spear vibration spacing is not less than 0.5m; Under normal temperature, concrete strength reaches 1.2Mpa and can remove wall form; After form removal, warming plate surface should be cleared up in time if any cement slurry, and checks the planeness on warming plate surface, then carries out next process;
h,the construction of leveling layer:
After agent structure acceptance(check), carry out construction of leveling blanket, first stop up cavity with heat preservation slurry or polyurethane foam glue, cleaning warming plate surface layer, after making surface layer cleaning without dirt, plaster, and carry out interface processing, after routinely plastering method construct, the whole and verticality of main levelling, can be with whole fiberglass gridding cloth paving to original sheet material straight joint position;
i,exterior wall finish construction:
After leveling layer completes, smear 3-5mm thick polymer adhesive mortar and be pressed into alkali proof fiber grid cloth one, after 24 hours, can carry out coatings decoration surface construction, while adopting face brick face, first check that whether basic unit is dry, whether surface is smooth, then use polymer bonding mortar binding face tile, the jointing of polymer bonding mortar face brick jointing agent.
Advantage of the present invention is:
The present invention has process standardization, mechanization degree is high, effectively improve the installation quality of warming plate and reduced labour intensity, improve efficiency of construction, save cost, the composite insulation boards surface thick inorganic cement fiberboard of the prefabricated 8mm of being compounded with has greatly improved this construction system strength of materials quality and integrally-built stability, safety, is applicable to high-rise building outer wall exterior insulation work; And this system carrying finish coat weight is high, is applicable to the finish coats such as binding face tile, stone material, has obvious Social benefit and economic benefit.
The specific embodiment
Embodiment: compound heat-insulation board of outer wall construction method of the present invention, comprises the following steps:
A, preparation warming plate:
Carry out warming plate preparation, numbering according to layout design wall size and the requirement of confiding a technological secret, when need cutting, warming plate docking site must adopt machinery to cut, the good size of Ying Xianliang, and adopt after ink fountain snap the line and conscientiously cut with bench saw or portable saw, can not arbitrarily cut, with to be used;
Hidden and the spacer of b, reinforcing bar is installed:
Eject sideline, body of wall position by design thickness of wall body, to guarantee that thickness of wall body is accurate; After the complete wall steel bar of colligation outside exterior wall reinforcing bar colligation spacer, and in every warming plate, be no less than 6-7 piece (cushion block quantity is depending on plate hight), so that there is the concrete isolation layer that is not less than 15mm between reinforcing bar and warming plate, meet code requirement to guarantee that warming plate and concrete wall surface fully contact with the topping of exterior wall reinforcing bar;
The installation and acceptance of c, composite insulation boards:
(1) composite insulation boards erection sequence: through hang just vertical after assembled warming plate progressively, when as larger in construction section, can or more than two places construct assembled at two places simultaneously;
(2) composite insulation boards assembling method: warming plate is reserved the position of anchoring piece and put into tube on warming plate face before installing, when assembled warming plate, upper, middle and lower three people of entire plate are firmly fitted together warming plate splicing simultaneously, and will fix with galvanized wire and wall steel bar colligation through the tube afterbody of warming plate, and carry out warming plate installation examination after adjustable plate face verticality, piece planeness;
D, template are installed:
By ejecting body of wall axial location control line, Template Location reinforcing bar is set, on wall steel bar, is not more than 0.8m by spacing outside cement support is installed, to guarantee body of wall interfacial thickness, template is in place, temporary fixed;
E, installation through-wall bolt:
The spacing requiring according to through-wall bolt, to thermal insulating composite panel boring, coincide the cavity of template and thermal insulating composite panel, and hole should not be too large in order to avoid through-wall bolt is passed hole by spillage;
F, fixing outboard template:
Fastening through-wall bolt, calibration template is vertical, planeness, and connecting must be tight, firm;
G, cast-in-situ wall concrete:
Concreting in lifts, one-time-concreting height should not exceed 1.0m, and concrete discharging should be uniformly dispersed, and carries out continuously, and vibrating spear vibration spacing is not less than 0.5m; Under normal temperature, concrete strength reaches 1.2Mpa and can remove wall form; After form removal, warming plate surface should be cleared up in time if any cement slurry, and checks the planeness on warming plate surface, then carries out next process;
h,the construction of leveling layer:
After agent structure acceptance(check), carry out construction of leveling blanket, first stop up cavity with heat preservation slurry or polyurethane foam glue, cleaning warming plate surface layer, after making surface layer cleaning without dirt, plaster, and carry out interface processing, after routinely plastering method construct, the whole and verticality of main levelling, can be with whole fiberglass gridding cloth paving to original sheet material straight joint position;
i,exterior wall finish construction:
After leveling layer completes, smear the thick YL106 polymer bonding mortar of 3-5mm and be pressed into alkali proof fiber grid cloth one, after 24 hours, can carry out the construction of coating (face brick) architectural surface, while adopting face brick face, first check that whether basic unit is dry, whether surface is smooth, then use YL106 polymer bonding mortar binding face tile, the jointing of YL103 face brick jointing agent.

Claims (1)

1. a compound heat-insulation board of outer wall construction method, is characterized in that: comprise the following steps:
A, preparation warming plate:
Carry out warming plate preparation, numbering according to layout design wall size and the requirement of confiding a technological secret, when need cutting, warming plate docking site must adopt machinery to cut, the good size of Ying Xianliang, and adopt after ink fountain snap the line and conscientiously cut with bench saw or portable saw, can not arbitrarily cut, with to be used;
Hidden and the spacer of b, reinforcing bar is installed:
Eject sideline, body of wall position by design thickness of wall body, to guarantee that thickness of wall body is accurate; After the complete wall steel bar of colligation outside exterior wall reinforcing bar colligation spacer, and in every warming plate, be no less than 6-7 piece, so that there is the concrete isolation layer that is not less than 15mm between reinforcing bar and warming plate, meet code requirement to guarantee that warming plate and concrete wall surface fully contact with the topping of exterior wall reinforcing bar;
The installation and acceptance of c, composite insulation boards:
(1) composite insulation boards erection sequence: through hang just vertical after assembled warming plate progressively, when as larger in construction section, can or more than two places construct assembled at two places simultaneously;
(2) composite insulation boards assembling method: warming plate is reserved the position of anchoring piece and put into tube on warming plate face before installing, when assembled warming plate, upper, middle and lower three people of entire plate are firmly fitted together warming plate splicing simultaneously, and will fix with galvanized wire and wall steel bar colligation through the tube afterbody of warming plate, and carry out warming plate installation examination after adjustable plate face verticality, piece planeness;
D, template are installed:
By ejecting body of wall axial location control line, Template Location reinforcing bar is set, on wall steel bar, is not more than 0.8m by spacing outside cement support is installed, to guarantee body of wall interfacial thickness, template is in place, temporary fixed;
E, installation through-wall bolt:
The spacing requiring according to through-wall bolt, to thermal insulating composite panel boring, coincide the cavity of template and thermal insulating composite panel, and hole should not be too large in order to avoid through-wall bolt is passed hole by spillage;
F, fixing outboard template:
Fastening through-wall bolt, calibration template is vertical, planeness, and connecting must be tight, firm;
G, cast-in-situ wall concrete:
Concreting in lifts, one-time-concreting height should not exceed 1.0m, and concrete discharging should be uniformly dispersed, and carries out continuously, and vibrating spear vibration spacing is not less than 0.5m; Under normal temperature, concrete strength reaches 1.2Mpa and can remove wall form; After form removal, warming plate surface should be cleared up in time if any cement slurry, and checks the planeness on warming plate surface, then carries out next process;
h,the construction of leveling layer:
After agent structure acceptance(check), carry out construction of leveling blanket, first stop up cavity with heat preservation slurry or polyurethane foam glue, cleaning warming plate surface layer, after making surface layer cleaning without dirt, plaster, and carry out interface processing, after routinely plastering method construct, the whole and verticality of main levelling, can be with whole fiberglass gridding cloth paving to original sheet material straight joint position;
i,exterior wall finish construction:
After leveling layer completes, smear 3-5mm thick polymer adhesive mortar and be pressed into alkali proof fiber grid cloth one, after 24 hours, can carry out coatings decoration surface construction, while adopting face brick face, first check that whether basic unit is dry, whether surface is smooth, then use polymer bonding mortar binding face tile, the jointing of polymer bonding mortar face brick jointing agent.
CN201210485476.XA 2012-11-26 2012-11-26 Compound heat-insulation board of outer wall constructional method Expired - Fee Related CN103835505B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210485476.XA CN103835505B (en) 2012-11-26 2012-11-26 Compound heat-insulation board of outer wall constructional method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210485476.XA CN103835505B (en) 2012-11-26 2012-11-26 Compound heat-insulation board of outer wall constructional method

Publications (2)

Publication Number Publication Date
CN103835505A true CN103835505A (en) 2014-06-04
CN103835505B CN103835505B (en) 2016-06-01

Family

ID=50799365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210485476.XA Expired - Fee Related CN103835505B (en) 2012-11-26 2012-11-26 Compound heat-insulation board of outer wall constructional method

Country Status (1)

Country Link
CN (1) CN103835505B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612289A (en) * 2015-02-13 2015-05-13 中冶建工集团有限公司 Method for constructing external walls
CN107143141A (en) * 2017-07-19 2017-09-08 上海宝冶集团有限公司 External wall of high-rise building warming plate construction
CN108035462A (en) * 2018-01-17 2018-05-15 江苏南通三建集团股份有限公司 One kind is without template low energy consumption without cold bridge cast-in-place concrete exterior wall construction technology
CN108915107A (en) * 2018-07-26 2018-11-30 中水电第十工程局(郑州)有限公司 A kind of inorganic infiltration heat preservation board construction method of EPS
CN109057059A (en) * 2018-08-15 2018-12-21 徽都建设有限公司 A kind of thermal insulation construction technique of exterior walls of buildings
CN109138227A (en) * 2018-10-19 2019-01-04 青岛建集团有限公司 Without exterior sheathing exterior-wall heat insulation and structure-integrated pouring molding construction technology
CN109610830A (en) * 2018-12-28 2019-04-12 沈阳中辰钢结构工程有限公司 A kind of granular polystyrene, clay mixture construction technology
CN110424575A (en) * 2019-08-26 2019-11-08 中冶建工集团有限公司 Construction method for building exterior wall heat preserving integrated system
CN111255103A (en) * 2020-03-10 2020-06-09 冒鹏飞 Construction process for heat preservation treatment of energy-saving building wall

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU206507U1 (en) * 2020-04-16 2021-09-14 Ефремочкин Роман Андреевич Self-cleaning façade tiles

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001355297A (en) * 2000-06-15 2001-12-26 Inaba Yoshie Heat insulating wall structure, heat insulating support member used therefor, and work execution method
JP2008223375A (en) * 2007-03-14 2008-09-25 Wow House Co Ltd Heat insulating panel and external heat insulating structure
CN101424117A (en) * 2008-11-05 2009-05-06 天津开发区福林发展有限公司 Gypsum insulation plate and connection method thereof with major structure of construction
CN102071797A (en) * 2010-12-30 2011-05-25 郑州大学 Fiber-reinforced plaster-free dismantle-free integrated heat-preservation template and exterior wall heat-preservation construction process
CN102605956A (en) * 2011-01-21 2012-07-25 林淑芬 Construction method of heat preservation walls and device thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001355297A (en) * 2000-06-15 2001-12-26 Inaba Yoshie Heat insulating wall structure, heat insulating support member used therefor, and work execution method
JP2008223375A (en) * 2007-03-14 2008-09-25 Wow House Co Ltd Heat insulating panel and external heat insulating structure
CN101424117A (en) * 2008-11-05 2009-05-06 天津开发区福林发展有限公司 Gypsum insulation plate and connection method thereof with major structure of construction
CN102071797A (en) * 2010-12-30 2011-05-25 郑州大学 Fiber-reinforced plaster-free dismantle-free integrated heat-preservation template and exterior wall heat-preservation construction process
CN102605956A (en) * 2011-01-21 2012-07-25 林淑芬 Construction method of heat preservation walls and device thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
冯向东等: "某高层住宅外墙复合保温板施工技术", 《施工技术》 *
沈苏华: "新型SJN组合自保温墙体技术的应用", 《建筑施工》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104612289A (en) * 2015-02-13 2015-05-13 中冶建工集团有限公司 Method for constructing external walls
CN107143141A (en) * 2017-07-19 2017-09-08 上海宝冶集团有限公司 External wall of high-rise building warming plate construction
CN108035462A (en) * 2018-01-17 2018-05-15 江苏南通三建集团股份有限公司 One kind is without template low energy consumption without cold bridge cast-in-place concrete exterior wall construction technology
CN108915107A (en) * 2018-07-26 2018-11-30 中水电第十工程局(郑州)有限公司 A kind of inorganic infiltration heat preservation board construction method of EPS
CN108915107B (en) * 2018-07-26 2020-07-07 中电建十一局工程有限公司 Construction method of EPS inorganic infiltration insulation board
CN109057059A (en) * 2018-08-15 2018-12-21 徽都建设有限公司 A kind of thermal insulation construction technique of exterior walls of buildings
CN109138227A (en) * 2018-10-19 2019-01-04 青岛建集团有限公司 Without exterior sheathing exterior-wall heat insulation and structure-integrated pouring molding construction technology
CN109610830A (en) * 2018-12-28 2019-04-12 沈阳中辰钢结构工程有限公司 A kind of granular polystyrene, clay mixture construction technology
CN110424575A (en) * 2019-08-26 2019-11-08 中冶建工集团有限公司 Construction method for building exterior wall heat preserving integrated system
CN111255103A (en) * 2020-03-10 2020-06-09 冒鹏飞 Construction process for heat preservation treatment of energy-saving building wall

Also Published As

Publication number Publication date
CN103835505B (en) 2016-06-01

Similar Documents

Publication Publication Date Title
CN103835505A (en) Outer wall compound heat preservation board construction method
CN107100299B (en) Composite outer wall with disassembly-free formwork and construction method thereof
CN101725185B (en) Compound heat preservation die plate and concrete one-off construction outer wall heat preservation system and construction technology thereof
CN200968053Y (en) Reinforced concrete detaching-free formwork
CN201605796U (en) Composite insulation template and concrete one-step constructed external wall insulation system
CN1982554A (en) Thermal-insulating binded composite wall with supporter
RU109771U1 (en) PLATE FACING DECORATIVE WARMING
CN105484391A (en) Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks
CN104074305B (en) A kind of self-heat conserving decoration integrated Multi-function light concrete composite plates and curtain wall
WO2015120794A1 (en) Building component replacing plaster layer with prefabricated panel protection layer
CN112459291A (en) Prefabricated heat insulation structure integrated wall structure and construction process thereof
CN102505762A (en) Sand aerated concrete heat-insulation block outer wall outer heat-insulation system and construction method thereof
CN104695662A (en) Stone facing prefabricated external wall plate as well as production method and external wall system thereof
CN105735518A (en) Laminboard thermal-insulating wall component
CN112459307A (en) Construction method of prefabricated heat-preservation-structure integrated wall external formwork
RU121831U1 (en) BUILDING FRAME (OPTIONS)
RU165441U1 (en) BLOCK FORMWORK
CN104831857A (en) Prefabricated aerated concrete plate or block
CN107415044B (en) A kind of assembled non-bearing armored concrete-air entrained concrete assembled wall board
CN205502377U (en) Hanging wallboard is partly inlayed to unit -installment light
CN211973951U (en) Outer wall system
CN211774597U (en) Assembly structure of wallboard and girder steel
CN210767303U (en) External thermal insulation structure of prefabricated wallboard
CN112459288A (en) Heat insulation structure integrated system and construction process thereof
CN204139380U (en) Non-form removal lightweight inner partition wall plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160601