CN102071797A - Fiber-reinforced plaster-free dismantle-free integrated heat-preservation template and exterior wall heat-preservation construction process - Google Patents
Fiber-reinforced plaster-free dismantle-free integrated heat-preservation template and exterior wall heat-preservation construction process Download PDFInfo
- Publication number
- CN102071797A CN102071797A CN 201010614556 CN201010614556A CN102071797A CN 102071797 A CN102071797 A CN 102071797A CN 201010614556 CN201010614556 CN 201010614556 CN 201010614556 A CN201010614556 A CN 201010614556A CN 102071797 A CN102071797 A CN 102071797A
- Authority
- CN
- China
- Prior art keywords
- formwork
- fiber concrete
- fiber
- thermal insulation
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Building Environments (AREA)
Abstract
本发明涉及一种纤维增强免抹灰免拆一体化保温模板和外墙保温施工工艺,保温模板是在纤维混凝土板一侧表面上复合一层EPS集料层,工艺是在预建墙体的位置处的两侧,分别竖向固定纤维砼模板和纤维砼复合保温板,该纤维砼模板和纤维砼复合保温板之间通过对拉螺栓固定在一起。在纤维砼模板和纤维砼复合保温板之间设置钢筋并浇筑混凝土形成钢筋砼承重墙体。本发明的一体化永久性免拆保温模板,代替外墙模板、外保温层和抹灰层满足外墙保温和抹灰层平整度要求。本发明工艺不用拆模,保温隔热和防水性能好,减少墙体厚度,节省大量材料及人工,可以缩短工期,满足节能要求、永久性模板与基层的粘接力和面层平整度要求。适用于高层及小高层建筑,可改善居住环境,提高建筑功能质量,提高建筑开发效益,具有广泛的应用前景。
The invention relates to a fiber-reinforced plaster-free and demolition-free integrated thermal insulation formwork and an exterior wall thermal insulation construction process. The thermal insulation formwork is compounded with a layer of EPS aggregate layer on the surface of a fiber concrete slab, and the process is in the pre-built wall. On both sides of the position, the fiber concrete formwork and the fiber concrete composite insulation board are vertically fixed respectively, and the fiber concrete formwork and the fiber concrete composite insulation board are fixed together by pull bolts. A reinforcing bar is arranged between the fiber concrete formwork and the fiber concrete composite insulation board, and concrete is poured to form a reinforced concrete load-bearing wall. The integrated permanent dismantling-free thermal insulation formwork of the present invention replaces the external wall formwork, the external thermal insulation layer and the plastering layer to meet the requirements of the external wall thermal insulation and the smoothness of the plastering layer. The process of the invention does not need to remove the formwork, has good thermal insulation and waterproof performance, reduces the thickness of the wall, saves a lot of materials and labor, can shorten the construction period, and meets the requirements of energy saving, the adhesive force of the permanent formwork and the base layer, and the smoothness of the surface layer. It is suitable for high-rise and small high-rise buildings, which can improve the living environment, improve the quality of building functions, and improve the efficiency of building development, and has broad application prospects.
Description
技术领域technical field
本发明涉及一种建筑外墙保温施工方法,具体是涉及一种外墙保温施工工艺。The present invention relates to a construction method for building exterior wall insulation, in particular to an exterior wall insulation construction process.
背景技术Background technique
近年来,随着建筑外保温技术进步,以及施工技术的不断革新,免拆墙膜在国内外得到开发应用。国外开发了一种混凝土模板——聚苯乙烯免拆模板,用于浇筑墙体,已用于住宅建筑和商业建筑。这种模板支膜浇注混凝土后,模板不拆卸,而是作为建筑的保温构造。若再将墙体的内外装饰考虑进来,那么主体承重结构、保温结构和内外装饰可一次完成;其施工过程简化后、施工速度之快是非常明显的。但是,由于模板强度小、刚度小,所以该技术只能用于简易房屋或低层房屋墙体施工。In recent years, with the advancement of building external insulation technology and the continuous innovation of construction technology, demolition-free wall membranes have been developed and applied at home and abroad. A kind of concrete formwork - polystyrene free formwork has been developed abroad, which is used for pouring walls and has been used in residential buildings and commercial buildings. After the concrete is poured into the formwork, the formwork is not disassembled, but used as the thermal insulation structure of the building. If the internal and external decoration of the wall is taken into consideration, then the main load-bearing structure, thermal insulation structure and internal and external decoration can be completed at one time; the construction process is simplified and the construction speed is very fast. However, due to the small strength and low rigidity of the formwork, this technology can only be used in the wall construction of simple houses or low-rise houses.
发明内容Contents of the invention
为克服现有外墙保温技术的缺陷,本发明提供一种外墙保温施工工艺。In order to overcome the defects of the existing external wall thermal insulation technology, the invention provides an external wall thermal insulation construction process.
技术方案:一种纤维增强免抹灰免拆一体化保温模板,在纤维混凝土板一侧表面上复合一层EPS集料层。Technical solution: a fiber-reinforced plaster-free and demolition-free integrated thermal insulation formwork, which is compounded with a layer of EPS aggregate layer on one side of the fiber concrete slab.
纤维混凝土板的厚度为20mm,EPS集料层厚度为50mm。The thickness of the fiber concrete slab is 20mm, and the thickness of the EPS aggregate layer is 50mm.
一种外墙保温施工工艺,包括以下步骤:An exterior wall insulation construction process, comprising the following steps:
(1) 预制出纤维混凝土板;(1) Prefabricated fiber concrete slabs;
(2) 预制出在纤维砼一体化保温模板:a、在模具的底层首先制出纤维混凝土层,b、再在该模具纤维混凝土层上侧制出一层EPS集料层;(2) Prefabricate the fiber-concrete integrated thermal insulation formwork: a. Firstly make a fiber concrete layer on the bottom of the mold, b. Make a layer of EPS aggregate layer on the upper side of the mold fiber concrete layer;
(3) 在预建墙体的位置处的两侧,以墙体厚度为间隔距离,分别竖向固定纤维砼模板和纤维砼复合保温板,该纤维砼模板和纤维砼复合保温板之间通过对拉螺栓固定在一起;(3) On both sides of the pre-built wall, take the thickness of the wall as the distance, and fix the fiber concrete formwork and the fiber concrete composite insulation board vertically, and the fiber concrete formwork and the fiber concrete composite insulation board pass through The pull bolts are fixed together;
(4) 在纤维砼模板和纤维砼复合保温板之间设置钢筋并浇筑混凝土形成钢筋砼承重墙体。(4) Set reinforcement between the fiber concrete formwork and fiber concrete composite insulation board and pour concrete to form a reinforced concrete load-bearing wall.
利用碳纤维增强聚合物筋对拉螺栓对纤维混凝土板和一体化保温模板进行加固。 The fiber concrete slab and the integrated thermal insulation formwork are reinforced by using carbon fiber reinforced polymer bars to pull bolts.
所述EPS集料层是由工业废料EPS颗粒与胶结材料组成。 The EPS aggregate layer is composed of industrial waste EPS particles and cementing materials. the
本发明的有益效果:Beneficial effects of the present invention:
1、本发明提供一种兼有模板、保温和抹灰等功能的一体化永久性免拆保温模板,代替外墙模板、外保温层和抹灰层满足外墙保温和抹灰层平整度要求。1. The present invention provides an integrated permanent non-dismantling heat preservation formwork with the functions of formwork, heat preservation and plastering, which can replace the exterior wall formwork, exterior heat preservation layer and plastering layer to meet the requirements of exterior wall heat preservation and plastering layer flatness .
2、安装本发明工艺施工,系统不用拆模,保温隔热和防水性能好,减少墙体厚度。2. Install the process of the present invention for construction, the system does not need to remove the formwork, the thermal insulation and waterproof performance is good, and the thickness of the wall is reduced.
3、节省大量材料及人工,可以缩短工期。3. Save a lot of materials and labor, and shorten the construction period.
4、能实现保温层和结构同寿命,打破目前规范规定的保温设计寿命25年的限制。4. It can achieve the same service life of the insulation layer and the structure, breaking the 25-year limit of the insulation design life specified in the current code.
5、满足节能要求、永久性模板与基层的粘接力和面层平整度要求。5. Meet the requirements of energy saving, the adhesion between the permanent formwork and the base layer and the flatness of the surface layer.
6、本发明作为剪力墙体结构的外墙保温体系。这种结构体系适用于高层及小高层建筑,可改善居住环境,提高建筑功能质量,提高建筑开发效益,具有广泛的应用前景。6. The present invention is used as an external wall thermal insulation system for a shear wall structure. This structural system is suitable for high-rise and small high-rise buildings, can improve the living environment, improve the quality of building functions, and improve the efficiency of building development, and has broad application prospects.
附图说明Description of drawings
图1是本发明保温外墙结构示意图。Fig. 1 is a schematic diagram of the structure of the thermal insulation exterior wall of the present invention.
图中标号1为钢筋砼承重墙体,2为纤维混凝土板,3为EPS集料层(保温层),4为碳纤维增强聚合物筋对拉螺栓。The
具体实施方式 Detailed ways
实施例一:参见图1,一种纤维增强免抹灰免拆一体化保温模板,是在纤维混凝土板2一侧表面上复合一层EPS集料层3。Embodiment 1: Referring to FIG. 1 , a fiber-reinforced plaster-free and non-demolition-free integrated thermal insulation formwork is composed of a layer of
纤维混凝土板的厚度为18-22mm,EPS集料层厚度为47-52mm。The thickness of the fiber concrete slab is 18-22mm, and the thickness of the EPS aggregate layer is 47-52mm.
其中,纤维混凝土板的厚度为20mm,EPS集料层厚度为50mm。Among them, the thickness of the fiber concrete slab is 20mm, and the thickness of the EPS aggregate layer is 50mm.
实施例二:参见图1,一种外墙保温施工工艺,包括以下步骤:Embodiment 2: Referring to Fig. 1, a construction process for exterior wall insulation comprises the following steps:
(1) 预制出纤维混凝土板;(1) Prefabricated fiber concrete slabs;
(2) 预制出在纤维砼一体化保温模板:a、在模具的底层首先制出纤维混凝土层,b、再在该模具纤维混凝土层上侧制出一层EPS集料层;(2) Prefabricate the fiber-concrete integrated thermal insulation formwork: a. Firstly make a fiber concrete layer on the bottom of the mold, b. Make a layer of EPS aggregate layer on the upper side of the mold fiber concrete layer;
(3) 在预建墙体的位置处的两侧,以墙体厚度为间隔距离,分别竖向固定纤维砼模板和纤维砼复合保温板,该纤维砼模板和纤维砼复合保温板之间通过碳纤维增强聚合物筋对拉螺栓固定在一起。(3) On both sides of the pre-built wall, take the thickness of the wall as the distance, and fix the fiber concrete formwork and the fiber concrete composite insulation board vertically, and the fiber concrete formwork and the fiber concrete composite insulation board pass through Carbon fiber-reinforced polymer ribs hold the bolts together.
(4) 在纤维砼模板和纤维砼复合保温板之间设置钢筋并浇筑混凝土形成钢筋砼承重墙体。(4) Set reinforcement between the fiber concrete formwork and fiber concrete composite insulation board and pour concrete to form a reinforced concrete load-bearing wall.
本实施例中,一体化保温模板是采用工业废料EPS颗粒与胶结材料(水泥)和外加剂为原料,持力层为20mm纤维混凝土增强板,经过一定尺寸的模具将两层压制成保温模板。该保温模板主要有两种功能:混凝土浇筑期间作为墙体侧模;完成浇筑后作为墙体保温材料和抹灰层永久利用。In this embodiment, the integrated thermal insulation formwork is made of industrial waste EPS particles, cement material (cement) and admixture as raw materials, and the bearing layer is a 20mm fiber reinforced concrete reinforced board. The thermal insulation formwork has two main functions: it is used as a side form of the wall during concrete pouring; it is permanently used as a wall insulation material and a plastering layer after pouring.
一体化保温模板保温层厚度安装线性建筑节能标准进行设计。该一体化保温板在工厂加工制作,在现场进行安装。但不同于大模板的是,他是一种永久性模板,还可作为外墙保温层和抹灰层。The thickness of the insulation layer of the integrated thermal insulation formwork is designed according to the linear building energy-saving standard. The integrated insulation board is manufactured in the factory and installed on site. But different from the large formwork, it is a permanent formwork, which can also be used as an external wall insulation layer and plastering layer.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010614556 CN102071797A (en) | 2010-12-30 | 2010-12-30 | Fiber-reinforced plaster-free dismantle-free integrated heat-preservation template and exterior wall heat-preservation construction process |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201010614556 CN102071797A (en) | 2010-12-30 | 2010-12-30 | Fiber-reinforced plaster-free dismantle-free integrated heat-preservation template and exterior wall heat-preservation construction process |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN102071797A true CN102071797A (en) | 2011-05-25 |
Family
ID=44030537
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201010614556 Pending CN102071797A (en) | 2010-12-30 | 2010-12-30 | Fiber-reinforced plaster-free dismantle-free integrated heat-preservation template and exterior wall heat-preservation construction process |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN102071797A (en) |
Cited By (34)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102433987A (en) * | 2011-12-31 | 2012-05-02 | 江苏华伟佳建材科技有限公司 | Method for casting heat-preserving non-dismantling template in one body |
| CN102758527A (en) * | 2012-07-11 | 2012-10-31 | 江苏尼高科技有限公司 | Method for pouring heat-preservation outer wall by using fiber reinforced composite material heat-preservation boards |
| CN103276819A (en) * | 2013-05-13 | 2013-09-04 | 浙江宏成建设集团有限公司 | Inorganic glass bead thermal insulation mortar outer wall energy-saving thermal insulation construction method |
| CN103758256A (en) * | 2014-02-14 | 2014-04-30 | 吕国兵 | Decorative heat preservation composite wall and manufacturing method thereof |
| CN103835413A (en) * | 2014-03-21 | 2014-06-04 | 北京工业大学 | Foamed concrete bearing wall wrapped with wire mesh mortar boards and provided with line-shaped frame and construction method |
| CN103835401A (en) * | 2014-03-21 | 2014-06-04 | 北京工业大学 | Foamed concrete bearing wall wrapped with wire mesh mortar boards and provided with cross-shaped frame and construction method |
| CN103835414A (en) * | 2014-03-21 | 2014-06-04 | 北京工业大学 | Foamed concrete bearing wall wrapped with wire mesh mortar boards and provided with Z-shaped frame and construction method |
| CN103835403A (en) * | 2014-03-21 | 2014-06-04 | 北京工业大学 | Foamed concrete bearing wall wrapped with wire mesh mortar boards and provided with T-shaped frame and construction method |
| CN103835404A (en) * | 2014-03-21 | 2014-06-04 | 北京工业大学 | Foamed concrete bearing wall wrapped with wire mesh mortar boards and provided with L-shaped frame and construction method |
| CN103835505A (en) * | 2012-11-26 | 2014-06-04 | 中国建筑第七工程局有限公司 | Outer wall compound heat preservation board construction method |
| CN103883042A (en) * | 2014-03-21 | 2014-06-25 | 北京工业大学 | Externally-coated steel wire gauze mortar plate foamed concrete line-shaped energy-saving bearing wall and manufacturing method |
| CN104032883A (en) * | 2014-06-16 | 2014-09-10 | 上海住总工程材料有限公司 | Painting-free thermal insulating wall body and manufacturing method thereof |
| CN104264873A (en) * | 2014-09-15 | 2015-01-07 | 马义和 | Construction method for three-dimensionally printing inside and outside decorating insulation structure walls of art buildings |
| CN104278773A (en) * | 2014-10-29 | 2015-01-14 | 成都绿建科技有限公司 | Heat-preservation structurally integrated wall and manufacture process thereof |
| CN104328845A (en) * | 2014-11-14 | 2015-02-04 | 中国建筑第八工程局有限公司 | Connection method and connection structure of 3D printed reinforced masonry shear walls |
| CN104328877A (en) * | 2014-09-15 | 2015-02-04 | 马义和 | Construction method of 3D (Three-Dimensional) printing dry method-constructed inner and outer decorative heat-preservation structure |
| CN104775554A (en) * | 2015-04-26 | 2015-07-15 | 山东科技大学 | Die plate dismantling-free cast-in-place concrete partition wall and construction method thereof |
| CN105019582A (en) * | 2015-08-04 | 2015-11-04 | 万保金 | Disassembly-free prefabricated concrete thermal-insulation wall formwork |
| CN106436964A (en) * | 2016-11-07 | 2017-02-22 | 朱凤起 | External wall structure |
| CN107100299A (en) * | 2017-06-19 | 2017-08-29 | 麦高德(吉林)工业化建筑技术有限公司 | A kind of non-dismantling formwork composite exterior wall and its method of construction |
| CN107130712A (en) * | 2017-05-31 | 2017-09-05 | 中国十九冶集团有限公司 | Light steel structure house wall |
| CN107780569A (en) * | 2017-09-20 | 2018-03-09 | 中国十七冶集团有限公司 | A kind of construction method of the basement shear wall non-dismantling formwork based on BIM |
| CN108166756A (en) * | 2017-11-28 | 2018-06-15 | 孔金河 | FRP tendons pulling plug component and its application in concrete-pouring template system |
| CN108442585A (en) * | 2018-06-01 | 2018-08-24 | 安徽建工集团有限公司 | One kind exempting from form removal external thermal insulation quake-proof integral shear wall |
| CN108571104A (en) * | 2018-05-03 | 2018-09-25 | 李娟� | A kind of cement formwork free of demolition and the wall moulding process using the masterplate |
| CN109930715A (en) * | 2019-04-04 | 2019-06-25 | 赵双永 | The construction method of plastering exterior wall insulation construction is exempted from a kind of integration |
| CN110700481A (en) * | 2019-11-07 | 2020-01-17 | 中国电建集团贵阳勘测设计研究院有限公司 | Template-free plastering-free structural heat-insulation decorative composite integrated board and processing technology thereof |
| CN111502049A (en) * | 2020-05-07 | 2020-08-07 | 上海圣奎塑业有限公司 | Heat-insulating construction method for special-shaped building |
| CN111622392A (en) * | 2020-07-04 | 2020-09-04 | 河北晶达建筑科技股份有限公司 | Composite heat-insulating wall based on prefabricated external formwork and construction method |
| CN111946053A (en) * | 2019-05-16 | 2020-11-17 | 上海圣奎塑业有限公司 | Prefabricated assembled disassembly-free heat preservation device and disassembly-free heat preservation system comprising same |
| CN113482202A (en) * | 2021-07-08 | 2021-10-08 | 王鹏 | Integrated structure of external template of basement and construction process thereof |
| CN114482304A (en) * | 2022-01-17 | 2022-05-13 | 中建八局第二建设有限公司 | Construction method of composite insulation board of building |
| CN115405041A (en) * | 2022-10-14 | 2022-11-29 | 日照宝岚新材料科技有限公司 | High-strength autoclaved aerated concrete plate |
| CN116905675A (en) * | 2023-08-02 | 2023-10-20 | 江苏淮洋建筑材料有限公司 | Partially prefabricated middle-arranged heat preservation structure |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11303384A (en) * | 1998-04-21 | 1999-11-02 | Haiesuto Home:Kk | Concrete form and work execution method thereof |
| CN200975041Y (en) * | 2006-10-20 | 2007-11-14 | 北京市丰台区榆树庄构件厂 | Concrete form panel precast concrete exterior wall decoration heat preservation formwork |
| CN101319546A (en) * | 2008-07-16 | 2008-12-10 | 中国建筑第六工程局有限公司 | A kind of external wall insulation board and its construction method |
| CN101614073A (en) * | 2009-06-17 | 2009-12-30 | 崔景新 | Non-dismantling self-heat-insulation building template |
| CN101725185A (en) * | 2009-10-30 | 2010-06-09 | 王新强 | Compound heat preservation die plate and concrete one-off construction outer wall heat preservation system and construction technology thereof |
-
2010
- 2010-12-30 CN CN 201010614556 patent/CN102071797A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11303384A (en) * | 1998-04-21 | 1999-11-02 | Haiesuto Home:Kk | Concrete form and work execution method thereof |
| CN200975041Y (en) * | 2006-10-20 | 2007-11-14 | 北京市丰台区榆树庄构件厂 | Concrete form panel precast concrete exterior wall decoration heat preservation formwork |
| CN101319546A (en) * | 2008-07-16 | 2008-12-10 | 中国建筑第六工程局有限公司 | A kind of external wall insulation board and its construction method |
| CN101614073A (en) * | 2009-06-17 | 2009-12-30 | 崔景新 | Non-dismantling self-heat-insulation building template |
| CN101725185A (en) * | 2009-10-30 | 2010-06-09 | 王新强 | Compound heat preservation die plate and concrete one-off construction outer wall heat preservation system and construction technology thereof |
Cited By (42)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102433987A (en) * | 2011-12-31 | 2012-05-02 | 江苏华伟佳建材科技有限公司 | Method for casting heat-preserving non-dismantling template in one body |
| CN102758527A (en) * | 2012-07-11 | 2012-10-31 | 江苏尼高科技有限公司 | Method for pouring heat-preservation outer wall by using fiber reinforced composite material heat-preservation boards |
| CN103835505A (en) * | 2012-11-26 | 2014-06-04 | 中国建筑第七工程局有限公司 | Outer wall compound heat preservation board construction method |
| CN103835505B (en) * | 2012-11-26 | 2016-06-01 | 中国建筑第七工程局有限公司 | Compound heat-insulation board of outer wall constructional method |
| CN103276819A (en) * | 2013-05-13 | 2013-09-04 | 浙江宏成建设集团有限公司 | Inorganic glass bead thermal insulation mortar outer wall energy-saving thermal insulation construction method |
| CN103758256A (en) * | 2014-02-14 | 2014-04-30 | 吕国兵 | Decorative heat preservation composite wall and manufacturing method thereof |
| CN103835413B (en) * | 2014-03-21 | 2016-11-09 | 北京工业大学 | Covered with Angles silk screen Mortar Plates in-line frame foamed concrete bearing wall and the practice |
| CN103835401A (en) * | 2014-03-21 | 2014-06-04 | 北京工业大学 | Foamed concrete bearing wall wrapped with wire mesh mortar boards and provided with cross-shaped frame and construction method |
| CN103835404A (en) * | 2014-03-21 | 2014-06-04 | 北京工业大学 | Foamed concrete bearing wall wrapped with wire mesh mortar boards and provided with L-shaped frame and construction method |
| CN103835414A (en) * | 2014-03-21 | 2014-06-04 | 北京工业大学 | Foamed concrete bearing wall wrapped with wire mesh mortar boards and provided with Z-shaped frame and construction method |
| CN103883042A (en) * | 2014-03-21 | 2014-06-25 | 北京工业大学 | Externally-coated steel wire gauze mortar plate foamed concrete line-shaped energy-saving bearing wall and manufacturing method |
| CN103835403A (en) * | 2014-03-21 | 2014-06-04 | 北京工业大学 | Foamed concrete bearing wall wrapped with wire mesh mortar boards and provided with T-shaped frame and construction method |
| CN103835413A (en) * | 2014-03-21 | 2014-06-04 | 北京工业大学 | Foamed concrete bearing wall wrapped with wire mesh mortar boards and provided with line-shaped frame and construction method |
| CN103835401B (en) * | 2014-03-21 | 2016-11-02 | 北京工业大学 | Covered with Angles silk screen Mortar Plates cross-frame foamed concrete bearing wall and the practice |
| CN104032883A (en) * | 2014-06-16 | 2014-09-10 | 上海住总工程材料有限公司 | Painting-free thermal insulating wall body and manufacturing method thereof |
| CN104328877A (en) * | 2014-09-15 | 2015-02-04 | 马义和 | Construction method of 3D (Three-Dimensional) printing dry method-constructed inner and outer decorative heat-preservation structure |
| CN104264873A (en) * | 2014-09-15 | 2015-01-07 | 马义和 | Construction method for three-dimensionally printing inside and outside decorating insulation structure walls of art buildings |
| CN104278773A (en) * | 2014-10-29 | 2015-01-14 | 成都绿建科技有限公司 | Heat-preservation structurally integrated wall and manufacture process thereof |
| CN104328845A (en) * | 2014-11-14 | 2015-02-04 | 中国建筑第八工程局有限公司 | Connection method and connection structure of 3D printed reinforced masonry shear walls |
| CN104328845B (en) * | 2014-11-14 | 2017-03-15 | 中国建筑第八工程局有限公司 | Connection method and connection structure of 3D printed reinforced masonry shear walls |
| CN104775554A (en) * | 2015-04-26 | 2015-07-15 | 山东科技大学 | Die plate dismantling-free cast-in-place concrete partition wall and construction method thereof |
| CN105019582A (en) * | 2015-08-04 | 2015-11-04 | 万保金 | Disassembly-free prefabricated concrete thermal-insulation wall formwork |
| CN106436964A (en) * | 2016-11-07 | 2017-02-22 | 朱凤起 | External wall structure |
| CN106436964B (en) * | 2016-11-07 | 2019-06-21 | 朱凤起 | an exterior wall structure |
| CN107130712A (en) * | 2017-05-31 | 2017-09-05 | 中国十九冶集团有限公司 | Light steel structure house wall |
| CN107100299A (en) * | 2017-06-19 | 2017-08-29 | 麦高德(吉林)工业化建筑技术有限公司 | A kind of non-dismantling formwork composite exterior wall and its method of construction |
| CN107100299B (en) * | 2017-06-19 | 2023-05-05 | 麦高德(吉林)工业化建筑技术有限公司 | Composite outer wall with disassembly-free formwork and construction method thereof |
| CN107780569A (en) * | 2017-09-20 | 2018-03-09 | 中国十七冶集团有限公司 | A kind of construction method of the basement shear wall non-dismantling formwork based on BIM |
| CN108166756A (en) * | 2017-11-28 | 2018-06-15 | 孔金河 | FRP tendons pulling plug component and its application in concrete-pouring template system |
| CN108571104A (en) * | 2018-05-03 | 2018-09-25 | 李娟� | A kind of cement formwork free of demolition and the wall moulding process using the masterplate |
| CN108442585A (en) * | 2018-06-01 | 2018-08-24 | 安徽建工集团有限公司 | One kind exempting from form removal external thermal insulation quake-proof integral shear wall |
| CN108442585B (en) * | 2018-06-01 | 2024-05-10 | 安徽建工集团股份有限公司 | Outer heat preservation antidetonation integrated shear force wall of form removal exempts from |
| CN109930715A (en) * | 2019-04-04 | 2019-06-25 | 赵双永 | The construction method of plastering exterior wall insulation construction is exempted from a kind of integration |
| CN111946053A (en) * | 2019-05-16 | 2020-11-17 | 上海圣奎塑业有限公司 | Prefabricated assembled disassembly-free heat preservation device and disassembly-free heat preservation system comprising same |
| CN110700481A (en) * | 2019-11-07 | 2020-01-17 | 中国电建集团贵阳勘测设计研究院有限公司 | Template-free plastering-free structural heat-insulation decorative composite integrated board and processing technology thereof |
| CN111502049A (en) * | 2020-05-07 | 2020-08-07 | 上海圣奎塑业有限公司 | Heat-insulating construction method for special-shaped building |
| CN111622392A (en) * | 2020-07-04 | 2020-09-04 | 河北晶达建筑科技股份有限公司 | Composite heat-insulating wall based on prefabricated external formwork and construction method |
| CN113482202A (en) * | 2021-07-08 | 2021-10-08 | 王鹏 | Integrated structure of external template of basement and construction process thereof |
| CN114482304A (en) * | 2022-01-17 | 2022-05-13 | 中建八局第二建设有限公司 | Construction method of composite insulation board of building |
| CN115405041A (en) * | 2022-10-14 | 2022-11-29 | 日照宝岚新材料科技有限公司 | High-strength autoclaved aerated concrete plate |
| CN115405041B (en) * | 2022-10-14 | 2023-12-19 | 日照宝岚新材料科技有限公司 | High-strength autoclaved sand aerated concrete plate |
| CN116905675A (en) * | 2023-08-02 | 2023-10-20 | 江苏淮洋建筑材料有限公司 | Partially prefabricated middle-arranged heat preservation structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103114663B (en) | Assemble type multifunctional outer wall body and production and installation method thereof | |
| CN104453093B (en) | Prefabricated steel reinforced concrete beam with transversal high-strength concrete clapboard, and construction method | |
| WO2007134517A1 (en) | Composite concrete shear wall for heat insulation | |
| CN104674987A (en) | Self-heat-preservation superposed shear wall structure and construction process | |
| CN105587073B (en) | The preparation method of lightweight Self-insulating composite wallboard | |
| CN205046685U (en) | External heated board of prefabricated masonry wall | |
| CN102425265B (en) | Composite wallboard manufacturing and installation methods | |
| CN106760101A (en) | A kind of prefabricated superimposed sheet | |
| CN103132633A (en) | Permanent shuttering cast-in-place extra light concrete self-insulation composite wall body and construction technology | |
| CN104594556A (en) | Prefabricated type steel reinforced concrete beam with transverse steel partition boards and construction method | |
| CN103306501B (en) | Energy-saving domestic architecture with cast-in-place industrial gypsum bearing wall and manufacturing method thereof | |
| WO2015120794A1 (en) | Building component replacing plaster layer with prefabricated panel protection layer | |
| CN108343193A (en) | A kind of light prefabricated assembling type outer wall plate and preparation method thereof | |
| CN103835505A (en) | Outer wall compound heat preservation board construction method | |
| CN205242731U (en) | Modular fire prevention heat preservation cast in situ concrete -in -place mould | |
| CN211690939U (en) | Double-sided superposed sandwich heat-insulation shear wall using heat-insulation concrete | |
| CN113668730A (en) | An assembled mixed recycled aggregate concrete composite wallboard and preparation method thereof | |
| CN204356996U (en) | The U-shaped beam of prefabricated reinforced concrete with horizontal steel diaphragm | |
| CN104863277A (en) | Composite insulation board and production method thereof | |
| CN206360172U (en) | A kind of assembled subtracts vermex concrete laminated floor slab | |
| CN201206293Y (en) | Wide span pre-stress hollow superimposed sheet | |
| CN203066294U (en) | Assembled multifunctional outer wall body | |
| CN201411775Y (en) | An energy-saving building structure system suitable for industrial production | |
| CN207672830U (en) | A concrete floor slab with foam concrete | |
| CN204456534U (en) | Self-insulation superimposed shear wall structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20110525 |