CN103669867B - Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform and installation method - Google Patents

Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform and installation method Download PDF

Info

Publication number
CN103669867B
CN103669867B CN201310724991.3A CN201310724991A CN103669867B CN 103669867 B CN103669867 B CN 103669867B CN 201310724991 A CN201310724991 A CN 201310724991A CN 103669867 B CN103669867 B CN 103669867B
Authority
CN
China
Prior art keywords
platform
column
building
main
stock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310724991.3A
Other languages
Chinese (zh)
Other versions
CN103669867A (en
Inventor
王乔
钟士宪
李恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Construction Engineering Quality Inspection And Testing Center Co ltd
Shandong Provincial Academy of Building Research
Original Assignee
Shandong Provincial Academy of Building Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Provincial Academy of Building Research filed Critical Shandong Provincial Academy of Building Research
Priority to CN201310724991.3A priority Critical patent/CN103669867B/en
Publication of CN103669867A publication Critical patent/CN103669867A/en
Application granted granted Critical
Publication of CN103669867B publication Critical patent/CN103669867B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明提供了一种建筑主体和外装饰施工用高差可调双层操作平台及安装方法。一种建筑主体和外装饰施工用高差可调双层操作平台,包括采用附墙架与建筑物连接固定的立柱、能够沿立柱上下移动的套架、连接在套架上的主平台和通过带有高度调节装置的连接吊杆悬挂在主平台下方的副平台。一种高差可调双层操作平台的安装方法,包括以下步骤:安装立柱;安装套架;安装主副操作台;安装完毕即可投入使用,套架带动主平台及副平台上下运行。

The invention provides a two-layer operating platform with adjustable height difference for building main body and exterior decoration construction and an installation method. A double-layer operating platform with adjustable height difference for building main body and exterior decoration construction, including a column fixed to the building with a wall frame, a sleeve frame that can move up and down along the column, a main platform connected to the sleeve frame and through A connecting boom with a height adjustment device is suspended from the sub-platform below the main platform. A method for installing a height-difference-adjustable double-layer operating platform includes the following steps: installing a column; installing a sleeve; installing a main and auxiliary operating platform;

Description

建筑主体和外装饰施工用高差可调双层操作平台及安装方法Height-difference-adjustable double-layer operating platform for building main body and exterior decoration construction and installation method

技术领域 technical field

本发明涉及一种建筑施工用操作平台,具体涉及一种建筑主体和外装饰施工用高差可调双层操作平台及安装方法。 The invention relates to an operating platform for building construction, in particular to a double-layer operating platform with adjustable height difference for building main body and exterior decoration construction and an installation method.

背景技术 Background technique

建筑施工分为主体施工和内外装饰施工两个阶段,目前国内建筑施工过程中供施工人员操作用的设施较为落后。在主体施工阶段,多层和低层建筑普遍采用落地式脚手架,高层建筑一般采用悬挑式脚手架。附着升降脚手架由于搭设复杂,只在50米以上高层建筑施工中部分采用,且由于升降动作操作复杂、不能分段升降等原因,不能应用于建筑外装饰施工过程。主体施工封顶后,需要将上述脚手架拆除,再采用高处作业吊篮进行建筑外装饰施工。因此,目前国内尚没有一种既能适合主体施工、又能同时应用于建筑外装饰施工的安全可靠的作业设施或设备。施工过程需要安装使用两种不同的作业设施,造成了人力、时间的浪费和使用成本的增加。 Building construction is divided into two stages: main body construction and interior and exterior decoration construction. At present, the facilities for construction personnel to operate in the domestic construction process are relatively backward. In the main construction stage, floor-to-ceiling scaffolding is generally used for multi-storey and low-rise buildings, and cantilevered scaffolding is generally used for high-rise buildings. Attached lifting scaffolding is only partially used in the construction of high-rise buildings above 50 meters due to its complicated erection, and it cannot be applied to the construction process of building exterior decoration due to the complicated lifting operation and the inability to lift in sections. After the main body construction is capped, the above-mentioned scaffolding needs to be dismantled, and then the hanging basket for high-altitude operation is used for building exterior decoration construction. Therefore, there is still no safe and reliable operating facility or equipment that can be suitable for main body construction and can be applied to building exterior decoration construction at present in China. The construction process requires the installation and use of two different operating facilities, resulting in a waste of manpower and time and an increase in use costs.

北京星河人施工技术有限责任公司从西班牙引进了电动施工升降平台,同时提供一人或多人在其上工作。如图1所示:平台结构采用单层平台,施工人员只能在建筑物的一个层面操作;如图2所示:连接操作平台沿立柱运行的套架采用6个滚轮只与立柱的2个主肢接触、立柱传力点少、刚度差,导致最上一个附着点以上的悬臂高度受到限制;另外,平台距离建筑物距离较大,需要加装扩展平台才能满足施工要求,导致平台自重加大;如图3所示:悬臂高度刚超过建筑物的2个层高。一般操作平台附墙架的间距为2个层高,在建筑主体施工时、特别是混凝土主体结构,需要一定的时间养护。如果操作平台悬臂高度刚超过建筑物的2个层高,就无法在没有达到养护周期的主体结构上安装附墙架,所以此类电动施工升降平台不能适应主体施工阶段的要求,目前只能用于建筑外装饰施工。同时由于造价高,单独在建筑外装饰阶段使用从经济性上无法与高处作业吊篮竞争,目前在工程中很少使用。 Beijing Xingheren Construction Technology Co., Ltd. introduced the electric construction lifting platform from Spain, and provides one or more people to work on it at the same time. As shown in Figure 1: the platform structure adopts a single-layer platform, and construction personnel can only operate on one level of the building; as shown in Figure 2: the sleeve frame connecting the operation platform and running along the column uses 6 rollers and only 2 of the column The contact of the main limbs, the lack of force transmission points of the column, and the poor rigidity lead to the limitation of the cantilever height above the last attachment point; in addition, the distance between the platform and the building is relatively large, and it is necessary to install an extended platform to meet the construction requirements, resulting in an increase in the platform's own weight; As shown in Figure 3: the cantilever height is just over 2 stories high of the building. Generally, the distance between the operation platform and the wall frame is 2 storeys high. During the construction of the main body of the building, especially the main structure of the concrete, it needs a certain amount of time for maintenance. If the cantilever height of the operating platform just exceeds the height of two floors of the building, it is impossible to install a wall frame on the main structure that has not reached the maintenance period. Therefore, this type of electric construction lifting platform cannot meet the requirements of the main construction stage. At present, it can only be used Decorate construction outside the building. At the same time, due to the high cost, it is economically unable to compete with the hanging basket for high-altitude operations when used alone in the building exterior decoration stage, so it is rarely used in projects at present.

发明内容 Contents of the invention

为了克服上述技术不足,本发明提供了一种建筑主体和外装饰施工用高差可调双层操作平台及安装方法。 In order to overcome the above-mentioned technical deficiencies, the present invention provides a two-layer operating platform with adjustable height difference for building main body and exterior decoration construction and an installation method.

本发明采用以下措施来实现的: The present invention adopts following measures to realize:

一种建筑主体和外装饰施工用高差可调双层操作平台,包括采用附墙架与建筑物连接固定的立柱、能够沿立柱上下移动的套架、连接在套架上的主平台和通过带有高度调节装置的连接吊杆悬挂在主平台下方的副平台。 A double-layer operating platform with adjustable height difference for building main body and exterior decoration construction, including a column fixed to the building with a wall frame, a sleeve frame that can move up and down along the column, a main platform connected to the sleeve frame and through A connecting boom with a height adjustment device is suspended from the sub-platform below the main platform.

上述操作平台中优选方案,套架四面包箍在立柱上,套架靠近建筑物的一面设有开口,套架上下两端均采用多个滚轮与立柱的4根主肢接触。 In the preferred solution of the above-mentioned operating platform, the four sides of the sleeve frame are hooped on the column, and the side of the sleeve frame close to the building is provided with openings. The upper and lower ends of the sleeve frame are in contact with the four main legs of the column with multiple rollers.

上述操作平台中优选方案,套架上连接平台及布置滚轮的位置上设置有U形加强圈梁。 In the preferred solution of the above-mentioned operating platform, a U-shaped reinforcing ring beam is arranged on the position where the connecting platform and the rollers are arranged on the sleeve frame.

上述操作平台中优选方案,上述操作平台中优选方案,套架上下两端面四角位置均采用2个滚轮与立柱的主肢接触。 In the preferred solution of the above-mentioned operating platform, in the preferred solution of the above-mentioned operating platform, two rollers are used to contact the main limbs of the column at the four corners of the upper and lower ends of the sleeve frame.

上述操作平台中优选方案,高度调节装置为多个套装在一起的管件结构。 In the preferred solution of the above-mentioned operation platform, the height adjustment device is a plurality of pipe fittings nested together.

一种所述建筑主体和外装饰施工用高差可调双层操作平台的安装方法,包括以下步骤: A method for installing a height-difference-adjustable double-layer operating platform for the building main body and exterior decoration construction, comprising the following steps:

1)安装立柱:根据使用高度,采用附墙架将立柱与建筑物连接固定; 1) Install the column: according to the height of use, use the attached wall frame to connect the column with the building;

2)安装套架:将套架采用滚轮与立柱的4个主肢接触; 2) Install the sleeve frame: use rollers to contact the sleeve frame with the four main limbs of the column;

3)安装主副操作台:在立柱上安装主平台,在连接吊杆上设有高度调节装置,根据建筑物的层高,在副平台安装前调整主平台和副平台的间距,通过连接吊杆将副平台悬挂在主平台下; 3) Install the main and auxiliary operating platforms: install the main platform on the column, and install a height adjustment device on the connecting boom. According to the height of the building, adjust the distance between the main platform and the auxiliary platform before installing the auxiliary platform. Rods suspend the secondary platform under the main platform;

4)安装完毕即可投入使用,套架带动主平台及副平台上下运行。 4) After installation, it can be put into use, and the set frame drives the main platform and the auxiliary platform to run up and down.

本发明主要有以下特点: The present invention mainly has following characteristics:

1) 既适合建筑主体施工、又能同时应用于外装饰施工的操作; 1) It is not only suitable for the construction of the main body of the building, but also can be applied to the operation of exterior decoration construction at the same time;

2) 主平台及设置在主平台下方的副平台,适应于施工人员同时在上下两层施工作业面操作; 2) The main platform and the auxiliary platform set under the main platform are suitable for construction personnel to operate on the upper and lower construction work surfaces at the same time;

3) 采用在主平台悬挂一层副平台的结构,受力更合理、结构更轻巧,同时使安全监控系统更为简洁可靠; 3) The structure of a sub-platform suspended on the main platform is adopted, the force is more reasonable, the structure is lighter, and the safety monitoring system is more concise and reliable;

4)主平台及副平台的高度差可以根据不同楼层间距进行调整; 4) The height difference between the main platform and the auxiliary platform can be adjusted according to different floor spacings;

5)套架与立柱包箍在一起,且设有开口,能够避免与附墙架干涉,且使操作平台更接近建筑物,便于施工,不必加装扩展平台。 5) The bracket and the column are hooped together, and there are openings, which can avoid interference with the wall bracket, and make the operating platform closer to the building, which is convenient for construction, and there is no need to install an extension platform.

附图说明 Description of drawings

图1为单层操作平台示意图。 Figure 1 is a schematic diagram of a single-layer operating platform.

图2为单层操作平台套架与立柱主肢接触结构示意图。 Figure 2 is a schematic diagram of the contact structure between the single-layer operating platform sleeve frame and the main leg of the column.

图3为单层操作平台最上一个附着点以上的悬臂高度示意图。 Fig. 3 is a schematic diagram of the height of the cantilever above the uppermost attachment point of the single-layer operation platform.

图4为双层操作平台套架与立柱主肢接触结构示意图。 Fig. 4 is a schematic diagram of the contact structure between the double-layer operation platform sleeve frame and the main leg of the column.

图5为双层操作平台最上一个附着点以上的悬臂高度示意图。 Fig. 5 is a schematic diagram of the height of the cantilever above the uppermost attachment point of the double-layer operation platform.

图6为本发明选定实施例结构示意图。 Fig. 6 is a structural schematic diagram of a selected embodiment of the present invention.

图7为高度调节装置示意图。 Figure 7 is a schematic diagram of the height adjustment device.

图中,1-立柱、2-套架、3-主平台,4-附墙架、5-建筑物、6-副平台、7-高度调节装置、8-加强圈梁,9-滚轮。 Among the figure, 1-column, 2-cover frame, 3-main platform, 4-attached wall frame, 5-building, 6-secondary platform, 7-height adjustment device, 8-reinforcing ring beam, 9-roller.

具体实施方式:detailed description:

下面结合附图和具体实施方式对本发明做进一步的说明。 The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

参考附图5及附图6,一种建筑主体和外装饰施工用高差可调双层操作平台,包括采用附墙架4与建筑物5连接固定的立柱1、能够沿立柱1上下移动的套架2、连接在套架2上的主平台3和通过带有高度调节装置7的连接吊杆悬挂在主平台3下方的副平台6。 Referring to accompanying drawings 5 and 6, a double-layer operating platform with adjustable height difference for building main body and exterior decoration construction includes a column 1 that is connected and fixed with a building 5 by a wall frame 4 , and a platform that can move up and down along the column 1. Cover frame 2, the main platform 3 connected on the cover frame 2 and the sub-platform 6 suspended below the main platform 3 through the connecting boom with height adjustment device 7.

参考附图4,套架2四面包箍在立柱1上,套架2靠近建筑物5的一面设有开口,套架2上下两端均采用多个滚轮9与立柱1的4根主肢接触,相当于提高了立柱1的刚度,大幅增加了立柱1在附墙架4以上的悬臂高度、可以超过3个建筑物层高、保证主体施工过程中2个层高的附墙架间距,使操作平台更靠近建筑物、便于施工,不必加装扩展平台。为了保证开口部分刚度,套架2上连接主平台3及布置滚轮9的位置上设置有U形加强圈梁8。实际中套架2上下两端面四角位置均采用2个滚轮9与立柱1的主肢接触。 With reference to accompanying drawing 4, cover frame 2 is bounded on four sides on column 1, and the side of cover frame 2 near building 5 is provided with opening, and cover frame 2 all adopts a plurality of rollers 9 to contact with 4 main limbs of column 1 at both upper and lower ends. , which is equivalent to improving the rigidity of the column 1, greatly increasing the cantilever height of the column 1 above the wall frame 4, which can exceed 3 building storey heights, and ensuring the distance between the wall frames of 2 storey heights during the construction of the main body, so that The operation platform is closer to the building, which is convenient for construction, and there is no need to install an expansion platform. In order to ensure the rigidity of the opening part, a U-shaped reinforcing ring beam 8 is arranged on the position where the sleeve frame 2 is connected to the main platform 3 and where the rollers 9 are arranged. In practice, two rollers 9 are used to contact the main limbs of the column 1 at the four corners of the upper and lower ends of the cover frame 2 .

参考附图7,高度调节装置7为多个套装在一起的管件结构。 Referring to accompanying drawing 7, the height adjustment device 7 is a plurality of tube structures that are nested together.

一种建筑主体和外装饰施工用高差可调双层操作平台的安装方法,其特征在于包括以下步骤: A method for installing a height-difference-adjustable double-layer operating platform for building main body and exterior decoration construction, which is characterized in that it includes the following steps:

1)安装立柱1:根据使用高度,采用附墙架4将立柱1与建筑物5连接固定; 1) Install the column 1: according to the height of use, use the attached wall frame 4 to connect and fix the column 1 with the building 5;

2)安装套架2:将套架2采用滚轮9与立柱1的4个主肢接触; 2) Install the sleeve frame 2: use the roller 9 to contact the sleeve frame 2 with the four main limbs of the column 1;

3)安装主副操作台:在立柱1上安装主平台3,在连接吊杆上设有高度调节装置7,根据建筑物5的层高,在副平台6安装前调整主平台3和副平台6的间距,通过连接吊杆将副平台6悬挂在主平台3下; 3) Install the main and auxiliary operating platforms: install the main platform 3 on the column 1, and install a height adjustment device 7 on the connecting boom. According to the floor height of the building 5, adjust the main platform 3 and the auxiliary platform before installing the auxiliary platform 6 6, the auxiliary platform 6 is suspended under the main platform 3 by connecting the boom;

4)安装完毕即可投入使用,套架2带动主平台3及副平台6上下运行。 4) It can be put into use after installation, and the sleeve frame 2 drives the main platform 3 and the auxiliary platform 6 to run up and down.

以上仅描述了本发明的基本原理和优选实施方式,本领域人员可以根据上述描述作出许多变化和改进,这些变化和改进应该属于本发明的保护范围。 The above only describes the basic principle and preferred implementation of the present invention, and those skilled in the art can make many changes and improvements according to the above description, and these changes and improvements should belong to the protection scope of the present invention.

Claims (4)

1. a building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform, it is characterized in that: include using wall-attached frame to be connected fixing column with building, the stock that can move up and down along column, the main platform that is connected on stock and be suspended on the auxiliary platform below main platform by the suspension rod that connects with arrangement for adjusting height, column cantilever height more than wall-attached frame is more than 3 building storey heights, stock four sides shroud ring is on column, stock is provided with opening near the one side of building, the upper and lower two ends of stock all use multiple roller to contact with the 4 of column main limbs, connect main platform on stock and arrange that being provided with U-shaped on the position of roller strengthens collar tie beam.
Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform the most according to claim 1, it is characterised in that: stock upper and lower both ends of the surface corner location all uses 2 rollers to contact with the main limb of column.
Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform the most according to claim 1, it is characterised in that: arrangement for adjusting height is multiple fitting structures being set in together.
4. building body described in a claim 1 and the outer decoration construction installation method of discrepancy in elevation adjustable double-layer operating platform, it is characterised in that comprise the following steps:
1) column is installed: according to using height, uses wall-attached frame to be connected with building by column fixing;
2) stock is installed: stock uses roller contact with the 4 of column main limbs;
3) major-minor operating board is installed: main platform is installed on stock, is provided with arrangement for adjusting height connecting on suspension rod, according to the floor height of building, before auxiliary platform is installed, adjust main platform and the spacing of auxiliary platform, by connecting suspension rod, auxiliary platform is suspended under main platform;
4) installing and can come into operation, stock drives main platform and auxiliary platform to run up and down.
CN201310724991.3A 2013-12-25 2013-12-25 Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform and installation method Expired - Fee Related CN103669867B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310724991.3A CN103669867B (en) 2013-12-25 2013-12-25 Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310724991.3A CN103669867B (en) 2013-12-25 2013-12-25 Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform and installation method

Publications (2)

Publication Number Publication Date
CN103669867A CN103669867A (en) 2014-03-26
CN103669867B true CN103669867B (en) 2016-09-28

Family

ID=50308576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310724991.3A Expired - Fee Related CN103669867B (en) 2013-12-25 2013-12-25 Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform and installation method

Country Status (1)

Country Link
CN (1) CN103669867B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883113B (en) * 2014-03-27 2016-01-06 王乔 CONSTRUCTION OPERATIONS platform static determinacy combined system and reconstruction of existing building construction method
CN103979383B (en) * 2014-04-29 2016-03-16 山东腾飞建设机械工程有限公司 Building operation multiple layer up-down plateform system
CN114080923A (en) * 2021-11-12 2022-02-25 长江勘测规划设计研究有限责任公司 Depend on showy afforestation equipment of aquatic building

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1285450A (en) * 1999-08-23 2001-02-28 弗拉科产品制造有限公司 Scaffold
CN201268937Y (en) * 2008-09-05 2009-07-08 高智鹏 Double-layer hanging cradle for working aloft
CN101586392A (en) * 2009-04-13 2009-11-25 许树根 Mast climbing type aerial working platform

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4293054A (en) * 1980-05-19 1981-10-06 Piat Impalcature Automatiche S.P.A. Scaffolding for supporting lifting working bridges and platforms
US8167089B2 (en) * 2008-01-15 2012-05-01 Bennu Parts And Service, Inc. Liftable scaffold
CN203640291U (en) * 2013-12-25 2014-06-11 山东省建筑科学研究院 Height-difference adjustable double-layer operating platform for construction of building body and external ornaments

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1285450A (en) * 1999-08-23 2001-02-28 弗拉科产品制造有限公司 Scaffold
CN201268937Y (en) * 2008-09-05 2009-07-08 高智鹏 Double-layer hanging cradle for working aloft
CN101586392A (en) * 2009-04-13 2009-11-25 许树根 Mast climbing type aerial working platform

Also Published As

Publication number Publication date
CN103669867A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN103979383B (en) Building operation multiple layer up-down plateform system
CN103758341B (en) Steel column drum rack support type hydraulic lifting overall steel platform cross truss layer construction method
CN205077885U (en) Hydraulic intelligent climbing protection platform for core tube of building
CN103206074B (en) Elevator shaft template construction method, platform and support
CN106437130A (en) Inner roof external climbing type formwork construction platform for super high-rise building construction
CN103603504B (en) The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction
CN103741947B (en) Tube-frame-supporting type hydraulic climbing integral steel platform formwork truss layer construction method
CN205476563U (en) Elevartor shaft design operation platform
CN104310165A (en) Guide rail type adhesion construction lifter and construction method thereof
CN106121255A (en) Apparatus installed by a kind of Super High glass curtain wall
CN103669867B (en) Building body and outer decoration construction discrepancy in elevation adjustable double-layer operating platform and installation method
CN104929353A (en) Detachable stepwise automatic climbing operating platform for elevator shafts
CN106400691A (en) Integrated construction process for anti-collision wall formwork
WO2023240812A1 (en) Overall construction platform structure and method for adding core tube wall body in air
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN110565937A (en) Door type integral lifting steel platform
CN115538792B (en) Building construction method and building construction structure by using residential building machine
CN203640291U (en) Height-difference adjustable double-layer operating platform for construction of building body and external ornaments
CN205654127U (en) Portable operation protective platform of assembly type structure stairwell
CN103375022B (en) Multi-functional dynamic rail attached lifting scaffold
CN203947755U (en) A kind of large Steel Cantilever trussed construction high-altitude construction first floor steel truss erecting device
CN105776092A (en) Stretching type basket device and construction method thereof
CN214995818U (en) Climbing type construction operation platform outside building
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork
CN202441045U (en) Rail-type electric attached lifting scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20140326

Assignee: SHANDONG TENGFEI CONSTRUCTION MECHANICAL ENGINEERING CO.,LTD.

Assignor: SHANDONG PROVINCIAL ACADEMY OF BUILDING RESEARCH

Contract record no.: 2017370000072

Denomination of invention: Altitude difference adjustable double-layer operating platform used for building body and outer decoration construction and installing method

Granted publication date: 20160928

License type: Common License

Record date: 20171106

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200820

Address after: 250031 Shandong Province Flyover District of Ji'nan City Road 29.

Co-patentee after: Shandong construction engineering quality inspection and Testing Center Co.,Ltd.

Patentee after: Shandong Academy of Building Science Co.,Ltd.

Address before: 250031 Shandong Province Flyover District of Ji'nan City Road 29.

Patentee before: SHANDONG PROVINCIAL ACADEMY OF BUILDING RESEARCH

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20211225