CN205476563U - Elevartor shaft design operation platform - Google Patents

Elevartor shaft design operation platform Download PDF

Info

Publication number
CN205476563U
CN205476563U CN201620144806.2U CN201620144806U CN205476563U CN 205476563 U CN205476563 U CN 205476563U CN 201620144806 U CN201620144806 U CN 201620144806U CN 205476563 U CN205476563 U CN 205476563U
Authority
CN
China
Prior art keywords
platform
fixed
elevator
mounting plate
sleeve pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620144806.2U
Other languages
Chinese (zh)
Inventor
王再
强振兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201620144806.2U priority Critical patent/CN205476563U/en
Application granted granted Critical
Publication of CN205476563U publication Critical patent/CN205476563U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses an elevartor shaft design operation platform belongs to elevartor shaft entrance to a cave safety protection technical field, including the upper mounting plate with be fixed in the support support body of upper mounting plate lower part, the upper mounting plate includes that rectangle platform frame lays in the platform checkered steel plate of rectangle platform frame upper surface with fixed, the top left and right sides of rectangle platform frame is fixed with rings respectively, the lateral part of rectangle platform frame is equipped with respectively all around and is used for the tight elevartor shaft lateral wall in top, prevents that the top that the platform rocked from tightly installing, supporting the support body and putting up including bearing diagonal pole and vertical supporting rod including the triangular supports frame that is fixed in the platform frame bottom parallel symmetrical arrangement in the left and right sides, triangular supports, vertical supporting rod's bottom and bearing diagonal pole fixed connection are equipped with the connecting rod between the bearing diagonal pole of the left and right sides, and the bottom of bearing diagonal pole is equipped with prevents moving the fender foot. The utility model discloses can recycle along with the floor rising to it is safe in utilization, convenient, reliable and stable, effectively reduce the construction cost.

Description

Elevator shaping operation platform
Technical field
This utility model relates to elevator hole technical field of safety protection.
Background technology
In daily construction, the protection of elevator vertical opening is to use steel pipe to set up support system, re-lays springboard on steel pipe.The protection of following one layer is dismantled when protecting at hole, upper strata, then set up protective frame, the most time-consuming take a lot of work but also unstable, be unfavorable for safety operation requirement.
Therefore, how to provide one safely, conveniently, stable, it is possible to rise with floor and recycle, effectively reduce the elevator shaping operation platform of construction cost, be that those skilled in the art need badly and solve the technical problem that.
Utility model content
The technical problems to be solved in the utility model, is to provide a kind of elevator shaping operation platform, and it can rise recycling with floor, and uses safely, conveniently, reliable and stable, effectively reduces construction cost.
For solving above-mentioned technical problem, technical solution adopted in the utility model is:
Elevator shaping operation platform, including upper mounting plate and the supporting frame being fixed on upper mounting plate bottom, described upper mounting plate includes rectangular platform framework and the fixing platform checkered steel plate being layed in rectangular platform frame upper surface, the left and right sides, top of described rectangular platform framework is respectively fixed with suspension ring, and the sidepiece surrounding of rectangular platform framework is respectively provided with the holding device holding out against elevator sidewall, preventing platform from rocking;That support frame as described above body includes being fixed on the left and right sides bottom platform framework and that Parallel Symmetric is arranged triangular support bracket, described triangular support bracket includes inclined support bar and vertical supporting bar, the bottom of described vertical supporting bar is fixing with inclined support bar to be connected, being provided with connecting rod between the inclined support bar of the described left and right sides, the bottom of inclined support bar is provided with anti-moving gear foot.
As preferably, described holding device includes sleeve pipe and is inserted into inside pipe casing the push rod coordinated with shell clearance, described sleeve pipe is fixed on the middle part of each side of rectangular platform framework, described push rod stretches out and is provided with the slide block that can limit push rod relative to cannula slide, described slide block and push rod interference fit with the outboard beam of sleeve pipe.
As preferably, the bottom of described rectangular platform framework is further fixed on reinforcement, described inclined support bar and vertical supporting bar and is all connected by reinforcement and rectangular platform framework are fixing.
As preferably, described rectangular platform framework, connecting rod, inclined support bar and vertical supporting bar all use I-steel to prepare.
As preferably, described suspension ring use round steel to bend and form.
As preferably, described anti-moving gear foot uses angle steel to prepare.
Use produced by technique scheme and have the beneficial effects that: the protection of following a layer is dismantled when prior art is protected at hole, upper strata, then set up protective frame, the most time-consuming take a lot of work but also unstable, be unfavorable for safety operation requirement.This programme is against on the elevator inwall at elevator door opening position by using supporting frame, supporting frame top is fixed for staff and stands the upper mounting plate of work, and the sidepiece at platform arranges holding device, withstand on elevator sidewall, prevent rocking of whole upper mounting plate.This device can rise recycling with floor, and uses safely, conveniently, more reliable and more stable, effectively reduces construction cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of one embodiment of this utility model;
Fig. 2 is the top view of upper mounting plate of the present utility model;
Each figure number is entitled: 1 platform checkered steel plate;2 rectangular platform frameworks;3 holding devices;301 sleeves;302 push rods;303 slide blocks;4 connecting rods;5 inclined support bars;6 suspension ring;7 vertical supportings;8 anti-moving gear feet;9 reinforcements.
Detailed description of the invention
Below in conjunction with the accompanying drawings and this utility model is described in further detail by an embodiment.
This utility model includes upper mounting plate and is fixed on the supporting frame of upper mounting plate bottom, described upper mounting plate includes rectangular platform framework 2 and the fixing platform checkered steel plate 1 being layed in platform framework 2 upper surface, the left and right sides, top of described rectangular platform framework 2 is respectively fixed with suspension ring 6, and the sidepiece surrounding of rectangular platform framework 2 is respectively provided with the holding device 3 holding out against elevator sidewall, preventing platform from rocking;That support frame as described above body includes being fixed on the left and right sides bottom platform framework 2 and that Parallel Symmetric is arranged triangular support bracket, described triangular support bracket includes inclined support bar 5 and vertical supporting bar 7, the bottom of described vertical supporting bar 7 is fixing with inclined support bar 5 to be connected, being provided with connecting rod 4 between the inclined support bar 5 of the described left and right sides, the bottom of inclined support bar 5 is provided with anti-moving gear foot 8.
Further, described holding device 3 includes sleeve pipe 301 and is inserted into sleeve pipe 301 inside the push rod 302 with sleeve pipe 301 matched in clearance, described sleeve pipe 301 is fixed on the middle part of each side of rectangular platform framework 2, described push rod 302 stretches out to be provided with the outboard beam of sleeve pipe 301 and can limit the slide block 303 that push rod 302 slides relative to sleeve pipe 301, described slide block 303 and push rod 302 interference fit.
Further, the bottom of described rectangular platform framework 2 is further fixed on reinforcement 9, and described inclined support bar 5 and vertical supporting bar 7 are all connected by reinforcement 9 is fixing with rectangular platform framework 2.
Further, described rectangular platform framework 2, connecting rod 4, inclined support bar 5 and vertical supporting bar 7 all use I-steel to prepare.
Further, described suspension ring 6 use round steel to bend to form.
Further, described anti-moving gear foot 8 uses angle steel to prepare.
Concrete installation process of the present utility model is: first, utilize the hanging devices such as crane that this utility model winches to construction part, hoisting wirerope is fixed on suspension ring 6, this device is winched in elevator, the anti-moving gear foot 8 utilizing the bottom of inclined support bar 5 is against on the floor at lower floor's elevator door opening position, then, the push rod 302 of recycling holding device 3 is against on the inwall of elevator, by beaing the position of mobile slide block 303, control push rod 302 and stretch out the length of sleeve pipe 301, regulate push rod 302 and the contact relation of elevator inwall or contact force size, ensure stablizing of upper mounting plate, prevent upper mounting plate from rocking, after platform fixes, it is laid on fixing for platform checkered steel plate 1 on rectangular platform framework 2, this utility model installation.
The beneficial effects of the utility model are: it is against on the elevator inwall at elevator door opening position by using supporting frame, supporting frame top is fixed for staff and stands the upper mounting plate of work, and the sidepiece at platform arranges holding device, withstood on elevator sidewall by the push rod of holding device, prevent rocking of whole upper mounting plate.This device can rise recycling with floor, and uses safely, conveniently, more reliable and more stable, effectively reduces construction cost.
Principle of the present utility model and embodiment are set forth by specific case used herein, and the explanation of above example is only intended to help to understand method of the present utility model and core concept thereof.Should be understood that; for those skilled in the art; on the premise of without departing from this utility model principle, it is also possible to this utility model is carried out some improvement and modification, these improve and modification also falls in this utility model scope of the claims.

Claims (6)

1. elevator shaping operation platform, it is characterized in that: include upper mounting plate and be fixed on the supporting frame of upper mounting plate bottom, described upper mounting plate includes rectangular platform framework (2) and the fixing platform checkered steel plate (1) being layed in rectangular platform framework (2) upper surface, the left and right sides, top of described rectangular platform framework (2) is respectively fixed with suspension ring (6), and the sidepiece surrounding of rectangular platform framework (2) is respectively provided with the holding device (3) holding out against elevator sidewall, preventing platform from rocking;Support frame as described above body includes that be fixed on the left and right sides, platform framework (2) bottom and that Parallel Symmetric is arranged triangular support bracket, described triangular support bracket includes inclined support bar (5) and vertical supporting bar (7), the bottom of described vertical supporting bar (7) is fixing with inclined support bar (5) to be connected, being provided with connecting rod (4) between the inclined support bar (5) of the described left and right sides, the bottom of inclined support bar (5) is provided with anti-moving gear foot (8).
Elevator shaping operation platform the most according to claim 1, it is characterized in that: described holding device (3) includes sleeve pipe (301) and is inserted into sleeve pipe (301) inside the push rod (302) with sleeve pipe (301) matched in clearance, described sleeve pipe (301) is fixed on the middle part of each side of rectangular platform framework (2), described push rod (302) stretches out to be provided with the outboard beam of sleeve pipe (301) and can limit the slide block (303) that push rod (302) slides relative to sleeve pipe (301), described slide block (303) and push rod (302) interference fit.
Elevator shaping operation platform the most according to claim 1, it is characterized in that: the bottom of described rectangular platform framework (2) is further fixed on reinforcement (9), described inclined support bar (5) and vertical supporting bar (7) and is all connected by reinforcement (9) and rectangular platform framework (2) are fixing.
Elevator shaping operation platform the most according to claim 1, it is characterised in that: described rectangular platform framework (2), connecting rod (4), inclined support bar (5) and vertical supporting bar (7) all use I-steel to prepare.
Elevator shaping operation platform the most according to claim 1, it is characterised in that: described suspension ring (6) use round steel to bend and form.
Elevator shaping operation platform the most according to claim 1, it is characterised in that: described anti-moving gear foot (8) uses angle steel to prepare.
CN201620144806.2U 2016-02-26 2016-02-26 Elevartor shaft design operation platform Expired - Fee Related CN205476563U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620144806.2U CN205476563U (en) 2016-02-26 2016-02-26 Elevartor shaft design operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620144806.2U CN205476563U (en) 2016-02-26 2016-02-26 Elevartor shaft design operation platform

Publications (1)

Publication Number Publication Date
CN205476563U true CN205476563U (en) 2016-08-17

Family

ID=56679165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620144806.2U Expired - Fee Related CN205476563U (en) 2016-02-26 2016-02-26 Elevartor shaft design operation platform

Country Status (1)

Country Link
CN (1) CN205476563U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277970A (en) * 2018-02-01 2018-07-13 温州市腾圣建设有限公司 Elevator civil construction mobile platform
CN108756197A (en) * 2018-06-26 2018-11-06 中冶建工集团有限公司 A kind of construction method of hoistway operation platform
CN108756198A (en) * 2018-06-26 2018-11-06 中冶建工集团有限公司 A kind of hoistway operation platform
CN109027557A (en) * 2018-08-31 2018-12-18 中国化学工程第三建设有限公司 For the mounting platform at the top of air cooler
CN111456401A (en) * 2020-03-24 2020-07-28 中国五冶集团有限公司 Elevator shaft construction operation platform
CN112343324A (en) * 2020-11-14 2021-02-09 王焕发 Elevator shaft lifting type operating platform
CN113818678A (en) * 2021-10-13 2021-12-21 广东蕉岭建筑工程集团有限公司 Movable construction platform in elevator shaft

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277970A (en) * 2018-02-01 2018-07-13 温州市腾圣建设有限公司 Elevator civil construction mobile platform
CN108756197A (en) * 2018-06-26 2018-11-06 中冶建工集团有限公司 A kind of construction method of hoistway operation platform
CN108756198A (en) * 2018-06-26 2018-11-06 中冶建工集团有限公司 A kind of hoistway operation platform
CN108756198B (en) * 2018-06-26 2020-06-02 中冶建工集团有限公司 Elevator shaft operating platform
CN109027557A (en) * 2018-08-31 2018-12-18 中国化学工程第三建设有限公司 For the mounting platform at the top of air cooler
CN111456401A (en) * 2020-03-24 2020-07-28 中国五冶集团有限公司 Elevator shaft construction operation platform
CN112343324A (en) * 2020-11-14 2021-02-09 王焕发 Elevator shaft lifting type operating platform
CN112343324B (en) * 2020-11-14 2022-01-21 山东泉顺达装配式智慧电梯科技有限公司 Elevator shaft lifting type operating platform
CN113818678A (en) * 2021-10-13 2021-12-21 广东蕉岭建筑工程集团有限公司 Movable construction platform in elevator shaft

Similar Documents

Publication Publication Date Title
CN205476563U (en) Elevartor shaft design operation platform
CN101672011B (en) Steel tube arch rib vertical lifting method
CN104310165A (en) Guide rail type adhesion construction lifter and construction method thereof
CN204163115U (en) Template construction device is hung in a kind of ater-casting
CN202248941U (en) Integral lifting, positioning and mounting device for large-scale steel members
GB201209006D0 (en) High rise building elevation concept
CN203855895U (en) Mobile jib operation platform for constructing and overhauling bridges
CN104420640B (en) Abnormity chimney construction platform
CN104527923B (en) Cabin entering mounting method used for main push motor and adopting auxiliary mounting bracket
CN104120701B (en) A kind of construction method of vertical ship lift great good lifting and device
CN201401005Y (en) Template sliding and lifting device
CN203113793U (en) Large formwork installation system of oblique structure
CN202689496U (en) Moving platform for steel pipe concrete post concrete casing
CN209038882U (en) A kind of moveable suspended bracket for lifting pipeline in piping lane
CN201972095U (en) Chain block lifting platform for thin-walled hollow piers of bridges
CN203394032U (en) Inside-cylinder climb-type operation frame
CN205740123U (en) Sound barrier panel hoisting machine under high-voltage fence
CN205529928U (en) Operation platform is removed in installation of bridge cable duct
CN204038917U (en) Dismountable external hanging service platform
CN204475350U (en) Bored pile construction system under high-voltage line
CN204326559U (en) A kind of solar building building site protective guard
CN103708374B (en) The installation method of RH finery hydraulic jacking equipment
CN204199691U (en) A kind of handrail formwork for placing structure of spiral stairs
CN202969944U (en) Concrete pouring blanking appliance
CN205638500U (en) Large -scale steel shotcrete of variant formula installation movable trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20180226