Multi-functional dynamic rail attached lifting scaffold
Technical field
The present invention relates to a kind of attached lifting scaffold, particularly relate to a kind of multi-functional dynamic rail adhering lifting
Scaffold.
Background technology
At present, in building field, along with the Large scale construction of skyscraper, attached lifting scaffold because of
Its adapt to high-building construction require more prominent feature and significant economic benefit and by vast unit in charge of construction
Favored.So-called attached lifting scaffold is i.e. attached in engineering structure by attachment supporting arrangement, relies on
The scaffold that the lowering or hoisting gear of self successively climbs with building structure or declines.Attachment supporting arrangement is the most logical
Cross bolt to be arranged in building structure, the various load of the frame structure of scaffold be transferred to building structure,
Scaffold is stepped up, until dismantling after engineering along with the carrying out of construction speed.But, existing
Attached lifting scaffold in, attachment supporting arrangement be all to be bolted in building structure, often
It is required for being individually moved its position after secondary lifting to retighten the most again, just can promote, execute to scene
Work brings a lot of inconvenience.
Summary of the invention
It is an object of the invention to provide a kind of multi-functional dynamic rail attached lifting scaffold, it is possible to convenient construction
Unit site operation, improves the work efficiency of unit in charge of construction.
For achieving the above object, the invention provides a kind of multi-functional dynamic rail attached lifting scaffold, bag
Including scaffold main body, electric block, guide rail and attached wall seat, described guide rail is fixed on by described attached wall seat
On body of wall, described scaffold main body is connected with described guide rail by guider, and described electric block is fixed
In the lifting beam of described scaffold main body, main chain and first hoisting rope of described electric block are connected,
The other end of described first hoisting rope is led described in being fixed on after the assembly pulley of described scaffold bottom part body
On rail, secondary chain and second hoisting rope of described electric block are connected, another of described second hoisting rope
End is fixed on described guide rail.
Preferably, the secondary chain of described electric block is fixed on the lifting beam or described of described scaffold main body
In scaffold main body.
Preferably, described assembly pulley is fixed on the described hard-wired pulley guide seat of scaffold bottom part body,
Described assembly pulley includes the first pulley and the second pulley, and described first pulley is parallel with described second pulley to be set
Put.
Preferably, described second hoisting rope is connected with described guide rail by the 3rd pulley and the 4th pulley.
Preferably, described hoisting rope is steel wire rope.
Preferably, described attached wall seat is provided with relief arrangement.
Therefore, the present invention uses the multi-functional dynamic rail attached lifting scaffold of said structure, it is possible to convenient
Unit in charge of construction's site operation, improves the work efficiency of unit in charge of construction.
Below by drawings and Examples, technical scheme is described in further detail.
Accompanying drawing explanation
Fig. 1 is the structural representation of the multi-functional dynamic rail attached lifting scaffold embodiment of the present invention;
Fig. 2 is the lifting status architecture signal of the multi-functional dynamic rail attached lifting scaffold embodiment of the present invention
Figure.
Detailed description of the invention
Embodiment
Fig. 1 is the structural representation of the multi-functional dynamic rail attached lifting scaffold embodiment of the present invention, i.e. originally
Embodiment is in structural representation when not promoting state, as it is shown in figure 1, include scaffold main body 1,
Electric block 2, guide rail 3 and attached wall seat 4, guide rail 3 is fixed on body of wall 5 by attached wall seat 4, attached wall
Seat 4 is provided with relief arrangement 6, and attached wall seat 4 is connected by relief arrangement 6 is fixing with body of wall 5.Foot hands
Frame body 1 is connected with guide rail 3 by guider 7, and the number of guider 7 needs according to practice of construction
It was determined that the present embodiment is not specifically limited.Electric block 2 is fixed on the lifting beam of scaffold main body 1
On 8, the main chain 9 of electric block 2 is connected with the first hoisting rope 10, the first hoisting rope 10 another
One end is fixed on guides 3 after the assembly pulley bottom scaffold main body 1, the secondary chain of electric block 2
Bar 11 is connected with the second hoisting rope 12, and the other end of the second hoisting rope 12 is fixing on guides 3.This
In embodiment, hoisting rope is steel wire rope.Assembly pulley is fixed on hard-wired pulley bottom scaffold main body 1
On guide bracket 13, assembly pulley includes the first pulley 14 and the second pulley 15, and the first pulley 14 and second is sliding
Wheel 15 be arranged in parallel, and the first pulley 14 is positioned at below electric block 2, and the second pulley 15 is positioned at attached wall seat
Below 4, the present embodiment completes the first hoisting rope direction of improvement by the first pulley 14 and the second pulley 15
Conversion.Need scaffold main body 1 is promoted after unit in charge of construction completes the construction of part floor
Time, after relief arrangement 6 and body of wall 5 being dismantled, start electric block 2, the main chain of electric block 2
Bar 9 is connected with the first hoisting rope 10, and lifting force will be promoted with the first hoisting rope 10 by pulley guide seat 13
Power is delivered on guide rail 3, and guide rail 3 is fixed on body of wall 5 by attached wall seat 4, therefore scaffold main body
1 is elevated along guide rail 3 under the effect of lifting force and guider 7, the pulley on pulley guide seat 13
Group i.e. the first pulley 14 and the second pulley 15 serves as the effect of movable pulley.Elevated in scaffold main body 1
Time, the main chain 9 of electric block 2 tightens up, and promotes, and secondary chain 11 is carried due to oneself height
Rise, therefore carry out nature and put chain, after scaffold main body 1 promotes and puts in place, by relief arrangement 6 by attached
Wall base 4 separates with body of wall 5, and secondary chain 11 carries out receiving chain, under the effect of the second hoisting rope 12 pulling force,
Guide rail 3 and attached wall seat 4 are also raised to position, and in the process, the main chain 9 of electric block 2 is in
Naturally putting chain state, Fig. 2 is the lifting shape of the multi-functional dynamic rail attached lifting scaffold embodiment of the present invention
State structural representation.Owing to the present embodiment being connected fixing to guide rail and body of wall, and by the first hoisting rope with
Second hoisting rope is connected with guide rail so that unit in charge of construction needs again to foot after completing the construction of this section of floor
The when that hand cradle main body 1 promoting, only need to be again started up electric block can realize to scaffold main body,
Guide rail and the lifting of attached wall guide bracket, it is not necessary to the most individually change the position of attached wall guide bracket, facilitate unit in charge of construction
Site operation, improves the work efficiency of unit in charge of construction.
In the present embodiment, the secondary chain of electric block 2 is fixed on lifting beam 8 or the foot hands of scaffold main body 1
Position on frame body 1, the second hoisting rope 12 is by the 3rd pulley 16 and the 4th pulley 17 and guide rail
3 are connected, and complete turning to of the second hoisting rope by the 3rd pulley 16 and the 4th pulley 17, and to
Two hoisting ropes play the effect that alignment, school are tight, and the 3rd pulley 16 and the 4th pulley 17 are fixed on scaffold
In main body 1.
In the present embodiment, the first hoisting rope 10 and the second hoisting rope 12 all select steel wire rope.
Therefore, the present invention uses the multi-functional dynamic rail attached lifting scaffold of said structure, it is possible to convenient
Unit in charge of construction's site operation, improves the work efficiency of unit in charge of construction.
It is last it is noted that it is only entered by above example in order to technical scheme to be described
Row limits, although the present invention being described in detail with reference to preferred embodiment, and the common skill of this area
Art personnel it is understood that technical scheme still can be modified or equivalent by it,
And these amendments or equivalent also can not make amended technical scheme depart from technical solution of the present invention
Spirit and scope.