CN103603502A - 基于大型场馆框架连续梁的高空球型网架拼接方法 - Google Patents

基于大型场馆框架连续梁的高空球型网架拼接方法 Download PDF

Info

Publication number
CN103603502A
CN103603502A CN201310497523.7A CN201310497523A CN103603502A CN 103603502 A CN103603502 A CN 103603502A CN 201310497523 A CN201310497523 A CN 201310497523A CN 103603502 A CN103603502 A CN 103603502A
Authority
CN
China
Prior art keywords
ball type
type network
network frame
altitude
continuous beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310497523.7A
Other languages
English (en)
Inventor
崔健
成永旭
陈福平
贾金现
余永拴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201310497523.7A priority Critical patent/CN103603502A/zh
Publication of CN103603502A publication Critical patent/CN103603502A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明涉及一种基于大型场馆框架连续梁的高空球型网架拼接方法,其步骤如下:⑴、在大型场馆框架连续梁的两端的下方分别搭建左安装平台以及右安装平台;⑵、在大型场馆框架连续梁上安装滑道,在滑道的两端分别滑动安装网架移动小车;⑶、将高空球型网架等分成N段,计算得出长度L米;⑷、拼装L米高空球型网架搭设在网架移动小车上;⑸、利用牵引设备将牵引网架移动小车使L米高空球型网架相对分别前移L米,如此反复将整个高空球型网架拼接组装成整体,拼接完毕。本发明的网架安装法可缩短工期,滑移系统加工制作简单,滑移操作速度快,占用场地空间小,降低了工人劳动强度,缩短了施工工期。

Description

基于大型场馆框架连续梁的高空球型网架拼接方法
技术领域
本发明属于球型网架施工领域,尤其是一种基于大型场馆框架连续梁的高空球型网架拼接方法。
背景技术
在屋面网架施工领域,采用吊车吊装球型网架安装的方法非常普遍。吊装过程中,网架下部建筑会受吊装影响需置后施工,这样工期相应就会拉长;还有常见的滑移施工方法,是采用在地面铺设固定轨道进行,需占用较大的场地,且会影响网架下部工程的同步施工。
发明内容
本发明的目的在于克服工期要求紧的前提下交叉作业的衔接困难,提供一种加快整体施工速度的高空球型网架拼接方法,安装简单,能够方便快速的将屋面网架在混凝土连续梁上从两端向中间进行滑移,加快了施工进度同时不影响网架以下其他结构的施工,形成了一个空间立体交叉作业。
本发明解决其技术问题是通过以下技术方案实现的:
一种基于大型场馆框架连续梁的高空球型网架拼接方法,其步骤如下:
⑴、在大型场馆框架连续梁的两端的下方分别搭建左安装平台以及右安装平台;
⑵、在大型场馆框架连续梁上安装滑道,在滑道的两端分别滑动安装网架移动小车;
⑶、将高空球型网架等分成N段,根据每段高空球型网架的强度和挠度计算得出每段高空球型网架的长度L米,4≤N≤20,1≤L≤50;
⑷、分别在左安装平台以及右安装平台上拼装L米高空球型网架,再分别将L米高空球型网架搭设在网架移动小车上;
⑸、利用牵引设备将牵引网架移动小车使L米高空球型网架相对分别前移L米,然后在分别在左安装平台以及右安装平台上拼装下一个L米高空球型网架并通过网架移动小车相对前移L米,如此反复将整个高空球型网架拼接组装成整体,通过千斤顶顶升整个高空球型网架撤出网架移动小车并使整个高空球型网架安装就位,整个高空球型网架拼接完毕。
上述的每段高空球型网架下方安装两个网架移动小车,该两个网架移动小车之间固装加固角钢。
在上述的大型场馆框架连续梁上面弹出网架滑移轨道纠偏轴线。
在上述的网架移动小车两侧的大型场馆框架连续梁上分别固装限侧滑角钢。
本发明的优点和有益效果为:
1、本基于大型场馆框架连续梁的高空球型网架拼接方法利用框架上部自身结构,采用网架移动小车等滑移系统装置进行高空滑移,减少了施工场地的占用,同时能够形成立体交叉作业,可以使网架以下内部建筑工程能够同步进行,缩短了工程的整体工期。在工期要求紧、施工场地狭小的前提下,使用该安装方法会更经济实用。
2、本基于大型场馆框架连续梁的高空球型网架拼接方法可以有效加快整体施工速度,安装简单,能够方便快速的将屋面网架在混凝土连续梁上滑移从两端向中间进行,加快了施工进度同时不影响网架以下其他结构的施工,形成了一个空间立体交叉作业。
3、本发明中每段高空球型网架下方安装两个网架移动小车,该两个网架移动小车之间固装加固角钢避免滑移过程中杆件受力变形错位。
4、本发明的网架安装法可缩短工期,滑移系统加工制作简单,滑移操作速度快,占用场地空间小,降低了工人劳动强度,缩短了施工工期。
附图说明
图1为本发明的大型场馆框架连续梁与各安装平台之间的安装示意图;
图2为本发明的大型场馆框架连续梁与网架移动小车局部示意图;
图3为图2的俯视图。
具体实施方式
下面通过具体实施例对本发明作进一步详述,以下实施例只是描述性的,不是限定性的,不能以此限定本发明的保护范围。
一种基于大型场馆框架连续梁的高空球型网架拼接方法,其步骤如下:
⑴、在大型场馆框架连续梁3的两端的下方分别搭建左安装平台1以及右安装平台4;
⑵、在大型场馆框架连续梁上安装滑道7,在滑道的两端分别滑动安装网架移动小车5;在大型场馆框架连续梁上面弹出网架滑移轨道纠偏轴线8;在网架移动小车两侧的大型场馆框架连续梁上分别固装限侧滑角钢6;
⑶、将高空球型网架2等分成N段,根据每段高空球型网架的强度和挠度计算得出每段高空球型网架的长度L米,4≤N≤20,1≤L≤50;
⑷、分别在左安装平台以及右安装平台上拼装L米高空球型网架,再分别将L米高空球型网架搭设在网架移动小车上;每段高空球型网架下方安装两个网架移动小车,该两个网架移动小车之间固装加固角钢;
⑸、利用牵引设备将牵引网架移动小车使L米高空球型网架相对分别前移L米,牵引设备采用相应吨位的手拉葫芦,然后在分别在左安装平台以及右安装平台上拼装下一个L米高空球型网架并通过网架移动小车相对前移L米,如此反复将整个高空球型网架拼接组装成整体,通过千斤顶顶升整个高空球型网架撤出网架移动小车并使整个高空球型网架安装就位,整个高空球型网架拼接完毕。

Claims (4)

1.一种基于大型场馆框架连续梁的高空球型网架拼接方法,其特征在于:该拼接方法的步骤如下:
⑴、在大型场馆框架连续梁的两端的下方分别搭建左安装平台以及右安装平台;
⑵、在大型场馆框架连续梁上安装滑道,在滑道的两端分别滑动安装网架移动小车;
⑶、将高空球型网架等分成N段,根据每段高空球型网架的强度和挠度计算得出每段高空球型网架的长度L米,4≤N≤20,1≤L≤50;
⑷、分别在左安装平台以及右安装平台上拼装L米高空球型网架,再分别将L米高空球型网架搭设在网架移动小车上;
⑸、利用牵引设备将牵引网架移动小车使L米高空球型网架相对分别前移L米,然后在分别在左安装平台以及右安装平台上拼装下一个L米高空球型网架并通过网架移动小车相对前移L米,如此反复将整个高空球型网架拼接组装成整体,通过千斤顶顶升整个高空球型网架撤出网架移动小车并使整个高空球型网架安装就位,整个高空球型网架拼接完毕。
2.根据权利要求1所述的基于大型场馆框架连续梁的高空球型网架拼接方法,其特征在于:所述的每段高空球型网架下方安装两个网架移动小车,该两个网架移动小车之间固装加固角钢。
3.根据权利要求1所述的基于大型场馆框架连续梁的高空球型网架拼接方法,其特征在于:在所述的大型场馆框架连续梁上面弹出网架滑移轨道纠偏轴线。
4.根据权利要求1所述的基于大型场馆框架连续梁的高空球型网架拼接方法,其特征在于:在所述的网架移动小车两侧的大型场馆框架连续梁上分别固装限侧滑角钢。
CN201310497523.7A 2013-10-21 2013-10-21 基于大型场馆框架连续梁的高空球型网架拼接方法 Pending CN103603502A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310497523.7A CN103603502A (zh) 2013-10-21 2013-10-21 基于大型场馆框架连续梁的高空球型网架拼接方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310497523.7A CN103603502A (zh) 2013-10-21 2013-10-21 基于大型场馆框架连续梁的高空球型网架拼接方法

Publications (1)

Publication Number Publication Date
CN103603502A true CN103603502A (zh) 2014-02-26

Family

ID=50121757

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310497523.7A Pending CN103603502A (zh) 2013-10-21 2013-10-21 基于大型场馆框架连续梁的高空球型网架拼接方法

Country Status (1)

Country Link
CN (1) CN103603502A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971289A (zh) * 2016-05-04 2016-09-28 中国建筑第八工程局有限公司 一种大跨度曲面网壳的高空曲线滑移施工方法
CN106049681A (zh) * 2016-07-30 2016-10-26 北京城建集团有限责任公司 大跨度蝶型空间弯扭管桁架及其施工方法
CN110158975A (zh) * 2019-06-17 2019-08-23 王建广 一种用于网架空间结构安装的平台滑移施工工艺
CN112576045A (zh) * 2020-11-30 2021-03-30 中国五冶集团有限公司 一种钢结构网架分步滑移安装方法
CN112609912A (zh) * 2020-12-10 2021-04-06 中铁五局集团建筑工程有限责任公司 一种高架运营地铁车站新建雨棚的施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11107534A (ja) * 1997-10-06 1999-04-20 Miyaji Construction & Engineering Co Ltd 大屋根の直吊り建方工法
CN101725255A (zh) * 2009-11-13 2010-06-09 高申甫 一种高空大跨度钢结构分段滑移拼装工艺
CN101775907A (zh) * 2010-01-22 2010-07-14 北京首钢建设集团有限公司 一种网架结构高空组队整体滑移安装方法
CN102146732A (zh) * 2011-03-09 2011-08-10 中国建筑第八工程局有限公司 超大面积双曲面焊接球网架滑移施工方法
CN102179651A (zh) * 2011-04-06 2011-09-14 中国建筑第八工程局有限公司 超大焊接球网架现场平面桁架及立体分段的拼装方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11107534A (ja) * 1997-10-06 1999-04-20 Miyaji Construction & Engineering Co Ltd 大屋根の直吊り建方工法
CN101725255A (zh) * 2009-11-13 2010-06-09 高申甫 一种高空大跨度钢结构分段滑移拼装工艺
CN101775907A (zh) * 2010-01-22 2010-07-14 北京首钢建设集团有限公司 一种网架结构高空组队整体滑移安装方法
CN102146732A (zh) * 2011-03-09 2011-08-10 中国建筑第八工程局有限公司 超大面积双曲面焊接球网架滑移施工方法
CN102179651A (zh) * 2011-04-06 2011-09-14 中国建筑第八工程局有限公司 超大焊接球网架现场平面桁架及立体分段的拼装方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105971289A (zh) * 2016-05-04 2016-09-28 中国建筑第八工程局有限公司 一种大跨度曲面网壳的高空曲线滑移施工方法
CN105971289B (zh) * 2016-05-04 2018-12-18 中国建筑第八工程局有限公司 一种大跨度曲面网壳的高空曲线滑移施工方法
CN106049681A (zh) * 2016-07-30 2016-10-26 北京城建集团有限责任公司 大跨度蝶型空间弯扭管桁架及其施工方法
CN106049681B (zh) * 2016-07-30 2019-03-29 北京城建集团有限责任公司 大跨度蝶型空间弯扭管桁架及其施工方法
CN110158975A (zh) * 2019-06-17 2019-08-23 王建广 一种用于网架空间结构安装的平台滑移施工工艺
CN112576045A (zh) * 2020-11-30 2021-03-30 中国五冶集团有限公司 一种钢结构网架分步滑移安装方法
CN112609912A (zh) * 2020-12-10 2021-04-06 中铁五局集团建筑工程有限责任公司 一种高架运营地铁车站新建雨棚的施工方法

Similar Documents

Publication Publication Date Title
CN103603502A (zh) 基于大型场馆框架连续梁的高空球型网架拼接方法
CN104213508A (zh) 一种利用横撑和体外索控制塔柱位移的方法
CN106522362A (zh) 连廊体系钢结构梁的施工装置及施工方法
CN103938880A (zh) 大跨度异形空间网格管桁架整体滑移施工方法
CN106677542A (zh) 一种屋盖基座桁架结构的施工方法
CN202544854U (zh) 地铁车站衬砌台车
CN103572703A (zh) 外包混凝土斜拉扣挂和分环分段组合法施工方法
CN101481903B (zh) 跨缆吊机倒退拼装架设山区悬索桥主桁方法
CN203213623U (zh) 滑移导向和纠偏装置
CN205400756U (zh) 可变断面台车
CN205100119U (zh) 一种自行式内钢模板装置
CN202176343U (zh) 一种自行式多功能模板台车组合装置
CN204691326U (zh) 移动式多功能构件加工车间
CN206753085U (zh) 一种用于安装高空网架钢结构的滑移平台
CN104120657B (zh) 随动式梁面斜拉索牵索入孔导向装置及施工方法
CN106150525A (zh) 一种岩锚梁施工台车及其施工方法
CN203716044U (zh) 一种下承或中承式索拱组合结构桥
CN203702178U (zh) 底端增压型小高度隧道衬砌台车
CN206667458U (zh) 连廊体系钢结构梁的施工装置
CN203284126U (zh) 简易组合门架高空重物吊装装置
CN206329348U (zh) 一种小型隧道衬砌台车
CN105625732B (zh) 超高悬挑钢结构桁架无支撑施工方法
CN107476573A (zh) 一种倒喇叭形弧形剪力墙的模板加固支撑系统
CN103615118A (zh) 一种大型拱形结构的提升安装方法
CN202744960U (zh) 一种大跨度钢桁梁悬索桥合龙装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140226