CN103486403A - 基坑上方管线的原位保护施工方法 - Google Patents

基坑上方管线的原位保护施工方法 Download PDF

Info

Publication number
CN103486403A
CN103486403A CN201310488171.9A CN201310488171A CN103486403A CN 103486403 A CN103486403 A CN 103486403A CN 201310488171 A CN201310488171 A CN 201310488171A CN 103486403 A CN103486403 A CN 103486403A
Authority
CN
China
Prior art keywords
box culvert
pipeline
truss
bearing beam
pipeline box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310488171.9A
Other languages
English (en)
Inventor
柴艳飞
安文河
徐利
任富芝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201310488171.9A priority Critical patent/CN103486403A/zh
Publication of CN103486403A publication Critical patent/CN103486403A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors
    • F16L1/11Accessories therefor, e.g. anchors for the detection or protection of pipes in the ground

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明公开了一种基坑上方管线的原位保护施工方法,包括以下步骤:一)破除路面;二)对应每个桁架两端的支点部位各打两根钢立柱,并在该两根钢立柱上架设水平设置的中部垫梁;三)挖土方;四)降水;五)在相对的两根中部垫梁上架设桁架,在桁架顶部设置上部垫梁;六)在管线箱涵四周包裹钢板,形成加强箱涵包裹筒,采用下部垫梁支撑在包裹筒底部,下部垫梁与上部垫梁一一相对;七)将下部垫梁和上部垫梁通过倒链和钢丝绳连接。本发明能够避免在基坑施工过程中管线箱涵发生沉降变形,从而实现了管线的原位保护。能够确保基坑施工范围内不具备迁改条件的重要管线沉降变形值不超过允许值,并且对基坑围护结构和主体结构的影响在可控范围内。

Description

基坑上方管线的原位保护施工方法
技术领域
本发明涉及一种管线的原位保护施工方法,特别是涉及一种基坑上方管线的原位保护施工方法。
背景技术
目前,在城市市区进行轨道交通及房屋建筑的基坑施工过程中会遇到大量的浅埋市政管线,这些市政管线埋深一般在2m左右,会影响基坑围护结构、土方开挖及主体结构的施工,目前主要采取迁改的方法解决,即暂时将管线从施工影响区域改迁到施工区域外,待基坑施工全部完成后,再将管线迁改回原位置。但是在基坑周围场地狭小或者管线非常重要且对变形沉降非常敏感等不具备迁改条件的情况,就需要对管线进行原位保护。采取何种结构形式既能确保管线沉降变形满足要求,又能做到经济合理,施工方便,目前还没有成熟的技术方案。
发明内容
本发明为解决公知技术中存在的技术问题而提供一种基坑上方管线的原位保护施工方法。
本发明为解决公知技术中存在的技术问题所采取的技术方案是:一种基坑上方管线的原位保护施工方法,包括以下步骤:
一)破除路面:在基坑施工前,破除管线箱涵上部混凝土路面;
二)打钢立柱:按照桁架的设计位置,对应每个桁架两端的支点部位各打两根钢立柱,并在该两根钢立柱上架设水平设置的中部垫梁;
三)挖土方:在需要保护的管线箱涵处开挖土方至管线箱涵垫层下0.8-1m处,形成沟槽,沟槽两侧留出作业面;
四)降水:在施工作业区内进行连续降水;
五)架设桁架:在相对的两根中部垫梁上架设横跨管线箱涵且水平布置的桁架,在桁架顶部设置与其垂直且水平布置的上部垫梁;
六)稳固管线箱涵:在管线箱涵四周包裹钢板,形成加强箱涵包裹筒,采用下部垫梁支撑在包裹筒底部,下部垫梁与步骤五)中的上部垫梁一一相对;
七)吊挂管线箱涵:将下部垫梁和上部垫梁通过倒链和钢丝绳连接,对管线箱涵形成有效的悬吊体系,进而实现对管线箱涵的原位保护。
本发明具有的优点和积极效果是:采用将钢立柱插入土层内支撑钢桁架,钢桁架通过钢丝绳和倒链将被保护的管线箱涵悬吊起来的方法,能够避免在基坑施工过程中管线箱涵发生沉降变形,从而实现了管线的原位保护。能够确保基坑施工范围内不具备迁改条件的重要管线沉降变形值不超过允许值,并且对基坑围护结构和主体结构的影响在可控范围内,适用于地铁车站、地下结构工程、房屋建筑等基坑施工过程中上方管线的原位保护。
附图说明
图1为本发明的平面图;
图2为本发明的立面图;
图3为图2的侧视图。
图中:1、承压钢板,2、上部垫梁,3、桁架,4、中部垫梁,5、钢立柱,6、钢丝绳,7、下部垫梁,8、管线箱涵,9、包裹筒,10、倒链。
具体实施方式
为能进一步了解本发明的发明内容、特点及功效,兹例举以下实施例,并配合附图详细说明如下:
请参阅图1~图3,一种基坑上方管线的原位保护施工方法,包括以下步骤:
一)破除路面:在基坑施工前,破除管线箱涵8上部混凝土路面;
由于管线箱涵8一般都埋设在地面以下,其上部一般均为混凝土硬化路面,施工前需要将管线箱涵8上部混凝土路面全部破除,并清运到指定位置。
二)打钢立柱5:按照桁架3的设计位置,对应每个桁架3两端的支点部位各打两根钢立柱5,并在该两根钢立柱5上架设水平设置的中部垫梁4;
本发明为了保证钢桁架整体的稳定,在每个支点部位各打2根钢立柱。
三)挖土方:在需要保护的管线箱涵8处开挖土方至管线箱涵垫层下0.8-1m处,形成沟槽,沟槽两侧留出作业面;
四)降水:由于管线箱涵8一般埋深低于地下水位,为保证正常施工,将潜水泵放于施工作业区处的集水坑内,进行连续降水;
五)架设桁架3:在相对的两根中部垫梁4上架设横跨管线箱涵8且水平布置的桁架3,在桁架3顶部设有与其垂直且水平布置的上部垫梁2;
在本实施例中,桁架按设计图纸,现场制作,然后在钢桁架上刷两遍防锈漆,架设桁架时采用吊车吊装,在桁架两侧分别留出工作面。桁架3由角钢通过焊接制成,桁架利用自身较大的刚度,起到悬吊管线箱涵的作用,在桁架3两端底部焊接有承压钢板1,能够增大桁架的局部抗压能力。桁架3与钢立柱5通过中部垫梁4焊接形成整体,钢立柱5可以将管线箱涵8的压力传到地基土中,对桁架3起到竖向支撑作用。
六)稳固管线箱涵8:在管线箱涵8四周包裹钢板,形成用于加强箱涵的包裹筒9,采用下部垫梁7支撑在包裹筒9底部,下部垫梁9与步骤五)中的上部垫梁2一一相对;
由于被保护的管线箱涵8一般为预制混凝土箱涵,为保证管线箱涵8的整体性,在管线箱涵8四周围包裹钢板,形成包裹筒9。施工过程从中间向两端分段清除管线箱涵底部土体,在需保护的管线箱涵底部穿钢板及下部垫梁,底部钢板应分段横穿管线箱涵底部,施工过程中严格保证两段管线箱涵的接缝处位于一块底部钢板的中部,底部钢板、两侧钢板及顶部钢板焊接,形成箱涵包裹筒,采用下部垫梁7支撑在包裹筒9底部。包裹筒9起到提高管线箱涵整体刚度的作用,防止管线箱涵因变形过大而开裂。
七)吊挂管线箱涵8:将下部垫梁7和上部垫梁2通过倒链10和钢丝绳6连接,对管线箱涵8形成有效的悬吊体系,进而实现对管线箱涵8的原位保护。
在上部垫梁2的两端设置对称的吊挂结构,每个吊挂结构包括一倒链,倒链挂在上部垫梁2的端部,采用钢丝绳6兜挂对应下部垫梁的端部,并将该钢丝绳连接在倒链上。上、下部垫梁起到扩散应力作用,倒链10可以调节控制管线箱涵8沉降变形的大小。
待此处基坑施工完成后,及时进行管线箱涵的土体回填与恢复。待管线箱涵回填完成后,拆除桁架和钢立柱等构件。
尽管上面结合附图对本发明的优选实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可以做出很多形式,这些均属于本发明的保护范围之内。

Claims (1)

1.一种基坑上方管线的原位保护施工方法,其特征在于,包括以下步骤:
一)破除路面:在基坑施工前,破除管线箱涵上部混凝土路面;
二)打钢立柱:按照桁架的设计位置,对应每个桁架两端的支点部位各打两根钢立柱,并在该两根钢立柱上架设水平设置的中部垫梁;
三)挖土方:在需要保护的管线箱涵处开挖土方至管线箱涵垫层下0.8-1m处,形成沟槽,沟槽两侧留出作业面;
四)降水:在施工作业区内进行连续降水;
五)架设桁架:在相对的两根中部垫梁上架设横跨管线箱涵且水平布置的桁架,在桁架顶部设置与其垂直且水平布置的上部垫梁;
六)稳固管线箱涵:在管线箱涵四周包裹钢板,形成加强箱涵包裹筒,采用下部垫梁支撑在包裹筒底部,下部垫梁与步骤五)中的上部垫梁一一相对;
七)吊挂管线箱涵:将下部垫梁和上部垫梁通过倒链和钢丝绳连接,对管线箱涵形成有效的悬吊体系,进而实现对管线箱涵的原位保护。
CN201310488171.9A 2013-10-17 2013-10-17 基坑上方管线的原位保护施工方法 Pending CN103486403A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310488171.9A CN103486403A (zh) 2013-10-17 2013-10-17 基坑上方管线的原位保护施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310488171.9A CN103486403A (zh) 2013-10-17 2013-10-17 基坑上方管线的原位保护施工方法

Publications (1)

Publication Number Publication Date
CN103486403A true CN103486403A (zh) 2014-01-01

Family

ID=49826872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310488171.9A Pending CN103486403A (zh) 2013-10-17 2013-10-17 基坑上方管线的原位保护施工方法

Country Status (1)

Country Link
CN (1) CN103486403A (zh)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105546278A (zh) * 2015-12-23 2016-05-04 国家电网公司 一种开挖管沟时地下管道的防护方法
CN105972313A (zh) * 2016-05-30 2016-09-28 广州地铁设计研究院有限公司 一种横跨基坑工程管线悬吊方法及悬吊结构
CN106838465A (zh) * 2017-02-24 2017-06-13 中冶建工集团有限公司 地下综合管廊既有管道开挖保护施工方法
CN108413132A (zh) * 2018-04-16 2018-08-17 天津市管道工程集团有限公司 一种既有管线加固保护可调式吊架装置及施工方法
CN108895203A (zh) * 2018-06-21 2018-11-27 中国十七冶集团有限公司 一种用于横跨综合管廊的管道承托结构及其施工方法
CN108988193A (zh) * 2018-08-09 2018-12-11 中铁十局集团第三建设有限公司 一种安全快捷式电排管线悬吊架及使用方法
CN109024670A (zh) * 2018-06-25 2018-12-18 中国建筑第八工程局有限公司 埋地高压电缆上穿地下综合管廊保护加固体系及加固方法
CN109113092A (zh) * 2018-07-12 2019-01-01 上海市基础工程集团有限公司 地下大直径管道原位通水保护施工方法
CN110230730A (zh) * 2019-05-20 2019-09-13 中国二冶集团有限公司 用于管线加固的施工方法
CN110578343A (zh) * 2019-09-26 2019-12-17 殷茜东 一种深基坑顶部高压电力管线的悬吊保护结构及方法
CN110965581A (zh) * 2019-12-12 2020-04-07 中铁十二局集团第二工程有限公司 地铁施工中地下管线的保护施工方法
CN112359881A (zh) * 2020-10-26 2021-02-12 广州地铁设计研究院股份有限公司 一种横穿基坑的管线的支护结构
CN112359838A (zh) * 2020-11-13 2021-02-12 威海市市政工程有限公司 一种安全环保型基坑内大跨度悬空管线防护施工方法
CN113629647A (zh) * 2021-07-21 2021-11-09 中国葛洲坝集团市政工程有限公司 地铁车站基坑内大跨度超高压电力管沟悬吊装置及方法
CN115789340A (zh) * 2023-02-13 2023-03-14 中铁十八局集团有限公司 一种管线迁改数字化施工的原位保护结构及施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1088598A (ja) * 1996-09-10 1998-04-07 Miyama Kogyo Kk 足掛具の自動取替え用マンホ―ル内部養生取付装置
CN101205723A (zh) * 2006-12-20 2008-06-25 上海市第一建筑有限公司 管线不搬迁前提下地下建筑出入口施工方法
CN201902703U (zh) * 2010-12-09 2011-07-20 西安建筑科技大学 一种地下管线悬吊保护装置
CN202099804U (zh) * 2011-05-19 2012-01-04 长业建设集团有限公司 跨越基坑管线贝雷架悬挂托换系统
CN102864780A (zh) * 2012-09-07 2013-01-09 中国建筑第六工程局有限公司 一种基坑支护结构及其支护方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1088598A (ja) * 1996-09-10 1998-04-07 Miyama Kogyo Kk 足掛具の自動取替え用マンホ―ル内部養生取付装置
CN101205723A (zh) * 2006-12-20 2008-06-25 上海市第一建筑有限公司 管线不搬迁前提下地下建筑出入口施工方法
CN201902703U (zh) * 2010-12-09 2011-07-20 西安建筑科技大学 一种地下管线悬吊保护装置
CN202099804U (zh) * 2011-05-19 2012-01-04 长业建设集团有限公司 跨越基坑管线贝雷架悬挂托换系统
CN102864780A (zh) * 2012-09-07 2013-01-09 中国建筑第六工程局有限公司 一种基坑支护结构及其支护方法

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105546278A (zh) * 2015-12-23 2016-05-04 国家电网公司 一种开挖管沟时地下管道的防护方法
CN105972313A (zh) * 2016-05-30 2016-09-28 广州地铁设计研究院有限公司 一种横跨基坑工程管线悬吊方法及悬吊结构
CN105972313B (zh) * 2016-05-30 2019-07-26 广州地铁设计研究院股份有限公司 一种横跨基坑工程管线悬吊方法及悬吊结构
CN106838465A (zh) * 2017-02-24 2017-06-13 中冶建工集团有限公司 地下综合管廊既有管道开挖保护施工方法
CN106838465B (zh) * 2017-02-24 2018-09-04 中冶建工集团有限公司 地下综合管廊既有管道开挖保护施工方法
CN108413132A (zh) * 2018-04-16 2018-08-17 天津市管道工程集团有限公司 一种既有管线加固保护可调式吊架装置及施工方法
CN108895203A (zh) * 2018-06-21 2018-11-27 中国十七冶集团有限公司 一种用于横跨综合管廊的管道承托结构及其施工方法
CN109024670A (zh) * 2018-06-25 2018-12-18 中国建筑第八工程局有限公司 埋地高压电缆上穿地下综合管廊保护加固体系及加固方法
CN109113092A (zh) * 2018-07-12 2019-01-01 上海市基础工程集团有限公司 地下大直径管道原位通水保护施工方法
CN108988193A (zh) * 2018-08-09 2018-12-11 中铁十局集团第三建设有限公司 一种安全快捷式电排管线悬吊架及使用方法
CN110230730A (zh) * 2019-05-20 2019-09-13 中国二冶集团有限公司 用于管线加固的施工方法
CN110578343A (zh) * 2019-09-26 2019-12-17 殷茜东 一种深基坑顶部高压电力管线的悬吊保护结构及方法
CN110965581A (zh) * 2019-12-12 2020-04-07 中铁十二局集团第二工程有限公司 地铁施工中地下管线的保护施工方法
CN112359881A (zh) * 2020-10-26 2021-02-12 广州地铁设计研究院股份有限公司 一种横穿基坑的管线的支护结构
CN112359838A (zh) * 2020-11-13 2021-02-12 威海市市政工程有限公司 一种安全环保型基坑内大跨度悬空管线防护施工方法
CN113629647A (zh) * 2021-07-21 2021-11-09 中国葛洲坝集团市政工程有限公司 地铁车站基坑内大跨度超高压电力管沟悬吊装置及方法
CN115789340A (zh) * 2023-02-13 2023-03-14 中铁十八局集团有限公司 一种管线迁改数字化施工的原位保护结构及施工方法

Similar Documents

Publication Publication Date Title
CN103486403A (zh) 基坑上方管线的原位保护施工方法
CN102691294B (zh) 一种地下连续墙的施工方法
CN100497841C (zh) 支腿式地下连续墙施工工法
CN104805854B (zh) 一种潮汐环境下深水超长钢板桩围堰施工方法
CN102720140B (zh) 大跨度预应力砼连续梁深水桥墩施工工艺
CN103114599B (zh) 深基坑封闭降水装置及其施工方法
CN103912134B (zh) 既有建筑原位地下空间结构及施工方法
CN110158649B (zh) 一种沉井下沉施工时邻近地下管线的施工方法
CN105804119A (zh) 一桩二用地下廊道结构及其施工方法
CN104762982B (zh) 一种富水红砂岩地质地下水位控制的施工方法
CN107842212B (zh) 一种建筑遗存顶管切割保护结构及其施工方法
CN111236241B (zh) 基于半盖挖法的软弱富水地层地铁基坑加固开挖方法
CN106088120B (zh) 一种围堰下放施工方法
CN104518473A (zh) 电缆箱涵管线悬吊保护结构及方法
CN109723089A (zh) 一种高压电力管涵原地保护结构及方法
CN107558489A (zh) 一种盾构下穿既有建筑物的施工方法
CN109594574B (zh) 基于有限空间的大型顶管沉井逆作施工方法
CN110994523B (zh) 一种保护电缆的方法和系统
CN104631489A (zh) 一种下穿明挖隧道施工中的桥梁承台受力托换技术
CN209066508U (zh) 横穿隧道基坑的现有电力管廊保护结构
CN104074195A (zh) 一种通过水平注浆控制基坑外地面沉降的方法
CN104594367B (zh) 一种组合式围堰结构及施工方法
CN203533086U (zh) 基坑上方管线的原位保护结构
CN203113361U (zh) 深基坑封闭降水装置
CN106120578B (zh) 一种山区公路深埋园管涵控制裂缝的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140101