CN103114599B - 深基坑封闭降水装置及其施工方法 - Google Patents

深基坑封闭降水装置及其施工方法 Download PDF

Info

Publication number
CN103114599B
CN103114599B CN201310067359.6A CN201310067359A CN103114599B CN 103114599 B CN103114599 B CN 103114599B CN 201310067359 A CN201310067359 A CN 201310067359A CN 103114599 B CN103114599 B CN 103114599B
Authority
CN
China
Prior art keywords
pile
steel sheet
water
sheet pile
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310067359.6A
Other languages
English (en)
Other versions
CN103114599A (zh
Inventor
张连科
邱乐方
万亚鲁
高瑞
张少康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201310067359.6A priority Critical patent/CN103114599B/zh
Publication of CN103114599A publication Critical patent/CN103114599A/zh
Application granted granted Critical
Publication of CN103114599B publication Critical patent/CN103114599B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及一种适用于地下水丰富区域基坑开挖施工的深基坑封闭降水装置及其施工方法。该深基坑封闭降水装置,包括基坑,其特征是:所述基坑上表面设置有支护体系,支护体系采用钢板桩支护,支护体系四周设置有止水帷幕体系,止水帷幕体系采用水泥粉喷桩搭接而成,钢板桩之间连接设置有横撑。本发明的有益效果是:能有效解决降水施工对周边环境产生的较大影响,同时提高了工作效率,节约了成本;具有良好的社会效益与经济效益,在地下水丰富的地区基坑开挖施工中有广阔的应用空间,有推广价值。

Description

深基坑封闭降水装置及其施工方法
(一)技术领域
本发明涉及一种深基坑封闭降水装置及其施工方法,特别涉及一种适用于地下水丰富区域基坑开挖施工的深基坑封闭降水装置及其施工方法。
(二)背景技术
深基坑降水施工过程中,经常出现因降水致使周边构(建)筑物出现不均匀沉降现象,目前,还没有一种设备和施工方法可以较好的解决这个问题。
(三)发明内容
本发明为了弥补现有技术的不足,提供了一种施工效率高、成本低、工程质量高、有效解决了降水施工对周边环境产生的较大影响的深基坑封闭降水装置及其施工方法。
本发明是通过如下技术方案实现的:
一种深基坑封闭降水装置,包括基坑,其特征是:所述基坑上表面设置有支护体系,支护体系采用钢板桩支护,支护体系四周设置有止水帷幕体系,止水帷幕体系采用水泥粉喷桩搭接而成,钢板桩之间连接设置有横撑。
所述止水帷幕体系设置于钢板桩以外1~2m处。
所述水泥粉喷桩的桩径选用500mm,水泥粉喷桩搭接长度为桩长的0.01~0.15,且不小于150mm,垂直度偏差≤1/100。
所述钢板桩的垂直度控制在1.5%。
一种深基坑封闭降水的施工方法,其特征是:包括以下步骤:
(1)、施工准备:根据地质勘察报告对基坑位置地下水位情况、土质等方面进行现场调查,通过掌握的数据,确定基坑支护体系及止水帷幕形式,按照设计要求,对基坑支护体系稳定性、止水帷幕桩身长度及桩径进行计算,确定施工参数;
(2)、测量放线:根据设计图纸,放出基坑边线,根据基坑边线确定支护体系平面位置,同时确定支护体系周边止水帷幕平面布置;
(3)、安装基坑钢板桩支护体系;
(4)、安装水泥粉喷桩止水帷幕:根据坑底渗透变形及基坑周边地面沉降两个方面确定止水帷幕桩体深度;
(5)、沟槽开挖:沟槽分步开挖,每完成一步同时进行支护体系围檩焊接加固及坑内辅助排水;
(6)、构筑物施工、回填及钢板桩回收:地下构筑物施工完成后,自基坑底分层回填夯实,回填至横撑位置时,拆除横撑继续回填,直至回填至设计标高。
本发明的有益效果是:止水帷幕结合基坑支护系统降水施工加大了地下水渗流的距径,改变了基坑周边地下水向坑内渗流的路径,截住坡面及基底的渗水,稳定土体,防止水土流失,克服流沙现象,将基坑周边的地层因降水形成的附加沉降控制在一定程度,从而减小了基坑降水对周边环境的影响;在保证基坑安全及有效的达到降水效果的条件下,确保了成本最小化;符合《建筑业10项新技术》绿色施工技术中基坑施工封闭降水技术的要求,取得了良好的环保效益;与传统工艺相比,具有良好的社会效益和经济效益,在市政工程深基坑施工中有极大地推广价值。
(四)附图说明
下面结合附图对本发明作进一步的说明。
附图1为本发明的平面结构示意图;
附图2为本发明的断面结构示意图;
图中,1基坑,2钢板桩,3水泥粉喷桩,4横撑。
(五)具体实施方式
附图为本发明的一种具体实施例。该实施例包括基坑1,基坑1上表面设置有支护体系,支护体系采用钢板桩2支护,支护体系四周设置有止水帷幕体系,止水帷幕体系采用水泥粉喷桩3搭接而成,钢板桩2之间连接设置有横撑4。止水帷幕体系设置于钢板桩2以外1~2m处。水泥粉喷桩3的桩径选用500mm,水泥粉喷桩3搭接长度为桩长的0.01~0.15,且不小于150mm,垂直度偏差≤1/100。钢板桩2的垂直度控制在1.5%。
一种深基坑封闭降水的施工方法,包括以下步骤:
(1)、施工准备:根据地质勘察报告对基坑位置地下水位情况、土质等方面进行现场调查,通过掌握的数据,确定基坑支护体系及止水帷幕形式等。按照设计要求,对基坑支护体系稳定性、止水帷幕桩身长度及桩径进行计算,确定施工参数。对于地下水丰富,水位较浅,且存在流沙现象的地区,基坑支护体系一般选用工字型钢板桩。封闭降水施工采用悬挂式止水帷幕;
(2)、测量放线:根据设计图纸,放出基坑边线,根据基坑边线确定支护体系平面位置,同时确定支护体系周边止水帷幕平面布置,止水帷幕设置在钢板桩以外1~2米处,沿钢板桩四周布置。
(3)、安装基坑钢板桩支护体系:根据计算数据,将钢板桩根据放线位置进行密排布置。选用液压履带式振动式打桩机打拔钢板桩,打桩过程中控制好桩的垂直度及打桩速度,防止打桩过程中造成倾斜现象。进桩时把桩卸到打拔机附近6米范围之内,打拔机把桩夹起同时吊到打桩灰线上空。钢板桩采用振动下沉,开始沉桩时采用自重下沉,待桩身有足够稳定后再采用振动下沉,后续钢板桩打入之前应将前一根板桩与前面的桩用钢筋临时焊接;
(4)、安装水泥粉喷桩止水帷幕:根据坑底渗透变形及基坑周边地面沉降两个方面确定止水帷幕桩体深度。首先根据打桩位置标高核准旋喷桩钻杆长度并做好标记,然后将旋喷桩机安放在定位孔位上,同时保证钻到规范要求的垂直度,桩机就位后,必须作水平校正,使钻机垂直对准孔位,并固定好桩机,垂直度偏差小于1/100。喷射注浆作业时,将注浆管达到规定的标高后,进行地下试喷,一切正常后即自下而上进行喷射作业,调整空压机、高压浆泵,使其压力达到设计要求后根据设计要求的提升速度提升旋转喷浆,至桩顶标高;
(5)、沟槽开挖:沟槽分步开挖,每完成一步同时进行支护体系围檩焊接加固及坑内辅助排水。同时采取潜水泵抽取或引渗基坑开挖范围内的现存地下水;
(6)、构筑物施工、回填及钢板桩回收:地下构筑物施工完成后,自基坑底分层回填夯实,回填至横撑位置时,拆除横撑继续回填,直至回填至设计标高。钢板桩拔出后留下的空隙用黄砂回填密实。
采用本发明的深基坑封闭降水装置及其施工方法,采用水泥粉喷桩止水帷幕+基坑底封底的截水措施结合基坑钢板桩支护系统,阻截基坑侧壁及基坑地面的地下水流入基坑。同时采取降水措施抽取或引渗基坑开挖范围内的现存地下水的降水方法,将基坑周边的地层因降水形成的附加沉降控制在一定程度,从而减小基坑降水对周边环境的影响。
采用本发明的深基坑封闭降水的施工方法,具体施工步骤如下:施工准备→测量放线→基坑钢板桩支护体系→水泥粉喷桩止水帷幕→沟槽开挖→构筑物施工、回填及钢板桩回收。
采用本发明的深基坑封闭降水装置及其施工方法,宜在地下水丰富、土质为流沙、或周边存有构(建)筑物区域的深基坑施工中采用。
采用本发明的深基坑封闭降水装置及其施工方法,在济南高新区7号路道路排水工程、济南第二垃圾处理厂110kV发电并网工程等过程中得到广泛应用,起到了显著降水的效果,并对周边环境没有产生不利影响。

Claims (1)

1.一种深基坑封闭降水装置,包括基坑(1),其特征是:所述基坑(1)上表面设置有支护体系,支护体系采用钢板桩(2)支护,支护体系四周设置有止水帷幕体系,止水帷幕体系采用水泥粉喷桩(3)搭接而成,钢板桩(2)之间连接设置有横撑(4);
其施工方法,包括以下步骤:
(1)、施工准备:根据地质勘察报告对基坑位置地下水位情况、土质方面进行现场调查,通过掌握的数据,确定基坑支护体系及止水帷幕形式,按照设计要求,对基坑支护体系稳定性、止水帷幕桩身长度及桩径进行计算,确定施工参数,对于地下水丰富,水位较浅,且存在流沙现象的地区,基坑支护体系选用工字型钢板桩,封闭降水施工采用悬挂式止水帷幕;
(2)、测量放线:根据设计图纸,放出基坑边线,根据基坑边线确定支护体系平面位置,同时确定支护体系周边止水帷幕平面布置;
(3)、安装基坑钢板桩支护体系:根据计算数据,将钢板桩根据放线位置进行密排布置,选用液压履带式振动式打桩机打拔钢板桩,打桩过程中控制好桩的垂直度及打桩速度,进桩时把桩卸到打拔机附近6米范围之内,打拔机把桩夹起同时吊到打桩灰线上空,钢板桩采用振动下沉,开始沉桩时采用自重下沉,待桩身有足够稳定后再采用振动下沉,后续钢板桩打入之前应将前一根板桩与前面的桩用钢筋临时焊接;
(4)、安装水泥粉喷桩止水帷幕:根据坑底渗透变形及基坑周边地面沉降两个方面确定止水帷幕桩体深度,首先根据打桩位置标高核准旋喷桩钻杆长度并做好标记,然后将旋喷桩机安放在定位孔位上,同时保证钻到规范要求的垂直度,桩机就位后,作水平校正,使钻机垂直对准孔位,并固定好桩机,垂直度偏差小于1/100,喷射注浆作业时,将注浆管达到规定的标高后,进行地下试喷,一切正常后即自下而上进行喷射作业,调整空压机、高压浆泵,使其压力达到设计要求后根据设计要求的提升速度提升旋转喷浆,至桩顶标高;
(5)、沟槽开挖:沟槽分步开挖,每完成一步同时进行支护体系围檩焊接加固及坑内辅助排水,同时采取潜水泵抽取或引渗基坑开挖范围内的现存地下水;
(6)、构筑物施工、回填及钢板桩回收:地下构筑物施工完成后,自基坑底分层回填夯实,回填至横撑位置时,拆除横撑继续回填,直至回填至设计标高,钢板桩拔出后留下的空隙用黄砂回填密实;
其中,水泥粉喷桩(3)的桩径选用500mm,水泥粉喷桩(3)搭接长度为桩长的0.01~0.15,且不小于150mm,垂直度偏差≤1/100;
止水帷幕体系设置于钢板桩(2)以外1~2m处,钢板桩(2)的垂直度控制在1.5%。
CN201310067359.6A 2013-03-04 2013-03-04 深基坑封闭降水装置及其施工方法 Active CN103114599B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310067359.6A CN103114599B (zh) 2013-03-04 2013-03-04 深基坑封闭降水装置及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310067359.6A CN103114599B (zh) 2013-03-04 2013-03-04 深基坑封闭降水装置及其施工方法

Publications (2)

Publication Number Publication Date
CN103114599A CN103114599A (zh) 2013-05-22
CN103114599B true CN103114599B (zh) 2016-05-18

Family

ID=48413026

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310067359.6A Active CN103114599B (zh) 2013-03-04 2013-03-04 深基坑封闭降水装置及其施工方法

Country Status (1)

Country Link
CN (1) CN103114599B (zh)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103526768A (zh) * 2013-11-01 2014-01-22 科达集团股份有限公司 一种隔断强透水层的施工方法
CN105133620B (zh) * 2015-08-19 2017-06-30 中国建筑第八工程局有限公司 局部流塑状淤泥质土体坑中坑支护结构及其施工方法
CN106545020A (zh) * 2016-11-02 2017-03-29 鲲鹏建设集团有限公司 一种深基坑支护的施工方法
CN106592608A (zh) * 2016-12-21 2017-04-26 东南大学 一种地下综合管廊新地基与老路基差异沉降控制方法
CN107740434B (zh) * 2017-10-23 2020-06-09 中国水利水电第九工程局有限公司 一种用于砂卵石、白云岩破碎带水坝基坑防水帷幕的施工方法
CN110629854B (zh) * 2019-09-18 2020-09-01 中国化学工程第六建设有限公司 适用于海岛环境高压旋喷桩结合排污泵的排水施工方法
CN111764403A (zh) * 2020-07-21 2020-10-13 中亿丰建设集团股份有限公司 基坑内u型钢板桩及钢管支撑结构的施工方法
CN112195938A (zh) * 2020-09-04 2021-01-08 北京市轨道交通建设管理有限公司 一种咬合桩渗水的处理方法
CN112832253B (zh) * 2021-01-07 2022-07-05 青岛理工大学 一种钢板桩支护基坑管涌的治理方法
CN114482016A (zh) * 2022-03-11 2022-05-13 中国十九冶集团有限公司 螺纹钢管桩及深基坑施工方法
CN115450227B (zh) * 2022-10-14 2024-01-19 中铁四局集团有限公司 一种地铁车站切断地下暗河基坑围护结构施工方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2101358A (en) * 1937-05-28 1937-12-07 Jones & Laughlin Steel Corp Method of making load sustaining structures
CN1563606A (zh) * 2004-04-09 2005-01-12 南京大学 砼芯水泥土搅拌桩基坑支护方法
CN101289852A (zh) * 2008-04-09 2008-10-22 中交三航局第二工程有限公司 水上基坑旋喷桩止水帷幕施工工艺
CN101328713A (zh) * 2008-07-18 2008-12-24 华丰建设股份有限公司 圆形深基坑支护的施工方法
CN102011404A (zh) * 2010-11-24 2011-04-13 温州中城建设集团有限公司 基坑支护结构及其施工方法
CN102116031A (zh) * 2011-01-17 2011-07-06 东南大学 一种钢板桩管桩组合基坑支护结构及其支护方法
CN102454167A (zh) * 2010-10-21 2012-05-16 五冶集团上海有限公司 大型超深沉井的施工方法
JP5007255B2 (ja) * 2008-03-18 2012-08-22 大成建設株式会社 地中壁構造
CN102787607A (zh) * 2012-08-28 2012-11-21 大元建业集团股份有限公司 一种适用于沿海地区的深基坑降水支护施工方法
CN203113361U (zh) * 2013-03-04 2013-08-07 济南城建集团有限公司 深基坑封闭降水装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002201623A (ja) * 2000-12-28 2002-07-19 Nkk Corp 二重矢板式護岸及びその構築方法

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2101358A (en) * 1937-05-28 1937-12-07 Jones & Laughlin Steel Corp Method of making load sustaining structures
CN1563606A (zh) * 2004-04-09 2005-01-12 南京大学 砼芯水泥土搅拌桩基坑支护方法
JP5007255B2 (ja) * 2008-03-18 2012-08-22 大成建設株式会社 地中壁構造
CN101289852A (zh) * 2008-04-09 2008-10-22 中交三航局第二工程有限公司 水上基坑旋喷桩止水帷幕施工工艺
CN101328713A (zh) * 2008-07-18 2008-12-24 华丰建设股份有限公司 圆形深基坑支护的施工方法
CN102454167A (zh) * 2010-10-21 2012-05-16 五冶集团上海有限公司 大型超深沉井的施工方法
CN102011404A (zh) * 2010-11-24 2011-04-13 温州中城建设集团有限公司 基坑支护结构及其施工方法
CN102116031A (zh) * 2011-01-17 2011-07-06 东南大学 一种钢板桩管桩组合基坑支护结构及其支护方法
CN102787607A (zh) * 2012-08-28 2012-11-21 大元建业集团股份有限公司 一种适用于沿海地区的深基坑降水支护施工方法
CN203113361U (zh) * 2013-03-04 2013-08-07 济南城建集团有限公司 深基坑封闭降水装置

Also Published As

Publication number Publication date
CN103114599A (zh) 2013-05-22

Similar Documents

Publication Publication Date Title
CN103114599B (zh) 深基坑封闭降水装置及其施工方法
CN102691294B (zh) 一种地下连续墙的施工方法
CN102454167B (zh) 大型超深沉井的施工方法
CN104196034A (zh) 一种利用钢板桩作为支护围堰的基坑施工方法
CN105133627B (zh) 单壁钢板桩围堰流水状态下施工工法
CN104805854B (zh) 一种潮汐环境下深水超长钢板桩围堰施工方法
CN103603342B (zh) 大直径组合套管超长灌注桩施工方法
CN104631475A (zh) 一种下穿河流浅埋暗挖隧道的安全快速施工方法
CN102286984A (zh) 一种止水帷幕及其施工方法
CN204510230U (zh) 地下水丰富且地质不良深基坑开挖支护结构
CN105240019A (zh) 一种顶管施工方法
CN204253056U (zh) 一种盾构机进出洞洞口加固结构
CN104612179B (zh) 贯穿超厚粉砂层的地下连续墙的施工方法
CN202194148U (zh) 一种止水帷幕
CN103526766A (zh) 一种深基坑减压井封堵方法
CN105696550B (zh) 一种辅助加固地下连续墙成槽的三轴搅拌桩施工方法
CN202194149U (zh) 一种止水帷幕
CN201762702U (zh) 钻孔咬合桩
CN206428707U (zh) 一种基坑支护降水一体化管桩护壁结构
CN206554099U (zh) 一种分块拼装式无底单壁钢套箱围堰
CN203113361U (zh) 深基坑封闭降水装置
CN110241836A (zh) 一种嵌岩止水帷幕的施工方法
CN104074195B (zh) 一种通过水平注浆控制基坑外地面沉降的方法
CN103343534A (zh) 基坑施工封闭降水方法
CN103046568A (zh) 长螺旋潜孔锤振动旋喷水泥土帷幕桩施工工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant