CN105546278A - 一种开挖管沟时地下管道的防护方法 - Google Patents
一种开挖管沟时地下管道的防护方法 Download PDFInfo
- Publication number
- CN105546278A CN105546278A CN201510975990.5A CN201510975990A CN105546278A CN 105546278 A CN105546278 A CN 105546278A CN 201510975990 A CN201510975990 A CN 201510975990A CN 105546278 A CN105546278 A CN 105546278A
- Authority
- CN
- China
- Prior art keywords
- pipeline
- construction
- steel structure
- rail
- shoulder guard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L57/00—Protection of pipes or objects of similar shape against external or internal damage or wear
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/14—Hangers in the form of bands or chains
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
本发明公开了一种开挖管沟时地下管道的防护方法,属于电力工程施工技术领域。所述施工方法包括以施工步骤,首先预制两个钢结构支架,并准备工字梁钢轨;然后将钢结构支架吊至沟槽两侧,将工字梁钢轨吊装至钢结构支架上与管道平行位于管道正上方;将包裹管道的泥土清理,并将防护钢板安装到位;将吊具安装在工字梁钢轨上,并使吊具通过防护钢板对管道进行悬吊保护。在施工过程中采用此方案,保证了在土方开挖施工过程中管道的安全,有利于施工的正常进行,还可以大大节省施工准备时间,节省工程成本。
Description
技术领域
本发明涉及一种开挖管沟时地下管道的防护方法,属于电力工程施工技术领域。
背景技术
现如今将电力架空线路进行入地改造成为未来城市发展规划的方向,而架空线路入地改造工程一般为全线明挖隧道,在施工过程中沿线管道较多,不便于土方开挖,现有施工方法不利于管道的保护,造成在开挖土方过程中外力对管道的损坏,造成不必要的经济损失。
发明内容
本发明需要解决的技术问题是提供一种开挖管沟时能够有效保护地下管道的方法。
为解决上述技术问题,本发明所采用的技术方案是:
一种开挖管沟时地下管道的防护方法,通过支撑吊架将管道悬吊起来,防止管道因自重下垂造成损坏,具体施工步骤如下,
a.施工前准备
预制两个钢结构支架,按开挖沟槽的宽度准备工字梁钢轨,工字梁钢轨长度比开挖沟槽长3~4m;
b.吊装支架和钢轨
将预制好的钢结构支架吊至沟槽两侧与沟槽平行,将工字梁钢轨吊装至钢结构支架上与管道平行位于管道正上方;
c.清理泥土
将包裹管道的泥土清理,并在管道下部沿管道方向挖3~4个用于安装防护钢板的沟槽,并将防护钢板安装到位,防护钢板均匀分布;
d.安装起吊用具
将吊具安装在工字梁钢轨上,吊具位置与防护钢板处于同一竖直线上,使用吊具的绳索绕过管道底部的防护钢板对管道进行悬吊保护。
进一步的,管道上方绕工字梁钢轨还搭设有防坠物安全网。
进一步的,步骤d中使用的吊具为带测力器的手扳葫芦。
进一步的,步骤d中使用的吊具为带测力器的钢丝绳和紧绳器。由于采用了上述技术方案,本发明取得的技术进步是:
在施工过程中采用此方案,保证了在土方开挖施工过程中管道的安全,有利于施工的正常进行。
本发明所述的技术方案使用可以预制的钢结构支架作为支座,可以大大节省施工准备时间,并且钢结构支架可以重复利用,节省了工程成本。
本发明中吊具加装了测力器,可以随时监测管道受力情况,避免了因操作失误对管道造成人为损坏。
本发明的技术方案中还搭设了防坠物安全网,可以在后续施工中防止坠物对管道造成损坏。
附图说明
图1是本发明管道支护完成后示意图;
其中,1是工字梁钢轨、2是钢结构支架、3是吊具、4是测力器、5是管道、6是防护钢板。
具体实施方式
一种开挖管沟时地下管道的防护方法,包括以下施工步骤:
a.施工前准备
预制两个钢结构支架2,按开挖沟槽的宽度准备工字梁钢轨1,工字梁钢轨1长度比开挖沟槽长3~4m;
b.吊装支架和钢轨
将预制好的钢结构支架2吊至沟槽两侧与沟槽平行,将工字梁钢轨1吊装至钢结构支架1上与管道5平行位于管道5正上方;
c.清理泥土
将包裹管道5的泥土清理,并在沿管道5下部沿管道5方向挖3~4个用于安装防护钢板6的沟槽,并将防护钢板6安装到位,防护钢板6均匀分布;
d.安装起吊用具
将吊具3安装在工字梁钢轨上,吊具3位置与防护钢板6处于同一竖直线上,使用吊具3的绳索绕过管道底部的防护钢板6对管道进行悬吊保护。
下面结合具体实施例对本发明做进一步详细说明:
所需开挖的沟槽宽度为10m。
a.施工前准备
预制两个钢结构支架2,准备长度为14m的工字梁钢轨1;
b.吊装支架和钢轨
将预制好的钢结构支架2吊至沟槽两侧与沟槽平行,将工字梁钢轨1吊装至钢结构支架2上与管道5平行位于管道5正上方;
c.清理泥土
将包裹管道5的泥土清理,并在沿管道5下部沿管道5方向挖4个用于安装防护钢板6的沟槽,并将防护钢板6安装到位,防护钢板6间距为2m,靠近沟槽的两个防护钢板6距沟槽侧边距离为2m;
d.安装起吊用具
将4个带测力器4的手扳葫芦安装在工字梁钢轨1上,手扳葫芦的位置与防护钢板6处于同一竖直线上,使手扳葫芦的吊索绕过管道底部的防护钢板6对管道5进行悬吊保护,手扳葫芦带有测力器4,施加悬吊力时根据预先计算的管道5的自重施加。
在开挖沟槽的土方以及后续施工中,为了更好地保护管道,防止管道上方坠物对管道的损坏,还可以搭设防坠物安全网,防坠物安全网上方绕工字梁钢轨下方两个端部低于管道底部。
步骤a中使用钢结构支架作为基座,相比混凝土基座可以缩短施工准备时间,在施工完成后钢结构支架还可以重复利用。
在管道吊护中施加大小合适的悬吊力很重要,悬吊力太小起不到保护管道的作用,悬吊力太大会对管道造成人为的伤害,本发明中步骤d使用的吊具均带有测力器,这样可以根据管道自重施加合适的悬吊力,较好地保护管道。
Claims (4)
1.一种开挖管沟时地下管道的防护方法,其特征在于:通过支撑吊架将管道悬吊起来,防止管道因自重下垂造成损坏,具体施工步骤如下,
a.施工前准备
预制两个钢结构支架,按开挖沟槽的宽度准备工字梁钢轨,工字梁钢轨长度比开挖沟槽长3~4m;
b.吊装支架和钢轨
将预制好的钢结构支架吊至沟槽两侧与沟槽平行,将工字梁钢轨吊装至钢结构支架上与管道平行位于管道正上方;
c.清理泥土
将包裹管道的泥土清理,并在管道下部沿管道方向挖3~4个用于安装防护钢板的沟槽,并将防护钢板安装到位,防护钢板均匀分布;
d.安装起吊用具
将吊具安装在工字梁钢轨上,吊具位置与防护钢板处于同一竖直线上,使用吊具的绳索绕过管道底部的防护钢板对管道进行悬吊保护。
2.根据权利要求1所述的一种开挖管沟时地下管道的防护方法,其特征在于:管道上方绕工字梁钢轨还搭设有防坠物安全网。
3.根据权利要求1所述的一种开挖管沟时地下管道的防护方法,其特征在于:步骤d中使用的吊具为带测力器的手扳葫芦。
4.根据权利要求1所述的一种开挖管沟时地下管道的防护方法,其特征在于:步骤d中使用的吊具为带测力器的钢丝绳和紧绳器。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510975990.5A CN105546278A (zh) | 2015-12-23 | 2015-12-23 | 一种开挖管沟时地下管道的防护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510975990.5A CN105546278A (zh) | 2015-12-23 | 2015-12-23 | 一种开挖管沟时地下管道的防护方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105546278A true CN105546278A (zh) | 2016-05-04 |
Family
ID=55825683
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510975990.5A Pending CN105546278A (zh) | 2015-12-23 | 2015-12-23 | 一种开挖管沟时地下管道的防护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105546278A (zh) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107448681A (zh) * | 2017-09-07 | 2017-12-08 | 鞍山三冶建筑工程有限公司 | 一种石油管线的支护结构 |
CN107701810A (zh) * | 2017-09-07 | 2018-02-16 | 鞍山三冶建筑工程有限公司 | 一种石油管线的支护方法 |
CN108194764A (zh) * | 2017-12-30 | 2018-06-22 | 南京华博供用电工程有限公司 | 一种开挖管沟时地下管道的防护方法 |
CN108413132A (zh) * | 2018-04-16 | 2018-08-17 | 天津市管道工程集团有限公司 | 一种既有管线加固保护可调式吊架装置及施工方法 |
CN108895203A (zh) * | 2018-06-21 | 2018-11-27 | 中国十七冶集团有限公司 | 一种用于横跨综合管廊的管道承托结构及其施工方法 |
CN110230730A (zh) * | 2019-05-20 | 2019-09-13 | 中国二冶集团有限公司 | 用于管线加固的施工方法 |
CN111396634A (zh) * | 2020-05-07 | 2020-07-10 | 广州市市政工程机械施工有限公司 | 一种既有大直径管道悬吊保护体系和保护方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5893682A (en) * | 1994-09-08 | 1999-04-13 | European Marine Contracters Limited | Pipe-laying |
CN201902703U (zh) * | 2010-12-09 | 2011-07-20 | 西安建筑科技大学 | 一种地下管线悬吊保护装置 |
CN202746764U (zh) * | 2012-06-18 | 2013-02-20 | 天津二十冶建设有限公司 | 一种用于管道对接调整的吊装支架 |
CN103486403A (zh) * | 2013-10-17 | 2014-01-01 | 中国建筑第六工程局有限公司 | 基坑上方管线的原位保护施工方法 |
CN104676110A (zh) * | 2015-01-22 | 2015-06-03 | 中国地质大学(武汉) | 一种基坑开挖状况下高压电缆贝雷架原地悬吊保护方法 |
-
2015
- 2015-12-23 CN CN201510975990.5A patent/CN105546278A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5893682A (en) * | 1994-09-08 | 1999-04-13 | European Marine Contracters Limited | Pipe-laying |
CN201902703U (zh) * | 2010-12-09 | 2011-07-20 | 西安建筑科技大学 | 一种地下管线悬吊保护装置 |
CN202746764U (zh) * | 2012-06-18 | 2013-02-20 | 天津二十冶建设有限公司 | 一种用于管道对接调整的吊装支架 |
CN103486403A (zh) * | 2013-10-17 | 2014-01-01 | 中国建筑第六工程局有限公司 | 基坑上方管线的原位保护施工方法 |
CN104676110A (zh) * | 2015-01-22 | 2015-06-03 | 中国地质大学(武汉) | 一种基坑开挖状况下高压电缆贝雷架原地悬吊保护方法 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107448681A (zh) * | 2017-09-07 | 2017-12-08 | 鞍山三冶建筑工程有限公司 | 一种石油管线的支护结构 |
CN107701810A (zh) * | 2017-09-07 | 2018-02-16 | 鞍山三冶建筑工程有限公司 | 一种石油管线的支护方法 |
CN108194764A (zh) * | 2017-12-30 | 2018-06-22 | 南京华博供用电工程有限公司 | 一种开挖管沟时地下管道的防护方法 |
CN108194764B (zh) * | 2017-12-30 | 2019-12-13 | 南京华博供用电工程有限公司 | 一种开挖管沟时地下管道的防护方法 |
CN108413132A (zh) * | 2018-04-16 | 2018-08-17 | 天津市管道工程集团有限公司 | 一种既有管线加固保护可调式吊架装置及施工方法 |
CN108895203A (zh) * | 2018-06-21 | 2018-11-27 | 中国十七冶集团有限公司 | 一种用于横跨综合管廊的管道承托结构及其施工方法 |
CN110230730A (zh) * | 2019-05-20 | 2019-09-13 | 中国二冶集团有限公司 | 用于管线加固的施工方法 |
CN111396634A (zh) * | 2020-05-07 | 2020-07-10 | 广州市市政工程机械施工有限公司 | 一种既有大直径管道悬吊保护体系和保护方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105546278A (zh) | 一种开挖管沟时地下管道的防护方法 | |
CN204530719U (zh) | 一种用于基坑开挖支护的快速装配式支护装置 | |
CN106838465B (zh) | 地下综合管廊既有管道开挖保护施工方法 | |
CN106436573B (zh) | 超高索塔大跨度上横梁牛腿钢桁支架施工方法 | |
CN104989873B (zh) | 压力钢管斜拉倒拼装方法 | |
CN102261518A (zh) | 在役油气管道遭遇采空区塌陷破坏复位施工方法 | |
CN111173027A (zh) | 一种既有管线加固保护的施工方法 | |
CN108278034A (zh) | 困难地段电杆更换施工方法 | |
CN103485410B (zh) | 特大直径钢筋混凝土企口管安装施工方法 | |
CN206495234U (zh) | 地下综合管廊既有管道开挖保护施工装置 | |
CN111395395A (zh) | 一种地铁深基坑盖挖下支撑系统安装工艺 | |
CN203180464U (zh) | 一种具有监控功能的电缆排管敷设系统 | |
CN105715094B (zh) | 一种高压线杆保护装置 | |
CN205442567U (zh) | 钢管杆作业平台 | |
CN202081900U (zh) | 一种锚索的安全保护装置 | |
CN111792540A (zh) | 全逆作法主体结构梁板悬挂移动式电动葫芦吊物施工方法 | |
CN101806377B (zh) | 陡崖管道安装施工方法 | |
CN204216502U (zh) | 拖令电缆放线支架 | |
CN206712336U (zh) | 杆塔电缆平台工作保护支架 | |
CN103231993B (zh) | 室内gis运输就位装置及使用方法 | |
CN103742717A (zh) | 平行式海底管道及海缆的保护支架 | |
CN107337099A (zh) | 一种针对水电站缆索起重机布设的防雷天网 | |
CN213206759U (zh) | 一种管线悬挂保护装置 | |
CN103235380A (zh) | 长距离管道输煤通信光缆穿越地下工程管道法 | |
CN108868787A (zh) | 一种过江隧道盾构始发施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160504 |