CN103233089A - 高炉炉壳倒装方法 - Google Patents

高炉炉壳倒装方法 Download PDF

Info

Publication number
CN103233089A
CN103233089A CN2013101633789A CN201310163378A CN103233089A CN 103233089 A CN103233089 A CN 103233089A CN 2013101633789 A CN2013101633789 A CN 2013101633789A CN 201310163378 A CN201310163378 A CN 201310163378A CN 103233089 A CN103233089 A CN 103233089A
Authority
CN
China
Prior art keywords
furnace
furnace zone
grate
zone
car
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101633789A
Other languages
English (en)
Inventor
王进
袁春阳
谢德斌
申斌
贾玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
NANJING BRANCH CHINA 19TH METALLURGICAL Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING BRANCH CHINA 19TH METALLURGICAL Corp filed Critical NANJING BRANCH CHINA 19TH METALLURGICAL Corp
Priority to CN2013101633789A priority Critical patent/CN103233089A/zh
Publication of CN103233089A publication Critical patent/CN103233089A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Tunnel Furnaces (AREA)

Abstract

本发明提供一种对高炉炉壳进行倒装的方法,其尤其适合于周围有炉架的高炉的改造,能够降低施工成本,加快施工速度。该高炉炉壳倒装方法,所述炉壳从下向上依次由第1炉带、第2炉带、……、第n炉带组成;包括下述步骤:在炉架的下部一侧开口,把第n炉带从所述开口处送入炉架内,通过位于炉架上部的行车把第n炉带提升,然后把第n炉带的周边与炉架固定;把第m炉带从所述开口处送入炉架内,通过行车把第m炉带提升,然后把第m炉带与第m+1炉带进行对接焊;m=n-1,n-2,…,2,1,n为自然数。

Description

高炉炉壳倒装方法
技术领域
本发明涉及对炉架内的高炉炉壳进行倒装的方法。
背景技术
高炉炉壳从下向上依次由第1炉带、第2炉带、第n炉带组成。安装高炉时,一般采用的是正装方法,即先安装好第1炉带,然后把第2炉带吊起(提升),把第2炉带与第1炉带进行对接焊,这样从下向上依次安装好各炉带。
对于旧的高炉改造时,因为高炉被炉架包围,提升高炉顶部的行车高度有限(行车下部距离炉架顶部的距离较小),无法通过行车把炉带提升至炉架之上水平移动后、再放入炉架内。因此无法进行正装。
但倒装则不同,倒装是先把第n炉带吊起,把第n炉带的周边与炉架固定;然后把第n-1炉带吊起,把第n-1炉带与第n炉带进行对接焊;这样从上向下依次安装好各炉带。
高炉倒装是较好的方法。进行倒装时,必须把炉带移动至炉架内。
发明内容
本发明的目的是提供一种对高炉炉壳进行倒装的方法,其尤其适合于周围有炉架的高炉的改造,能够降低施工成本,加快施工速度
本发明的高炉炉壳倒装方法,所述炉壳从下向上依次由第1炉带、第2炉带、……、第n炉带组成;包括下述步骤:
在炉架的下部一侧开口,开口大小要能够使得组成炉壳的各炉带通过;把第n炉带从所述开口处送入炉架内,通过位于炉架上部的行车把第n炉带提升,然后把第n炉带的周边与炉架固定;
把第m炉带从所述开口处送入炉架内,通过行车把第m炉带提升,然后把第m炉带与第m+1炉带进行对接焊;
m=n-1,n-2,…,2,1,n为自然数。
上述的高炉炉壳倒装方法,把第1炉带从所述开口处送入炉架内,然后把第1炉带下部固定在地基上;
把第s炉带从所述开口处送入炉架内,然后把第s炉带与第1炉带进行对接焊;s=2,3;
把第4炉带从所述开口处送入炉架内,然后把第4炉带与第3炉带、第5炉带进行对接焊;
m=n-1,n-2,…,5。
上述的高炉炉壳倒装方法,在所述开口处设置有水平延伸至炉架内的推移梁,在推移梁上设置有轨道,推移车滚动设置在轨道上,在推移梁与推移车之间设置带动推移车沿轨道移动的驱动装置;通过把各炉带放置在推移车上、并驱动推移车的方法把各炉带送入炉架内。
上述的高炉炉壳倒装方法,把上下相邻的两个炉带进行对接焊后,再把位于下部的那个炉带的周边与炉架固定的步骤。
本发明的有益效果:采用本发明的施工方法对炉架内的高炉进行改造,无需花费时间拆除旧的炉架,只需要在炉架的侧部开口,使得炉带能够进入炉架内即可。同时还可利用旧的炉架对炉带进行固定。不断降低了施工成本,也加快了施工进度。
附图说明
图1是高炉炉壳安装后的示意图。
图2是安装第1炉带、第2炉带、第3炉带后的示意图。
图3是安装第16炉带后的示意图。
图4是安装第15炉带后的示意图。
图5是安装第5炉带后的示意图。
图6是安装第4炉带后的示意图。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步说明。
参见图1,在炉架1的下侧部有开口,在所述开口处设置有水平延伸至炉架1内的两根平行的推移梁2,两根推移梁2之间的距离大于高炉的最大直径。在推移梁上设置有轨道3,推移车4通过底部的滚轮5滚动设置在轨道上,卷扬机6的机架设置在连接在两根推移梁之间的横梁上,卷扬机的卷绕绳7与推移车相连。
炉壳从下向上由16个炉带组成,依次为第1炉带、第2炉带、……、第16炉带组成。
该高炉炉壳倒装和正装结合的方法如下。
参见图2,把第1炉带101通过推移车运送至送入炉架内,然后通过行车11吊起第1炉带101,移动推移车至炉架的外部,然后把第1炉带下降后,固定在地基上。
参见图2,把第2炉带102通过推移车运送至送入炉架内,然后通过行车11吊起第2炉带,移动推移车至炉架的外部,然后把第2炉带下降后,,然后把第2炉带与第1炉带进行对接焊。
参见图2,把第3炉带103通过推移车运送至送入炉架内,然后通过行车吊起第3炉带,移动推移车至炉架的外部,然后把第3炉带下降后,,然后把第3炉带与第2炉带进行对接焊。
参见图3,把第16炉带1016通过推移车运送至送入炉架内,通过行车11把第16炉带提升,移动推移车至炉架的外部,然后把第16炉带的周边通过H型钢8与炉架焊接固定;
参见图4,把第15炉带1015通过推移车运送至送入炉架内,通过行车把第15炉带提升,移动推移车至炉架的外部,然后把第15炉带与第16炉带进行对接焊;必要时,然后把第15炉带的周边通过H型钢9与炉架焊接固定;
这样,再依次焊接好第14炉带、第13炉带,直至第5炉带105,参见图5。需要时在炉带与炉架之间焊接固定支撑梁10。
参见图6,再把第4炉带104通过推移车运送至送入炉架内,通过行车11把第4炉带提升,移动推移车至炉架的外部,然后把第4炉带104与第5炉带105、第3炉带103进行对接焊。

Claims (4)

1.高炉炉壳倒装方法,所述炉壳从下向上依次由第1炉带、第2炉带、……、第n炉带组成;其特征是:它包括下述步骤:
在炉架的下部一侧开口,开口大小要能够使得组成炉壳的各炉带通过;把第n炉带从所述开口处送入炉架内,通过位于炉架上部的行车把第n炉带提升,然后把第n炉带的周边与炉架固定;
把第m炉带从所述开口处送入炉架内,通过行车把第m炉带提升,然后把第m炉带与第m+1炉带进行对接焊;
m=n-1,n-2,…,2,1,n为自然数。
2.如权利要求1所述的高炉炉壳倒装方法,其特征是: 
把第1炉带从所述开口处送入炉架内,然后把第1炉带下部固定在地基上;
把第s炉带从所述开口处送入炉架内,然后把第s炉带与第1炉带进行对接焊;s=2,3;
把第4炉带从所述开口处送入炉架内,然后把第4炉带与第3炉带、第5炉带进行对接焊;
m=n-1,n-2,…,5。
3.如权利要求2所述的高炉炉壳倒装方法,其特征是:在所述开口处设置有水平延伸至炉架内的推移梁,在推移梁上设置有轨道,推移车滚动设置在轨道上,在推移梁与推移车之间设置带动推移车沿轨道移动的驱动装置;通过把各炉带放置在推移车上、并驱动推移车的方法把各炉带送入炉架内。
4.如权利要求1所述的高炉炉壳倒装方法,其特征是:把上下相邻的两个炉带进行对接焊后,再把位于下部的那个炉带的周边与炉架固定的步骤。
CN2013101633789A 2013-05-05 2013-05-05 高炉炉壳倒装方法 Pending CN103233089A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101633789A CN103233089A (zh) 2013-05-05 2013-05-05 高炉炉壳倒装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101633789A CN103233089A (zh) 2013-05-05 2013-05-05 高炉炉壳倒装方法

Publications (1)

Publication Number Publication Date
CN103233089A true CN103233089A (zh) 2013-08-07

Family

ID=48881153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101633789A Pending CN103233089A (zh) 2013-05-05 2013-05-05 高炉炉壳倒装方法

Country Status (1)

Country Link
CN (1) CN103233089A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103962808A (zh) * 2014-05-16 2014-08-06 中国十九冶集团有限公司 用于高炉炉壳的制作安装方法
CN106799559A (zh) * 2016-12-23 2017-06-06 首钢总公司 一种热风炉炉壳整带更换方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5565305A (en) * 1978-11-08 1980-05-16 Kawasaki Steel Corp Repairing method for blast furnace
JPH11256212A (ja) * 1998-03-09 1999-09-21 Nkk Corp 高炉炉体の改修方法
JP2000087123A (ja) * 1998-07-14 2000-03-28 Nippon Steel Corp 高炉炉体の改修・建設方法
CN1272552A (zh) * 1999-04-30 2000-11-08 川崎制铁株式会社 高炉的短时间改建和建设方法及设备
CN1974792A (zh) * 2006-12-01 2007-06-06 莱芜钢铁集团有限公司 高炉大修拆装炉自吊装施工方法及炉顶起重装置
CN102031320A (zh) * 2010-09-20 2011-04-27 中冶天工集团有限公司 一种高炉炉壳的更换方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5565305A (en) * 1978-11-08 1980-05-16 Kawasaki Steel Corp Repairing method for blast furnace
JPH11256212A (ja) * 1998-03-09 1999-09-21 Nkk Corp 高炉炉体の改修方法
JP2000087123A (ja) * 1998-07-14 2000-03-28 Nippon Steel Corp 高炉炉体の改修・建設方法
CN1272552A (zh) * 1999-04-30 2000-11-08 川崎制铁株式会社 高炉的短时间改建和建设方法及设备
CN1974792A (zh) * 2006-12-01 2007-06-06 莱芜钢铁集团有限公司 高炉大修拆装炉自吊装施工方法及炉顶起重装置
CN102031320A (zh) * 2010-09-20 2011-04-27 中冶天工集团有限公司 一种高炉炉壳的更换方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡俊鸽等: "高炉快速大修技术的发展", 《冶金丛刊》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103962808A (zh) * 2014-05-16 2014-08-06 中国十九冶集团有限公司 用于高炉炉壳的制作安装方法
CN106799559A (zh) * 2016-12-23 2017-06-06 首钢总公司 一种热风炉炉壳整带更换方法

Similar Documents

Publication Publication Date Title
CN104265334B (zh) 盾构机管片快速卸载装置
CN105781590B (zh) Tbm用接收洞负环拆除工艺
CN102430592A (zh) 支撑车卧式活套装置
CN103233089A (zh) 高炉炉壳倒装方法
CN202639805U (zh) 还原炉agd管道拆装顶升装置
CN104308413B (zh) 一种钢管组焊装置及其快速安装移动方法
CN106089230A (zh) 一种地铁施工的出渣装置及其方法
CN208455637U (zh) 一种基坑内钢支撑的安装系统
CN103343176B (zh) 高炉炉壳倒装的定位方法
CN203529267U (zh) 汽车拆解用上料板式输送机
CN103342321B (zh) 在役核电站蒸汽发生器的整体更换吊装方法
CN203238282U (zh) 高炉炉壳进行倒装而使用的推移平台
CN205472386U (zh) 一种中频炉前上料装置
CN104878146B (zh) 用于重力除尘器顶部波纹补偿器更换的施工方法
CN103333974B (zh) 定位简单准确的高炉炉壳倒装方法
CN202337945U (zh) 外侧就地提升梁体的装置
CN200986391Y (zh) 快速平烧机
CN107671255A (zh) 一种连铸坯头尾切割用台车
CN206033818U (zh) 一种铝卷退火炉
JP6037921B2 (ja) 溶銑処理工場の操業方法
CN202704876U (zh) 遮板小吊机
CN202079425U (zh) 冷轧连退机组的废料导料板
CN201997173U (zh) 高炉水渣渣水分离装置
CN107356121A (zh) 一种烧结机台车的安装方法
CN201424282Y (zh) 托辊隐藏式转载皮带机尾架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 210000 NANJING, JIANGSU PROVINCE TO: 617000 PANZHIHUA, SICHUAN PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20130827

Address after: 617000 Panzhihua, Sichuan, East Street, No. 350

Applicant after: China 19th Metallurgical Corporation

Address before: Banqiao street in Yuhuatai District of Nanjing city Jiangsu province 210000 Zhenxing Road No. 117

Applicant before: Nanjing Branch, China 19th Metallurgical Corporation

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130807