CN1030788C - 使轨道连续下降到给定标高的作业方法 - Google Patents

使轨道连续下降到给定标高的作业方法 Download PDF

Info

Publication number
CN1030788C
CN1030788C CN91111744A CN91111744A CN1030788C CN 1030788 C CN1030788 C CN 1030788C CN 91111744 A CN91111744 A CN 91111744A CN 91111744 A CN91111744 A CN 91111744A CN 1030788 C CN1030788 C CN 1030788C
Authority
CN
China
Prior art keywords
track
absolute altitude
given
load
physical location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN91111744A
Other languages
English (en)
Other versions
CN1062570A (zh
Inventor
约瑟夫·斯俄尔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Franz Plasser Bahnbaumaschinen Industrie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Franz Plasser Bahnbaumaschinen Industrie GmbH filed Critical Franz Plasser Bahnbaumaschinen Industrie GmbH
Publication of CN1062570A publication Critical patent/CN1062570A/zh
Application granted granted Critical
Publication of CN1030788C publication Critical patent/CN1030788C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B35/00Applications of measuring apparatus or devices for track-building purposes
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/20Compacting the material of the track-carrying ballastway, e.g. by vibrating the track, by surface vibrators

Abstract

一种使轨道连续下降到给定标高的作业方法,作业时使轨道产生水平振动,并施加垂直的临时静荷载,直到轨道下沉到给定位置,其特征是:在轨道下沉之前,先测取轨道的实际位置,从中算出一条理想的给定标高线,然后根据轨道实际位置与给定标高之间误差的大小比例的一组参数如垂直临时荷载、作业前进速度和轨道振动频率中至少一个参数的变化,使轨道得到不同高度的下沉。

Description

使轨道连续下降到给定标高的作业方法
本申请是91100609.5号专利申请的分案申请,涉及一种使轨道下降到给定标高的作业方法。
91100609.5号专利申请涉及一部夯实轨道道碴床用的连续走行式线路施工机械。该机械装有走行驱动机构和支承在走行机构上的机架,上面至少有一套利用驱动机构控制和调节高度的轨道稳定机组。轨道稳定机组装有滚轮机构,利用扩张驱动机构可使之贴靠钢轨内侧,并利用振动器使之振动。机架还有一套水平基准系统,该系统装有高度测值传感器的测量轮轴。
根据US—PS4064807号专利介绍的一种称为轨道稳定车的线路施工机械,用于夯实道碴床,已为人们所知。机械两端的走行机构之间,装有可调节高度的轨道稳定机组。该机组利用带缘滚轮能在轨道上走行,同时利用与钢轨刚性连接的能侧向转动的滚动圆盘,可使机组牢固嵌合在钢轨上。这种带缘滚轮和滚动圆盘一般称之为滚轮机构。为了消除带缘滚轮与钢轨之间的游间,用扩张驱动机构将轨道稳定机组的带缘滚轮挤靠在钢轨内侧上。利用两个与机架相连的垂直液压驱动机构,向轨道稳定机组施加可以调节的静荷载。轨道稳定机组利用振动器使轨道产生与机械纵趱向成横向的水平振动。这样,轨道稳定本在连续前进作业时,结合临时静荷载,即可使轨道下沉使道床密实。为了检验轨道下沉量,有一套由两根张紧的钢绳组成的水平基准系统。前面提到的一套拨道基准系统,在此不做进一步介绍。
根据US—PS4046079号专利还有一种与线路捣固机连挂的轨道稳定车,已为人们所知。轨道稳定车有一套带拨道基准系统的拨道驱动机构,用于拨正轨道。使用一套普通的跨接两部机械的基准系统即可用指示记录仪绘制轨道位置的图形,基准系统钢绳由相应轨道的一根导轨无游间地导向。如果发现轨道有剩余误差,即可用拨道驱动机构予以校正。这套为人们所知的基准系统主要用于线路捣固机,但为上述目的也适用于两部机械。
另外,根据US—PS4643101号专利有一种装有铰接式机架的连续走行式线路施工机械,已为人们所知。这部线路施工机械依作业方向的前面是一部线路捣固机,它有一个能依捣固机的纵向移动的机具架,上面装有捣固起拨道机组。机架的后部有两套轨道稳定机组,机组之间有一个由轨道导向的高度可调的测量轮轴形式的探测机构。探测机构的上端装有与水平基准系统的钢绳参考基准一同动作的开关机构。从机架的前端到后端贯穿一根张紧的属于拨道基准系统的钢绳。钢绳位于机械横向的中间位置。这条纲绳在捣固装置处配备有正矢测量传感器,以临控捣固机的起道拨道机组对轨道的横向位移。
本发明的目的是提供一种使轨道连续下降到给定标高的作业方法。
本发明的使轨道连续下沉到给定标高的作业方法是:作业时使轨道产生水平的振动,并施加垂直的临时静荷载,直到轨道下沉到给定位置。这套作业方法的特点是,在轨道下沉之前,先测取轨道的实际位置,从中算出一条理想的给定标高线,然后根据轨道实际位置与给定标高之间误差的大小成比例的一组参数中,如垂直荷载、前进作业速度和轨道振动频率,至少一个参数的变化,使轨道得到不同高度的下沉。这样就首次做到利用轨道稳定车来校正轨道标高的误差,而过去轨道稳定车则是用于使事先经捣固机校正到正确位置的轨道均匀下沉。这套作业方法与捣固机相反,不是控制起道的力,而是根据轨道标高误差的比例控制使轨道下沉的力,比如控制垂直的临时荷载。轨道的这种校正方法,可以用特别有利的方法连续进行。
本发明的这套作业方法的一个有利的改进内容是:对全部整修线段的轨道施加一个中等的临时静荷载,确切地说基本荷载。根据轨道实际位置和给定位置间偏差的大小,按比例改变这个基本荷载。利用垂直的临时静荷载,确切地说基本荷载预先给出调节范围。该荷载产生所需之轨道平均下沉量,确切地说体现轨道稳定程度。还有缺陷(凸起或凹陷)时,即按比例提高或减少垂直临时荷载。这样,轨道稳定车作业以后,就可以形成一条符合道碴所需密实度下沉的而且标高准确的轨道。
下文将借助于附图示的实施例,进一步阐明本发明。附图有:
图1为装有夯实轨道碴床用的轨道稳定机组的连续走行式线路施工机械的侧视图,该机械有一套水平基准系统和一个位于轨道稳定机组依作业方向后面的测量轮轴;
图2为水平基准系统的示意图;
图3为水平基准系统调整电路的示意图;
图4为连续走行式线路施工机械另一实施例的侧视图;
图5为按图4的水平基准系统的示意图;
图6为按图4和图5的水平基准系统的调整电路的示意图;
图7为连续走行式线路施工机械另一实施例的侧视图,其中的水平基准系统有三个测量轮轴;
图8为图7所示水平基准系统的示意图;
图9为图7和图8所示水平基准系统的调整电路的另一示意图。
图1所示一般称为轨道稳定车的线路施工机械1,它有一个尺寸很大的机架2,两端通过转向架式走行机构3,能在一条由轨枕4和钢轨5组成的轨道6上走行。走行驱动机构7、振动驱动机构8和其他驱动机构的动力,由中央动力供应站9提供。机械1的前后端各设一个隔音的驾驶室10,安装在振荡式底架上。为了控制各种驱动机构和处理各种测量信号,设有中央控制、计算与记录单元11。两个走行机构3之间有两套轨道稳定机组12。该机组有滚轮机构13,利用扩张驱动机构能使之贴靠钢轨内侧,并用振动器13使之产生水平振动。为了向轨道稳定机组12施加临时静荷载,有两个垂直的与机架2铰接的液压驱动机构15。水平基准系统16为每根钢轨5配备一根张紧的钢绳17做为参考基准。每根钢绳有一个高度测值传感器18。这个传感器与装在机架2上能调节高度并通过带缘滚轮能在轨道6上滚动的测量轮轴19相连。钢绳,确切地说参考基准17的前后两端固定在一个安装在机架2上能调节高度并支承在走行机构3的轴承上的标高测取器20上。箭头21表示机械1的作业方向。在另一个有利的变换实施例中,如一点一划细线所示,也可以再安设一个第二测量轮轴22。这样,当测量轮轴19从轨道6上被抬起的时候,也能依另一个作业方向使用机械1。
图2所示的参考基准17,由端部的两个标高测取器20沿轨道6进行移动。装在下面的滚轮可以看做是转向架式走行机构3。通过安装在机架2上能调节高度的标高测取器23与测量轮轴19相连的高度测值传感器18是一个旋转式电位计,牢固地与张紧的钢绳17相接。A表示用两套轨道稳定机组12使轨道6下沉到给定位置所需之平均下沉量。l和a为前面标高测取器20及中间标高测取器23分别与后面的标高测取器20之间的距离。FA是轨道稳定机组12向轨道6施加的垂直临时荷载。
轨道稳定机组12范围内的垂直临时荷载是这样控制的,就是使给定位置和高度测值传感器18所测取的实际位置之间的差值等于零。此时要将垂直的基本荷载调整到使轨道能达到所需之下沉量A的平均数的程度。如果轨道在测量轮轴19范围内因凸起而过高,那么就按比例提高临时荷载EA,如果轨道过低,则相应减少临时荷载FA。控制频率也取得上述效果,在30—40赫之间可使轨道达到最大下沉量。由于测量系统的前端还处于有误差的轨道上,因此可以认为前面的标高测取器20位于用一划一点细线所示之轨道凸起部分24上。这会使前面的标高测取器20产生误差FA。这样中间的标高测取器23自然也会测取错误的数值fvA,从而实际上会在测量轮轴19范围内出现用虚线所示之下沉量25的假象。所测取的误差可以用下列公式准确算出:
         fvA=Fv·a/l,
如果轨道给定纵截面为已知,加上高度测值传感器18测出的实际纵截面的误差,电子水平控制系统就能利用相应的校正值fvA自动考虑前面测取的误差Fv。这样,这个误差在中间测量轮轴19处就不会对校正标高产生任何影响。
利用机械1本身进行测量,也可以确定上述的轨道给定纵截面。为此要按以下步骤进行:
在机械1的机架中进行测量行驶时测定轨道6的实际标高;利用适当的计算机程序在计算机单元11上算出轨道的给定纵截面;
用线路施式机械1对轨道6进行轨道稳定作业,确切地说使轨道6下沉;
根据所确定的给定纵截面标高与测定的实际纵截面标高之前的误差,向水平基准系统16发出控制信号和调整信号,用来操纵机械1。
另一个可能性是由当地铁路局预先给定轨道几何图形。在这种情况下,用表格式软盘形式将数据交给机械的乘务组,然后读入计算机单元11。也可以由机械的乘务组在进行轨道稳定作业之前用人工,比如用光学仪器进行测量。计算出的校正值在线路整修过程中可由乘务组人工输入,也可自动输入。
根据示意图3所示,由高度测值传感器18连续测取轨道实际标高,并将相应的测值传送给差动放大器26。此外通过导线27将相应的校正值△fvA也传送给差动放大器26。经微分得出的给定一实际比较值最后传送给加法器28。这个加法器也属于一个调节基本荷载使轨道达到相应下沉量A的可调电位计29。加法器28的输出端与液压控制元件,确切地说与伺服阀30相连。这个伺服阀根据加法器28所输出的测值,按一定比例关系控制轨道稳定机组12的液压驱动机构15。虚线所示之导线31是测量轮轴19落在轨道6上以后形成的反馈线,确切地说形成的闭合调谐回路。
图4所示之线路施工机械1除偏离中心的测量轮轴19外,还有一个位于两个轨道稳定机组12之间并与标高测取器32及高度测值传感器33相连的测量轮轴34。
图5所示的水平基准系统16的基础是两个高度测值传感器18与33之间的恒定比例关系。恒定比例关系求法如下:
i=f1/f2=a(a+b)    △f2v=i·△flv
这个系统的优点是,在前面的标高测取器20范围内出现的误差,不至于再在标高测取器32范围内引起误差。
示意图6所示的是在图3中增加了高度测值传感器33、差动放大器35和放大器36。通过导线27自动考虑预先给定的校正值△flv=fva/l。利用高度测值传感器33的测值求差以后,测量信号在放大器36内用i值进行放大后,做为给定值传送差动放大器26。差动放大器26通过其第二个输入端与高度测值传感器18相连。在差动放大器26的输出端产生给定—实际比较值。这个值要加在可用电位计29调节的基本荷载上。
图7所示的线路施工机械1同时使用三个测量轮轴19,22和34。其中额外增加的测量轮轴22位于轨道稳定机组12依作业方向的前面。这个测量轮轴22通过一个装在机架上能调节高度的标高测取器37与高度测值传感器38相连。
特别如图8所示,利用两个外侧高度测值传感器18和38提供一条由钢绳,确切地说由参考基准17所体现的直线。位于中间的高度测值传感器33即应处于这条直线上。这样就可使在前面和后面测取的误差(Fv或Fh)自动得到补偿。在中部高度测值传感器33处的给定纵截面标高fA求法如下;
fA=(f3·c+f4·b)/(b+c)
其中f3是后面高度测值传感器18处的纵截面标高,f4是前面高度测值传感器38处的纵截面标高。F是轨道假定下沉时的实际误差;fist是轨道位置的实际误差。如果机械1由给定纵向断面标高值和校正值引导前进,则位于高度测值传感器38处的误差会得到补偿。
如示意图9所示,实际标高由高度测值传感器33传送给差动放大器26。在放大器39内将取自高度测值传感器18的数值F3用因数c/b+c进行放大,然后传送给加法器42。在差动放大器41内求出经导线27传入的校正值与高度测值传感器38测取的数值之间的差值,然后传送给放大器40。用因子b/b+c放大的测值传送给加法器42,最后做为给定值输入差动放大器26。在差动放大器内产生给定一实际比较值,并在加法器28内加在可由电位计29任意调节的基本荷载上。下一步即按图3所述之方式方法控制轨道稳定机组12的液压驱动机构15。

Claims (2)

1.一种使轨道连续下降到给定标高的作业方法,其步骤包括:作业时使轨道产生水平的振动,并施加垂直的临时静荷勒,直到轨道下沉到给定位置,其特征是:在轨道下沉之前,先测取轨道的实际位置,从中算出一条理想的给定标高线,然后根据轨道的实际位置与给定标高之间误差的大小成比例的包括垂直临时荷载、作业前进速度和轨道振动频率的一组参数中至少一个参数的变化,使轨道得到不同高度的下沉。
2.根据权利要求1所述的作业方法,其特征是:对全部整修线段的轨道施加一个中等的临时静荷载,确切地说基本荷载,根据轨道实际位置和给定位置间偏差的大小,按比例改变这个基本荷载。
CN91111744A 1990-02-06 1991-12-20 使轨道连续下降到给定标高的作业方法 Expired - Fee Related CN1030788C (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ATA250/90 1990-02-06
AT0025090A AT401398B (de) 1990-02-06 1990-02-06 Kontinuierlich verfahrbare gleisbaumaschine zum verdichten der schotterbettung

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN91100609A Division CN1026427C (zh) 1990-02-06 1991-02-01 夯实道碴床的连续走行式线路施工机械

Publications (2)

Publication Number Publication Date
CN1062570A CN1062570A (zh) 1992-07-08
CN1030788C true CN1030788C (zh) 1996-01-24

Family

ID=3485545

Family Applications (2)

Application Number Title Priority Date Filing Date
CN91100609A Expired - Fee Related CN1026427C (zh) 1990-02-06 1991-02-01 夯实道碴床的连续走行式线路施工机械
CN91111744A Expired - Fee Related CN1030788C (zh) 1990-02-06 1991-12-20 使轨道连续下降到给定标高的作业方法

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN91100609A Expired - Fee Related CN1026427C (zh) 1990-02-06 1991-02-01 夯实道碴床的连续走行式线路施工机械

Country Status (18)

Country Link
US (1) US5257579A (zh)
JP (1) JP2885945B2 (zh)
CN (2) CN1026427C (zh)
AT (1) AT401398B (zh)
AU (2) AU631718B2 (zh)
BE (2) BE1003129A3 (zh)
CA (1) CA2033865C (zh)
CH (1) CH683108A5 (zh)
DE (1) DE4102872C2 (zh)
DK (1) DK174873B1 (zh)
ES (1) ES2030362A6 (zh)
FR (2) FR2657900B1 (zh)
GB (1) GB2240573B (zh)
IT (1) IT1251536B (zh)
NL (1) NL191613C (zh)
RU (1) RU2025548C1 (zh)
SE (2) SE508825C2 (zh)
UA (1) UA35544C2 (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109891027A (zh) * 2016-11-04 2019-06-14 普拉塞-陶伊尔铁路机械出口股份有限公司 用于校正轨道位置误差的方法和轨道维护机器

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ATE184935T1 (de) * 1994-06-17 1999-10-15 Plasser Bahnbaumasch Franz Verfahren zur kontinuierlichen messung des querverschiebewiderstandes eines gleises
AT403708B (de) * 1994-09-15 1998-05-25 Plasser Bahnbaumasch Franz Gleisbaumaschine
DE19833520A1 (de) * 1998-07-25 2000-01-27 Weiss Gmbh & Co Leonhard Verfahren zum Verlegen und/oder Richten einschließlich Stabilisieren eines Eisenbahn-Gleisrostes in einem Schotterbett
AT7266U3 (de) * 2004-08-19 2005-12-15 Plasser Bahnbaumasch Franz Gleisbaumaschine
PL1650348T3 (pl) * 2004-09-22 2008-08-29 Franz Plasser Bahnbaumaschinen Ind Mbh Sposób sprawdzania położenia toru kolejowego
ES2313109T3 (es) * 2004-11-22 2009-03-01 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Procedimiento para corregir errores de posicion en altura de una via.
AT504517B1 (de) * 2007-04-12 2008-06-15 Plasser Bahnbaumasch Franz Verfahren und maschine zur absenkung eines gleises
RU2468136C1 (ru) * 2011-03-30 2012-11-27 Максим Николаевич Балезин Способ подбивки шпал железнодорожного пути и машина для его осуществления
ES2397739B1 (es) 2011-11-25 2013-11-26 José Antonio IBÁÑEZ LATORRE Máquina y método de mantenimiento de vía ferrea para nivelación, alineación, compactación y estabilización de vía, con capacidad de operar sin interrupciones en su avance.
CN104775339B (zh) * 2014-01-10 2017-01-11 中国铁建高新装备股份有限公司 米轨多功能动力稳定车
AT515507B1 (de) * 2014-02-28 2016-03-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Verfahren zum Arbeitseinsatz von Gleisbaumaschinen
WO2016023609A1 (de) * 2014-08-13 2016-02-18 Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. Maschine zur stabilisation eines gleises
CA3032145A1 (en) * 2016-08-05 2018-02-08 Harsco Technologies LLC Rail vehicle having stabilizer workhead with powered axles
AT520795B1 (de) * 2017-12-21 2020-03-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Gleisbaumaschine und Verfahren zum Nivellieren eines Gleises
AT520894B1 (de) * 2018-01-22 2021-01-15 Hp3 Real Gmbh Verfahren zur Gleislageverbesserung durch eine gleisfahrbare Gleisstopfmaschine
RU2703819C1 (ru) * 2018-12-18 2019-10-22 Федеральное государственное бюджетное образовательное учреждение высшего образования "Сибирский государственный университет путей сообщения" (СГУПС) Способ автоматического контроля качества уплотнения балластного слоя рельсового пути и устройство для его осуществления
CN109881541A (zh) * 2019-03-12 2019-06-14 江苏航运职业技术学院 可修复沉降的港口运输轨道
AT523228A1 (de) * 2019-12-10 2021-06-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Maschine und Verfahren zum Stabilisieren eines Schottergleises

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT319993B (de) * 1971-07-14 1975-01-27 Plasser Bahnbaumasch Franz Fahrbare Gleisnivellier-Stopfmaschine
AT337241B (de) * 1975-03-05 1977-06-27 Plasser Bahnbaumasch Franz Fahrbare maschine zum verdichten und korrigieren des gleises
AT343165B (de) * 1975-01-31 1978-05-10 Plasser Bahnbaumasch Franz Fahrbare schotterbett-verdichtmaschine zur korrektur der gleislage
AT345881B (de) * 1975-08-18 1978-10-10 Plasser Bahnbaumasch Franz Fahrbare maschine zum kontinuierlichen nivellieren und verdichten der schotterbettung eines gleises
AT343167B (de) * 1976-02-20 1978-05-10 Plasser Bahnbaumasch Franz Fahrbare gleisstopfmaschine
AT359110B (de) * 1977-08-16 1980-10-27 Plasser Bahnbaumasch Franz Selbstfahrbare gleisbaumaschinenanordnung
FR2490495A1 (fr) * 1980-09-19 1982-03-26 Roussel Uclaf Nouvelles glycoproteines hydrosolubles immunostimulantes extraites de klebsiella pneumoniae, leur procede d'obtention, leur application a titre de medicaments et les compositions les renfermant
AT372724B (de) * 1981-02-27 1983-11-10 Plasser Bahnbaumasch Franz Fahrbare maschinenanlage mit mehreren, unabhaengig voneinander verfahrbaren gleisbaumaschinen
US4643101A (en) * 1982-11-23 1987-02-17 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile track leveling, lining and tamping machine
AT391904B (de) * 1988-09-15 1990-12-27 Plasser Bahnbaumasch Franz Gleisbaumaschine mit gleis-stabilisator

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109891027A (zh) * 2016-11-04 2019-06-14 普拉塞-陶伊尔铁路机械出口股份有限公司 用于校正轨道位置误差的方法和轨道维护机器
US11174598B2 (en) 2016-11-04 2021-11-16 Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. Method and track maintenance machine for correction of track position errors

Also Published As

Publication number Publication date
BE1003129A3 (fr) 1991-12-03
JP2885945B2 (ja) 1999-04-26
FR2657900A1 (fr) 1991-08-09
IT1251536B (it) 1995-05-16
NL191613B (nl) 1995-07-03
SE9003432L (zh)
ITMI910225A1 (it) 1992-07-31
AT401398B (de) 1996-08-26
DK20691A (da) 1991-08-07
AU631330B2 (en) 1992-11-19
SE9200031D0 (sv) 1992-01-08
ES2030362A6 (es) 1992-10-16
FR2671114B1 (fr) 1994-01-28
CN1062570A (zh) 1992-07-08
CA2033865A1 (en) 1991-08-07
ATA25090A (de) 1996-01-15
DE4102872C2 (de) 1995-03-16
AU631718B2 (en) 1992-12-03
SE9003432D0 (sv) 1990-10-29
GB2240573A (en) 1991-08-07
UA35544C2 (uk) 2001-04-16
AU7025291A (en) 1991-08-08
FR2657900B1 (fr) 1992-07-03
CN1054460A (zh) 1991-09-11
RU2025548C1 (ru) 1994-12-30
DK20691D0 (da) 1991-02-06
BE1005265A3 (fr) 1993-06-15
CH683108A5 (de) 1994-01-14
AU8964091A (en) 1992-02-06
ITMI910225A0 (it) 1991-01-31
SE508824C2 (sv) 1998-11-09
DK174873B1 (da) 2004-01-12
GB9101992D0 (en) 1991-03-13
NL191613C (nl) 1995-11-06
NL9002436A (nl) 1991-09-02
GB2240573B (en) 1994-04-13
SE508825C2 (sv) 1998-11-09
FR2671114A1 (fr) 1992-07-03
JPH04360902A (ja) 1992-12-14
CA2033865C (en) 1999-10-19
US5257579A (en) 1993-11-02
CN1026427C (zh) 1994-11-02
SE9200031L (sv) 1992-04-30
DE4102872A1 (de) 1991-08-08

Similar Documents

Publication Publication Date Title
CN1030788C (zh) 使轨道连续下降到给定标高的作业方法
CN1026428C (zh) 夯实道碴床的连续走行式线路施工机械
CN1044400C (zh) 测量轨道横向阻力的方法及其专用机械
CN1108416C (zh) 校正轨道位置的方法
CA2151993C (en) Method for continuously measuring the lateral resistance of a track
CN1066509C (zh) 校正轨道位置用的线路作业机械
CA2298110C (en) A method of correcting the position of a track
SU1259963A3 (ru) Передвижна выправочно-подбивочна машина
HU177023B (hu) Konstrukcija samokhodnogo putevogo kombajna dlja vyveski,usilenija i rikhtovki putej,a tak zhe method obrabotki putej
US5640909A (en) Method and machine for tamping and stabilizing a track
US4046078A (en) Track surfacing apparatus
US4643101A (en) Mobile track leveling, lining and tamping machine
US3486461A (en) Method and apparatus for aligning track
US6158352A (en) Machine and method for rehabilitating a track
US4627358A (en) Continuous action track leveling, lining and tamping machine
CA1043630A (en) Mobile track tamper
CA1229017A (en) Mobile track leveling, lining and tamping machine
RU2468136C1 (ru) Способ подбивки шпал железнодорожного пути и машина для его осуществления
GB2250765A (en) Process for continuously lowering a railway track to the required level
CA1094885A (en) Mobile track surfacing machine
GB2135369A (en) Travelling railway track tamping machine with two pivotally interconnected machine frames
ITMI950147A1 (it) Procedimento per l'abbassamento continuo di un binario in una prescritta posizione di altezza

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C15 Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993)
OR01 Other related matters
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 19960124

Termination date: 20100201