CN102587291A - 一种钢箱梁步履式多点顶推施工方法及施工系统 - Google Patents

一种钢箱梁步履式多点顶推施工方法及施工系统 Download PDF

Info

Publication number
CN102587291A
CN102587291A CN2012100847907A CN201210084790A CN102587291A CN 102587291 A CN102587291 A CN 102587291A CN 2012100847907 A CN2012100847907 A CN 2012100847907A CN 201210084790 A CN201210084790 A CN 201210084790A CN 102587291 A CN102587291 A CN 102587291A
Authority
CN
China
Prior art keywords
jack
steel case
steel
case beam
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100847907A
Other languages
English (en)
Other versions
CN102587291B (zh
Inventor
陈国良
袁求武
周盛初
吴浩
荣劲松
陈鸣
陈衡
陆广明
王爱溪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority to CN201210084790.7A priority Critical patent/CN102587291B/zh
Publication of CN102587291A publication Critical patent/CN102587291A/zh
Application granted granted Critical
Publication of CN102587291B publication Critical patent/CN102587291B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种钢箱梁步履式多点顶推施工方法,是针对拖拉式顶推方式的缺点改进后的优化方案,即在拼装平台、各个临时墩、主墩等多点安装顶推装置,先用竖向千斤顶将钢箱梁整体顶升使其与落梁架分离,然后利用推移千斤顶纵桥向推移一个行程,再下放钢箱梁至落梁架,接着回缩推移千斤顶,准备下一行程的顶推,循环工作,直至钢箱梁完成安装。本发明的钢箱梁顶推施工采用多点步履式顶推体系,除可解决常规工艺的缺点外,还具有①极大减小墩顶水平力;②简化临时墩顶结构;③对钢箱梁的损伤小;④施工成本较经济等优点。

Description

一种钢箱梁步履式多点顶推施工方法及施工系统
技术领域
本发明涉及技术适用于公路、铁路行业相关大型桥梁的钢箱梁顶推施工技术领域,尤其涉及多点步履式顶推系统的应用。 
背景技术
拖拉式顶推为钢箱梁顶推施工的常规工艺,即在拼装平台、临时墩、主墩下横梁上设置滑道梁,钢箱梁在滑道梁上采用钢绞线通过前方的连续作用千斤顶牵引而滑动。每提升、焊接一个节段,则拖拉一个节段,循环工作,逐步将钢箱梁拖拉至对岸,直至钢箱梁完成安装。 
此方案在国内顶推施工中使用较多、工艺成熟,其主要缺点归纳如下: 
①、墩顶产生较大水平力
拖拉式顶推会在临时墩与主墩的墩顶位置产生较大水平力,对临时墩刚度要求高,对主墩可能造成根部混凝土开裂而无法修复。 
②、临时墩墩顶结构复杂
拖拉式顶推临时墩墩顶结构非常复杂,稳定性较差,特别是竖向调整千斤顶的稳定性不好,在拖拉过程中,受偏载(水平力)的影响,钢箱梁有倾覆的危险。 
类似的专利申请有:公开号为CN101078189A,公开日为2007年11月28日,发明名称为“一种应用于自锚式悬索桥的钢箱梁架设方法”的中国发明专利申请,其公开了一种自锚式悬索桥的钢箱梁架设方法,其首先在岸上或非通航区域设置钢箱梁支架,在钢箱梁支架上对钢箱梁进行分段预拼装;设置钢箱梁临时墩;用顶推或拖曳的方法将预拼好的钢箱梁向前推移,使钢箱梁从钢箱梁支架移到钢箱梁临时墩上,利用钢箱梁临时墩支撑;按此法继续分段预拼装及顶推钢箱梁直至到达河道对面的岸上。 
公开号为CN101250855A,公开日为2008年8月27日,发明名称为“多点整体顶推钢箱梁施工工法”的中国发明专利申请公开了一种多点整体顶推钢箱梁的施工工法,其利用顶推千斤顶推程对钢箱梁和导梁施加顶推力,另外通过顶升千斤顶提供支撑和调整相应点标高。该技术方案仍然是通过推拉/拖曳方式来对钢箱梁进行顶推。 
公开号为CN101967800A,公开日为2011年2月9日,发明名称为“钢箱梁的架设顶推滑移方法”公开了一种大吨位钢箱梁的架设顶推滑移方法。首先在各桥墩顶布置整平钢垫箱,获得平整面,在平整面上安装主动顶推器或被动顶推器与起落梁用液压千 斤顶,并将钢箱梁移入桥墩,然后启动主动顶推器,带动钢箱梁梁体往前滑移,待活塞行程走行完毕,再同时起升起落梁用液压千斤顶,顶起钢箱梁,并将主动顶推器回复到初始位置,再落下液压千斤顶;重复活塞行程,使钢箱梁移动就位。该技术方案中,仍然是通过主动顶推器对钢箱梁施加顶推力,而液压千斤顶把钢箱梁向上顶起只是为了主动顶推器的复位。因此,仍然存在推拉式顶推的弊端。 
发明内容
本发明的目的在于针对拖拉式顶推的上述缺点,提供一种改进的悬索桥钢箱梁顶推施工方案。 
为了达到上述目的,本发明采用了以下技术方案:钢箱梁步履式多点顶推施工方法,其包括以下施工步骤: 
(1)钢箱梁加工; 
(2)钢箱梁现场施工准备及架设安装; 
(2.1)现场安装施工拼装平台和临时墩,然后在每一临时墩、主墩和拼装平台顶部安装至少一套顶推装置,在每套顶推装置沿桥纵向前后方设置落梁架,每套顶推装置由若干台竖向千斤顶和一台推移千斤顶组成,在拼装平台上安装提升固定吊架,安装行走、起吊装置和控制系统; 
(2.2)钢箱梁分节段加工制造由固定吊架提升并滑移至安装有顶推装置的拼装平台顶面;
(2.3)钢箱梁在拼装平台顶面逐段焊接后,控制系统控制多套顶推装置多点同步顶推,顶推操作按以下步骤操作: 
(2.31)竖向千斤顶同步起顶,将钢箱梁顶起至离开落梁架后,持压; 
(2.32)推移千斤顶向前推移,使竖向千斤顶及钢箱梁共同向前推移一个行程,推移千斤顶停止; 
(2.33)竖向千斤顶缓慢卸载至将钢箱梁放置到落梁架上,竖向千斤顶继续回缩至与钢箱梁底部脱离; 
(2.34)推移千斤顶回缩,连同竖向千斤顶回复至起始位置,准备下一行程; 
(2.4)逐段重复上述顶推操作步骤至各段钢箱梁落梁就位全桥安装完成。 
为减少最大悬臂时钢箱梁的应力及挠度,在钢箱梁首推节段前端设置钢导梁,钢导梁采用桁架结构形式,钢导梁前端底部设置向前上方倾斜的斜面。 
在临时墩和主墩靠近钢箱梁顶推始发端的一侧设置有接应装置,所述接应装置包括一固定座,一安装于固定座顶部的滚轮及液压千斤顶。 
所述竖向千斤顶安装于竖向千斤顶支座上,竖向千斤顶支座安置于所述推移千斤顶部的滑移基座上,当所述推移千斤顶对所述竖向千斤顶支座施加顶推作用力时,所述竖向千斤顶支座相对于所述滑移基座向前滑动。 
所述滑移基座设有用于限制所述竖向千斤顶支座向前位移距离的纵向限位结构,所述步骤2.32中,一个行程为40~50厘米,所述纵向限位结构限定所述推移千斤顶每次前移2~3厘米。 
所述滑移基座还设有用于限制所述钢箱梁横向移位的横向限位结构。 
一种自锚式悬索桥钢箱梁多点步履式顶推施工系统,包括沿桥纵向布置的包含拼装平台、临时墩和主墩的桥梁支撑结构,桥梁支撑结构上安装有顶推装置、行走装置、液压系统和电脑控制系统,所述拼装平台上安装有用于提升所述钢箱梁的提升固定吊架,在每一临时墩、主墩和拼装平台顶部设置至少一套顶推装置,在顶推装置沿桥纵向的前后设置落梁架,每套顶推装置由若干台竖向千斤顶和一台推移千斤顶组成,竖向千斤顶顶部安置有用于承载钢箱梁的千斤顶垫梁,竖向千斤顶固定于竖向千斤顶支座上,所述竖向千斤顶支座安置于所述推移千斤顶部的滑移基座并可相对滑移基座纵向移动,多套顶推装置由控制电路统一控制共同升降或平移。 
钢箱梁首推节段前端设置有钢导梁,钢导梁采用桁架结构形式,钢导梁前端底部设置向前上方倾斜的斜面。 
所述固定吊架具有固定支脚及活动支脚,固定支脚固定安装于桥梁边墩上,活动支脚滑行于相邻于边墩的拼装平台上钢箱梁或钢导梁的顶面轨道,固定支脚与活动支脚之间为横向联系梁,横向联系梁上布设有提升机构滑道。 
本发明采用的多点步履式顶推是针对拖拉式顶推方式的缺点改进后的优化方案,即在拼装平台、各个临时墩、主墩等多点安装顶推装置,先用竖向千斤顶将钢箱梁整体顶升使其与落梁架分离,然后利用推移千斤顶纵桥向推移一个行程,再下放钢箱梁至落梁架,接着回缩推移千斤顶,准备下一行程的顶推,循环工作,直至钢箱梁完成安装。 
本发明的钢箱梁顶推施工采用多点步履式顶推体系,除可解决常规工艺的缺点外,还具有以下优点: 
①、极大减小墩顶水平力 
在各独立的顶推系统中,向前的推移力与摩擦反力数值相等,方向相反,即为一对内力,对临时墩或主墩不构成外力,理论上匀速顶推过程中且在各顶推装置同步的情况下,不存在水平力。在每一行程开始与结束时有比较小的水平力,考虑同步差异,最大水平力相对于拖拉式亦可忽略不计。 
②、简化了临时墩顶结构 
顶推装置作为一个整体构件,其本身结构也较为简单。顶推装置下方只有两层分配梁,结构大为简化,稳定性却较大提高,确保施工安全。 
③、对钢箱梁的损伤小 
顶推装置中的竖向千斤顶受控于计算机控制系统,可在不同工况下根据需要调整竖向顶升力,使钢箱梁的应力值达到最小,确保钢箱梁的安全。 
④、施工成本较经济 
步履式较拖拉式的辅助用钢量减少,施工成本较为经济。 
附图说明
图1是本发明施工立面布置图。 
图2是本发明施工平面布置图。 
图3是固定吊架与拼装平台安装示意图。 
图4是钢箱梁提升到位并与钢导梁连接安装示意图。 
图5是临时墩墩顶顶推装置立面布置图。 
图6是带接应装置的临时墩墩顶立面布置图。 
其中,过渡墩1  拼装平台2  主墩3  临时墩4  临时墩5  主墩6  临时墩7过渡墩8  提升固定吊架9  后支腿9.1  前支腿9.2  顶推装置10  竖向千斤顶10.1  推移千斤顶10.2  垫梁10.3  支座10.4  滑移基座10.5  钢导梁11  斜面11.1  落梁架12  钢箱梁13  接应装置14  固定座14.1  滚轮14.2 
具体实施方式
如图1所示,根据钢箱梁顶推工艺要求和现场情况,在主梁设计位置处,沿纵桥方向,依次布置:过渡墩1、拼装平台2、主墩3、临时墩4、临时墩5、主墩6、临时墩7与过渡墩8等支撑结构。在临时墩4、5的上下游两侧设置防撞墩。在过渡墩1与拼装平台2间设置用于钢箱梁吊装、组拼与焊接的钢箱梁提升固定吊架9。在拼装平台2、各主墩与临时墩上设置顶推装置10。 
其中, 
如图3所示,拼装平台2为钢箱梁匹配、焊接及顶推的重要施工部位,采用平面T字形结构。考虑成本控制,其中受力最大的位于中间的10根管桩采用变截面设计,即下部为Φ1.2m钻孔灌注桩,上部为Φ1.0m钢管桩,纵桥向均布5排,每排跨距为8m;位于上、下游方向的两翼各布置3根Φ0.8m钢管桩,共同组成拼装平台。 
如图3所示的提升固定吊架9由4片主桁架拼装而成,其后支腿9.1固定于过渡墩 1,前支腿9.2为活动支腿,可滑行于钢箱梁或钢导梁顶面的轨道。主桁间在两端设置横向联系梁,主桁上布设钢轨作为提升机构滑道,采用卷扬机和滑轮组构成提升机构,每套提升机构的最大吊重为60t,采用四套提升机构组成钢箱梁的提升系统。 
为减少最大悬臂时钢箱梁的应力及挠度,在钢箱梁首推节段前端设置如图3所示的钢导梁11,钢导梁的长度应不小于相邻的支撑结构之间的距离。钢导梁采用工字钢、槽钢及钢板等组合成桁架结构。钢导梁分为上、下游2幅单独导梁,中间连接系采用钢管焊接形成桁架,连接系与两侧型钢焊接牢固。钢导梁前端底部设置向前上方倾斜的斜面11.1。在临时墩和主墩靠近顶推始发端的一侧设置有接应装置14,所述接应装置14包括一固定座14.1,一安装于固定座顶部的滚轮14.2及液压千斤顶等。其中,如图5、6所示为临时墩4的立面结构,为了减小顶推施工中最大悬臂状态下钢箱梁的受力,图6所示的临时墩4的接应装置14向相邻的主墩3方向前移,将实际跨径减小。钢导梁前端到达接应装置并通过钢导梁的前端斜面压到接应装置的滚轮上,在向前推移的过程中,接应装置开始承载竖向压力,提前迫使钢箱梁悬臂状态转换进入简支状态,改善钢箱梁的受力。接应装置的高度可通过液压千斤顶调节,并能准确控制承载的竖向力。在顶起步骤中,一同顶起,下落步骤中一同下落但不落到底(保证有合适的竖向承载力)。当钢导梁到达顶推装置顶端后,接应装置不再作用,防止过大的偏载对临时墩的安全构成影响。 
按照以下步骤进行施工: 
(1)钢箱梁预制加工。 
(2)钢箱梁现场施工准备及架设安装。 
现场安装施工拼装平台2和临时墩,临时墩及主墩6也可根据顶推进度后续施工,但应保证在钢导梁前端到达前施工完毕。 
在拼装平台2与过渡墩1之间安装提升固定吊架9,安装泵站、液压系统和控制系统;在每一临时墩、主墩和拼装平台顶部安装至少一套顶推装置10,如图5所示,每套顶推装置沿桥纵向的前、后方设置落梁架12。每套顶推装置10由若干台竖向千斤顶10.1和一台推移千斤顶10.2组成。竖向千斤顶10.1顶部安置有用于承载钢箱梁的千斤顶垫梁10.3,竖向千斤顶固定于竖向千斤顶支座10.4上,所述竖向千斤顶支座10.4安置于推移千斤顶10.2顶部的滑移基座10.5上。当推移千斤顶10.2向竖向千斤顶支座施加水平方向的顶推力时,竖向千斤顶及其支座相对于滑移基座向前滑行。滑移基座的上表面为一钢滑板,其作用在于减小竖向千斤顶支座向前滑行的阻力。滑移基座设有用于限制所述竖向千斤顶支座向前位移距离的纵向限位结构及用于限制所述钢箱梁横向移位的 横向限位结构。横向限位结构可以是安装在滑移基座上的钢滚轮,其作用在于减少顶推行走时的横向偏位。所述步骤2.32中,一个行程为40~50厘米,所述纵向限位结构限定所述推移千斤顶每次前移2~3厘米。各套顶推装置由控制电路统一控制共同升降或平移。 
安装钢导梁11。提升固定吊架9的后支腿固定支撑于过渡墩1,前支墩支撑于钢导梁11上。钢导梁或钢箱梁顶面均设有滑轨。 
钢箱梁13分节段制造后由提升固定吊架9提升并滑移至安装有顶推装置的拼装平台顶面,钢箱梁节段中心线与桥梁设计中心线对齐并与钢导梁11连接。 
钢箱梁节段在拼装平台顶面分段连接焊接后,控制系统控制多套顶推装置多点同步顶推,多点步履式顶推同步循环经“顶”“推”“降”“缩”四个步骤完成钢箱梁安装,具体如下: 
所有竖向千斤顶10.1同步起顶,将钢箱梁13顶起至离开落梁架12约3厘米后,持压; 
所有推移千斤顶10.2向前推移,使竖向千斤顶10.1及其顶部的钢箱梁13共同向前推移一个行程,约40~50厘米,推移千斤顶10.2停止。在此过程中,纵向限位结构限定推移千斤顶每次前移2~3厘米,以避免推送过度引起的危险。 
竖向千斤顶10.1缓慢卸载至将钢箱梁13放置到落梁架12上,竖向千斤顶10.1继续回缩至与钢箱梁底部脱离2厘米以上。 
推移千斤顶10.2回缩,连同其上的竖向千斤顶回复至起始位置,准备下一行程。 
逐段重复上述顶推操作步骤至各段钢箱梁落梁就位全桥安装完成。 
在多点步履式顶推施工过程中,应确保每套液压系统采用一台计算机统一控制,以确保顶推装置同步工作。在施工过程中,应进行严格的监控,如在主墩处沿钢箱梁轴线设置红外线设备,在钢箱梁匹配与顶推过程中,使用红外线进行轴线监控;同时采用智能应力监控设备对固定吊架、钢导梁和钢箱梁进行内力监控,及时掌握钢结构的安全状况,确保施工安全。 

Claims (9)

1.钢箱梁步履式多点顶推施工方法,其特征在于,包括以下施工步骤:
(1)钢箱梁加工;
(2)钢箱梁现场施工准备及架设安装;
(2.1)现场安装施工拼装平台和临时墩,然后在每一临时墩、主墩和拼装平台顶部安装至少一套顶推装置,在每套顶推装置沿桥纵向前后方设置落梁架,每套顶推装置由若干台竖向千斤顶和一台推移千斤顶组成,在拼装平台上安装提升固定吊架,安装行走装置、液压系统和电脑控制系统;
(2.2)钢箱梁分节段加工制造由固定吊架提升并滑移至安装有顶推装置的拼装平台顶面;
(2.3)钢箱梁在拼装平台顶面逐段焊接后,控制系统控制多套顶推装置多点同步顶推,顶推操作按以下步骤操作:
(2.31)竖向千斤顶同步起顶,将钢箱梁顶起至离开落梁架后,持压;
(2.32)推移千斤顶向前推移,使竖向千斤顶及钢箱梁共同向前推移一个行程,推移千斤顶停止;
(2.33)竖向千斤顶缓慢卸载至将钢箱梁放置到落梁架上,竖向千斤顶继续回缩至与钢箱梁底部脱离;
(2.34)推移千斤顶回缩,连同竖向千斤顶回复至起始位置,准备下一行程;
(2.4)逐段重复上述顶推操作步骤至各段钢箱梁落梁就位全桥安装完成。
2.根据权利要求1所述的施工方法,其特征在于:在钢箱梁首推节段前端设置钢导梁,钢导梁采用桁架结构形式,钢导梁前端底部设置向前上方倾斜的斜面。
3.根据权利要求2所述的施工方法,其特征在于:在临时墩或主墩靠近钢箱梁顶推始发端的一侧设置接应装置,所述接应装置包括一固定座,一安装于固定座顶部的滚轮,及液压千斤顶。
4.根据权利要求1所述的施工方法,其特征在于:所述竖向千斤顶安装于竖向千斤顶支座上,竖向千斤顶支座安置于所述推移千斤顶部的滑移基座上,当所述推移千斤顶对所述竖向千斤顶支座施加顶推作用力时,所述竖向千斤顶支座相对于所述滑移基座向前滑动。
5.根据权利要求4所述的施工方法,其特征在于:所述滑移基座设有用于限制所述竖向千斤顶支座向前位移距离的纵向限位结构,所述步骤2.32中,一个行程为40~50厘米,所述纵向限位结构限定所述推移千斤顶每次前移2~3厘米。
6.根据权利要求4所述的施工方法,其特征在于:所述滑移基座还设有用于限制所述钢箱梁横向移位的横向限位结构。
7.自锚式悬索桥钢箱梁多点步履式顶推施工系统,包括沿桥纵向布置的包含拼装平台、临时墩和主墩的桥梁支撑结构,桥梁支撑结构上安装有顶推装置、行走装置、液压系统和电脑控制系统,其特征在于:所述拼装平台上安装有用于提升所述钢箱梁的提升固定吊架,在每一临时墩、主墩和拼装平台顶部设置至少一套顶推装置,在顶推装置沿桥纵向的前后设置落梁架,每套顶推装置由若干台竖向千斤顶和一台推移千斤顶组成,竖向千斤顶顶部安置有用于承载钢箱梁的千斤顶垫梁,竖向千斤顶固定于竖向千斤顶支座上,所述竖向千斤顶支座安置于所述推移千斤顶部的滑移基座并可相对滑移基座纵向移动,多套顶推装置由控制电路统一控制共同升降或平移。
8.根据权利要求7所述的施工系统,其特征在于:钢箱梁首推节段前端设置有钢导梁,钢导梁采用桁架结构形式,钢导梁前端底部设置向前上方倾斜的斜面。
9.根据权利要求8所述的施工系统,其特征在于:所述固定吊架具有固定支脚及活动支脚,固定支脚固定安装于桥梁边墩上,活动支脚滑行于相邻于边墩的拼装平台上钢箱梁或钢导梁的顶面轨道,固定支脚与活动支脚之间为主桁,主桁上布设有提升机构滑道。
CN201210084790.7A 2012-03-27 2012-03-27 一种钢箱梁步履式多点顶推施工方法及施工系统 Active CN102587291B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210084790.7A CN102587291B (zh) 2012-03-27 2012-03-27 一种钢箱梁步履式多点顶推施工方法及施工系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210084790.7A CN102587291B (zh) 2012-03-27 2012-03-27 一种钢箱梁步履式多点顶推施工方法及施工系统

Publications (2)

Publication Number Publication Date
CN102587291A true CN102587291A (zh) 2012-07-18
CN102587291B CN102587291B (zh) 2014-11-05

Family

ID=46476485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210084790.7A Active CN102587291B (zh) 2012-03-27 2012-03-27 一种钢箱梁步履式多点顶推施工方法及施工系统

Country Status (1)

Country Link
CN (1) CN102587291B (zh)

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352437A (zh) * 2013-06-19 2013-10-16 北京市政路桥管理养护集团有限公司 基于桥梁同步顶升和整体置换的快速降梁方法
CN103541308A (zh) * 2013-11-01 2014-01-29 鞍山东方钢构桥梁有限公司 变截面悬臂桥箱梁自锁同步顶推系统及施工方法
CN103774554A (zh) * 2013-10-30 2014-05-07 北京工业大学 一种自锚式悬索桥箱梁的主塔牵拉架设法
CN103924528A (zh) * 2014-04-14 2014-07-16 上海市机械施工集团有限公司 大跨度桥箱梁结构整体长距离顶推滑移施工方法
CN103993560A (zh) * 2014-06-06 2014-08-20 上海隧道工程股份有限公司 大跨度钢混结合梁步履式顶推施工方法及装置
CN104030204A (zh) * 2014-06-05 2014-09-10 同济大学 一种基于滑动摩擦的步履式顶推装置
CN104746437A (zh) * 2015-04-20 2015-07-01 中国铁建大桥工程局集团有限公司 一种自锚式悬索桥安装方法
CN104790298A (zh) * 2015-04-23 2015-07-22 中铁一局集团有限公司 一种连续梁架设施工用顶推装置及顶推方法
CN105019359A (zh) * 2015-07-21 2015-11-04 宝鸡中铁宝桥天元实业发展有限公司 钢梁架设结构及其架设方法
CN105442451A (zh) * 2015-11-11 2016-03-30 中铁大桥局集团第一工程有限公司 平弯钢槽梁顶推施工装置及方法
CN105696471A (zh) * 2016-01-26 2016-06-22 盈都桥梁钢构工程有限公司 一种钢箱梁顶推组件及施工方法
CN106087747A (zh) * 2016-06-17 2016-11-09 柳州黔桥工程材料有限公司 步履顶推施工纠偏方法
CN106498976A (zh) * 2016-11-17 2017-03-15 中铁十八局集团轨道交通工程有限公司 一种城际铁路下穿高速公路明挖施工群顶托换方法
CN106948268A (zh) * 2017-04-24 2017-07-14 中铁七局集团武汉工程有限公司 变截面钢箱梁顶推组合装置及使用方法
CN108330838A (zh) * 2018-02-09 2018-07-27 重庆三峡学院 一种钢箱梁的多点自适应顶推装置
CN108708294A (zh) * 2018-07-11 2018-10-26 中铁大桥局集团第六工程有限公司 用于不等节间桁架梁顶推施工的短滑道梁及顶推方法
CN109958051A (zh) * 2019-03-04 2019-07-02 中国建筑第八工程局有限公司 大跨度高度差系杆拱结构顶推机构及顶推方法
CN110205934A (zh) * 2019-04-30 2019-09-06 中铁八局集团第二工程有限公司 一种用于预制节段梁支架法拼梁移动装配式架梁系统
CN111663451A (zh) * 2020-06-18 2020-09-15 中铁四局集团有限公司 高山峡谷大跨度上承式连续钢桁梁桥的超高塔架施工方法
CN111691314A (zh) * 2020-06-15 2020-09-22 中国能源建设集团安徽电力建设第一工程有限公司 一种钢箱梁步距式多点顶推安装方法
CN111852516A (zh) * 2020-07-15 2020-10-30 中铁第一勘察设计院集团有限公司 用于隧道洞口棚洞钢架的限位顶升装置及其施工方法
CN112281683A (zh) * 2020-09-09 2021-01-29 中交武汉港湾工程设计研究院有限公司 一种应用于大吨位长距离钢箱梁的双向顶推工艺
CN112359729A (zh) * 2020-10-23 2021-02-12 浙江毕姆信息科技有限公司 单孔大跨径钢箱梁跨地铁步履式顶推施工工法
CN112442947A (zh) * 2020-11-25 2021-03-05 中铁十局集团第七工程有限公司 用于上跨繁忙高速节段拼装钢箱梁步履式顶推施工方法
CN112813846A (zh) * 2021-02-09 2021-05-18 中铁上海设计院集团有限公司 一种自平衡无推力拖拉顶推系统
CN112942139A (zh) * 2021-01-14 2021-06-11 中铁七局集团武汉工程有限公司 一种钢箱梁施工方法
CN113585100A (zh) * 2021-08-10 2021-11-02 中铁九局集团第七工程有限公司 一种桥梁顶推及转体自动化施工方法
CN113699897A (zh) * 2021-08-23 2021-11-26 中国建筑第八工程局有限公司 钢箱梁滑进施工装置及方法
CN113774812A (zh) * 2021-08-21 2021-12-10 华东交通大学 一种桥梁连续顶推作业的分级顶推台车系统及施工方法
CN114016438A (zh) * 2021-12-28 2022-02-08 中鹏联合重工集团有限公司 一种桥梁顶推施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101725115A (zh) * 2009-12-18 2010-06-09 中铁大桥局集团第二工程有限公司 一种顶推钢箱梁的固定起吊支架装置及施工方法
CN201574358U (zh) * 2009-11-24 2010-09-08 中交第二航务工程局有限公司 步履式平移顶推装置
CN202492807U (zh) * 2012-03-27 2012-10-17 中交四航局第一工程有限公司 钢箱梁步履式多点顶推施工系统

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201574358U (zh) * 2009-11-24 2010-09-08 中交第二航务工程局有限公司 步履式平移顶推装置
CN101725115A (zh) * 2009-12-18 2010-06-09 中铁大桥局集团第二工程有限公司 一种顶推钢箱梁的固定起吊支架装置及施工方法
CN202492807U (zh) * 2012-03-27 2012-10-17 中交四航局第一工程有限公司 钢箱梁步履式多点顶推施工系统

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
上海先为土木工程有限公司等: "80米双线下承式钢桁梁顶推施工初步说明", 《HTTP://WENKU.BAIDU.COM/VIEW/7743D2482B160B4E767FCF27.HTML》, 12 February 2012 (2012-02-12) *
周光强,向剑,舒大勇,申蒙: "杭州九堡大桥多跨连续组合拱桥", 《施工技术》, vol. 40, no. 340, 30 September 2011 (2011-09-30), pages 27 - 31 *
宋延旭: "顶推施工阶段钢箱梁桥受力性能研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》, 6 September 2011 (2011-09-06) *
陈永宏: "平胜大桥自锚式悬索桥钢箱梁顶推施工", 《桥梁建筑》, no. 1, 20 June 2006 (2006-06-20), pages 33 - 35 *

Cited By (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352437A (zh) * 2013-06-19 2013-10-16 北京市政路桥管理养护集团有限公司 基于桥梁同步顶升和整体置换的快速降梁方法
CN103774554A (zh) * 2013-10-30 2014-05-07 北京工业大学 一种自锚式悬索桥箱梁的主塔牵拉架设法
CN103774554B (zh) * 2013-10-30 2015-11-18 北京工业大学 一种自锚式悬索桥箱梁的主塔牵拉架设法
CN103541308A (zh) * 2013-11-01 2014-01-29 鞍山东方钢构桥梁有限公司 变截面悬臂桥箱梁自锁同步顶推系统及施工方法
CN103541308B (zh) * 2013-11-01 2015-04-15 鞍山东方钢构桥梁有限公司 变截面悬臂桥箱梁自锁同步顶推系统及施工方法
CN103924528A (zh) * 2014-04-14 2014-07-16 上海市机械施工集团有限公司 大跨度桥箱梁结构整体长距离顶推滑移施工方法
CN103924528B (zh) * 2014-04-14 2016-03-09 上海市机械施工集团有限公司 大跨度桥箱梁结构整体长距离顶推滑移施工方法
CN104030204A (zh) * 2014-06-05 2014-09-10 同济大学 一种基于滑动摩擦的步履式顶推装置
CN103993560B (zh) * 2014-06-06 2016-04-13 上海隧道工程有限公司 大跨度钢混结合梁步履式顶推施工方法及装置
CN103993560A (zh) * 2014-06-06 2014-08-20 上海隧道工程股份有限公司 大跨度钢混结合梁步履式顶推施工方法及装置
CN104746437A (zh) * 2015-04-20 2015-07-01 中国铁建大桥工程局集团有限公司 一种自锚式悬索桥安装方法
CN104746437B (zh) * 2015-04-20 2016-10-05 中国铁建大桥工程局集团有限公司 一种自锚式悬索桥安装方法
CN104790298A (zh) * 2015-04-23 2015-07-22 中铁一局集团有限公司 一种连续梁架设施工用顶推装置及顶推方法
CN105019359A (zh) * 2015-07-21 2015-11-04 宝鸡中铁宝桥天元实业发展有限公司 钢梁架设结构及其架设方法
CN105442451A (zh) * 2015-11-11 2016-03-30 中铁大桥局集团第一工程有限公司 平弯钢槽梁顶推施工装置及方法
CN105696471A (zh) * 2016-01-26 2016-06-22 盈都桥梁钢构工程有限公司 一种钢箱梁顶推组件及施工方法
CN105696471B (zh) * 2016-01-26 2018-03-13 盈都桥梁钢构工程有限公司 一种钢箱梁顶推组件及施工方法
CN106087747A (zh) * 2016-06-17 2016-11-09 柳州黔桥工程材料有限公司 步履顶推施工纠偏方法
CN106498976A (zh) * 2016-11-17 2017-03-15 中铁十八局集团轨道交通工程有限公司 一种城际铁路下穿高速公路明挖施工群顶托换方法
CN106948268A (zh) * 2017-04-24 2017-07-14 中铁七局集团武汉工程有限公司 变截面钢箱梁顶推组合装置及使用方法
CN106948268B (zh) * 2017-04-24 2023-07-21 中铁七局集团武汉工程有限公司 变截面钢箱梁顶推组合装置及使用方法
CN108330838A (zh) * 2018-02-09 2018-07-27 重庆三峡学院 一种钢箱梁的多点自适应顶推装置
CN108708294A (zh) * 2018-07-11 2018-10-26 中铁大桥局集团第六工程有限公司 用于不等节间桁架梁顶推施工的短滑道梁及顶推方法
CN108708294B (zh) * 2018-07-11 2023-12-12 中铁大桥局集团第六工程有限公司 用于不等节间桁架梁顶推施工的短滑道梁及顶推方法
CN109958051A (zh) * 2019-03-04 2019-07-02 中国建筑第八工程局有限公司 大跨度高度差系杆拱结构顶推机构及顶推方法
CN110205934A (zh) * 2019-04-30 2019-09-06 中铁八局集团第二工程有限公司 一种用于预制节段梁支架法拼梁移动装配式架梁系统
CN111691314A (zh) * 2020-06-15 2020-09-22 中国能源建设集团安徽电力建设第一工程有限公司 一种钢箱梁步距式多点顶推安装方法
CN111663451A (zh) * 2020-06-18 2020-09-15 中铁四局集团有限公司 高山峡谷大跨度上承式连续钢桁梁桥的超高塔架施工方法
CN111852516A (zh) * 2020-07-15 2020-10-30 中铁第一勘察设计院集团有限公司 用于隧道洞口棚洞钢架的限位顶升装置及其施工方法
CN112281683A (zh) * 2020-09-09 2021-01-29 中交武汉港湾工程设计研究院有限公司 一种应用于大吨位长距离钢箱梁的双向顶推工艺
CN112359729A (zh) * 2020-10-23 2021-02-12 浙江毕姆信息科技有限公司 单孔大跨径钢箱梁跨地铁步履式顶推施工工法
CN112442947A (zh) * 2020-11-25 2021-03-05 中铁十局集团第七工程有限公司 用于上跨繁忙高速节段拼装钢箱梁步履式顶推施工方法
CN112942139A (zh) * 2021-01-14 2021-06-11 中铁七局集团武汉工程有限公司 一种钢箱梁施工方法
CN112813846A (zh) * 2021-02-09 2021-05-18 中铁上海设计院集团有限公司 一种自平衡无推力拖拉顶推系统
CN113585100A (zh) * 2021-08-10 2021-11-02 中铁九局集团第七工程有限公司 一种桥梁顶推及转体自动化施工方法
CN113585100B (zh) * 2021-08-10 2023-03-21 中铁九局集团第七工程有限公司 一种桥梁顶推及转体自动化施工方法
CN113774812A (zh) * 2021-08-21 2021-12-10 华东交通大学 一种桥梁连续顶推作业的分级顶推台车系统及施工方法
CN113699897A (zh) * 2021-08-23 2021-11-26 中国建筑第八工程局有限公司 钢箱梁滑进施工装置及方法
CN114016438A (zh) * 2021-12-28 2022-02-08 中鹏联合重工集团有限公司 一种桥梁顶推施工方法

Also Published As

Publication number Publication date
CN102587291B (zh) 2014-11-05

Similar Documents

Publication Publication Date Title
CN102587291B (zh) 一种钢箱梁步履式多点顶推施工方法及施工系统
CN202492807U (zh) 钢箱梁步履式多点顶推施工系统
CN101831874B (zh) 多孔大跨度连续钢桁梁多点同步顶推施工方法
CN103541308B (zh) 变截面悬臂桥箱梁自锁同步顶推系统及施工方法
CN106948268B (zh) 变截面钢箱梁顶推组合装置及使用方法
CN105088959B (zh) 一种钢桁梁节点自适应连续顶推系统
CN206646417U (zh) 一种多跨混凝土简支梁桥整体顶升系统
CN102587281A (zh) 步履式多点顶推施工方法
CN103437300A (zh) 墩顶钢梁无墩旁托架架设双悬臂的施工方法
CN103993560A (zh) 大跨度钢混结合梁步履式顶推施工方法及装置
CN109868750B (zh) 一种简支钢桁梁四点支撑顶推系统及顶推方法
CN103510475A (zh) 三主桁钢桁梁单联双跨无导梁长距离顶推施工方法
CN105350459A (zh) 一种大型钢梁滑移装置及其施工方法
CN106522112A (zh) 斜拉桥边跨梁段架设系统及其方法
CN112900281B (zh) 复杂曲线梁上顶推施工装置及方法
CN103147405B (zh) 斜主桁斜拉桥钢梁架设方法
CN113026563B (zh) 一种悬索桥高低位移梁栈桥吊装钢梁设施及其施工方法
CN113215991B (zh) 钢箱梁快速架设装置及其施工方法
CN208533370U (zh) 一种大跨度钢混组合梁架设施工的架桥机
CN110205948A (zh) 一种宽体架桥机及其架设方法
CN206538687U (zh) 斜拉桥边跨梁段架设系统
CN112726411A (zh) 一种单孔大悬臂钢桁梁整体拖拉施工方法
CN112211112A (zh) 一种在既有桥梁上采用双导梁架桥机的钢箱梁安装方法
CN205242238U (zh) 一种应用于自锚式悬索桥的主梁结构
CN207987749U (zh) 骑索式桥面吊机

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant