CN101725115A - 一种顶推钢箱梁的固定起吊支架装置及施工方法 - Google Patents

一种顶推钢箱梁的固定起吊支架装置及施工方法 Download PDF

Info

Publication number
CN101725115A
CN101725115A CN200910263284A CN200910263284A CN101725115A CN 101725115 A CN101725115 A CN 101725115A CN 200910263284 A CN200910263284 A CN 200910263284A CN 200910263284 A CN200910263284 A CN 200910263284A CN 101725115 A CN101725115 A CN 101725115A
Authority
CN
China
Prior art keywords
hoisting bracket
girder
fixed
hoisting
fixed hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910263284A
Other languages
English (en)
Other versions
CN101725115B (zh
Inventor
章国平
许佳平
夏帮军
董继红
陈亚强
杨晓健
农代培
吴立平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Co Ltd
2nd Engineering Co Ltd of MBEC
Original Assignee
2nd Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 2nd Engineering Co Ltd of MBEC filed Critical 2nd Engineering Co Ltd of MBEC
Priority to CN2009102632842A priority Critical patent/CN101725115B/zh
Publication of CN101725115A publication Critical patent/CN101725115A/zh
Application granted granted Critical
Publication of CN101725115B publication Critical patent/CN101725115B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

本发明是顶推施工钢箱梁的固定起吊支架装置及其施方法,其结构是包括固定起吊支架主梁,提升系统,起吊扁担梁,待吊梁段,运梁船舶,前支腿,前支腿底座,滑道,后支腿铰座,后支腿立柱,已浇注梁段,导梁及已架梁段,拼装平台滑道,拼装平台,提升系统滑道,固定起吊支架主梁之间的横联结构。施工方法:固定起重起吊支架的拼装搭设工作;固定起吊支架动力提升系统的安装;钢箱梁的提升;钢箱梁的体系转换,进行钢箱梁的悬拼。优点:保证钢箱梁稳步匀速连续快捷的提升到位;以钢箱梁顶推平台或已架梁段梁顶作为其中固定起吊支架前支腿的支撑点,减少支腿至河床的支撑高度,节省钢结构加工用量;支架结构受力简单明确,取材方便拼装迅速,易推广。

Description

一种顶推钢箱梁的固定起吊支架装置及施工方法
技术领域
本发明涉及的是一种顶推施工钢箱梁的固定起吊支架装置及施工方法,属于桥梁施工技术领域。
背景技术
在现有的桥梁施工中,顶推法施工钢箱梁节段,钢箱梁节段重量一般在100t-300t范围内,钢箱梁节段的提升作业通常需设置大型的起吊装置和大型的起吊平台,或者采用大型水上吊船进行起吊安装作业。前者对施工中钢材的需求增大,作业空间要求大,后者对施工条件处的水深要求较高,能满足吊船的停靠要求,水上通航条件受限,同时,大型浮式吊船的来源也是限制条件之一,工艺推广性不强。
发明内容
本发明提出的是一种顶推施工钢箱梁的固定起吊支架装置及施工方法,乃是根据自锚式悬索桥钢箱梁吊装作业的施工需要,结合现场实际情况而提出的。首先提升动力系统采用设有多重保险装置的连续顶推千斤顶,保证钢箱梁稳步、匀速、连续、快捷的提升到位;其次,以钢箱梁顶推平台作为固定起吊支架的其中一支撑点,节省大量钢结构加工用量,再次,支架结构受力简单明确,取材方便,拼装迅速,推广性强。
本发明的技术解决方案:其特征是固定起吊支架主梁上安装提升系统,提升系统在提升系统滑道上,提升系统连接起吊扁担梁,待吊梁段放在运梁船舶上,前支腿支承在前支腿底座上,前支腿底座与滑道之间的摩擦系数小于导梁及已架梁段与滑道之间的摩擦系数,后支腿立柱接在后支腿铰座的下方,后支腿立柱支承并固定在已浇注梁段上,拼装平台滑道在拼装平台上,固定起吊支架主梁之间的横联结构是连接在2组固定起吊支架主梁之间的横向联结系。
顶推施工钢箱梁的施工方法,其特征是包括如下工艺步骤:
一、固定起吊支架拼装过程中,主梁采用贝雷梁组;
二、固定起吊支架一支腿立于顶推平台的钢箱梁上,支腿下设有抄垫钢板,钢板下开槽,四氟板在环氧树脂粘结力作用下镶嵌于钢槽内,减少箱梁顶推前行的摩擦力;
三、提升动力系统为液压同步提升系统,在主梁上设有钢轨和走行天车,提升动力系统位于天车上可以往返滑移;
四、主梁与立柱以及支腿之间的连接为铰接;
五、起吊扁担梁根据箱梁的重心进行转动后自动找平,保证钢箱梁的水平起吊。
本发明的优点:是一种可滑移式固定起重起吊支架,固定起重起吊支架动力提升装置为LSD液压同步提升系统,根据起吊荷载可以配置不同数量的千斤顶。根据贝雷梁力学特性,采用贝雷梁为起吊支架主横梁;主横梁与起吊支架立柱之间的连接采用铰接构件,释放弯矩,保证竖向荷载传递至立柱柱脚下;主梁上布置提升系统滑道,保证提升系统吊装钢箱梁时走行滑移方便、稳定;前支腿下设置抄垫型钢,并开槽利用环氧树脂粘贴四氟板镶嵌其中,下铺设两块不锈钢板条,用来减小箱梁顶推过程产生的摩擦力,确保支腿结构不被破坏,从而形成顶推过程中“梁走、架不移”的受力结构。首先提升动力系统采用设有多重保险装置的连续顶推千斤顶,保证钢箱梁稳步、匀速、连续、快捷的提升到位;其次本发明以钢箱梁顶推平台作为其中一支撑点,节省大量钢结构加工,再次支架结构受力简单明确,拼装方便,使得发明本身结构推广性强。
附图说明
附图1是固定起吊起吊支架总体结构布置图
附图2是固定起吊起吊支架在前支腿处的侧剖面图
附图3是固定起吊起吊支架在后支腿处的侧剖面图
图中的1是固定起吊支架主梁,2是提升系统,3是起吊扁担梁,4是待吊梁段,5是运梁船舶,6是前支腿,7是前支腿底座,8是滑道,9是后支腿铰座,10是后支腿立柱,11是已浇注梁段,12是导梁及已架梁段,13是拼装平台滑道,14是拼装平台,15是提升系统滑道,16是固定起吊支架主梁之间的横联结构。
具体实施方式:
对照附图,其结构是固定起吊支架主梁1上安装提升系统2,提升系统2在提升系统滑道15上,提升系统2连接起吊扁担梁3,待吊梁段4放在运梁船舶5上,前支腿6支承在前支腿底座7上,前支腿底座7与滑道8之间的摩擦系数小于导梁及已架梁段12与滑道8之间的摩擦系数,后支腿立柱10接在后支腿铰座9的下方,后支腿立柱10支承并固定在已浇注梁段11上,拼装平台滑道13在拼装平台14上,固定起吊支架主梁1之间的横联结构16是连接在2组固定起吊支架主梁1之间的横向联结系。
工作时,运梁船舶5上放待吊梁段4,运至固定起吊支架主梁1的正下端时,提升系统2沿固定起吊支架主梁1上的提升系统滑道15移动到待吊梁段4物正上方,提升系统2通过起吊扁担梁3将待吊梁段4连接固定,然后启动提升系统2,将待吊梁段4提升至拼装平台14高度处,对位、连接后,在拼装平台滑道13上顶推导梁及已架梁段12,这时,前支腿6支承在前支腿底座7上,后支腿立柱10支承并固定在已浇注梁段11上。由于前支腿底座7与滑道8之间的摩擦系数相对于导梁及已架梁段12与滑道8之间的摩擦系数小很多,因此形成了“梁走、架不移”的力学现象。
固定起吊支架主梁1之间的横联结构16是连接在2组固定起吊支架主梁1之间的横向联结系,以增加两片主桁之间的横向刚度,保证结构的横向稳定。

Claims (5)

1.顶推施工钢箱梁的固定起吊支架装置,其特征是固定起吊支架主梁上安装提升系统,提升系统在提升系统滑道上,提升系统连接起吊扁担梁,待吊梁段放在运梁船舶上,前支腿支承在前支腿底座上,前支腿底座与滑道之间的摩擦系数小于导梁及已架梁段与滑道之间的摩擦系数,后支腿立柱接在后支腿铰座的下方,后支腿立柱支承并固定在已浇注梁段上,拼装平台滑道在拼装平台上,固定起吊支架主梁之间的横联结构是连接在2组固定起吊支架主梁之间的横向联结系。
2.顶推施工钢箱梁的施工方法,其特征是包括如下工艺步骤:
一、固定起吊支架拼装过程中,主梁采用贝雷梁组;
二、固定起吊支架一支腿立于顶推平台的钢箱梁上,支腿下设有抄垫钢板,钢板下开槽,四氟板在环氧树脂粘结力作用下镶嵌于钢槽内,减少箱梁顶推前行的摩擦力;
三、提升动力系统为液压同步提升系统,在主梁上设有钢轨和走行天车,提升动力系统位于天车上可以往返滑移;
四、主梁与立柱以及支腿连接为铰接;
五、起吊扁担梁根据箱梁的重心进行转动后自动找平,保证钢箱梁的水平起吊。
2、根据权利要求2所述的顶推施工钢箱梁的施工方法,其特征是桥梁施工为顶推法施工,桥梁主梁为钢箱梁,且设有顶推平台。
3.根据权利要求2所述的顶推施工钢箱梁的施工方法,其特征是所述固定起吊支架提升系统为LSD液压同步提升系统,并且提升系统装配于天车上,能够进行在轨道上滑移前行。
4.根据权利要求2所述的顶推施工钢箱梁的施工方法,其特征是固定起吊支架一支腿立于顶推平台的钢箱梁上,支腿下设有开槽沾有四氟板的抄垫钢板。
5.根据权利要求2所述的顶推施工钢箱梁的施工方法,其特征是固定起吊支架的提升扁担梁具有自动找平特征,根据钢箱梁的重心点设置提升扁担梁的形心线,保证钢箱梁提升时保持水平状态。
CN2009102632842A 2009-12-18 2009-12-18 一种顶推钢箱梁的固定起吊支架装置及施工方法 Active CN101725115B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009102632842A CN101725115B (zh) 2009-12-18 2009-12-18 一种顶推钢箱梁的固定起吊支架装置及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009102632842A CN101725115B (zh) 2009-12-18 2009-12-18 一种顶推钢箱梁的固定起吊支架装置及施工方法

Publications (2)

Publication Number Publication Date
CN101725115A true CN101725115A (zh) 2010-06-09
CN101725115B CN101725115B (zh) 2011-05-04

Family

ID=42446615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009102632842A Active CN101725115B (zh) 2009-12-18 2009-12-18 一种顶推钢箱梁的固定起吊支架装置及施工方法

Country Status (1)

Country Link
CN (1) CN101725115B (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587291A (zh) * 2012-03-27 2012-07-18 中交四航局第一工程有限公司 一种钢箱梁步履式多点顶推施工方法及施工系统
CN102720138A (zh) * 2012-06-29 2012-10-10 中铁大桥局集团有限公司 钢桁梁架设系统、方法及提升站
CN103334381A (zh) * 2013-06-25 2013-10-02 宁波市政工程建设集团股份有限公司 安装钢箱梁的全支架轨道台车驼移装置及施工方法
CN103556575A (zh) * 2013-11-11 2014-02-05 中铁十五局集团有限公司 跨越铁路主干线的钢箱梁落梁施工方法
CN103603275A (zh) * 2013-10-22 2014-02-26 中铁大桥局集团第四工程有限公司 一种节段钢箱梁滑移上岸的系统及方法
CN105507160A (zh) * 2015-11-25 2016-04-20 杭州江润科技有限公司 现浇箱梁移动式贝雷梁操作平台施工方法
CN108179816A (zh) * 2017-12-15 2018-06-19 浙江精工钢结构集团有限公司 一种偏位提升滑移装置及方法
CN112144403A (zh) * 2020-09-09 2020-12-29 中交武汉港湾工程设计研究院有限公司 适用于钢箱梁腹板变化的提梁站及其顶推工艺
WO2021000290A1 (zh) * 2019-07-03 2021-01-07 广州五羊建设机械有限公司 一种l型双向悬挑结构整体提升施工方法
CN112281680A (zh) * 2020-11-23 2021-01-29 中铁大桥局集团第八工程有限公司 一种钢箱梁复合式提升系统及其施工方法
CN113638320A (zh) * 2021-08-31 2021-11-12 山东交通学院 配合顶推施工的钢箱梁对位匹配施工方法
CN113931070A (zh) * 2021-10-15 2022-01-14 中铁十五局集团有限公司 一种海域浅水区高潮差码头卸梁方法
CN114892539A (zh) * 2022-05-15 2022-08-12 中建七局第四建筑有限公司 一种带有沉降监测功能的钢箱梁顶推施工支架及其使用方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3146172B2 (ja) 1997-03-25 2001-03-12 オリエンタル建設株式会社 張設ケーブルを利用した橋梁の構築工法
JP2006077521A (ja) * 2004-09-13 2006-03-23 Oriental Construction Co Ltd 橋梁構築装置
CN101078198B (zh) * 2007-07-04 2010-07-28 湖南省交通规划勘察设计院 一种应用于自锚式悬索桥的钢箱梁架设方法
CN101225638A (zh) * 2007-12-20 2008-07-23 中铁大桥局股份有限公司 地锚式悬索桥预应力混凝土加劲箱梁安装方法
CN101446066B (zh) * 2008-12-22 2010-12-08 湖南路桥建设集团公司 一种悬索桥加劲梁架设方法及装置

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102587291A (zh) * 2012-03-27 2012-07-18 中交四航局第一工程有限公司 一种钢箱梁步履式多点顶推施工方法及施工系统
CN102720138A (zh) * 2012-06-29 2012-10-10 中铁大桥局集团有限公司 钢桁梁架设系统、方法及提升站
CN103334381B (zh) * 2013-06-25 2015-01-07 宁波市政工程建设集团股份有限公司 安装钢箱梁的全支架轨道台车驮移装置及施工方法
CN103334381A (zh) * 2013-06-25 2013-10-02 宁波市政工程建设集团股份有限公司 安装钢箱梁的全支架轨道台车驼移装置及施工方法
CN103603275A (zh) * 2013-10-22 2014-02-26 中铁大桥局集团第四工程有限公司 一种节段钢箱梁滑移上岸的系统及方法
CN103556575B (zh) * 2013-11-11 2015-07-29 中铁十五局集团有限公司 跨越铁路主干线的钢箱梁落梁施工方法
CN103556575A (zh) * 2013-11-11 2014-02-05 中铁十五局集团有限公司 跨越铁路主干线的钢箱梁落梁施工方法
CN105507160A (zh) * 2015-11-25 2016-04-20 杭州江润科技有限公司 现浇箱梁移动式贝雷梁操作平台施工方法
CN105507160B (zh) * 2015-11-25 2017-04-26 杭州江润科技有限公司 现浇箱梁移动式贝雷梁操作平台施工方法
CN108179816A (zh) * 2017-12-15 2018-06-19 浙江精工钢结构集团有限公司 一种偏位提升滑移装置及方法
CN112912567A (zh) * 2019-07-03 2021-06-04 广州建筑股份有限公司 一种l型双向悬挑结构整体提升施工方法
WO2021000290A1 (zh) * 2019-07-03 2021-01-07 广州五羊建设机械有限公司 一种l型双向悬挑结构整体提升施工方法
CN112912567B (zh) * 2019-07-03 2022-11-01 广州建筑股份有限公司 一种l型双向悬挑结构整体提升施工方法
CN112144403A (zh) * 2020-09-09 2020-12-29 中交武汉港湾工程设计研究院有限公司 适用于钢箱梁腹板变化的提梁站及其顶推工艺
CN112281680A (zh) * 2020-11-23 2021-01-29 中铁大桥局集团第八工程有限公司 一种钢箱梁复合式提升系统及其施工方法
CN113638320A (zh) * 2021-08-31 2021-11-12 山东交通学院 配合顶推施工的钢箱梁对位匹配施工方法
CN113638320B (zh) * 2021-08-31 2022-11-15 山东交通学院 配合顶推施工的钢箱梁对位匹配施工方法
CN113931070A (zh) * 2021-10-15 2022-01-14 中铁十五局集团有限公司 一种海域浅水区高潮差码头卸梁方法
CN113931070B (zh) * 2021-10-15 2023-08-18 中铁十五局集团有限公司 一种海域浅水区高潮差码头卸梁方法
CN114892539A (zh) * 2022-05-15 2022-08-12 中建七局第四建筑有限公司 一种带有沉降监测功能的钢箱梁顶推施工支架及其使用方法
CN114892539B (zh) * 2022-05-15 2023-07-25 中建七局第四建筑有限公司 一种带有沉降监测功能的钢箱梁顶推施工支架及其使用方法

Also Published As

Publication number Publication date
CN101725115B (zh) 2011-05-04

Similar Documents

Publication Publication Date Title
CN101725115B (zh) 一种顶推钢箱梁的固定起吊支架装置及施工方法
CN201826525U (zh) 建筑爬升模板体系装置
CN201077721Y (zh) 一种落梁龙门吊
CN101537976B (zh) 双塔桅巨型自升降起重设备及其跟携吊装方法
CN207361624U (zh) 一种多功能步履式桥面吊机结构
CN201106155Y (zh) 斜拉索辅助全悬臂架设钢桁梁装置
CN103233588B (zh) 带筏板基础建筑物的平移方法
CN104060835B (zh) 一种单榀平面桁架的提升滑移施工方法
CN103243658A (zh) 斜拉桥牵索挂篮及其组拼方法
CN201376848Y (zh) 双塔桅巨型自升降起重设备
CN101284628A (zh) 大吨位压力机架的吊装方法
CN201506952U (zh) 无支架临时索配合挂篮建筑混凝土斜拉桥
CN110258293A (zh) 斜拉桥钢桁梁主塔墩顶架设施工方法
CN102041779A (zh) 一种桥面吊机及其施工方法
CN203113793U (zh) 一种倾斜结构大模板安装系统
CN104594206A (zh) 一种钢桁梁纵移吊挂式拖拉锚座及方法
CN106400700A (zh) 双线悬臂式架桥机
CN205114897U (zh) 塔机内置内爬式支撑系统的自倒运装置
CN205775791U (zh) 一种升降式便桥
CN201826320U (zh) 一种用于双壁钢围堰拼装和下沉的装置
CN209397510U (zh) 一种大跨度钢桁柔性拱桥拱肋整体液压提升施工装置
CN203755173U (zh) 用于桥梁高墩液压爬升的模板装置
CN202467170U (zh) 铝合金攀升模板系统
CN102251477B (zh) 系杆拱横移施工方法
CN201943006U (zh) 辅助不变幅架梁吊机架设钢箱梁用主塔区活动支架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant