CN102535846B - One-step forming construction process for integrally pouring housing construction - Google Patents

One-step forming construction process for integrally pouring housing construction Download PDF

Info

Publication number
CN102535846B
CN102535846B CN201210050130.7A CN201210050130A CN102535846B CN 102535846 B CN102535846 B CN 102535846B CN 201210050130 A CN201210050130 A CN 201210050130A CN 102535846 B CN102535846 B CN 102535846B
Authority
CN
China
Prior art keywords
formwork module
template
construction
wall
roof panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210050130.7A
Other languages
Chinese (zh)
Other versions
CN102535846A (en
Inventor
王志成
林百智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Taizhiruirui Construction Engineering Co., Ltd.
Original Assignee
王志成
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王志成 filed Critical 王志成
Priority to CN201210050130.7A priority Critical patent/CN102535846B/en
Publication of CN102535846A publication Critical patent/CN102535846A/en
Application granted granted Critical
Publication of CN102535846B publication Critical patent/CN102535846B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a one-step forming construction process for integrally pouring a housing construction. According to the requirement of a construction drawing, the one-step forming construction process comprises the following steps of: prefabricating a template module; supporting a ground beam template; pouring concrete; laying and binding reinforcements and reinforcing meshes on the solidified concrete, and supporting the template module; laying and arranging concrete embedded parts, power supply facility illuminating circuits, water supply and drainage pipelines, ventilation channels, warming facilities and the like according to the requirement of construction technology; and performing integral pouring. According to the one-step forming construction process, the effect of decorating inside and outside of a house in one time is realized, the complex procedure of the housing construction is reduced, wood materials, decorating materials and manpower cost are saved, the construction efficiency is improved, the construction cost is reduced, the effects of sound isolation, heat insulation, fire proofing and seismic resistance are improved, human ecological environment is protected, and environment friendliness inside and outside the house is realized.

Description

The integrated poured once-molding construction process of building construction
One, technical field
The present invention relates to housing construction field, specifically the integrated poured once-molding construction process of a kind of building construction.
Two, background technology
Building construction is one of mainstay industry of Chinese national economy, is for the mankind, to build the place of production, life.From man invented, at the platform of compacting, build yoke tree house, to Qin brick and Han tile, the mankind progressively tend to ripe to building construction technology.But the continuous progress along with development of human history, continuing to bring out of new constructional materials, building technology is also being constantly brought forth new ideas, the mankind start to stride forward to high structure, long span building, and the equipment such as the water supply and drainage of building construction, air conditioning, warm keeping, daylighting illumination, sound-insulating dust-proof, safety fire fighting are also updated, make people's the environment such as inhabitation, production, recreation increasingly comfortable.
Current, the method for building construction adopts two kinds of brick mix structure, frame constructions substantially.Brick mix structure refers to brick or the concrete block masonry for structural wall of vertical load-bearing in building, and the employing reinforced concrete structures such as post, beam, roof panel are made, and on the wall, the weight of floor conducts to basis by body of wall to prefabricated reinforced concrete floor overlap joint.Brick mix structure needs a large amount of brick or building block, and land resources waste is serious, and freight volume is large, long construction period, and complex process, in order to guarantee verticality, planeness, operating technology requires high, and thermal property is poor, and antiseismic ability is low, has not advocated now application.Frame construction refers to that in building, major bearing structures is made with steel concrete as wall, post, beam, roof panel etc., and non-bearing wall is filled with building block or other material; Cast-in-place concrete floor weight is conducted to post by beam, by post, is conducted to basis, and body of wall only plays to be separated and insulation effect, and exterior wall is plastered, and indoorly could live after fitting up by remodeling.Although the building method of this kind of building structure has shortened construction period, has saved land resources, improved antiseismic ability; But the steel concrete cast-in-site of the wall of load-bearing, post, beam, roof panel needs a large amount of timber to carry out supporting, after the timber dismounting of supporting, recycling rate is only 20% to 30% left and right, a large amount of timber are consumed, and a large amount of felling consumption of timber cause the waste of resource and the destruction of human ecological environment; Sound insulation, the effect of heat insulation of body of wall are poor, and the interior and exterior finishes in house also needs ornament materials and a considerable amount of labour cost of a large amount of timber, costliness, has improved building construction cost, has left disaster hidden-trouble.
Three, summary of the invention
In order to solve the deficiencies in the prior art, the object of this invention is to provide the integrated poured once-molding construction process of a kind of building construction, removed house from and again fitted up, improved sound insulation, effect of heat insulation is poor, has saved a large amount of timber, has protected human ecological environment.
The technical scheme that realizes object employing of the present invention is: according to construction drawing requirement, formulate construction requirement and the planning book of integrated poured one-shaping technique, prefab form module, the ground beam template of the good reinforced frame of colligation of supporting is fluid concrete then, solidify after reaching laying thereon after intensity, assembling reinforcement and steel mesh reinforcement and carry out formwork module supporting, press construction technical requirement and lay, configure concrete embedded part, power supply facilities illuminating line, water-feeding & drainaging pipeline, ventilation passage, heating facility etc., then carry out integrated poured.
Described prefab form module comprises prefabricated ground beam template, precast facade template, inner wall decoration formwork module, staircase formwork module, escalator formwork module; Outer wall template is by exterior wall decoration formwork module, window mouth decoration formwork module, and balcony, rain are taken balcony decoration formwork module, inner corner trim, external corner line decoration formwork module, beam, post decoration formwork module form; Inner wall decoration formwork module is by inner wall panel decoration formwork module, beam, post decoration formwork module, inner corner trim, external corner line decoration formwork module, parlor roof panel decoration formwork module, bedroom roof panel decoration formwork module, study roof panel decoration formwork module, dining room roof panel decoration formwork module, kitchen wallboard, roof panel decoration formwork module, washroom wallboard, roof panel decoration formwork module, skirting decoration formwork module forms; Staircase formwork module is by stair decoration formwork module, roof panel decoration formwork module, and ground decoration formwork module, inner corner trim, external corner line decoration formwork module, skirting formwork module forms; Escalator formwork module is by elevator doorway decoration formwork module, wallboard decoration formwork module, ground decoration formwork module, and inner corner trim, external corner line formwork module, skirting formwork module, roof panel decoration formwork module forms.
The material of described formwork module is comprised of waste or used plastics particle, flyash, sawdust and adhesive, and material is put into mould through extrusion modling after mixing, and the inner chamber of mould is made various shapes as required; Formwork module is by the vegetarian noodles formwork module without any plating and have the non-vegetarian noodles formwork module of ornamental plating to form.The plating of ornamental plating formwork module is realized by forming the mould of formwork module.According to people, the inside and outside decorative effect in house is required to have nothing in common with each other, each community is different, and each family is different, and compartment is different, and color and luster is different, respectively has feature, respectively gets the needs of inclination, and plating is must pattern various.Adopt the construction method of the decoration platings such as imitative coloured reason stone that formwork module prints, ornamental stone, decoration ceramic tile, make metope texture true to nature, do not fade, safety non-pollution, class be luxurious.House wall surface, by support template module one-time cast-forming, has been removed from and has been fitted up required expensive ornament materials and labour cost, has reduced building construction cost, has removed disaster hidden-trouble.
The described formwork module supporting concrete steps of carrying out are unwrapping wire on grade beam, successively side column, inner prop are carried out to supporting, inner, external wall template support, doors and windows template supporting, staircase delays platform template support, stair template supporting, Lift well mould slab supporting, rain is taken balcony slab supporting, and roof panel carries out arching, treats that beam column, rain being taken to balcony slab after the reinforcing bar of beam, post, reinforcing bar binding that rain is taken balcony slab carries out template support; Post is touched plate, wall is touched between plate and will be overlapped tightly, must strictly seal body of wall intermediate air layer, and lay steel mesh reinforcement in exterior wall when inner, external wall template support, comprehensively fixing with screw through walls; Beam forms and column template, wall form, rain are taken balcony template overlap joint and are wanted tight, the reinforcing bar that the reinforcing bar of beam, post, rain are taken balcony slab is connected firm with body of wall gauze wire cloth, while laying shuttering of root boarding, between template, must connect with fastening buckle, to prevent template play impact cast effect, the roof panel reinforcing bar of binding will be connected firmly with other reinforcing bar; To the house template support having completed, to carry out once careful safety inspection comprehensively, carry out again casting and constructing after errorless.
It is that the formwork module of roof panel is made into arching body that described roof panel carries out arching, props up guard housing form supporting by bar shaped; Its benefit is that it cancels each other the outward thrust of another arching body of a part of pressure and adjacent (another), so it can bear larger pressure, can also save a large amount of support bars, and arching has stability more simultaneously.
Described integrated poured the steps include: of carrying out first implemented pouring concrete to body of wall, coupled columns, beam carry out pouring concrete again, then to roof panel, rain take, balcony slab carries out pouring concrete, and stair are carried out to pouring concrete, and elevator shaft shear wall is carried out to filling concrete.
Before the inside and outside cement injection mortar of External Wall, first wall face template is sprayed and pours into a mould inside and outside metope cement mortar afterwards again with the colored cement mortar of particular modulation, use vibrator vibration tamp simultaneously; During exterior wall sand pulp casting and constructing, the construction of the cement mortar cast of metope in simultaneously starting.After also will be first before beam column, roof panel, rain are taken the pouring concrete of balcony slab spraying with the colored cement mortar of particular modulation, can carry out pouring concrete.To elevator shaft shear wall pouring concrete, must or pour into a mould early than beam column with the beam column while, be connected simultaneously and become integral body with beam column, roof panel.Spray coloured cement mortar and can make metope beautiful, avoid finishing.
Described body of wall intermediate air layer is surrounded by inside and outside combined wall board and packing bar, and certain thickness packing bar sealing is supported on the periphery place between inside and outside wallboard, and inside and outside wallboard is erect and is fixed on beam, then fluid concrete.The setting of body of wall intermediate air layer can realize wall self-insulation, has both saved expensive wall heat insulation material, and fire prevention, heat insulation, sound insulation, saved a large amount of heat insulating materials again.
Guarantee that high-quality completes integrated poured one-time formed key and is: the one, template selection is superior in quality, prefabricated superior rationally, point, face, line rib, angle texts are clearly clear.The 2nd, template support is firm, and construction technology is orderly, and constructional materials must meet national requirements.The 3rd, it is stable that wall cement mortar color and luster is allocated even science, do not occur changing and contrast, and texture true nature, decoration of exterior wall clear layer, aberration are clearly demarcated, mutually set off.The 4th, template ejection technique reaches a standard.The 5th, program, indispensable must be strictly adhered in the sealing of body of wall intermediate air layer, careful and responsible, meticulous.On the above-mentioned critical problem that these affect construction quality, must set up inspection system, fulfill one's duties.
The integrated poured once-molding construction process of building construction of the present invention, use prefabricated formwork module, in conjunction with arching mode, realize overall perfusion one-shot forming, make exterior wall gauze wire cloth and beam, post reinforcing bar is connected, Cement for walls mortar and beam column concrete are bordered, beam column top and roof panel are bordered on, make body of wall and beam, post, roof panel, balcony slab forms an integral body, master plate mould is once fitted up effect inside and outside having realized house, removed house fitment process again from, thereby reduced the complicated procedures of building construction, saved a large amount of timber, expensive ornament materials and a considerable amount of manpower expense, improved efficiency of construction, significantly reduced building construction cost, protected human ecological environment, realized the environmental protection of indoor and outdoor, to resident, brought easy dwelling environment, evaded and moved in resident because fitting up in every household, a large amount of hidden dangers such as fire of using flammable inflammable ornament materials and causing, also solved the difficult problem of fire supervision department to the bad management of finishing of resident resident family.Meanwhile, the set intermediate air layer of body of wall is in closed state, and isolated outside air, realizes wall self-insulation ability, has played sound insulation, effect of heat insulation.Therefore, apply the integrated poured one-time formed new Building technology of building construction and there is epoch-making milestone significance.

Claims (4)

1. the integrated poured once-molding construction process of building construction, this technique is according to construction drawing requirement, formulate construction requirement and the planning book of integrated poured one-shaping technique, prefab form module, the ground beam template of the good reinforced frame of colligation of supporting is fluid concrete then, solidify after reaching laying thereon after intensity, assembling reinforcement and steel mesh reinforcement and carry out formwork module supporting, press construction technical requirement and lay, configure concrete embedded part, power supply facilities illuminating line, water-feeding & drainaging pipeline, ventilation passage, heating facility, then carry out integrated poured; It is characterized in that: described prefab form module comprises prefabricated ground beam template, precast facade template, inner wall decoration formwork module, staircase formwork module, escalator formwork module; Precast facade template is by exterior wall decoration formwork module, window mouth decoration formwork module, and balcony, rain are taken balcony decoration formwork module, inner corner trim, external corner line decoration formwork module, beam, post decoration formwork module form; Inner wall decoration formwork module is by inner wall panel decoration formwork module, beam, post decoration formwork module, inner corner trim, external corner line decoration formwork module, parlor roof panel decoration formwork module, bedroom roof panel decoration formwork module, study roof panel decoration formwork module, dining room roof panel decoration formwork module, kitchen wallboard, roof panel decoration formwork module, washroom wallboard, roof panel decoration formwork module, skirting decoration formwork module forms; Staircase formwork module is by stair decoration formwork module, roof panel decoration formwork module, and ground decoration formwork module, inner corner trim, external corner line decoration formwork module, skirting formwork module forms; Escalator formwork module is by elevator doorway decoration formwork module, wallboard decoration formwork module, ground decoration formwork module, and inner corner trim, external corner line formwork module, skirting formwork module, roof panel decoration formwork module forms.
2. the integrated poured once-molding construction process of building construction as claimed in claim 1, it is characterized in that: the described formwork module supporting concrete steps of carrying out are unwrapping wire on grade beam, successively side column, inner prop are carried out to supporting, inner, external wall template support, doors and windows template supporting, staircase delays platform template support, stair template supporting, Lift well mould slab supporting, rain is taken balcony slab supporting, roof panel carries out arching, treats that beam column, rain being taken to balcony slab after the reinforcing bar of beam, post, reinforcing bar binding that rain is taken balcony slab carries out template support; Between column template, wall form, to overlap tightly, when inner, external wall template support, must strictly seal body of wall intermediate air layer, and lay steel mesh reinforcement in exterior wall, comprehensively fixing with screw through walls; Beam forms and column template, wall form, rain are taken balcony template overlap joint and are wanted tight, the reinforcing bar that the reinforcing bar of beam, post, rain are taken balcony slab is connected firm with body of wall gauze wire cloth, while laying shuttering of root boarding, between template, must connect with fastening buckle, to prevent template play impact cast effect, the roof panel reinforcing bar of binding will be connected firmly with other reinforcing bar; To the house template support having completed, to carry out once careful safety inspection comprehensively, carry out again casting and constructing after errorless.
3. the integrated poured once-molding construction process of building construction as claimed in claim 1 or 2, is characterized in that: it is that the formwork module of roof panel is made into arching body that described roof panel carries out arching, props up guard housing form supporting by bar shaped; To be it cancel each other the outward thrust of a part of pressure and adjacent another arching to its benefit, so it can bear larger pressure, can also save a large amount of support bars, and arching has stability more simultaneously.
4. the integrated poured once-molding construction process of building construction as claimed in claim 2, it is characterized in that: described body of wall intermediate air layer is surrounded by inside and outside combined wall board and packing bar, certain thickness packing bar sealing is supported on the periphery place between inside and outside wallboard, inside and outside wallboard is erect and is fixed on beam, then fluid concrete.
CN201210050130.7A 2012-02-22 2012-02-22 One-step forming construction process for integrally pouring housing construction Active CN102535846B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210050130.7A CN102535846B (en) 2012-02-22 2012-02-22 One-step forming construction process for integrally pouring housing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210050130.7A CN102535846B (en) 2012-02-22 2012-02-22 One-step forming construction process for integrally pouring housing construction

Publications (2)

Publication Number Publication Date
CN102535846A CN102535846A (en) 2012-07-04
CN102535846B true CN102535846B (en) 2014-08-13

Family

ID=46343738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210050130.7A Active CN102535846B (en) 2012-02-22 2012-02-22 One-step forming construction process for integrally pouring housing construction

Country Status (1)

Country Link
CN (1) CN102535846B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352569A (en) * 2013-07-31 2013-10-16 清远新绿环建筑材料有限公司 Construction method of integrally-poured architecture building
CN105370039A (en) * 2014-08-29 2016-03-02 S·S·瑞恩 Method for building modular buildings by single casting concrete
CN105064553B (en) * 2015-09-09 2017-09-05 江苏中南建筑产业集团有限责任公司 Flexible prefabricated assembling shear wall exterior window integrated construction system and its construction method
CN105604346B (en) * 2016-01-13 2019-02-19 卓达新材料科技集团有限公司 Integrated molding from the inside to the outside prepare house unit method and house unit obtained
CN105863253B (en) * 2016-05-25 2018-06-01 恒德建设有限公司 Integral formwork support is asynchronous to pour staircase wall column formwork system and construction method
CN105863357A (en) * 2016-06-06 2016-08-17 陈俞任 Shockproof house of integrated structure
DE102016120047B4 (en) 2016-10-20 2018-05-03 Dmf Deutsche Modulhaus Fabrik Gmbh Device and method for the integral production of a three side elements and a floor element and / or a ceiling element having room module
CN106884480A (en) * 2017-04-03 2017-06-23 刘建军 Once grouting is molded the construction process of moveable house
CN107558604A (en) * 2017-09-14 2018-01-09 郭瑞华 A kind of method for exempting from form removal raised table building
CN113266151A (en) * 2021-05-25 2021-08-17 玉溪市明瑞建设工程有限公司 Integral casting one-step forming construction process for house building
CN114059772B (en) * 2021-12-22 2023-02-28 瑞洲建设集团有限公司 Integral casting one-step forming construction process for house building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998016704A1 (en) * 1996-10-17 1998-04-23 Sten Engwall House building module and method related thereto
CN1636919A (en) * 2004-12-17 2005-07-13 中国科学院长春应用化学研究所 Building formwork produced with wooden material, waste plastic and flyash
CN101649649A (en) * 2008-08-12 2010-02-17 何建国 One-time forming construction process for concrete building structures and decoration
CN101818539A (en) * 2010-06-04 2010-09-01 北京万科企业有限公司 Assembled integral building and construction method thereof
CN101967851A (en) * 2009-07-28 2011-02-09 董杨 Board-mixing structure assembly type house and building method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998016704A1 (en) * 1996-10-17 1998-04-23 Sten Engwall House building module and method related thereto
CN1636919A (en) * 2004-12-17 2005-07-13 中国科学院长春应用化学研究所 Building formwork produced with wooden material, waste plastic and flyash
CN101649649A (en) * 2008-08-12 2010-02-17 何建国 One-time forming construction process for concrete building structures and decoration
CN101967851A (en) * 2009-07-28 2011-02-09 董杨 Board-mixing structure assembly type house and building method thereof
CN101818539A (en) * 2010-06-04 2010-09-01 北京万科企业有限公司 Assembled integral building and construction method thereof

Also Published As

Publication number Publication date
CN102535846A (en) 2012-07-04

Similar Documents

Publication Publication Date Title
CN102535846B (en) One-step forming construction process for integrally pouring housing construction
CN101818527B (en) Assembled integral shear wall structure system and construction method thereof
CN202644775U (en) Prefabricated sandwich external wall panel with thermal insulation concrete
CN104005502B (en) A kind of precast light building cover board and industrialized building house floor slab structure
CN103334504B (en) High-strength composite corrugated fiber foam cement heat insulation material
CN102650152A (en) Prefabricated sandwich heat-preservation heat insulation concrete external wall panel and fabrication method
CN102182265A (en) Multifunctional fast building formwork wallboard structure system
CN101307629A (en) Fastener type self-decoration composite heat insulation high layer dwelling building module and its construction method
CN101967866B (en) Stone reinforced light type composite board
CN102251662A (en) Cast-in-place process for ultra light foamed cement-based bearing heat insulation wallboard
CN102248577B (en) Superlight-foamed-cement-based manufacturing process for thermal-insulation bearing wall panel
CN202090469U (en) Multifunctional die wallboard structural system for fast house building
CN109356319A (en) A kind of one assembly concrete Side fascia of the six directions and its production method
CN100588810C (en) Assembly building method for energy-saving reconstruction of existing building
CN112459291A (en) Prefabricated heat insulation structure integrated wall structure and construction process thereof
CN209040360U (en) The cast-in-situ thermal-insulated decorating wall of non-dismantling formwork is made of decoration panel and keel
CN107435385A (en) A kind of wallboard and production method of fire-resistant light granules and filling polyurethane
CN106958358A (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN104652604A (en) Assembly type green building system and construction method
CN105275206A (en) A construction method of an external wall of a building
CN108978989A (en) A kind of Assembled self-insulating fire-proof sound insulation wallboard
CN106639135A (en) Novel assembled type H-shaped prefabricated composite wall board and preparation method thereof
CN105908877A (en) Self-insulation composite fireproof curtain wall board and preparation method thereof
CN206681418U (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
ITTV20110055A1 (en) PROCEDURE FOR THE PRODUCTION OF DECORATIVE AND PROTECTIVE CLADDING PANELS AND PANEL OBTAINED BY SUCH PROCEDURE.

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190507

Address after: 400,000 Nanbin Road, Nanan District, Chongqing City, 83 with No. 5, 3-8

Patentee after: Chongqing Taizhiruirui Construction Engineering Co., Ltd.

Address before: 125000 First Floor of Zhengdao Hotel in the Middle Section of Haibin Road, Huludao City, Liaoning Province

Patentee before: Wang Zhicheng