CN105863357A - Shockproof house of integrated structure - Google Patents
Shockproof house of integrated structure Download PDFInfo
- Publication number
- CN105863357A CN105863357A CN201610393664.8A CN201610393664A CN105863357A CN 105863357 A CN105863357 A CN 105863357A CN 201610393664 A CN201610393664 A CN 201610393664A CN 105863357 A CN105863357 A CN 105863357A
- Authority
- CN
- China
- Prior art keywords
- house
- integrated structure
- shockproof
- integrative
- window frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention discloses a shockproof house of an integrated structure. The difference between the shockproof house and a traditional framework house lies in that pillars are core supporting parts of the traditional framework house, the whole house is supported through the pillars, after a body is built, walls are built, and a door frame and a window frame are installed. According to the shockproof house of the integrated structure, the pillars are not used, the walls are not built, and the walls, the door frame and the window frame are poured at a time and combined totally. The shockproof house of the integrated structure has the advantages that the integrated structure is firm, rainwater does not permeate into the walls, and the whole structure of the house will not be influenced by any damage. Even if the shockproof house, with eight floors or less, of the integrated structure falls down, the shockproof house will not be disintegrated, and the shockproof house is particularly suitable for areas where earthquake occurs frequently. The wall thickness of the shockproof house, with high floors, of the integrated structure adapts to the height, the bottom layer is thicker, and the thickness is reduced layer by layer. Formworks are tied to the steel mesh reinforcement structure well welded to be fixed, which is key to success of construction of the shockproof house of the integrated structure.
Description
Technical field
The present invention relates to a kind of integrative-structure quakeproof house, the integrative-structure quakeproof house of less than eight layers, even if falling down, also will not disintegrate, being particularly suitable for earthquake prone areas.
Background technology
Integrative-structure quakeproof house, is that the world is blank.
Summary of the invention
In order to shockproof, reduce Casualties Caused By Earthquakes, invented integrative-structure quakeproof house.
The technical solution adopted for the present invention to solve the technical problems is: integrative-structure quakeproof house can not have post not build a wall, body of wall, doorframe, window frame, and once-cast all combines.
The invention has the beneficial effects as follows integrative-structure, firm, the not permeable rainwater of body of wall, any point is damaged all without the overall structure affecting house.The integrative-structure quakeproof house of less than eight layers, even if falling down, also will not disintegrate, being particularly suitable for earthquake prone areas.
Accompanying drawing explanation
In order to the embodiment of the present invention or of the prior art technical scheme are better described, accompanying drawing required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in describing below is only one embodiment of the present of invention, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawings according to these accompanying drawings.
Figure
1
It it is integrative-structure quakeproof house structural representation.In figure, the parts of mark are:
1
Be body of wall steel mesh reinforcement structure,
2
It is roof steel mesh reinforcement structure,
A
It is doorframe,
B
It it is window frame
B
,
C
It it is window frame
C
,
D
It it is window frame
D
,
E
It it is window frame
E
,
F
It it is window frame
F
,
G
It it is window frame
G
,
H
It it is window frame
H
,
I
It it is window frame
I
。
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art are obtained under not paying creative work premise, broadly fall into the scope of protection of the invention.
Figure
1
It it is integrative-structure quakeproof house structural representation.Requirement for height according to house builds up the ground of integrative-structure quakeproof house, and first layer ground first to have welded steel mesh reinforcement structure and pour into a mould concrete again.Body of wall is also first to have welded steel mesh reinforcement structure, and doorframe, window frame is fixed, and reserved water flowing energising ventilation blowdown and air-conditioning pore, template is tied up in steel mesh reinforcement structure fixing, then poured into a mould concrete.The construction on roof, as existing Building technology, first completes template, has welded steel mesh reinforcement structure and has poured into a mould concrete again.Integrative-structure quakeproof house is with the difference in conventional frame house: post is the core support parts in conventional frame house, and bed rearrangement house supports by post, and main body is built a wall after building up again and filled doorframe, window frame.Integrative-structure quakeproof house then can not have post not build a wall, body of wall, doorframe, window frame, and once-cast all combines.The advantage of integrative-structure quakeproof house is: integrative-structure, firm, the not permeable rainwater of body of wall, and any point is damaged all without the overall structure affecting house.The integrative-structure quakeproof house of less than eight layers, even if falling down, also will not disintegrate, being particularly suitable for earthquake prone areas.The thickness of wall body of high-rise integrative-structure quakeproof house will with highly adapt, underlayer thickness is big, successively reduces.Template is tied up in the steel mesh reinforcement structure welded fixing, is that the construction of integrative-structure quakeproof house is the most crucial.
One of ordinary skill in the art will appreciate that: accompanying drawing is the schematic diagram of an embodiment, module or flow process in accompanying drawing are not necessarily implemented necessary to the present invention.
Last it is noted that above example is only in order to illustrate technical scheme, it is not intended to limit;Although the present invention being described in detail with reference to previous embodiment, it will be understood by those within the art that: the technical scheme described in previous embodiment still can be modified by it, or wherein portion of techniques feature is carried out equivalent;And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of embodiment of the present invention technical scheme.
Claims (1)
1. integrative-structure quakeproof house, feature is the ground that the requirement for height according to house builds up integrative-structure quakeproof house, and first layer ground first to have welded steel mesh reinforcement structure and pour into a mould concrete again;Body of wall is also first to have welded steel mesh reinforcement structure, and doorframe, window frame is fixed, and reserved water flowing energising ventilation blowdown and air-conditioning pore, template is tied up in steel mesh reinforcement structure fixing, then poured into a mould concrete;The construction on roof, as existing Building technology, first completes template, has welded steel mesh reinforcement structure and has poured into a mould concrete again;Integrative-structure quakeproof house is with the difference in conventional frame house: post is the core support parts in conventional frame house, and bed rearrangement house supports by post, and main body is built a wall after building up again and filled doorframe, window frame;Integrative-structure quakeproof house then can not have post not build a wall, body of wall, doorframe, window frame, and once-cast all combines.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610393664.8A CN105863357A (en) | 2016-06-06 | 2016-06-06 | Shockproof house of integrated structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610393664.8A CN105863357A (en) | 2016-06-06 | 2016-06-06 | Shockproof house of integrated structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105863357A true CN105863357A (en) | 2016-08-17 |
Family
ID=56676803
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610393664.8A Pending CN105863357A (en) | 2016-06-06 | 2016-06-06 | Shockproof house of integrated structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105863357A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4377927A (en) * | 1981-06-29 | 1983-03-29 | Dyar Harrison G | Prefabricated thermal insulating system for buildings |
CN201016231Y (en) * | 2007-03-02 | 2008-02-06 | 李永峰 | Heat preservation environment protection shockproof house |
CN201050113Y (en) * | 2007-04-27 | 2008-04-23 | 刘泳霞 | Light aggregate reinforcing steel bar concrete energy-saving domestic architecture structure system |
CN101307616A (en) * | 2008-07-11 | 2008-11-19 | 湖南山河智能机械股份有限公司 | House building process |
CN201377121Y (en) * | 2009-02-16 | 2010-01-06 | 于占林 | Entirely-poured concrete house |
CN102535846A (en) * | 2012-02-22 | 2012-07-04 | 王志成 | One-step forming construction process for integrally pouring housing construction |
CN103924714A (en) * | 2014-03-18 | 2014-07-16 | 昆山生态屋建筑技术有限公司 | Wire mesh integral-frame building wall and manufacture process thereof |
CN203867253U (en) * | 2014-06-06 | 2014-10-08 | 大连万达商业地产股份有限公司 | Novel safe house structure |
-
2016
- 2016-06-06 CN CN201610393664.8A patent/CN105863357A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4377927A (en) * | 1981-06-29 | 1983-03-29 | Dyar Harrison G | Prefabricated thermal insulating system for buildings |
CN201016231Y (en) * | 2007-03-02 | 2008-02-06 | 李永峰 | Heat preservation environment protection shockproof house |
CN201050113Y (en) * | 2007-04-27 | 2008-04-23 | 刘泳霞 | Light aggregate reinforcing steel bar concrete energy-saving domestic architecture structure system |
CN101307616A (en) * | 2008-07-11 | 2008-11-19 | 湖南山河智能机械股份有限公司 | House building process |
CN201377121Y (en) * | 2009-02-16 | 2010-01-06 | 于占林 | Entirely-poured concrete house |
CN102535846A (en) * | 2012-02-22 | 2012-07-04 | 王志成 | One-step forming construction process for integrally pouring housing construction |
CN103924714A (en) * | 2014-03-18 | 2014-07-16 | 昆山生态屋建筑技术有限公司 | Wire mesh integral-frame building wall and manufacture process thereof |
CN203867253U (en) * | 2014-06-06 | 2014-10-08 | 大连万达商业地产股份有限公司 | Novel safe house structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631512B (en) | Hang modulus method after-pouring band beam-slab construction method | |
CN103015565A (en) | Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method | |
CN204298825U (en) | Foundation ditch builds elephant trunk supporting and regulating device | |
CN101845889A (en) | Concrete casting and tamping method of steel tube concrete structure column | |
CN206607863U (en) | A kind of post-cast strip temporary support structure | |
CN202787570U (en) | Prefabricated integral reinforced concrete load bearing wall | |
CN105625566A (en) | Fabricated concrete orthogonal-diagonal lattice space grid box type tube-in-tube structure and making method thereof | |
CN203257090U (en) | Framework system of cantilever slab | |
CN106592996B (en) | The construction method that small ocean housing reform is made | |
CN105332506A (en) | Formwork support system for parallel multi-section stair and method for constructing same | |
CN204456428U (en) | A kind of entirety being installed on composite wallboard is waftd window | |
CN204920210U (en) | Dysmorphism spar template reinforced structure | |
CN201554034U (en) | Horizontal embedding support structure for post-pouring belt of top-down construction | |
CN105804426B (en) | Masonry structure remodeling method and the underpinning structure being transformed for masonry structure | |
CN204059420U (en) | Late poured band support structure | |
CN203947493U (en) | Assembling type device for detecting manhole | |
CN204266373U (en) | A kind of assembled integral Steel Space grid box structure room for earthquake region | |
CN105863357A (en) | Shockproof house of integrated structure | |
CN205975995U (en) | Cast -in -place concrete floor indent steel tube frame | |
CN104234418A (en) | Early removal formwork for fabrication of reinforced concrete beams and construction method thereof | |
CN103352579A (en) | Reinforcement and reconstruction masonry structure using externally-added gallery bridge and externally-added elevator and construction method | |
CN102220808A (en) | Beam lowering construction method of frame structure | |
CN204139190U (en) | A kind of Liftable preformed bricks fetal membrane | |
CN108104506A (en) | It is a kind of to be used for structural demolition and the temporary facility rebuilded and its construction method | |
CN107642241A (en) | The stress supporting construction and construction method of a kind of prefabricated balcony |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160817 |
|
WD01 | Invention patent application deemed withdrawn after publication |