CN102535846A - One-step forming construction process for integrally pouring housing construction - Google Patents

One-step forming construction process for integrally pouring housing construction Download PDF

Info

Publication number
CN102535846A
CN102535846A CN2012100501307A CN201210050130A CN102535846A CN 102535846 A CN102535846 A CN 102535846A CN 2012100501307 A CN2012100501307 A CN 2012100501307A CN 201210050130 A CN201210050130 A CN 201210050130A CN 102535846 A CN102535846 A CN 102535846A
Authority
CN
China
Prior art keywords
formwork module
wall
module
roof panel
template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100501307A
Other languages
Chinese (zh)
Other versions
CN102535846B (en
Inventor
王志成
林百智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Taizhiruirui Construction Engineering Co., Ltd.
Original Assignee
王志成
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王志成 filed Critical 王志成
Priority to CN201210050130.7A priority Critical patent/CN102535846B/en
Publication of CN102535846A publication Critical patent/CN102535846A/en
Application granted granted Critical
Publication of CN102535846B publication Critical patent/CN102535846B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a one-step forming construction process for integrally pouring a housing construction. According to the requirement of a construction drawing, the one-step forming construction process comprises the following steps of: prefabricating a template module; supporting a ground beam template; pouring concrete; laying and binding reinforcements and reinforcing meshes on the solidified concrete, and supporting the template module; laying and arranging concrete embedded parts, power supply facility illuminating circuits, water supply and drainage pipelines, ventilation channels, warming facilities and the like according to the requirement of construction technology; and performing integral pouring. According to the one-step forming construction process, the effect of decorating inside and outside of a house in one time is realized, the complex procedure of the housing construction is reduced, wood materials, decorating materials and manpower cost are saved, the construction efficiency is improved, the construction cost is reduced, the effects of sound isolation, heat insulation, fire proofing and seismic resistance are improved, human ecological environment is protected, and environment friendliness inside and outside the house is realized.

Description

The integrated poured once-molding construction process of building construction
One, technical field
The present invention relates to the housing construction field, the integrated poured once-molding construction process of specifically a kind of building construction.
Two, background technology
Building construction is one of mainstay industry of Chinese national economy, is the place of building production, life for the mankind.From the platform building yoke tree house of mankind's invention in compacting, to Qin brick and Han tile, the mankind progressively tend to ripe to building construction technology.But continuous progress along with the human history development; Continuing to bring out of new constructional materials; The building technology is also being constantly brought forth new ideas; The mankind begin to stride forward to high structure, long span building, and equipment such as, safe fire-fighting dustproof to the water supply and drainage of building construction, air conditioning, heating insulation, daylighting illumination, sound insulation are also updated, and make people's environment such as inhabitation, production, recreation comfortable day by day.
Current, the method for building construction adopts two kinds of brick mix structure, frame constructions basically.Brick mix structure is meant the structural wall of vertical load-bearing in the building with brick or concrete block masonry, and employing reinforced concrete structures such as post, beam, roof panel are processed, and prefabricated reinforced concrete floor overlaps on the wall, and the weight of floor conducts to the basis through body of wall.Brick mix structure needs a large amount of brick or building block, and the land resources waste is serious, and freight volume is big, long construction period, and complex process, in order to guarantee verticality, planeness, operating technology requires high, and thermal property is poor, and antiseismic ability is low, has not advocated application now.Frame construction refers in the building that major bearing structures such as wall, post, beam, roof panel etc. process with steel concrete, and non is filled with building block or other material; Cast-in-place concrete floor weight is conducted to post through beam, is conducted to the basis by post, and body of wall only plays to be separated and insulation effect, and exterior wall is plastered, and is indoor through living behind the remodeling finishing.Though the building method of this kind building structure has shortened construction period, has saved land resources, improved antiseismic ability; But the steel concrete cast-in-site of the wall of load-bearing, post, beam, roof panel needs a large amount of timber to carry out supporting; After the dismounting of the timber of supporting again utilization rate be merely about 20% to 30%; A large amount of timber are consumed, and a large amount of felling consumption of timber cause the waste of resource and the destruction of human ecological environment; Sound insulation, the effect of heat insulation of body of wall are poor, and the interior and exterior finishes in house also needs the ornament materials and a considerable amount of labour cost of a large amount of timber, costliness, has improved the building construction cost, has stayed disaster hidden-trouble.
Three, summary of the invention
In order to solve the deficiency of prior art, the purpose of this invention is to provide the integrated poured once-molding construction process of a kind of building construction, removed the house from and fitted up once more, improved sound insulation, effect of heat insulation is poor, has saved a large amount of timber, has protected human ecological environment.
Realize that the technical scheme that the object of the invention adopts is: according to the construction drawing requirement; Formulate the construction requirement and planning book of integrated poured one-shaping technique; The prefab form module; The ground beam forms of the good reinforced frame of supporting colligation is fluid concrete then; Solidify and carry out the formwork module supporting after reaching laying above that after the intensity, assembling reinforcement and steel mesh reinforcement, press that construction technical requirement is laid, concrete embedded of configuration, power supply facilities illuminating line, water-feeding & drainaging pipeline, ventilation passage, heating facility etc., carry out integrated poured then.
Described prefab form module comprises prefabricated ground beam forms, precast facade template, inner wall decoration formwork module, staircase formwork module, escalator formwork module; Outer wall template is by outer body of wall decoration formwork module, window mouth decoration formwork module, and balcony, rain are taken balcony decoration formwork module, inner corner trim, the decorated formwork module of external corner, beam, post decoration formwork module are formed; The inner wall decoration formwork module is by inner wall panel decoration formwork module, beam, post decoration formwork module, inner corner trim, the decorated formwork module of external corner; Parlor roof panel decoration formwork module, bedroom roof panel decoration formwork module, study roof panel decoration formwork module; Dining room roof panel decoration formwork module; Kitchen wallboard, roof panel decoration formwork module, washroom wallboard, roof panel decoration formwork module, skirting decoration formwork module is formed; The staircase formwork module is by stair decoration formwork module, roof panel decoration formwork module, and the ground decoration formwork module, inner corner trim, the decorated formwork module of external corner, the skirting formwork module is formed; The escalator formwork module is by elevator doorway decoration formwork module, wallboard decoration formwork module, ground decoration formwork module, and inner corner trim, external corner line template module, the skirting formwork module, roof panel decoration formwork module is formed.
The material of described formwork module is made up of waste or used plastics particle, flyash, sawdust and adhesive, puts into mould after the material mixing through extrusion modling, and the inner chamber of mould is processed different shape as required; Formwork module is by the vegetarian noodles formwork module that has no plating and have the non-vegetarian noodles formwork module of ornamental plating to constitute.The plating of ornamental plating formwork module is realized by the mould that forms formwork module.According to people the inside and outside decorative effect in house is required to have nothing in common with each other, each sub-district is different, and each family is different, and compartment is different, and color and luster is different, and characteristics are respectively arranged, and respectively gets the needs of inclination, and plating is must pattern various.Adopt the job practices of decoration platings such as imitative coloured reason stone that formwork module prints, ornamental stone, decoration ceramic tile, make metope texture true to nature, do not fade, safety non-pollution, class be luxurious.House wall surface leans on supporting formwork module one-time cast-forming, has removed the ornament materials and the labour cost of fitting up required costliness from, has reduced the building construction cost, has removed disaster hidden-trouble.
The described formwork module supporting concrete steps of carrying out are unwrapping wire on grade beam, successively side column, inner prop are carried out supporting, the inner, external wall template support; The doors and windows template supporting, staircase delays platform template support, stair template support; The Lift well mould slab supporting; Rain is taken the balcony slab supporting, and roof panel carries out arching, treats that the reinforcing bar of beam, post, reinforcing bar binding that rain the is taken balcony slab back that finishes takes balcony slab to beam column, rain and carry out template support; Post is touched plate, wall and is touched and will overlap tightly between the plate, when the inner, external wall template support, must carry out the strictness sealing to body of wall intermediate air layer, and lay steel mesh reinforcement in exterior wall, fixes with screw through walls comprehensively; It is tight that beam forms and column template, wall form, rain are taken balcony template overlap joint; The reinforcing bar that the reinforcing bar of beam, post, rain are taken balcony slab is connected firm with the body of wall gauze wire cloth; When laying the roof panel template; Must connect with fastening buckle between the template, to prevent template play influence cast effect, the roof panel reinforcing bar of binding will be connected firmly with other reinforcing bar; To carry out once careful safety inspection comprehensively to the house integral mold plate supporting of having accomplished, carry out casting and constructing again after errorless.
It is to be made into the arching body to the formwork module of roof panel that described roof panel carries out arching, props up guard housing through bar shaped and forms supporting; Its benefit is that it cancels each other the outward thrust of another arching body of a part of pressure and adjacent (another), so it can bear bigger pressure, can also save a large amount of support bars, and arching has stability more simultaneously.
Describedly carry out integrated poured the steps include: and earlier body of wall is implemented concrete pouring; Coupled columns, beam carry out concrete pouring again; Then to roof panel, rain take, balcony slab carries out concrete pouring, and stair are carried out concrete pouring, and the elevator shaft shear wall is carried out concrete spouting.
Externally within the walls, before the outer filling cement mortar, pour into a mould inside and outside metope cement mortar again after spraying the wall face template with the colored cement mortar of particular modulation earlier, vibrate with vibrator simultaneously and tamp; During exterior wall mortar casting and constructing, the construction of the cement mortar cast of metope in starting simultaneously.Can carry out concrete pouring after also will be earlier before beam column, roof panel, rain are taken the concrete pouring of balcony slab spraying with the colored cement mortar of particular modulation.To the concrete pouring of elevator shaft shear wall, must pour into a mould simultaneously or early than beam column with beam column, being connected simultaneously with beam column, roof panel becomes integral body.Spray coloured cement mortar and can make metope beautiful, avoid finishing.
Described body of wall intermediate air layer is surrounded by inside and outside combined wall board and packing bar, and certain thickness packing bar sealing is supported on the perimeter between the inside and outside wallboard, and inside and outside wallboard is erect and is fixed on the beam, then fluid concrete.The setting of body of wall intermediate air layer can realize wall self-insulation, has both practiced thrift expensive wall heat insulation material, and a large amount of heat insulating materials has been saved in fire prevention, heat insulation, sound insulation again.
Guarantee that high-quality accomplishes integrated poured one-time formed key and be: the one, the template selection superior in quality, prefabricated superior rationally, effects such as point, face, line rib, angle are clear clearly.The 2nd, template support is firm, and construction technology is orderly, and constructional materials must meet national requirements.The 3rd, it is stable that metope cement mortar color and luster is allocated even science, do not occur changing and contrast, and the texture true nature, decoration of exterior wall clear layer, aberration are clearly demarcated, set off each other.The 4th, the template ejection technique reaches a standard.The 5th, the sealing of body of wall intermediate air layer must strictness be adhered to program, indispensable, and be careful and responsible, meticulous.Must set up inspection system to the above-mentioned critical problem that these influence construction quality, fulfill one's duties.
The integrated poured once-molding construction process of building construction of the present invention uses prefabricated formwork module, realizes the overall perfusion one-shot forming in conjunction with the arching mode; Outer body of wall gauze wire cloth is connected with beam, post reinforcing bar, and body of wall cement mortar and beam column concrete are bordered, and beam column top and roof panel are bordered on; Make body of wall and beam, post, roof panel, balcony slab form an integral body, the master plate mould has been realized once fitting up effect inside and outside the house, has removed house fitment process once more from; Thereby reduced the complicated procedures of building construction; Save the ornament materials and a considerable amount of manpower expense of a large amount of timber, costliness, improved efficiency of construction, significantly reduced the building construction cost; Protected human ecological environment; Realized the environmental protection of indoor and outdoor, brought easy dwelling environment, evaded and moved in the resident and fit up because of the every household to the resident; A large amount of hidden dangers such as fire of using flammable inflammable ornament materials and causing have also solved the difficult problem of fire supervision department to the bad management of finishing of resident resident family.Simultaneously, the set intermediate air layer of body of wall is in closed state, and isolated outside air is realized the wall self-insulation ability, has played sound insulation, effect of heat insulation.Therefore, apply the integrated poured one-time formed new Building technology of building construction and have epoch-making milestone significance.

Claims (7)

1. integrated poured once-molding construction process of building construction; It is characterized in that: according to the construction drawing requirement; Formulate the construction requirement and planning book of integrated poured one-shaping technique; The ground beam forms of the good reinforced frame of prefab form module, supporting colligation is fluid concrete then, solidifies to carry out the formwork module supporting after reaching laying above that after the intensity, assembling reinforcement and steel mesh reinforcement; Press construction technical requirement laying, concrete embedded of configuration, power supply facilities illuminating line, water-feeding & drainaging pipeline, ventilation passage, heating facility etc., carry out integrated poured then.
2. the integrated poured once-molding construction process of building construction as claimed in claim 1 is characterized in that: described prefab form module comprises prefabricated ground beam forms, precast facade template, inner wall decoration formwork module, staircase formwork module, escalator formwork module; Outer wall template is by outer body of wall decoration formwork module, window mouth decoration formwork module, and balcony, rain are taken balcony decoration formwork module, inner corner trim, the decorated formwork module of external corner, beam, post decoration formwork module are formed; The inner wall decoration formwork module is by inner wall panel decoration formwork module, beam, post decoration formwork module, inner corner trim, the decorated formwork module of external corner; Parlor roof panel decoration formwork module, bedroom roof panel decoration formwork module, study roof panel decoration formwork module; Dining room roof panel decoration formwork module; Kitchen wallboard, roof panel decoration formwork module, washroom wallboard, roof panel decoration formwork module, skirting decoration formwork module; The staircase formwork module is by stair decoration formwork module, roof panel decoration formwork module, ground decoration formwork module, inner corner trim, the decorated formwork module of external corner, skirting formwork module; The escalator formwork module is by elevator doorway decoration formwork module, wallboard decoration formwork module, ground decoration formwork module, and inner corner trim, external corner line template module, the skirting formwork module, roof panel decoration formwork module is formed.
3. according to claim 1 or claim 2 the integrated poured once-molding construction process of building construction; It is characterized in that: the material of described formwork module is made up of waste or used plastics particle, flyash, sawdust and adhesive; Put into mould after the material mixing through extrusion modling, the inner chamber of mould is processed different shape as required; Formwork module is by the vegetarian noodles formwork module that has no plating and have the non-vegetarian noodles formwork module of ornamental plating to constitute; The plating of ornamental plating formwork module is realized by the mould that forms formwork module.
4. the integrated poured once-molding construction process of building construction as claimed in claim 1 is characterized in that: the described formwork module supporting concrete steps of carrying out are unwrapping wire on grade beam, successively side column, inner prop are carried out supporting; The inner, external wall template support; The doors and windows template supporting, staircase delays platform template support, stair template support; The Lift well mould slab supporting; Rain is taken the balcony slab supporting, and roof panel carries out arching, treats that the reinforcing bar of beam, post, reinforcing bar binding that rain the is taken balcony slab back that finishes takes balcony slab to beam column, rain and carry out template support; Post is touched plate, wall and is touched and will overlap tightly between the plate, when the inner, external wall template support, must carry out the strictness sealing to body of wall intermediate air layer, and lay steel mesh reinforcement in exterior wall, fixes with screw through walls comprehensively; It is tight that beam forms and column template, wall form, rain are taken balcony template overlap joint; The reinforcing bar that the reinforcing bar of beam, post, rain are taken balcony slab is connected firm with the body of wall gauze wire cloth; When laying the roof panel template; Must connect with fastening buckle between the template, to prevent template play influence cast effect, the roof panel reinforcing bar of binding will be connected firmly with other reinforcing bar; To carry out once careful safety inspection comprehensively to the house integral mold plate supporting of having accomplished, carry out casting and constructing again after errorless.
5. like claim 1 or the integrated poured once-molding construction process of 4 described building constructions, it is characterized in that: it is to be made into the arching body to the formwork module of roof panel that described roof panel carries out arching, props up guard housing through bar shaped and forms supporting; To be it cancel each other the outward thrust of a part of pressure and adjacent another arching to its benefit, so it can bear bigger pressure, can also save a large amount of support bars, and arching has stability more simultaneously.
6. the integrated poured once-molding construction process of building construction as claimed in claim 1; It is characterized in that: describedly carry out integrated poured the steps include: and earlier body of wall is implemented concrete pouring; Coupled columns, beam carry out concrete pouring again; Then to roof panel, rain take, balcony slab carries out concrete pouring, and stair are carried out concrete pouring, and the elevator shaft shear wall is carried out concrete spouting.
7. the integrated poured once-molding construction process of building construction as claimed in claim 1; It is characterized in that: described body of wall intermediate air layer is surrounded by inside and outside combined wall board and packing bar; Certain thickness packing bar sealing is supported on the perimeter between the inside and outside wallboard; Inside and outside wallboard is erect and is fixed on the beam, then fluid concrete.
CN201210050130.7A 2012-02-22 2012-02-22 One-step forming construction process for integrally pouring housing construction Active CN102535846B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210050130.7A CN102535846B (en) 2012-02-22 2012-02-22 One-step forming construction process for integrally pouring housing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210050130.7A CN102535846B (en) 2012-02-22 2012-02-22 One-step forming construction process for integrally pouring housing construction

Publications (2)

Publication Number Publication Date
CN102535846A true CN102535846A (en) 2012-07-04
CN102535846B CN102535846B (en) 2014-08-13

Family

ID=46343738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210050130.7A Active CN102535846B (en) 2012-02-22 2012-02-22 One-step forming construction process for integrally pouring housing construction

Country Status (1)

Country Link
CN (1) CN102535846B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352569A (en) * 2013-07-31 2013-10-16 清远新绿环建筑材料有限公司 Construction method of integrally-poured architecture building
CN105064553A (en) * 2015-09-09 2015-11-18 江苏中南建筑产业集团有限责任公司 Flexible prefabricated and assembled shear wall-external window integrated construction system and method
CN105370039A (en) * 2014-08-29 2016-03-02 S·S·瑞恩 Method for building modular buildings by single casting concrete
CN105863357A (en) * 2016-06-06 2016-08-17 陈俞任 Shockproof house of integrated structure
CN105863253A (en) * 2016-05-25 2016-08-17 杭州江润科技有限公司 Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
CN106884480A (en) * 2017-04-03 2017-06-23 刘建军 Once grouting is molded the construction process of moveable house
WO2017121100A1 (en) * 2016-01-13 2017-07-20 卓达新材料科技集团有限公司 Method of performing interior-to-exterior manufacturing to manufacture integrated housing unit and manufactured housing unit
CN107558604A (en) * 2017-09-14 2018-01-09 郭瑞华 A kind of method for exempting from form removal raised table building
CN109963696A (en) * 2016-10-20 2019-07-02 莱希纳集团有限公司 Device and method and such room modules for the integral type production including three side elements and base member and/or the room modules of ceiling element
CN113266151A (en) * 2021-05-25 2021-08-17 玉溪市明瑞建设工程有限公司 Integral casting one-step forming construction process for house building
CN114059772A (en) * 2021-12-22 2022-02-18 瑞洲建设集团有限公司 Integral casting one-step forming construction process for house building

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998016704A1 (en) * 1996-10-17 1998-04-23 Sten Engwall House building module and method related thereto
CN1636919A (en) * 2004-12-17 2005-07-13 中国科学院长春应用化学研究所 Building formwork produced with wooden material, waste plastic and flyash
CN101649649A (en) * 2008-08-12 2010-02-17 何建国 One-time forming construction process for concrete building structures and decoration
CN101818539A (en) * 2010-06-04 2010-09-01 北京万科企业有限公司 Assembled integral building and construction method thereof
CN101967851A (en) * 2009-07-28 2011-02-09 董杨 Board-mixing structure assembly type house and building method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998016704A1 (en) * 1996-10-17 1998-04-23 Sten Engwall House building module and method related thereto
CN1636919A (en) * 2004-12-17 2005-07-13 中国科学院长春应用化学研究所 Building formwork produced with wooden material, waste plastic and flyash
CN101649649A (en) * 2008-08-12 2010-02-17 何建国 One-time forming construction process for concrete building structures and decoration
CN101967851A (en) * 2009-07-28 2011-02-09 董杨 Board-mixing structure assembly type house and building method thereof
CN101818539A (en) * 2010-06-04 2010-09-01 北京万科企业有限公司 Assembled integral building and construction method thereof

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103352569A (en) * 2013-07-31 2013-10-16 清远新绿环建筑材料有限公司 Construction method of integrally-poured architecture building
CN105370039A (en) * 2014-08-29 2016-03-02 S·S·瑞恩 Method for building modular buildings by single casting concrete
CN105064553A (en) * 2015-09-09 2015-11-18 江苏中南建筑产业集团有限责任公司 Flexible prefabricated and assembled shear wall-external window integrated construction system and method
WO2017121100A1 (en) * 2016-01-13 2017-07-20 卓达新材料科技集团有限公司 Method of performing interior-to-exterior manufacturing to manufacture integrated housing unit and manufactured housing unit
CN105863253A (en) * 2016-05-25 2016-08-17 杭州江润科技有限公司 Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
CN105863253B (en) * 2016-05-25 2018-06-01 恒德建设有限公司 Integral formwork support is asynchronous to pour staircase wall column formwork system and construction method
CN105863357A (en) * 2016-06-06 2016-08-17 陈俞任 Shockproof house of integrated structure
CN109963696A (en) * 2016-10-20 2019-07-02 莱希纳集团有限公司 Device and method and such room modules for the integral type production including three side elements and base member and/or the room modules of ceiling element
CN109963696B (en) * 2016-10-20 2021-05-04 莱希纳集团有限公司 Device and method for the integrated production of room modules
US11643829B2 (en) 2016-10-20 2023-05-09 Lechner Group Gm Bh Apparatus and method for the one-piece production of a room module having three side elements and a floor element and/or a ceiling element, and room module of this type
CN106884480A (en) * 2017-04-03 2017-06-23 刘建军 Once grouting is molded the construction process of moveable house
CN107558604A (en) * 2017-09-14 2018-01-09 郭瑞华 A kind of method for exempting from form removal raised table building
CN113266151A (en) * 2021-05-25 2021-08-17 玉溪市明瑞建设工程有限公司 Integral casting one-step forming construction process for house building
CN114059772A (en) * 2021-12-22 2022-02-18 瑞洲建设集团有限公司 Integral casting one-step forming construction process for house building
CN114059772B (en) * 2021-12-22 2023-02-28 瑞洲建设集团有限公司 Integral casting one-step forming construction process for house building

Also Published As

Publication number Publication date
CN102535846B (en) 2014-08-13

Similar Documents

Publication Publication Date Title
CN102535846B (en) One-step forming construction process for integrally pouring housing construction
CN101818527B (en) Assembled integral shear wall structure system and construction method thereof
CN104005502B (en) A kind of precast light building cover board and industrialized building house floor slab structure
CN101307629B (en) Fastener type self-decoration composite heat insulation high layer dwelling building module and its construction method
CN202644775U (en) Prefabricated sandwich external wall panel with thermal insulation concrete
CN103334504B (en) High-strength composite corrugated fiber foam cement heat insulation material
CN102650152A (en) Prefabricated sandwich heat-preservation heat insulation concrete external wall panel and fabrication method
CN102182265A (en) Multifunctional fast building formwork wallboard structure system
CN102251662A (en) Cast-in-place process for ultra light foamed cement-based bearing heat insulation wallboard
CN102248577B (en) Superlight-foamed-cement-based manufacturing process for thermal-insulation bearing wall panel
CN202090469U (en) Multifunctional die wallboard structural system for fast house building
CN209040360U (en) The cast-in-situ thermal-insulated decorating wall of non-dismantling formwork is made of decoration panel and keel
AU2016329634A1 (en) Method for producing a wall or roof panel having installations included, walls or roofs pre-fabricated using said method and joints between the wall and roof panels
CN100588810C (en) Assembly building method for energy-saving reconstruction of existing building
CN109356319A (en) A kind of one assembly concrete Side fascia of the six directions and its production method
CN106368312A (en) Modular house
CN107435385A (en) A kind of wallboard and production method of fire-resistant light granules and filling polyurethane
CN106958358A (en) The industrialization commercial residential buildings of energy-conserving and environment-protective
CN104652604A (en) Assembly type green building system and construction method
CN105275206A (en) A construction method of an external wall of a building
CN108978989A (en) A kind of Assembled self-insulating fire-proof sound insulation wallboard
CN105908877A (en) Self-insulation composite fireproof curtain wall board and preparation method thereof
CN106639135A (en) Novel assembled type H-shaped prefabricated composite wall board and preparation method thereof
CN103074954A (en) Earthenware tile assembly, preparing die thereof, earthenware tile stone wall and heat insulation unit of earthenware tile assembly
CN206681418U (en) The industrialization commercial residential buildings of energy-conserving and environment-protective

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190507

Address after: 400,000 Nanbin Road, Nanan District, Chongqing City, 83 with No. 5, 3-8

Patentee after: Chongqing Taizhiruirui Construction Engineering Co., Ltd.

Address before: 125000 First Floor of Zhengdao Hotel in the Middle Section of Haibin Road, Huludao City, Liaoning Province

Patentee before: Wang Zhicheng