CN102521709A - Building construction quality safety online risk management system - Google Patents
Building construction quality safety online risk management system Download PDFInfo
- Publication number
- CN102521709A CN102521709A CN2011104360178A CN201110436017A CN102521709A CN 102521709 A CN102521709 A CN 102521709A CN 2011104360178 A CN2011104360178 A CN 2011104360178A CN 201110436017 A CN201110436017 A CN 201110436017A CN 102521709 A CN102521709 A CN 102521709A
- Authority
- CN
- China
- Prior art keywords
- risk
- project
- module
- management
- engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention provides a building construction quality safety online risk management system, which relates to the technical field of risk management of building engineering and comprises a general subsystem and a single project management subsystem. The general management subsystem consists of a project risk condition function module, a risk monitoring and early warning function module, a work reminder function module, an instruction issuing function module, an emergency practice function module and the like, and is used for browsing relevant information of all the projects undertaken by a company, transmitting instructions to project departments and checking daily work of the project departments; and the single project management subsystem comprises an engineering information function module, a risk identification function module, a risk assessment function module, a risk tracking function module, an early warning emergency function module, a document management function module, a work reminder function module, an instruction reply function module, a video monitoring function module and the like, and is used for realizing risk identification, assessment and tracking and early warning emergency by the aid of engineering situation information and remotely monitoring an engineering field. An online risk assessment system, a remote monitoring system and a risk management information platform are integrated in the building construction quality safety online risk management system, and real-time management and whole-process management for risks of large-size building construction engineering projects are realized.
Description
Technical field
The invention belongs to the risk management technology field of construction work, the online risk management system of particularly a kind of building operation quality safety.
Background technology
Flourish along with the Chinese large-sized construction project, engineering construction demonstrate that the diversification of investment subjects, technical matters are complicated, novelization of building materials and characteristics such as independentization of enterprise, the maximization of construction project scale.For a large-scale construction engineering, quality safety is the important foundation that guarantees that construction is carried out smoothly, used safely, in case quality accident takes place; Gently then the influence construction is carried out smoothly; Heavy then stay hidden dangers in project or shorten tenure of use of buildings, even cause building collapsing, cause casualties and enormous economic loss; Therefore, quality safety risk in the construction project and safety problem receive widely and paying close attention to.
Along with the high speed development of infotech, the risk pipe that carries out the heavy construction quality safety with the form of computer software has become a kind of trend.The formation stage that the large-scale construction project construction stage is the construction project entity is the Main Stage that quality risk and security risk expose, and also is the Main Stage of quality control and security control simultaneously.But; Because large-scale construction project receives the restriction of each side condition, the risk uncertain factor is many, and risk is various and at random; In case quality accidents; Huge to environmental impact and social influence degree, need the quality safety management pattern of the large-scale construction project construction stage that formation had not only tallied with the national condition but also can be in line with international standards badly, form the effective risk management system of engineering construction field.Therefore; Make up the online risk management system of heavy construction quality safety; Can one cover systemization, perfect, effective risk management pattern be provided for Chinese large-sized engineering construction project risk management work; Also can discern and assess risk in advance, take effectively prevention and counter-measure to reduce risk then, guarantee carrying out smoothly and safe operation of large-scale construction project through risk management.Utilize information-based means and remote control technology to carry out the real-time management of risk; Form the quality safety risk management pattern of continuation, circular form and dynamic; Become the risk management pattern of the risk management of passive emergency, reduce the engineering risk conscientiously into the active early warning type.
Summary of the invention
The objective of the invention is to: the risk of heavy construction project is discerned and assessed; And the risk that identifies carried out dynamic tracking; Realization is to the record and the management of project management planning, a series of information of implementation process; The relevant information and the decision support of Construction Project Risk are provided; Auxiliary risk manager carries out risk management planning and risk tracking Control, for realizing company's aspect and item layer real-time management and the Whole Course Management in the face of the large-scale construction engineering project risk, provides a kind of heavy construction quality safety online risk management system.
In order to realize the foregoing invention purpose, adopt following technical scheme following:
The online risk management system of a kind of heavy construction quality safety comprises, integrated management subsystem and single project management subsystem, and have strict user authority management; The main users of integrated management subsystem is corporate operations personnel and the managerial personnel of project management department; Corresponding enterprise-level authority; Be used for to the view company all items information, carry out monitoring of the current check of individual event purpose, risk and early warning, project management department is carried out work reminds concurrent load instruction; The main users of single project management subsystem is the member of project management department; Corresponding project level authority; Be used to browse, the typing project information; Transmitting-receiving file and uplink data carry out that risk identification, risk assessment, risk are followed the tracks of, work is reminded, early warning is emergent and video monitoring, the instruction of providing through system's online answer integrated management subsystem simultaneously.
The integrated management subsystem also comprises: project risk situation module, risk monitoring are provided module and risk rehearsal module with early warning module, work prompting module, instruction,
The single project management subsystem also comprises: module, work prompting module and video monitoring module are replied in engineering information module, risk identification module, risk evaluation module, risk tracking module, the emergent module of early warning, document management module, instruction,
Project risk situation module is used to browse, inquires about all items information, writes down the risk level and the situation of change of each project, and all items is added up; Be used for to all individual event purpose current checks of company and information inquiry, browse.
The risk monitoring is used for writing down each project in the phenomenon of work progress Monitoring Data above warning value with the early warning module, and record is carried out in the processing of alert event; Be used to inquire about, add up the warning message of each project.
The work prompting module is used to write down the item that the same day or current generation user need handle, and adds, the various reminded contents of inquiry all items risk management, reflects that the linkage work that enterprise-level supvr and project take part in building between the each side is machine-processed.
Instruction granting module is used for the enterprise-level supvr project work is sent dependent instruction, comprises the item instruction of interpolation, editor, inquiry all items.
Risk rehearsal module is used for writing down, inquire about, browsing the emergency preplan rehearsal situation of each project at work progress.
The single project management subsystem comprises following functional module:
The engineering information module is used for the basic condition of record entry, comprises checking, add, edit, delete basic operation; Also be used for typing, editor and the deletion of kinds of construction and partitioned project information; Browse the project progress situation.
The risk identification module is used for according to project profile information, carries out system through the embedded rule of system and discerns automatically, obtains the risk case of project and the risk inventory of risk factors, and draws the risk tree.
Risk evaluation module is used for the risk assessment of building operation project, through confirming computation model, calculates the overall risk class of each risk case and engineering; Be used for the sensitivity analysis of heavy construction project, confirm the significance level of risk factors.
The risk tracking module is used for writing down the variation of engineering process each item Monitoring Data, according to the progress of branch, kinds of construction risk class is dynamically adjusted.
The emergent module of early warning is used for writing down the phenomenon that engineering construction process Monitoring Data surpasses warning value, and the disposition of alert event is carried out record.
The document management module is used for the management of Miscellaneous Documents in the heavy construction project risk management processes, comprises and browses and download.
Instruction is replied module and is used to inquire about the instruction that the higher level assigns, and online answer is carried out in higher level's instruction.
The work prompting module is used to write down the item that the same day or current generation need handle, and comprises the item of browsing, add, inquire about the needs processing.
Video monitoring module is used for carrying out on-the-spot risk management through long distance control system reflection project field condition.
In the technique scheme, the main users of said integrated management subsystem is the senior enterprise leader managerial personnel, can browse all items for information about, and sends instruction to project management department; The user of single project management subsystem is the member of each project management department, mainly comprises project manager, project chief engineer, documenter, and each user's authority is different with responsibility.
The project risk situation module of said integrated management subsystem is used to inquire about, browse the risk status of each building operation project; Be used for all building operation projects are added up according to item types, risk class and project status; The risk situation that is used for all single projects of company is carried out current check, comprises inquiry, browses risk case, risk class, the disposition of project.
The risk monitoring of said integrated management subsystem is used to inquire about and add up the warning message of each project with the early warning module; Be used for writing down each project and surpass the phenomenon of warning value, and write down the disposition of alert event in the work progress Monitoring Data.
The work prompting module of said integrated management subsystem is used to add, inquire about the item that the same day or current generation user need handle, and sends the work prompting message to the each side that takes part in building.
The instruction of said integrated management subsystem is provided module and is used for according to individual event purpose risk case, alarm condition, disposal route, the item instruction of adding, editing, inquiring about all items, and to the transmission instruction of related item portion.
The risk rehearsal module of said integrated management subsystem is used for inquiring about, browsing the emergency drilling information of each project at work progress.
The engineering information module of said single project management subsystem is used to check, adds, the essential information of editor, delete items; The information that also is used for typing, editor and deletion unit project and partitioned project; Be used for adding, browsing project progress information.
The risk identification module of said single project management subsystem is used for the risk case and the risk factors of building operation project being discerned through the embedded rule of system according to project profile information; Comprise editor and confirm project overview information, formation risk inventory, draw three key steps of risk tree; The editor who is used for project overview information, risk inventory and risk tree.
The risk evaluation module of said single project management subsystem is used for the risk assessment of building operation project; Be used for the probability of happening P of calculated risk incident and the loss consequence C of risk case; Be used for the risk factors of risk inventory are carried out the weight setting; Be used for evaluation of risk, confirm the risk class and the risk factor of risk case; Be used for the sensitivity analysis of project, confirm the significance level of risk factors, confirm the key risk factor.
The risk tracking module of said single project management subsystem is used for typing project construction progress; Be used for the inquiry and the typing of project under construction risk Monitoring Data; Be used for quantizing and having the item of material impact to carry out the data typing to construction quality safety to being difficult for; Be used for engineering being carried out dynamic evaluation according to branch, kinds of construction progress situation and risk tracking data.
The emergent module of the early warning of said single project management subsystem is used for writing down the warning information and the disposition of work progress; Be used for inquiring about and having access to the emergency preplan of work progress; Be used for writing down the emergency preplan rehearsal situation of work progress; Be used for writing down the disposition of the emergency event of work progress.
The document management module of said single project management subsystem is used for the normality management that the heavy construction project is carried out all kinds of documents of process, comprises inquiry, browses and downloads.
The instruction of said single project management subsystem is replied module and is used to inquire about the instruction that the higher level assigns through the integrated management subsystem, and online answer is carried out in higher level's instruction.
The work prompting module of said single project management subsystem is used to write down with the timing of inquiring about and working relevant reminds, and comprises SMS, Email, three kinds of modes of network system; Be used to browse, add the item of the same day or required processing of current generation.
The video monitoring module of said single project management subsystem is used for through the remote wireless monitoring technology project scene being monitored, and reflects field condition, instructs the related work of risk management.
The beneficial effect of the online risk management system of heavy construction quality safety of the present invention is:
1) powerful self-study mechanism.System has powerful self-learning function, and each risk assessment is to the correction of expert (user) to assessment result, the rule that sophisticated systems is embedded; Along with being on the increase of evaluation item, the assessment result of system is more near truth.
2) information management system of a comprehensive integration.Native system is a heavy construction quality safety crisis management information integral system that integrates the online risk evaluating system of network, digitizing building site technology, long distance control system, crisis management information platform.This integral system is the basis with the modern construction quality security risk database based on information management; With the online risk evaluating system of network is core; With digitizing building site, engineering long distance control system is risk tracing and monitoring means; With the crisis management information platform is carrier, has realized the dynamic and Whole Course Management to engineering risk.
3) powerful data analysis function.Native system is according to the project profile information of user's input; Rule and the data analysing method embedded through system carry out risk identification, and calculated risk probability of occurrence P and loss C form risk inventory, risk class table and risk tree; Carry out risk assessment, realize the purpose of quick assessment.
4) dynamic risk of standard management control flow and modification rule.Can in time the result who has identified be revised according to engineering progress situation and environmental change, realize tracking control of full process risk and the purpose of controlling risk, guarantee the smooth implementation of engineering.
5) take into account static risk management and dynamic risk management.Native system is not only supported static risk assessment and the risk management before the building operation project kickoff; Also support dynamic risk assessment and risk management in the project implementation process; The situation of change of clear and definite different risk cases realizes that dynamic evaluation, risk are followed the tracks of, risk is monitored, the purpose of dynamic early warning.
6) deployment is simple, easy to operate.Native system is the online risk management system of B/S structure, and native system is deployed on the corporate server, and the various places engineering project is utilized access to netwoks, uses software easily, supports a plurality of projects to carry out risk assessment and risk management simultaneously simultaneously; Native system is set up orderliness job menu and convenient simple and direct tool button clearly, and detailed careful help system is provided, even non-computer or professional risk assessment personnel also can be familiar with and grasp the use of this software very soon.
7) good system architecture, database programming interface flexibly.Based on the consideration of system upgrade and maintenance, project organization is clear, the system architecture of organization rational; The database that the various information design data is different, and in the different interfaces of system, operate on it, make things convenient for data management, reduce data redundancy; Through the data interaction interface, realize data interaction and shared between native system and environment framework, other Software tools.
The present invention is through the effective cooperation of total management system and single project management system; Set up complete heavy construction quality safety risk management system; Carry out effective interlock of company and project management department; Realize " risk identification---risk assessment---risk trackings---risk is controlled in advance in risk monitoring---Risk-warning---" target, the passive emergent risk management during heavy construction constructed becomes the quality safety risk management pattern of active.
Description of drawings
Fig. 1 is a functional module composition diagram of the present invention
Embodiment
Below in conjunction with accompanying drawing the online risk management system of heavy construction quality safety of the present invention is described.
Functional module composition diagram of the present invention is as shown in Figure 1; The online risk management system of a kind of heavy construction quality safety comprises integrated management subsystem and single project management subsystem two sub-systems, and wherein the integrated management subsystem comprises project risk situation module, risk monitoring and early warning module, work prompting module, instruction granting module, risk rehearsal module; The single project management subsystem comprises engineering information module, risk identification module, risk evaluation module, risk tracking module, the emergent module of early warning, document management module, instruction answer module, video monitoring module.Total management system can get into the single project management subsystem through the link of individual event order, and the routine work of project management department is checked.
The input information that system implementation mode of the present invention relates to comprises: the construction information of current generation and the surrounding enviroment information of current generation in engineering information, construction information, surrounding enviroment information, engineering geology hydrogeology information, the work progress; System database comprises: casualty data storehouse, risk case inventory storehouse, risk case probability storehouse, risk case loss storehouse, risk case are controlled storehouse and the emergent storehouse of risk case in advance; Output information comprises: valuation, risk case coefficients R and risk class, the preparatory control means of risk case and the emergency measure of risk inventory, risk case probability P value and loss C value, risk case probability P and loss C, and Risk Assessment Report.
The main users of integrated management subsystem is the senior enterprise leader managerial personnel, mainly be all items born of view company for information about, and send instruction, the routine work of inspection item portion simultaneously to project management department; The user of single project management subsystem is the user of project management department, and each user can browse notice, information according to the authority of oneself, the file of typing transmitting-receiving, uplink data.
Project risk situation module is used to inquire about, browse the risk level and the situation of change of each project, comprises project profile information, project progress situation, warning message, work prompting situation; Be used for all items is added up according to item types, risk class and project status; Be used for the browsing of risk situation, inquiry and the current check of single project.
Risk monitoring and early warning module are used to inquire about, browse the warning message of each project, comprise warning project, warning sum, warning position, warning numerical value, alert level, red alarm quantity, yellow alarm quantity, warning treatment state, untreated warning message, overtime warning message and the warning message of having handled; Be used for carrying out the statistical study of warning message according to risk class, item types, risk status; Be used to browse the alarm condition process information, comprise processing department, treatment measures, treatment effect and leftover problem.
The work prompting module is used to write down the item that the same day or current generation user need handle, the various reminded contents of adding, inquiring about all items risk management, and alerting pattern comprises SMS, Email and network system.
Instruction is provided module and is used for project work is sent dependent instruction, comprises the item instruction of interpolation, editor, inquiry all items, comprises instructing and provides people, Time Of Release, granting content.
Risk rehearsal module is used for writing down, inquire about, browsing the emergency preplan rehearsal situation of each project at work progress, comprises prediction scheme numbering, prediction scheme title, rehearsal unit, commander people, rehearsal place, start time, concluding time, accountability unit, participation department and personnel, the number of participant, goods and materials preparation and staff training situation, rehearsal purpose and content, rehearsal process prescription.
The engineering information module is used to check and edits building operation project master data information; The data message that also is used for typing, editor, deletion unit project and partitioned project; The data message of unit project comprises: unit project title, engineering type, type of foundation, structure type and floor area of building; The data message of partitioned project comprises: base pit engineering, xoncrete structure and steel construction.
The risk identification module is used for according to the engineering information overview, and system carries out risk identification automatically, and key step comprises data validation, risk inventory, risk tree; Be used for modification and affirmation to the data of building operation project; Comprise the data message of building operation project, the data message of unit project and data and engineering characteristics information, engineering geology and the hydrogeological information of partitioned project, surrounding enviroment information and project accident information; According to the risk factors of the automatic recognitive engineering project of embedded rule of system, confirm the risk path, form the risk inventory, and the risk inventory is made amendment and confirm according to engineering project information; Set up the logical relation of risk case and risk factors, form the risk tree of engineering project; Be used for risk tree editor and revise, reload structure and make structure tree and risk tree be complementary.
Risk evaluation module is used for after the risk identification whole engineering project being carried out risk assessment, mainly comprises six steps: computation model affirmation, probability of happening, loss consequence, event weights, evaluation of risk and sensitivity analysis; Be used for the affirmation of risk evaluation model, comprise fuzzy comprehensive evaluation method, analytical hierarchy process and Bayesian network method; The probability of happening P and the loss consequence C that are used for the risk factors of calculated risk inventory, wherein, probability of happening P confirms that according to the ratio of the shared risk case library of this risk case loss consequence C mainly is made up of project subject loss and surrounding enviroment loss; Be used to utilize analytical hierarchy process to confirm the weight of each risk case; Utilize subordinate function to carry out fuzzy overall evaluation, confirm the risk class and the risk factor of risk case; Each risk factors that is used for heavy construction are carried out sensitivity analysis, confirm the significance level of each risk factors.
The risk tracking module is used for the risk of construction stage to be followed the tracks of, and comprises construction progress, risk monitoring, risk tour and dynamic evaluation; Be used for the typing and the modification of construction progress information; Be used for browsing, edit and revising of risk Monitoring Data, comprise that monitoring project, Monitoring Data are worth most, the monitoring site configuration; Being used for some is difficult for quantification and has the item of material impact to carry out on-the-spot inspection of manual work and record inspection result to construction quality safety; Be used for the monitoring of engineering progress process, risk and make an inspection tour data when changing; Engineering is carried out the dynamic risk assessment; Confirm the current grade and the current coefficient of risk case, through with the commenting grade in advance and comment coefficient to compare in advance of risk case, form the assessment report of building operation project.
The emergent module of early warning is used for that work progress is reported to the police and emergency response, comprises warning information, emergency preplan, emergency drilling, emergency processing; Be used for inquiring about, writing down the warning information and the disposition of work progress; Be used for the work progress emergency preplan inquiry, browse; Be used for writing down the emergency preplan rehearsal situation of work progress; Be used for writing down the disposition of the emergency event of work progress.
All kinds of documents that the document management module is used for writing down, process is carried out in inquiry, download items comprise all kinds of technical standards, working specification, emergency preplan.
Instruction is replied module and is used to inquire about the instruction that the higher level provides through the integrated management subsystem, and carries out online answer.
Video monitoring module is used for through the remote wireless monitoring technology project scene being monitored, and instructs the related work of risk management.
Claims (19)
1. the online risk management system of building operation quality safety is characterized in that, comprises integrated project ADMINISTRATION SUBSYSTEM and single project management subsystem,
Said integrated management subsystem is used for the layer personnel of company management and bears project for information about to browsing all, sends instruction and the routine work of inspection item portion to project management department,
Said single project management subsystem is used for that the member of project management department browses, typing project relevant information and data, and carry out project risk identification, assessment, tracking, early warning is emergent and video monitoring,
Said integrated management subsystem and single project management subsystem have enterprise-level administration authority and project level administration authority respectively, belong to the relation of higher level and subordinate,
Said integrated management subsystem also comprises: project risk situation module, risk monitoring are provided module and risk rehearsal module with early warning module, work prompting module, instruction,
Said single project management subsystem also comprises: module, work prompting module and video monitoring module are replied in engineering information module, risk identification module, risk evaluation module, risk tracking module, the emergent module of early warning, document management module, instruction,
The workflow of said integrated management subsystem is, according to the project risk situation, engineering risk monitored, the each side's issue work of taking part in building is reminded, and assigned instruction,
The workflow of said single project management subsystem is, according to project profile information, carries out risk identification, risk assessment, risk tracking, Risk-warning and emergent through the embedded rule of system, replys the instruction that the higher level assigns, the management of the style of writing of going forward side by side shelves,
Said project risk situation module is used to check the risk level and the situation of change of each project, comprises inquiry, browses, statistical study,
The monitoring of said risk is used for monitoring each project in work progress alert event and event handling situation with the early warning module, and comprise inquiry, browse, statistical study,
Said work prompting module is used to write down the item that the same day or current generation user need handle, and comprise interpolation, inquire about various reminded contents,
Said instruction is provided module and is used for project work is sent dependent instruction, comprises interpolation, editor, inquiry,
Said risk rehearsal module is used for writing down the emergency preplan rehearsal situation of each project at work progress, and comprise and inquire about and browse,
Said engineering information module provides the master data management of information interface of building operation project, comprise browse, modification and deletion action, and the data message of typing, editor, deletion unit project and partitioned project,
Said risk identification module is used for discerning risk factors automatically through the project profile infosystem, comprises data validation, risk inventory, three steps of risk tree,
Said risk evaluation module is used to assess each risk case and the overall risk class of engineering, comprises computation model affirmation, probability of happening, loss consequence, event weights, evaluation of risk, six basic steps of sensitivity analysis,
Said risk tracking module is used for writing down the variation of engineering process each item Monitoring Data, dynamically adjusts risk class, comprises construction progress, risk monitoring, risk tour and four parts of dynamic evaluation,
The emergent module of said early warning is used for writing down the alarm condition and the disposition of engineering construction process Monitoring Data, comprises warning information, emergency preplan, emergency drilling, four parts of emergency processing,
Said document management module is used for writing down building operation project risk management process Miscellaneous Documents, and comprise and browse and download,
Said instruction is replied module and is used for online answer is carried out in the instruction that the higher level assigns through total management system,
Said video monitoring module is used for through long distance control system reflection building operation project field condition.
2. the online risk management system of heavy construction quality safety according to claim 1; It is characterized in that, integrated project management and single project management are integrated in the crisis management information integral system, be the basis with system construction quality safety vulnerability database; With online risk assessment is core; With the remote monitoring is risk tracing and monitoring means, is carrier with the crisis management information platform, realizes the dynamic and Whole Course Management of engineering risk.
3. the online risk management system of heavy construction quality safety according to claim 1 is characterized in that the user can directly login using system through the internet.
4. the online risk management system of heavy construction quality safety according to claim 1; It is characterized in that; System has strict user authority management, and the main users of integrated management subsystem is corporate operations personnel and the managerial personnel of project management department, corresponding enterprise-level authority; The main users of single project management subsystem is the member of project management department, corresponding project level authority; Integrated management subsystem and single project management subsystem belong to the relation of higher level and subordinate.
5. the online risk management system of heavy construction quality safety according to claim 1; It is characterized in that the risk level of said project risk situation module refers to individual event purpose risk assessment grade, comprise five risk class of 1-5; Wherein light breeze danger grade is minimum, and the highest grade of strong breeze danger.
6. the online risk management system of heavy construction quality safety according to claim 1 is characterized in that, the risk status statistics in the said risk status module is to carry out statistical study according to risk class, item types, project status.
7. the online risk management system of heavy construction quality safety according to claim 1 is characterized in that, said risk monitoring is meant that with the alert event of early warning module Monitoring Data surpasses the phenomenon of warning value; Disposition comprise handle, be untreated, overtime.
8. the online risk management system of heavy construction quality safety according to claim 1; It is characterized in that; Said work prompting module is to be reminded from take part in building each side issue work of involuntary movements by system, and alerting pattern comprises SMS, Email, three kinds of modes of network system.
9. the online risk management system of heavy construction quality safety according to claim 1; It is characterized in that; The granting content that module is provided in said instruction is that corporate operations personnel is sent instruction according to alert event to the personnel of project management department, and command status comprises sends, replys, cancels three kinds of states.
10. the online risk management system of heavy construction quality safety according to claim 1; It is characterized in that; Said risk is drilled the situation of module records and inquiry emergency drilling, comprises prediction scheme numbering, prediction scheme title, rehearsal unit, commander people, rehearsal place, start time, concluding time, accountability unit, participation department and personnel, the number of participant, goods and materials preparation and staff training situation, rehearsal purpose and content, rehearsal process prescription; The original material of emergency drilling must not be revised once uploading system.
11. the online risk management system of heavy construction quality safety according to claim 1; It is characterized in that; Said engineering information module comprises unit project information and partitioned project information, and wherein unit project information comprises unit project title, engineering type, type of foundation, structure type and floor area of building; Partitioned project information comprises base pit engineering, concrete structure engineering and structural steelwork.
12. the online risk management system of heavy construction quality safety according to claim 1; It is characterized in that; The said risk identification modular system method of identification automatically is the fault tree analysis process; Through similar, close engineering project information in engineering project profile information of importing and the database is compared, confirm this engineering risk factor through analogy method; The risk inventory is the logical relation table of risk case and risk factors, and wherein risk case is made up of the risk factors that identified and its corresponding risk path; The risk tree is to be made up of the logical relation between risk case, risk factors and risk case and the risk factors.
13. the online risk management system of heavy construction quality safety according to claim 1 is characterized in that the computation model of said evaluation module is a fuzzy synthetic evaluation model; Probability of happening P adopts the ratio in the shared risk case library of this risk case to estimate; Loss consequence C is estimated engineering loss consequence C by construction costs through the funtcional relationship of structure construction costs and engineering loss, mainly comprises project subject loss and surrounding enviroment loss; Event weights adopts analytical hierarchy process to confirm the weight of each risk case; Evaluation of risk is represented by risk class and risk factor; Sensitivity analysis is used for confirming the significance level of building operation project risk factors.
14. the online risk management system of heavy construction quality safety according to claim 1 is characterized in that, the construction progress of said risk tracking module comprise do not construct, construct in, four kinds of states complete, stop work; The accumulation that risk monitoring is used to monitor all items is worth with rate of change and is worth most most, and monitoring site is set, and typing Monitoring Data and Monitoring Data must not be revised once typing; Risk is maked an inspection tour the risk item input system that is used for being difficult for quantification, and data must not be revised once typing; Dynamic evaluation comprises that according to the variation reflection risk situation of change of construction progress, risk Monitoring Data and tour data risk case disappears or the rising or the decline of newly-increased and risk level.
15. the online risk management system of heavy construction quality safety according to claim 1 is characterized in that the warning information of said early warning information module comprises alert level, number of alarms, alarm disposition; Emergency preplan comprises prediction scheme numbering, prediction scheme title, establishment time, establishment people, prediction scheme download; Emergency drilling is used for record entry work progress emergency drilling situation, comprises rehearsal time, rehearsal place, commander people, emergency preplan, rehearsal purpose and content, rehearsal process prescription; Emergency processing is used to write down the disposition of emergency event, comprise handle, be untreated, overtime.
16. the online risk management system of heavy construction quality safety according to claim 1 is characterized in that the document of said document management module comprises browsing and downloading of all kinds of engineering documents, emergency preplan.
17. the online risk management system of heavy construction quality safety according to claim 1 is characterized in that, said instruction is replied module and is used for carrying out online answer to the instruction that the higher level assigns, and comprises and replys people, answer date, reply content.
18. the online risk management system of heavy construction quality safety according to claim 1 is characterized in that, said video monitoring module is used for the project scene is monitored and being instructed through the remote wireless monitoring system.
19. the online risk management system of heavy construction quality safety according to claim 1; It is characterized in that said instruction release module is replied module with instruction and reflected that the enterprise-level supvr is with machine-processed referring to connected effect and the information feedback of each side in project management.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110436017.8A CN102521709B (en) | 2011-12-22 | 2011-12-22 | A kind of online risk management system of Construction Quality safety |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110436017.8A CN102521709B (en) | 2011-12-22 | 2011-12-22 | A kind of online risk management system of Construction Quality safety |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102521709A true CN102521709A (en) | 2012-06-27 |
CN102521709B CN102521709B (en) | 2016-06-29 |
Family
ID=46292620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110436017.8A Active CN102521709B (en) | 2011-12-22 | 2011-12-22 | A kind of online risk management system of Construction Quality safety |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102521709B (en) |
Cited By (42)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103412538A (en) * | 2013-08-06 | 2013-11-27 | 湖南省华顺建设项目管理有限公司 | Construction quality safety early-warning system |
CN104183168A (en) * | 2013-05-28 | 2014-12-03 | 中建八局第一建设有限公司 | Building construction 4D remote assessment system |
CN104318408A (en) * | 2014-11-25 | 2015-01-28 | 上海建科工程咨询有限公司 | Multi-target and multi-dimension risk management system for large building engineering construction |
CN104463717A (en) * | 2014-12-09 | 2015-03-25 | 中国水利水电第十四工程局有限公司 | Construction expert information system applicable to extra-large underground cavern group |
CN105719077A (en) * | 2016-01-20 | 2016-06-29 | 中国矿业大学(北京) | Laneway explosion construction quality management method and laneway explosion construction quality management system |
CN106156343A (en) * | 2016-07-21 | 2016-11-23 | 中国地质大学(武汉) | A kind of deep foundation pit construction Scheme Security evaluation knowledge base and automatic safe reviewing method |
CN106485408A (en) * | 2016-09-28 | 2017-03-08 | 上海异工同智信息科技有限公司 | A kind of engineering construction overall process intelligent management system and its application |
TWI578262B (en) * | 2015-08-07 | 2017-04-11 | 緯創資通股份有限公司 | Risk assessment system and data processing method |
CN107146024A (en) * | 2017-05-08 | 2017-09-08 | 合肥工业大学 | The three-dimensional dynamic safety management method of building enterprise's overall process |
CN107256445A (en) * | 2017-04-27 | 2017-10-17 | 清华大学 | Analysis method, the device and system of production environment security |
CN107313769A (en) * | 2017-06-30 | 2017-11-03 | 合肥贺财工程项目管理有限公司 | A kind of architectural engineering geological mapping monitoring system |
CN103971288B (en) * | 2014-05-16 | 2018-03-02 | 上海建科工程咨询有限公司 | A kind of Construction of Steel Structure methods of risk assessment based on accident case reasoning |
CN107886247A (en) * | 2017-11-14 | 2018-04-06 | 中国铁路总公司 | A kind of railway electronics fortune 46 systems of system of identity-based certification |
CN108182505A (en) * | 2017-11-28 | 2018-06-19 | 杭州品茗安控信息技术股份有限公司 | A kind of method that information interaction device is relied on to carry out construction safety inspection |
CN108520342A (en) * | 2018-03-23 | 2018-09-11 | 中建三局第建设工程有限责任公司 | Platform of internet of things management method based on BIM and its system |
CN109583792A (en) * | 2018-12-27 | 2019-04-05 | 深圳市城市公共安全技术研究院有限公司 | Informatization management and control method and system for static-dynamic risk of in-building project |
CN109615324A (en) * | 2018-12-06 | 2019-04-12 | 江苏苏科建设项目管理有限公司 | One kind being based on the project management method of " wisdom management " system |
CN109685307A (en) * | 2018-11-09 | 2019-04-26 | 无锡市安泰安全技术服务有限公司 | A kind of hidden troubles removing governing system |
CN110402447A (en) * | 2016-11-14 | 2019-11-01 | 雷派普私人有限公司 | For providing and receiving the method and system of live crisis management information |
CN110516963A (en) * | 2019-08-23 | 2019-11-29 | 华新项目管理集团有限公司 | A kind of whole process engineering consulting project risk management method |
CN110533276A (en) * | 2019-07-12 | 2019-12-03 | 浙江电力建设工程咨询有限公司 | Project of transmitting and converting electricity construction risk early warning system |
CN110533293A (en) * | 2019-07-29 | 2019-12-03 | 河北远东通信系统工程有限公司 | A kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal |
CN110750237A (en) * | 2019-08-31 | 2020-02-04 | 苏州浪潮智能科技有限公司 | Project risk assessment reminding system and method based on cloud computing technology |
CN111459956A (en) * | 2020-03-23 | 2020-07-28 | 盛安保险技术股份有限公司 | Engineering quality latent defect insurance (IDI) project technology risk management method and system |
CN111612356A (en) * | 2020-05-21 | 2020-09-01 | 盛安保险技术股份有限公司 | Engineering quality insurance risk management effect and scheme analysis method and system |
CN111794338A (en) * | 2020-07-16 | 2020-10-20 | 沈阳建筑大学 | Drainage facility life cycle assessment method |
CN112100215A (en) * | 2020-09-08 | 2020-12-18 | 福建中信网安信息科技有限公司 | Protection progress inquiry system based on level protection integrated management platform |
CN112241830A (en) * | 2020-09-24 | 2021-01-19 | 上海荷福人工智能科技(集团)有限公司 | Safety production management method based on artificial intelligence driving block chain |
CN112434943A (en) * | 2020-11-24 | 2021-03-02 | 中咨工程管理咨询有限公司 | Security quality consultation method, system, terminal equipment and readable storage medium |
CN113408998A (en) * | 2021-02-05 | 2021-09-17 | 浙江安防职业技术学院 | Construction cost consultation service implementation method and system |
CN113554257A (en) * | 2020-04-24 | 2021-10-26 | 中国水利水电第一工程局有限公司 | Intelligent subway construction risk identification and intelligent early warning evacuation system and working method thereof |
CN114037314A (en) * | 2021-11-17 | 2022-02-11 | 北京中百信信息技术股份有限公司 | Information system engineering supervision project risk dynamic analysis method |
CN115239039A (en) * | 2021-04-23 | 2022-10-25 | 中国石油化工股份有限公司 | Chemical device risk correction early warning method and device based on process safety indexes |
CN115630752A (en) * | 2022-11-30 | 2023-01-20 | 中国矿业大学(北京) | PBA station construction risk assessment method based on dynamic fuzzy comprehensive Bayesian network |
CN115796608A (en) * | 2023-02-06 | 2023-03-14 | 北京万赋互联网科技集团有限公司 | Building construction wind control management method and system based on portable interaction |
CN115983648A (en) * | 2023-03-22 | 2023-04-18 | 无锡广盈集团有限公司 | Cable accessory installation monitoring method and system |
CN116188699A (en) * | 2023-04-27 | 2023-05-30 | 南京长江都市建筑设计股份有限公司 | Engineering data management method and system based on BIM |
CN116822967A (en) * | 2023-08-28 | 2023-09-29 | 深圳市睿拓新科技有限公司 | Project cost risk management method and management system |
CN117035378A (en) * | 2023-10-10 | 2023-11-10 | 广州海晟科技有限公司 | Intelligent building site management method and system based on Internet of things |
CN117114922A (en) * | 2023-10-24 | 2023-11-24 | 天津广正建设项目咨询股份有限公司 | Consultation service and evaluation method and system based on whole process engineering consultation |
CN117236688A (en) * | 2023-09-14 | 2023-12-15 | 湖北毅瑞建设工程咨询有限公司 | Building safety accident risk prevention and early warning system based on big data technology |
CN117291329A (en) * | 2023-08-29 | 2023-12-26 | 质点数字科技有限公司 | Anomaly monitoring method, device, equipment and medium based on high-level reconstruction project |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101256647A (en) * | 2008-03-31 | 2008-09-03 | 上海星露信息科技有限公司 | Item management system being suitable for garden engineering |
CN101676932A (en) * | 2008-09-16 | 2010-03-24 | 深圳市红旗信息技术有限公司 | Electronic monitoring method and system of government-invested construction project |
CN102226915A (en) * | 2011-05-27 | 2011-10-26 | 同济大学 | Deep foundation pit engineering dynamic risk information management system |
-
2011
- 2011-12-22 CN CN201110436017.8A patent/CN102521709B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101256647A (en) * | 2008-03-31 | 2008-09-03 | 上海星露信息科技有限公司 | Item management system being suitable for garden engineering |
CN101676932A (en) * | 2008-09-16 | 2010-03-24 | 深圳市红旗信息技术有限公司 | Electronic monitoring method and system of government-invested construction project |
CN102226915A (en) * | 2011-05-27 | 2011-10-26 | 同济大学 | Deep foundation pit engineering dynamic risk information management system |
Cited By (53)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104183168A (en) * | 2013-05-28 | 2014-12-03 | 中建八局第一建设有限公司 | Building construction 4D remote assessment system |
CN103412538B (en) * | 2013-08-06 | 2016-12-28 | 湖南省华顺建设项目管理有限公司 | A kind of construction quality safety pre-warning system |
CN103412538A (en) * | 2013-08-06 | 2013-11-27 | 湖南省华顺建设项目管理有限公司 | Construction quality safety early-warning system |
CN103971288B (en) * | 2014-05-16 | 2018-03-02 | 上海建科工程咨询有限公司 | A kind of Construction of Steel Structure methods of risk assessment based on accident case reasoning |
CN104318408A (en) * | 2014-11-25 | 2015-01-28 | 上海建科工程咨询有限公司 | Multi-target and multi-dimension risk management system for large building engineering construction |
CN104463717A (en) * | 2014-12-09 | 2015-03-25 | 中国水利水电第十四工程局有限公司 | Construction expert information system applicable to extra-large underground cavern group |
TWI578262B (en) * | 2015-08-07 | 2017-04-11 | 緯創資通股份有限公司 | Risk assessment system and data processing method |
CN105719077A (en) * | 2016-01-20 | 2016-06-29 | 中国矿业大学(北京) | Laneway explosion construction quality management method and laneway explosion construction quality management system |
CN106156343A (en) * | 2016-07-21 | 2016-11-23 | 中国地质大学(武汉) | A kind of deep foundation pit construction Scheme Security evaluation knowledge base and automatic safe reviewing method |
CN106156343B (en) * | 2016-07-21 | 2020-02-18 | 中国地质大学(武汉) | Deep foundation pit construction scheme safety evaluation knowledge base and automatic safety evaluation method |
CN106485408A (en) * | 2016-09-28 | 2017-03-08 | 上海异工同智信息科技有限公司 | A kind of engineering construction overall process intelligent management system and its application |
CN110402447A (en) * | 2016-11-14 | 2019-11-01 | 雷派普私人有限公司 | For providing and receiving the method and system of live crisis management information |
CN107256445A (en) * | 2017-04-27 | 2017-10-17 | 清华大学 | Analysis method, the device and system of production environment security |
CN107256445B (en) * | 2017-04-27 | 2018-05-01 | 清华大学 | Analysis method, the device and system of production environment security |
WO2018196538A1 (en) * | 2017-04-27 | 2018-11-01 | 清华大学 | Production environment safety analysis method, device, and system |
CN107146024A (en) * | 2017-05-08 | 2017-09-08 | 合肥工业大学 | The three-dimensional dynamic safety management method of building enterprise's overall process |
CN107313769A (en) * | 2017-06-30 | 2017-11-03 | 合肥贺财工程项目管理有限公司 | A kind of architectural engineering geological mapping monitoring system |
CN107886247A (en) * | 2017-11-14 | 2018-04-06 | 中国铁路总公司 | A kind of railway electronics fortune 46 systems of system of identity-based certification |
CN107886247B (en) * | 2017-11-14 | 2024-04-02 | 中国铁路总公司 | Railway electronic operation system 46 system based on identity authentication |
CN108182505A (en) * | 2017-11-28 | 2018-06-19 | 杭州品茗安控信息技术股份有限公司 | A kind of method that information interaction device is relied on to carry out construction safety inspection |
CN108520342A (en) * | 2018-03-23 | 2018-09-11 | 中建三局第建设工程有限责任公司 | Platform of internet of things management method based on BIM and its system |
CN108520342B (en) * | 2018-03-23 | 2021-12-17 | 中建三局第一建设工程有限责任公司 | BIM-based Internet of things platform management method and system |
CN109685307A (en) * | 2018-11-09 | 2019-04-26 | 无锡市安泰安全技术服务有限公司 | A kind of hidden troubles removing governing system |
CN109615324A (en) * | 2018-12-06 | 2019-04-12 | 江苏苏科建设项目管理有限公司 | One kind being based on the project management method of " wisdom management " system |
CN109583792A (en) * | 2018-12-27 | 2019-04-05 | 深圳市城市公共安全技术研究院有限公司 | Informatization management and control method and system for static-dynamic risk of in-building project |
CN110533276A (en) * | 2019-07-12 | 2019-12-03 | 浙江电力建设工程咨询有限公司 | Project of transmitting and converting electricity construction risk early warning system |
CN110533293A (en) * | 2019-07-29 | 2019-12-03 | 河北远东通信系统工程有限公司 | A kind of underground engineering Quality Monitoring System based on the collaboration of mobile Internet multiterminal |
CN110516963A (en) * | 2019-08-23 | 2019-11-29 | 华新项目管理集团有限公司 | A kind of whole process engineering consulting project risk management method |
CN110750237A (en) * | 2019-08-31 | 2020-02-04 | 苏州浪潮智能科技有限公司 | Project risk assessment reminding system and method based on cloud computing technology |
CN111459956A (en) * | 2020-03-23 | 2020-07-28 | 盛安保险技术股份有限公司 | Engineering quality latent defect insurance (IDI) project technology risk management method and system |
CN113554257A (en) * | 2020-04-24 | 2021-10-26 | 中国水利水电第一工程局有限公司 | Intelligent subway construction risk identification and intelligent early warning evacuation system and working method thereof |
CN111612356A (en) * | 2020-05-21 | 2020-09-01 | 盛安保险技术股份有限公司 | Engineering quality insurance risk management effect and scheme analysis method and system |
CN111794338A (en) * | 2020-07-16 | 2020-10-20 | 沈阳建筑大学 | Drainage facility life cycle assessment method |
CN112100215B (en) * | 2020-09-08 | 2022-06-07 | 福建中信网安信息科技有限公司 | Protection progress query system based on comprehensive level protection management platform |
CN112100215A (en) * | 2020-09-08 | 2020-12-18 | 福建中信网安信息科技有限公司 | Protection progress inquiry system based on level protection integrated management platform |
CN112241830A (en) * | 2020-09-24 | 2021-01-19 | 上海荷福人工智能科技(集团)有限公司 | Safety production management method based on artificial intelligence driving block chain |
CN112434943A (en) * | 2020-11-24 | 2021-03-02 | 中咨工程管理咨询有限公司 | Security quality consultation method, system, terminal equipment and readable storage medium |
CN113408998A (en) * | 2021-02-05 | 2021-09-17 | 浙江安防职业技术学院 | Construction cost consultation service implementation method and system |
CN115239039A (en) * | 2021-04-23 | 2022-10-25 | 中国石油化工股份有限公司 | Chemical device risk correction early warning method and device based on process safety indexes |
CN115239039B (en) * | 2021-04-23 | 2023-06-30 | 中国石油化工股份有限公司 | Chemical device risk correction early warning method and device based on process safety index |
CN114037314A (en) * | 2021-11-17 | 2022-02-11 | 北京中百信信息技术股份有限公司 | Information system engineering supervision project risk dynamic analysis method |
CN115630752A (en) * | 2022-11-30 | 2023-01-20 | 中国矿业大学(北京) | PBA station construction risk assessment method based on dynamic fuzzy comprehensive Bayesian network |
CN115796608A (en) * | 2023-02-06 | 2023-03-14 | 北京万赋互联网科技集团有限公司 | Building construction wind control management method and system based on portable interaction |
CN115983648A (en) * | 2023-03-22 | 2023-04-18 | 无锡广盈集团有限公司 | Cable accessory installation monitoring method and system |
CN116188699A (en) * | 2023-04-27 | 2023-05-30 | 南京长江都市建筑设计股份有限公司 | Engineering data management method and system based on BIM |
CN116822967A (en) * | 2023-08-28 | 2023-09-29 | 深圳市睿拓新科技有限公司 | Project cost risk management method and management system |
CN117291329A (en) * | 2023-08-29 | 2023-12-26 | 质点数字科技有限公司 | Anomaly monitoring method, device, equipment and medium based on high-level reconstruction project |
CN117291329B (en) * | 2023-08-29 | 2024-03-19 | 质点数字科技有限公司 | Anomaly monitoring method, device, equipment and medium based on high-level reconstruction project |
CN117236688A (en) * | 2023-09-14 | 2023-12-15 | 湖北毅瑞建设工程咨询有限公司 | Building safety accident risk prevention and early warning system based on big data technology |
CN117035378A (en) * | 2023-10-10 | 2023-11-10 | 广州海晟科技有限公司 | Intelligent building site management method and system based on Internet of things |
CN117035378B (en) * | 2023-10-10 | 2024-02-02 | 广州海晟科技有限公司 | Intelligent building site management method and system based on Internet of things |
CN117114922A (en) * | 2023-10-24 | 2023-11-24 | 天津广正建设项目咨询股份有限公司 | Consultation service and evaluation method and system based on whole process engineering consultation |
CN117114922B (en) * | 2023-10-24 | 2024-01-26 | 天津广正建设项目咨询股份有限公司 | Consultation service and evaluation method and system based on whole process engineering consultation |
Also Published As
Publication number | Publication date |
---|---|
CN102521709B (en) | 2016-06-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102521709A (en) | Building construction quality safety online risk management system | |
CN102521710B (en) | A kind of online risk evaluating system of Construction Quality safety | |
CN101887547A (en) | Assistant decision system for condition-based maintenance and risk evaluation of power transmission and transformation equipment | |
CN110329862B (en) | Elevator intelligent integrated management system based on cloud platform | |
KR20170137098A (en) | Method and system for providing and receiving information for on-site risk management | |
CN107085759A (en) | Risk management method and system for land based transportation systems | |
CN108171637A (en) | A kind of nuclear power station fire cost application system | |
CN101582192A (en) | Establishing method of water body environment early warning system | |
CN109857080A (en) | A kind of intelligent ship lock operational system based on BIM | |
CN103390218A (en) | Three-chain coupling integrated emergency security system and method for emergencies | |
CN110402447A (en) | For providing and receiving the method and system of live crisis management information | |
US20070244975A1 (en) | System and methods for processing operating experience data | |
CN111932113B (en) | Environment supervision and management method, platform and storage medium | |
CN111815015A (en) | Engineering management optimization method and system | |
CN115424212A (en) | Electric power operation field violation identification system and application thereof | |
CN113516399B (en) | Nuclear power plant operation risk database logic processing and intelligent analysis early warning system | |
CN111639832B (en) | Elevator information safety management system and method | |
Yadav et al. | Regulatory Considerations in Use of Digital Twin for Nuclear Reactor Application | |
Devaiah et al. | Application of BIM for effective construction safety management in high rise buildings | |
Liu et al. | Rescue command communication systems and emergency management platform in mine based on internet of things | |
Fang et al. | Design and Development of Industrial Safety APPs | |
Lee et al. | Process-oriented development of failure reporting, analysis, and corrective action system | |
Fang et al. | Research of potential safety hazard investigation and risk control system for mine enterprise | |
Mohamad et al. | Dashboard for analyzing SCADA data log: a case study of urban railway in Malaysia | |
US20240104483A1 (en) | System and method for data connector for external labor management systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |