CN110533276A - Project of transmitting and converting electricity construction risk early warning system - Google Patents

Project of transmitting and converting electricity construction risk early warning system Download PDF

Info

Publication number
CN110533276A
CN110533276A CN201910630489.3A CN201910630489A CN110533276A CN 110533276 A CN110533276 A CN 110533276A CN 201910630489 A CN201910630489 A CN 201910630489A CN 110533276 A CN110533276 A CN 110533276A
Authority
CN
China
Prior art keywords
risk
project
transmitting
construction
converting electricity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910630489.3A
Other languages
Chinese (zh)
Inventor
陈展红
雷东
纪旻
黄孝琪
刘提
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Electric Power Construction Engineering Consulting Co Ltd
Original Assignee
Zhejiang Electric Power Construction Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Electric Power Construction Engineering Consulting Co Ltd filed Critical Zhejiang Electric Power Construction Engineering Consulting Co Ltd
Priority to CN201910630489.3A priority Critical patent/CN110533276A/en
Publication of CN110533276A publication Critical patent/CN110533276A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses a kind of project of transmitting and converting electricity construction risk early warning systems, background server and mobile terminal including communication connection, wherein, background server is equipped with project of transmitting and converting electricity construction risk Early-warning Model, project of transmitting and converting electricity is carried out Type division by the project of transmitting and converting electricity construction risk Early-warning Model, every class project of transmitting and converting electricity is divided into several processes, and construction risk existing for each process correspondence markings;Mobile terminal is equipped with project progress input module and risk information display module, engineering staff inputs project progress information by project progress input module, project of transmitting and converting electricity construction risk Early-warning Model is according to the project progress of statistics, the next working procedure of engineering and corresponding construction risk are picked out and comes and is pushed to mobile terminal, and be shown by risk information display module, show that content includes the next security risk content of early warning and counter-measure.The present invention can be reminded in time and be averted risks, to strengthen safety in production.

Description

Project of transmitting and converting electricity construction risk early warning system
Technical field
The present invention relates to project of transmitting and converting electricity informationization technology fields.
Background technique
Current stage, electricity transmitting and converting construction process is still quite arduous, and field work, living condition are poor, so ginseng It is larger with the owner of construction, management, construction personnel's mobility, cause those of skill in the art to be lost, new hand is more.Due to power transmission and transformation Construction project is located in field, and information summary, complexity, many new hands even veteran is from want of experience, it is unclear that oneself is i.e. by face The security risk faced and how should successfully manage.In practical work process, it is desirable to have a Risk-warning mechanism, energy Relevant construction each side is reminded in time, learns and be preventive from possible trouble in advance, this is an effective way for improving safety in production.But How construction risk and Practical Project progress are linked up with, as engineering progress is gradually implemented to give warning in advance or a difficult point.
Summary of the invention
The technical problem to be solved by the invention is to provide a kind of project of transmitting and converting electricity construction risk early warning systems, construction Risk and Practical Project progress hook, as engineering progress is gradually implemented to give warning in advance.
In order to solve the above technical problems, the present invention adopts the following technical scheme: project of transmitting and converting electricity construction risk early warning system, Background server and mobile terminal including communication connection, wherein background server is equipped with the early warning of project of transmitting and converting electricity construction risk Project of transmitting and converting electricity is carried out Type division by model, the project of transmitting and converting electricity construction risk Early-warning Model, and every class project of transmitting and converting electricity is drawn It is divided into several processes, and construction risk existing for each process correspondence markings;Mobile terminal be equipped with project progress input module and Risk information display module, engineering staff input project progress information, project of transmitting and converting electricity construction by project progress input module Risk warning model picks out the next working procedure of engineering and corresponding construction risk according to the project progress of statistics Carry out and be pushed to mobile terminal, and be shown by risk information display module, shows that content includes the next peace of early warning Full Risk Content and counter-measure.
Optionally, the project of transmitting and converting electricity construction risk Early-warning Model analyzes history engineering construction information, according to Analyzing result is that every class engineering constructs multiple security risk events.
Optionally, Engineering Division is several processes by State Grid's construction industry acceptance of engineering quality review approach, according to The information of previous power transmission and transformation construction project safety accident event debates knowledge to each procedure expansion security risk, and presses process Classifying Sum forms power transmission and transformation construction project security risk inventory.
Optionally, the probability and risk that project of transmitting and converting electricity construction risk Early-warning Model occurs according to risk are graded, And corresponding risk prevention measure is set for every kind of risk.
Optionally, according to power transmission and transformation construction project security risk inventory, the security risk come is picked out to each single item, with regard to wind A possibility that danger occurs and influence degree the two dimensions, carry out evaluation marking, are used as this using the score product of the two dimensions The rank sum of risk item.
Optionally, inspection of quality item is arranged to each process in system, and carries out according to logic before and after the construction of engineering construction Tissue sequence;After engineering staff checks and accepts through information each inspection of quality item input of Process of Engineering Construction, power transmission and transformation work Journey construction risk Early-warning Model confirms that the process is completed, i.e., recordable to count the progress situation that examination is completed in engineering, and divides Lower which procedure together, which will be precipitated, to occur, and be associated with out the counter-measure of lower one of risk, and relevant risk information is pushed To the mobile phone of engineering construction personnel.
The present invention by adopting the above technical scheme, has the following beneficial effects:
Each construction link of project of transmitting and converting electricity is finely divided, the construction risk of each link, and root are picked out The probability and risk occurred according to risk is graded, and corresponding technical measures and management measure are formulated.On the other hand, exploitation letter Breath system allows present engineering staff to play the inspection of quality of Process of Engineering Construction item by item with computer and mobile terminal Card, thus can acceptance of engineering quality statistics project progress is associated with out, and next stage working procedure is shown, will The Risk Identification encountered comes out, and risk information and counter-measure is pushed in advance in the cell phone application of related personnel, in time Prompting averts risks, to strengthen safety in production.
The specific technical solution of the present invention and its advantages will carry out detailed in the following detailed description Explanation.
Specific embodiment
" construction quality inspection and evaluation range divide " is worked out according to engineering construction logic, and process is clear, marks Quasi- specification is finely divided each construction link of project of transmitting and converting electricity according to " construction quality inspection and evaluation range divide ", The construction risk of each link is picked out, and the probability and risk that occur according to risk are graded, and power transmission and transformation work is established Journey construction risk Early-warning Model.
Project of transmitting and converting electricity construction risk early warning system, background server and mobile terminal including communication connection are mobile whole End can be mobile phone or tablet computer etc., be equipped with project of transmitting and converting electricity construction risk early warning APP, wherein background server is set There is project of transmitting and converting electricity construction risk Early-warning Model, which carries out type for project of transmitting and converting electricity It divides, every class project of transmitting and converting electricity is divided into several processes, and construction risk existing for each process correspondence markings;Mobile terminal Equipped with project progress input module and risk information display module, engineering staff by project progress input module input engineering into Spend information, project of transmitting and converting electricity construction risk Early-warning Model according to the project progress of statistics, the next working procedure of engineering with And corresponding construction risk picks out and carrys out and be pushed to mobile terminal, and is shown by risk information display module, shows Content includes the next security risk content of early warning and counter-measure, with the next security risk content of early warning and is answered To measure, engineering construction personnel is helped to take precautions against security risk.
Wherein, the project of transmitting and converting electricity construction risk Early-warning Model analyzes history engineering construction information, according to point Analysing result is that every class engineering constructs multiple security risk events.Such as: State Grid's construction industry acceptance of engineering quality evaluation rule Engineering Division is unit engineering, branch, subdivisional work by model, is sub-divided into the inspection lot of most final stage process always.According to previous The information of power transmission and transformation construction project safety accident event, we debate knowledge to each procedure expansion security risk: regardless of risk Size, identify and as long as having, and summarize by Activity Classification, form power transmission and transformation construction project security risk inventory.
The probability and risk that project of transmitting and converting electricity construction risk Early-warning Model occurs according to risk are graded, and for every Corresponding risk prevention measure is arranged in kind risk.Such as: according to power transmission and transformation construction project security risk inventory, we are to each single item A possibility that picking out the security risk come, occurring with regard to risk and influence degree the two dimensions, carry out evaluation marking;With this two Rank sum of the score product of a dimension as the risk item.A possibility that risk occurs is bigger, and extent of injury influence is bigger, Score is higher;On the contrary, score is then lower.All power transmission and transformation construction projects come that pick out in inventory are evaluated in such processes to pacify Full blast danger.Then, for each single item pick out come security risk formulate corresponding technical measures, further according to evaluating The risk of different stage formulates corresponding management measure.
Inspection of quality item is arranged to each process in system, and carries out tissue row according to logic before and after the construction of engineering construction Sequence;After engineering staff passes through acceptance information to each inspection of quality item input of Process of Engineering Construction, project of transmitting and converting electricity construction Risk warning model confirms that the process is completed, i.e., recordable to count the progress situation that examination is completed in engineering, and analyzes down Which procedure will occur together, be associated with out the counter-measure of lower one of risk, relevant risk information is pushed to work in time The mobile phone of journey construction personnel, the purpose realized security risk early warning, reinforce protection management.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, is familiar with The those skilled in the art should be understood that the present invention includes but is not limited to content described in specific embodiment above.It is any Modification without departing from function and structure principle of the invention is intended to be included in the range of claims.

Claims (6)

1. project of transmitting and converting electricity construction risk early warning system, it is characterised in that: background server and movement including communication connection are eventually End, wherein background server is equipped with project of transmitting and converting electricity construction risk Early-warning Model, the project of transmitting and converting electricity construction risk Early-warning Model Project of transmitting and converting electricity is subjected to Type division, every class project of transmitting and converting electricity is divided into several processes, and each process correspondence markings are deposited Construction risk;Mobile terminal is equipped with project progress input module and risk information display module, engineering staff pass through engineering Progress input module inputs project progress information, project of transmitting and converting electricity construction risk Early-warning Model according to the project progress of statistics, The next working procedure of engineering and corresponding construction risk, which pick out, carrys out and is pushed to mobile terminal, and passes through risk information Display module is shown, and shows that content includes the next security risk content of early warning and counter-measure.
2. project of transmitting and converting electricity construction risk early warning system according to claim 1, it is characterised in that: the project of transmitting and converting electricity Construction risk Early-warning Model analyzes history engineering construction information, constructs multiple safety based on the analysis results for every class engineering Risk case.
3. project of transmitting and converting electricity construction risk early warning system according to claim 2, it is characterised in that: State Grid's construction row Engineering Division is several processes by industrial engineering (IE) inspection of quality review approach, according to previous power transmission and transformation construction project safety accident event Information, knowledges is debated to each procedure expansion security risk, and summarize by Activity Classification, it is safe to form power transmission and transformation construction projects Risk inventory.
4. project of transmitting and converting electricity construction risk early warning system according to claim 3, it is characterised in that: project of transmitting and converting electricity construction The probability and risk that risk warning model occurs according to risk are graded, and corresponding risk is arranged for every kind of risk and prevents Model measure.
5. project of transmitting and converting electricity construction risk early warning system according to claim 4, it is characterised in that: built according to power transmission and transformation Engineering safety risk inventory, to each single item pick out come security risk, with regard to risk occur a possibility that and influence degree this two A dimension carries out evaluation marking, using the score product of the two dimensions as the rank sum of the risk item.
6. project of transmitting and converting electricity construction risk early warning system as claimed in any of claims 1 to 5, it is characterised in that: Inspection of quality item is arranged to each process in system, and carries out tissue sequence according to logic before and after the construction of engineering construction;Work as engineering After personnel pass through information to each inspection of quality item input examination of Process of Engineering Construction, project of transmitting and converting electricity construction risk early warning mould Type confirms that the process is completed, i.e., recordable to count the progress situation that examination is completed in engineering, and analyzes down which road work together Sequence will occur, and be associated with out the counter-measure of lower one of risk, and relevant risk information is pushed to engineering construction personnel's Mobile phone.
CN201910630489.3A 2019-07-12 2019-07-12 Project of transmitting and converting electricity construction risk early warning system Pending CN110533276A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910630489.3A CN110533276A (en) 2019-07-12 2019-07-12 Project of transmitting and converting electricity construction risk early warning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910630489.3A CN110533276A (en) 2019-07-12 2019-07-12 Project of transmitting and converting electricity construction risk early warning system

Publications (1)

Publication Number Publication Date
CN110533276A true CN110533276A (en) 2019-12-03

Family

ID=68659755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910630489.3A Pending CN110533276A (en) 2019-07-12 2019-07-12 Project of transmitting and converting electricity construction risk early warning system

Country Status (1)

Country Link
CN (1) CN110533276A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521709A (en) * 2011-12-22 2012-06-27 上海建科工程咨询有限公司 Building construction quality safety online risk management system
CN102999695A (en) * 2012-10-31 2013-03-27 华中科技大学 Subway construction safety risk identification and evaluation system and working method thereof
CN107688908A (en) * 2017-09-06 2018-02-13 北京城乡建设集团有限责任公司 Study and judge the method and device of construction safety risk
CN109583792A (en) * 2018-12-27 2019-04-05 深圳市城市公共安全技术研究院有限公司 Informatization management and control method and system for static-dynamic risk of in-building project

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521709A (en) * 2011-12-22 2012-06-27 上海建科工程咨询有限公司 Building construction quality safety online risk management system
CN102999695A (en) * 2012-10-31 2013-03-27 华中科技大学 Subway construction safety risk identification and evaluation system and working method thereof
CN107688908A (en) * 2017-09-06 2018-02-13 北京城乡建设集团有限责任公司 Study and judge the method and device of construction safety risk
CN109583792A (en) * 2018-12-27 2019-04-05 深圳市城市公共安全技术研究院有限公司 Informatization management and control method and system for static-dynamic risk of in-building project

Similar Documents

Publication Publication Date Title
Verma et al. Identifying patterns of safety related incidents in a steel plant using association rule mining of incident investigation reports
CN104363106A (en) Electric power information communication fault early warning analysis method based on big-data technique
CN106709567A (en) Method for diagnosing switch faults based on deep learning model
CN110620906A (en) Electric power construction safety management system based on thing networking
CN104863842A (en) Diaphragm pump fault diagnosis method and device based on fractal theory
CN104267668A (en) Bayes-method-based spaceflight valve part fault diagnosis method in machining process
CN114048952B (en) Iron-making plant safety situation sensing method based on edge internet of things technology and neural network
US20220299987A1 (en) Method for learning and detecting abnormal part of device through artificial intelligence
CN109190545A (en) Bird's Nest automatic recognition system and its methods and applications in transmission line of electricity
CN113919618A (en) Underground building construction management method based on BIM technology
CN116629589B (en) Safety production management system of power plant
Zou et al. A data mining framework within the Chinese NPPs operating experience feedback system for identifying intrinsic correlations among human factors
CN110533276A (en) Project of transmitting and converting electricity construction risk early warning system
CN115018291A (en) Large bridge engineering risk assessment method
CN108761263B (en) Fault diagnosis system based on evidence theory
CN109711819B (en) Mining area safety monitoring system
CN113340547A (en) Winch vibration diagnosis method based on improved lumped mean-square decomposition
CN106873050A (en) A kind of high speed rail earthquake pre-warning system detectio evaluation method
CN116185757A (en) Intelligent monitoring system for energy consumption of machine room
CN110348517A (en) A kind of clean energy resource heating system alarm triage prediction technique based on big data
CN115439001A (en) Agricultural machinery supply and demand scheduling management system and method based on shared agricultural machinery big data
CN115148336A (en) AI discernment is supplementary psychological disorders of lower System for evaluating treatment effect of patient
CN115293189A (en) Rotating machinery state monitoring method based on stack self-coding dimension reduction
CN106295959A (en) Nuclear power plant's personnel's behavior analysis and management system and method
CN114358539A (en) Risk-based railway operation safety identification method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination