CN103412538B - A kind of construction quality safety pre-warning system - Google Patents
A kind of construction quality safety pre-warning system Download PDFInfo
- Publication number
- CN103412538B CN103412538B CN201310339415.7A CN201310339415A CN103412538B CN 103412538 B CN103412538 B CN 103412538B CN 201310339415 A CN201310339415 A CN 201310339415A CN 103412538 B CN103412538 B CN 103412538B
- Authority
- CN
- China
- Prior art keywords
- module
- quality
- central control
- project
- control module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
The invention discloses a kind of construction quality safety pre-warning system, this construction quality safety pre-warning system includes: Central Control Module, power module, display module, project file memory module, quality pre-alert module, remote monitoring module;Construction project, by modular design, can be implemented whole process supervision by the present invention, quality that may be present, potential safety hazard are automatically analyzed, anticipation, warning, quality, security incident are eliminated in bud, thus stop the generation of accident;The present invention can be at project scene query specification at any time, standard provision, play the effect of current specifications, standard to greatest extent, the qualification of unit of taking part in building each to project and personnel can implement dynamic supervision, thus reduce the service differentiation between the regional difference of supervision level, project unit of taking part in building, promote entirety supervision level;The present invention can provide an instant communication for each side responsible party, synchronize the information platform of concern, the information in the comprehensive timely grasp project parties face of energy.
Description
Technical field
The invention belongs to construction engineering technical field, particularly relate to a kind of construction quality safety pre-warning system.
Background technology
Project Supervision is born protection national wealth and people's life safety and provides high-quality project for owner
The double liability of implementation management service, when current engineering construction project emerges in large numbers like the mushrooms after rain, management
Importance is self-evident, and after carrying out project supervision system, produced social benefit is it is clear that but be not reality
After row project supervision system the implementation management of history denounce without exception and except, the quality of construction project just can allow
User is the most relieved, and jerry-built project just can thoroughly eliminate, and current project delivery method is still deposited
Problem have many reasons, wherein the construction of regulation has to be strengthened and sound, the supervision of government need strengthen
Dynamics and raising effectiveness, owner needs to recognize management and kind treatment management, the fulfilling energy of Supervision Organization further
Power and responsibility need reinforcement badly, and the overall qualities of supervisor need raising badly, therefore the management of high-efficiency high-quality and
Improve management scientific and technological level be Supervision Enterprise must faced by eternal problem.
But traditional construction also exist safety pre-warning system can not reaction information comprehensively, exchange delayed
Problem.
Summary of the invention
The purpose of the embodiment of the present invention is to provide a kind of construction quality safety pre-warning system, it is intended to solve tradition
Construction also exist safety pre-warning system can not reaction information comprehensively, exchange delayed problem.
The embodiment of the present invention is achieved in that a kind of construction quality safety pre-warning system, and this construction quality is pacified
Full early warning system includes: Central Control Module, power module, display module, project file memory module,
Quality pre-alert module, remote monitoring module;
For to power module, display module, project file memory module, quality pre-alert module, remotely supervise
Control module sends the Central Control Module of instruction, for the nucleus module of construction quality safety pre-warning system;
It is connected with Central Control Module, for carrying out the remote monitoring module of remote monitoring activities, data is sent out
Deliver to Central Control Module and quality pre-alert module processes;
It is connected with remote monitoring module, Central Control Module and display module, for the data to remotely monitoring
The quality pre-alert module analyzed and construction quality causes danger report to the police, receives the prison of remote monitoring module
Control data, accept the control of master controller, the data of analysis are sent to display module;
It is connected with quality pre-alert module, Central Control Module, for the data of quality warning module analysis are entered
The display module of row display in real time, the data of quality of reception warning module, accept the control of Central Control Module;
It is connected with Central Control Module, carries out the project file memory module stored for project file, accept
The control of Central Control Module;
With Central Control Module, display module, project file memory module, quality pre-alert module, remotely supervise
Control module connects, control module centered by being used for, project file memory module, quality pre-alert module, remotely
Monitoring module provides the power module of power supply.
Further, Central Control Module uses AT89S52 single-chip microcomputer.
Further, quality pre-alert module have employed data analysis and acoustic-optic alarm, at Central Control Module
Control under, analyze on-the-spot various data and abnormal situation reported to the police with acoustooptic.
Further, display module uses the LCD MODULE showing numerical value under daylight, sets on display module
It is equipped with the sensitivity selecting switch of data processing mode for determining Central Control Module.
Further, this construction quality safety pre-warning system is additionally provided with the inquiry mould being connected with Central Control Module
Block, inquires about the data of storage in project file memory module by Central Control Module, possesses powerful inquiry
Function, can inquire about all mandatory specification of construction quality safe early warning, and the quality safety being expounded through peer review
Prophylactico-therapeutic measures, provides related advisory measure.
The construction quality safety pre-warning system that the present invention provides, by modular design, can be to construction project
Project implementation whole process supervision, quality that may be present, potential safety hazard are automatically analyzed, anticipation, police
Show, quality, security incident are eliminated in bud, thus stop the generation of accident;The present invention can be at item
Mesh scene query specification at any time, standard provision, play the effect of current specifications, standard to greatest extent;Utilize
Native system, the qualification of unit of taking part in building each to project and personnel can implement dynamic supervision, thus reduce supervision level
Regional difference, service differentiation between project unit of taking part in building, promote entirety supervision level;The present invention can be
Each side responsible party provides an instant communication, synchronizes the information platform of concern, can comprehensive timely grasp item
The information of mesh each side;It is thus possible to traditional construction there is safety pre-warning system can not be the most anti-
Answer information, exchange delayed problem.
Accompanying drawing explanation
Fig. 1 is the structural representation of the construction quality safety pre-warning system that the embodiment of the present invention provides;
In figure: 1, Central Control Module;2, power module;3, display module;4, project file storage
Module;5, quality pre-alert module;6, remote monitoring module;7, enquiry module.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with embodiment,
The present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to
Explain the present invention, be not intended to limit the present invention.
Fig. 1 shows the construction quality safety pre-warning system structure that the present invention provides.For convenience of description, only
Illustrate only part related to the present invention.
The construction quality safety pre-warning system of the embodiment of the present invention, this construction quality safety pre-warning system includes:
Central Control Module, power module, display module, project file memory module, quality pre-alert module, remote
Range monitoring module;
For to power module, display module, project file memory module, quality pre-alert module, remotely supervise
Control module sends the Central Control Module of instruction, for the nucleus module of construction quality safety pre-warning system;
It is connected with Central Control Module, for carrying out the remote monitoring module of remote monitoring activities, data is sent out
Deliver to Central Control Module and quality pre-alert module processes;
It is connected with remote monitoring module, Central Control Module and display module, for the data to remotely monitoring
The quality pre-alert module analyzed and construction quality causes danger report to the police, receives the prison of remote monitoring module
Control data, accept the control of master controller, the data of analysis are sent to display module;
It is connected with quality pre-alert module, Central Control Module, for the data of quality warning module analysis are entered
The display module of row display in real time, the data of quality of reception warning module, accept the control of Central Control Module;
It is connected with Central Control Module, carries out the project file memory module stored for project file, accept
The control of Central Control Module;
With Central Control Module, display module, project file memory module, quality pre-alert module, remotely supervise
Control module connects, control module centered by being used for, project file memory module, quality pre-alert module, remotely
Monitoring module provides the power module of power supply.
As a prioritization scheme of the embodiment of the present invention, Central Control Module uses AT89S52 single-chip microcomputer.
As a prioritization scheme of the embodiment of the present invention, quality pre-alert module have employed data analysis and acousto-optic report
Alarm device, under the control of Central Control Module, analyzes on-the-spot various data and to abnormal situation with sound
Light mode is reported to the police.
As a prioritization scheme of the embodiment of the present invention, display module uses the liquid crystal showing numerical value under daylight
Show module, display module is provided with the sensitivity of data processing mode for determining Central Control Module
Select switch.
As a prioritization scheme of the embodiment of the present invention, this construction quality safety pre-warning system be additionally provided with in
The enquiry module that heart control module connects, is inquired about in project file memory module by Central Control Module and deposits
The data of storage, possess powerful query function, can inquire about all mandatory specification of construction quality safe early warning,
And the quality safety prophylactico-therapeutic measures being expounded through peer review, provide related advisory measure.
Below in conjunction with the accompanying drawings and the application principle of the present invention is further described by specific embodiment.
As it is shown in figure 1, the construction quality safety pre-warning system of the embodiment of the present invention is mainly by Central Control Module
1, power module 2, display module 3, project file memory module 4, quality pre-alert module 5, remotely monitor
Module 6 forms;Central Control Module 1 is the nucleus module of construction quality safety pre-warning system, and center controls
Module 1 is provided power supply by power module 2, and interlocking item archives storage module 4 and remote monitoring module 6 are also
The data of project file memory module 4 and remote monitoring module 6 are processed, and result is transmitted
To display module 3 and quality pre-alert module 5;Power module 2 interlocking item archives storage module 4, quality are pre-
Alert module 5 and remote monitoring module 6 be project file memory module 4, quality pre-alert module 5 and long-range
Monitoring module 6 provides power supply;Project file memory module 4 connects Central Control Module 1, for project
Archives store;Quality pre-alert module 5 connects Central Control Module 1 and display module 2, is used for analyzing
With the function reported to the police, enquiry module 7 is connected with Central Control Module 1, by Central Control Module 1 at item
Mesh archives storage module 4 is inquired about the data of storage, possesses powerful query function, construction quality peace can be inquired about
The all mandatory specification of full early warning, and the quality safety prophylactico-therapeutic measures being expounded through peer review, provide related advisory
Measure.
Central Control Module 1 mainly have employed AT89S52 single-chip microcomputer, is mainly compiled by hardware connection and software
Journey realizes interlocking item project file memory module 4 and remote monitoring module 6 and further by result
It is transferred to display module 2 and quality pre-alert module 5, beneficially Based Intelligent Control;Project file memory module 4
Use stable high-quality hard disk, be more beneficial for for project file is stored;Quality pre-alert module
5 have employed data analysis software and acoustic-optic alarm, under the control of Central Control Module 1, analyze existing
Various data and abnormal situation is reported to the police with acoustooptic;Display module 2 uses special liquid crystal
Display module, is conducive to can also clearly showing that in the sunlight numerical value, is provided with on display module 2 simultaneously
Sensitivity selecting switch is for determining the data processing mode of Central Control Module 1.
The operation principle of the present invention:
1, quality pre-alert
In the project implementation process, to quality that may be present, potential safety hazard, when present invention invention is by first
Between carry out automatically analyzing, anticipation, the Harm level classification early warning of consequence may be produced by this hidden danger, early warning
Propose the suggestion and measure of hidden danger punishment simultaneously, and form the early warning record each responsible party of notice, responsibility can be warned
Quality, security incident are eliminated in bud by main body.
2, technology inquiry
In the project implementation process, can stay indoors at project scene and inquire required codes and standards, solve
The certainly problem of codes and standards inquiry difficulty.
3, remotely monitor
One management end can utilize the Internet to realize the long-range microcosmic to multiple project construction processes and monitor, bag
Include and execute the supervision to project construction procedural legality, each unit of taking part in building qualification and the dynamic supervision of personnel, every day
Work monitoring dynamically etc..
4, project file
By engineering log masterplate typing construction every day preset dynamically, engineering log can be formed, with early warning record
Together, the electronic record of accurately embodiment Process of Engineering Construction is formed.
The early warning principle of the present invention
The present invention establishes a professional data base, data base include Current Building ' job specfication data base (with
" Current Building ' job specfication complete works of " is source), applicable safety normative database, common quality defect preventing and treating number
According to storehouse and safe Tongbianling capsule data base, and the existing relevant regulation in Hunan Province, regulations (other provinces
Relevant laws and regulations, regulations enrich data base by region).Project i.e. enables the present invention from commencement date of work, by one
Side responsible party grasps (it is considered that site supervision mechanism is relatively advisable), on-the-spot by project process typing day by day
Quality, the data of security and various aspects, invention will be preserved, and form engineering log.Once inputted
Quality safety data specification corresponding with data base regulation entry is not inconsistent, or occurs in Tongbianling capsule data base
The common fault comprised, or regulation, the regulations relevant to place conflict mutually, and the present invention will judge quality or peace automatically
The order of severity of full hidden danger grading forewarning system, provide violated codes and standards provision, or Tongbianling capsule simultaneously
Suggestion treatment measures.
Early warning once sends, it is necessary to eliminating hidden danger could release.If do not released within the time of regulation,
Invention will be automatically fed to upper level authorities, until top management.
Except word feeds back, invention is also provided with picture feedback function.Photo site and the word of early warning item
Describing and coordinate, the problem that can make early warning is more clear, it is possible to make the indeterminable difficulty of field technician ask
Topic, or disputed problem, issue authorities by the form of photo and request help.
Use the present invention to supervise the overall process of construction project, quality, potential safety hazard eliminating can be sent out in accident
Before life, can avoid to greatest extent even stopping quality and security incident!
Early warning classification: early warning is set to three grades, one-level is for relating to mandatory standard provision and construction safety weight
The problem of big dangerous matter sources, two grades for not meet specification generality standard provision and to cause the problem of more serious future trouble,
Three grades for common fault, do not meet specification generality standard provision and the problem causing slight future trouble.
Remotely monitoring
Can be as construction industry authorities, quality safety supervisory and management department to all items in institute's compass of competency
Purpose micromanagement, it is possible to as electric power, water conservancy, traffic, Large Real Estate company, Project Management Company,
Project management in the invention such as supervisor, construction enterprises.Cooperation research and development unit Changsha County work with this software
As a example by business office, chief can check the microcosmic situation of project in office by the Internet, understand each at any time
Project construction program is the most legal, if there is security-hidden trouble, and the quality of project, safely, enter
Degree, management condition, can assign the instruction to project the most targetedly, area under one's jurisdiction project is carried out full side
The dynamic management of position.
Build authorities as management end
Project micromanagement, each project is equipped with a site operation personnel (supervising engineer), operator
While record " engineering log ", to being directed to there may be the data letter of quality, potential safety hazard
Breath, processes according to invention workbook in time, generates early warning record, notices each responsible party, warning
Quality, security incident are eliminated in bud by responsible party.To word can not the problem of sake of clarity, can
With picture statement or by its process of video presentation, and leave as archives material.
Quality, potential safety hazard substantially can be divided into two classes.One class is the doubtful hidden danger that Field Force cannot differentiate.
Example: artificial digging pile stake footpath (cast-in-place concrete retaining wall) deviation 55MM occurs in scene, Field Force without
Method judges whether within the scope of tolerance, input invention, invention inform specification tolerance for ±
50MM, and send two grades of early warning.Another kind of know for Field Force problematic, but do not know the tight of problem
Weight degree, needs the character of examination problem and provides solution.
3, codes and standards inquiry
The current specifications standard database of relevant speciality has been included in the present invention, can be as industry standard standard
Complete works, site operation people and associated field professional and technical personnel input keyword (word) can find phase
Closing specification, the knotty problem that there is scene carries out specific aim inquiry, and needs immediately to find phase according to scene
Corresponding specification provision.
The present invention establishes the data base of specialty, and data base includes that Current Building ' job specfication data base is (with " existing
Row construction specification is complete works of " 2009 editions be source), applicable safety normative database, common quality defect prevent and treat
Data base and safe Tongbianling capsule data base, and the existing relevant regulation in Hunan Province, regulations (other provinces
The relevant laws and regulations in city, regulations enrich data base by region)
Security-hidden trouble punishment handbook: included us in the present invention and organized associated specialist group jointly to write to execute
Work scene FAQs preventing and treating data base, to security-hidden trouble that may be present in the project implementation process, this
Invent the suggestion and measure by proposing hidden danger punishment.
Invention realizes quality and safety standard and quality safety common fault is screened and inquiry:
1. quality security problem diagnosis: go wrong in work progress, Field Force has query or assurance
Indefinite, the available present invention screens, and makes " order of severity " of problem clear, and how problem " is located
Reason ".
2. codes and standards inquiry: can be complete works of as industry standard standard, required for project scene is inquired about
Data.Refer to flow chart:
Progress monitoring: utilize the present invention, is controlled project progress, it is achieved progress is controlled, and for super
Go out that the target advance duration carries out labor, remarks explanation is done in comparison.
Danger source: utilize the present invention, as long as operator is according to project on-site actual situations, in system
Selecting to add the dangerous matter sources of all existence of this project, such as run into corresponding dangerous matter sources in the construction stage, system will
Meeting automatic discrimination early warning, thus improve the control level of job site security risk.
This masterplate typing day by day of the data message of collection in worksite is invented, and i.e. forms project together with early warning record
Build the electronic record of daily record.As historical archives accurately.
After project final acceptance of construction, a whole set of real project data i.e. defines project " engineering log "
Electronic document, the overall process record to work progress, the most proper to the process of quality, potential safety hazard,
In time, and the impact causing construction quality, safety, progress, cost etc. all can be reviewed, and both may be used
Distinct responsibility, it is possible to offer reference for processing same problems.
Another effect of engineering log, is the supervision for Whole Life Cycle of Projects.Daily record extends to
The overall process that project uses, the maintenance and repair during record use, quality, safety problem process.Wherein
Initial data in process of construction, such as facility, the specifications and models of equipment, service life etc., can be that project sets
Arrange the standby maintenance that upgrades in time and foundation is provided, make the working service more science of project, reasonable, safety.
Can tracing function, after project final acceptance of construction, a whole set of real project data i.e. defines project
The electronic document of " engineering log ", the most proper to the process of quality in work progress, safety in production hidden danger,
In time, and the impact causing construction quality, safety, progress, cost etc. all can be reviewed, and both may be used
Distinct responsibility, it is possible to offer reference for processing same problems.
Information is fed back: the entry terminal of system is provided with information feedback function, is formed mutually with higher level supervision department
Dynamic, the technical problem that scene occurs is made picture or video or written historical materials by field technician or owner,
It is uploaded to higher authority or relevant expert, obtains in time and instruct and support.Online help is provided.
Present invention achieves the high level docking of computer technology and architectural engineering technology: computer technology solves
Problem be the most all constant or regular governed vector, or phase can be set up by its inherent law
The mathematical model answered;Utilize information technology, substantial amounts of engineering discipline specified digitized, utilizes network technology,
Achieve the long-range monitoring to project micromanagement.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all at this
Any amendment, equivalent and the improvement etc. made within bright spirit and principle, should be included in the present invention
Protection domain within.
Claims (1)
1. a construction quality safety pre-warning system, it is characterised in that this construction quality safety is pre-
Alarm system includes:
For to power module, display module, project file memory module, quality pre-alert module,
Remote monitoring module sends the Central Control Module of instruction, for construction quality safety pre-warning system
Nucleus module;
It is connected with Central Control Module, for carrying out the remote monitoring module of remote monitoring activities,
Send data to Central Control Module and quality pre-alert module processes;
It is connected with remote monitoring module, Central Control Module and display module, for remotely prison
The data analysis controlled and the quality pre-alert module that construction quality causes danger report to the police, receive
The monitoring data of remote monitoring module, accept the control of Central Control Module, the data that will analyze
It is sent to display module;
It is connected with quality pre-alert module, Central Control Module, for quality warning module is analyzed
The display module that shows in real time of data, the data of quality of reception warning module, in acceptance
The control of heart control module;
It is connected with Central Control Module, carries out the project file storage mould stored for project file
Block, has retrospective function, and the data of storage cannot be revised, and once having an accident can basis
Project storage data investigate related personnel's responsibility, accept the control of Central Control Module;
With Central Control Module, display module, project file memory module, quality pre-alert module,
Remote monitoring module connects, control module, project file memory module, quality centered by being used for
Warning module, remote monitoring module provide the power module of power supply;
Central Control Module uses AT89S52 single-chip microcomputer;
Quality pre-alert module have employed data analysis and acoustic-optic alarm, at Central Control Module
Control under, analyze on-the-spot various data and abnormal situation reported to the police with acoustooptic;
Described data analysis is that the order of severity according to quality or potential safety hazard is analyzed, described acousto-optic
Alarm device carries out grading forewarning system, and provides violated codes and standards provision while early warning,
Or the suggestion treatment measures of Tongbianling capsule;
Display module uses the LCD MODULE showing numerical value under daylight, sets on display module
It is equipped with the sensitivity selecting switch of data processing mode for determining Central Control Module;
This construction quality safety pre-warning system is additionally provided with the inquiry mould being connected with Central Control Module
Block, for being inquired about the data of storage in project file memory module by Central Control Module,
Possess query function, all mandatory specification of construction quality safe early warning, Yi Jizhuan can be inquired about
The quality safety prophylactico-therapeutic measures of family's demonstration, provides related advisory measure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310339415.7A CN103412538B (en) | 2013-08-06 | 2013-08-06 | A kind of construction quality safety pre-warning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310339415.7A CN103412538B (en) | 2013-08-06 | 2013-08-06 | A kind of construction quality safety pre-warning system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103412538A CN103412538A (en) | 2013-11-27 |
CN103412538B true CN103412538B (en) | 2016-12-28 |
Family
ID=49605563
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310339415.7A Active CN103412538B (en) | 2013-08-06 | 2013-08-06 | A kind of construction quality safety pre-warning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103412538B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104049608B (en) * | 2014-06-12 | 2016-07-06 | 北京中见智海科技有限公司 | A kind of supervisory systems and monitoring and managing method |
CN104463717A (en) * | 2014-12-09 | 2015-03-25 | 中国水利水电第十四工程局有限公司 | Construction expert information system applicable to extra-large underground cavern group |
CN108093218A (en) * | 2017-12-25 | 2018-05-29 | 浙江东南建设管理有限公司 | A kind of construction quality video Supervision and system |
CN109345196A (en) * | 2018-09-14 | 2019-02-15 | 淮南矿业(集团)有限责任公司 | A kind of early warning platform and method for early warning |
CN110378674A (en) * | 2019-07-20 | 2019-10-25 | 深圳市实瑞建筑技术有限公司 | A kind of project delivery method information management system |
CN114924535B (en) * | 2022-05-18 | 2022-12-02 | 北京天辰信科技有限公司 | Method and system for acquiring information from engineering data to perform safety production early warning |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201392471Y (en) * | 2009-04-02 | 2010-01-27 | 广厦建设集团有限责任公司 | Engineering construction safety warning device based on on-site digital vision disparity |
CN102044127A (en) * | 2009-10-14 | 2011-05-04 | 中冶(北京)交通科技发展有限公司 | Early warning service management system based on remote expert service |
CN102521709A (en) * | 2011-12-22 | 2012-06-27 | 上海建科工程咨询有限公司 | Building construction quality safety online risk management system |
CN202424744U (en) * | 2011-12-06 | 2012-09-05 | 广东建科建筑工程质量检测中心 | Construction engineering detection and supervision system |
CN103186822A (en) * | 2011-12-27 | 2013-07-03 | 上海市第七建筑有限公司 | Troubleshooting and early warning management system for potential quality hazards of engineering project |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101199017B1 (en) * | 2011-12-26 | 2012-11-08 | 정상무 | Integrated management system for playground |
-
2013
- 2013-08-06 CN CN201310339415.7A patent/CN103412538B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201392471Y (en) * | 2009-04-02 | 2010-01-27 | 广厦建设集团有限责任公司 | Engineering construction safety warning device based on on-site digital vision disparity |
CN102044127A (en) * | 2009-10-14 | 2011-05-04 | 中冶(北京)交通科技发展有限公司 | Early warning service management system based on remote expert service |
CN202424744U (en) * | 2011-12-06 | 2012-09-05 | 广东建科建筑工程质量检测中心 | Construction engineering detection and supervision system |
CN102521709A (en) * | 2011-12-22 | 2012-06-27 | 上海建科工程咨询有限公司 | Building construction quality safety online risk management system |
CN103186822A (en) * | 2011-12-27 | 2013-07-03 | 上海市第七建筑有限公司 | Troubleshooting and early warning management system for potential quality hazards of engineering project |
Also Published As
Publication number | Publication date |
---|---|
CN103412538A (en) | 2013-11-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103412538B (en) | A kind of construction quality safety pre-warning system | |
CN102521709B (en) | A kind of online risk management system of Construction Quality safety | |
CN104376430A (en) | Hidden risk management system based on cloud service platform and implementing method of hidden risk management system | |
CN110221582A (en) | A kind of production of five in one or engineering safety service and support method and system | |
CN111126839A (en) | Occupational health self-discipline management platform system for enterprise based on block chain technology | |
CN115130807A (en) | Intelligent supervision method for pharmaceutical production safety | |
Bing et al. | Study on coal mine safety management system based on “hazard, latent danger and emergency responses” | |
US20220017328A1 (en) | Process and method for uniform maintenance for conveyance apparatuses | |
CN110544026A (en) | Railway transportation safety monitoring system | |
CN109543998A (en) | A kind of supervision of harbour emphasis equipment and accident emergency management information system | |
CN109657954A (en) | A kind of HSE-ACT risk control method and system | |
CN116402344A (en) | Safety management platform | |
CN112561399A (en) | Supervision method for construction quality in project supervision | |
CN108710978A (en) | Enterprise management method and system and computer readable storage medium | |
CN111932113A (en) | Environment supervision and management method, platform and storage medium | |
Savchuk | Development of Automation Systems for the Unified Duty Dispatch Service “System-112” in Order to Increase Efficiency Activities in the Field of Protection of the Population and Territories | |
CN111639832B (en) | Elevator information safety management system and method | |
CN113393164A (en) | Real-time card control method and system for product quality | |
Wilkinson | Safety cases: success or failure? | |
CN105930968A (en) | Passenger line construction risk control and early warning system | |
Díreš | Analysis of logistic provision of revisions for central state administration bodies | |
KR20070104033A (en) | Work admission system for risk workshop safety management | |
Yin et al. | Theoretical research based on the application of safety information management in power construction site | |
CN112381494B (en) | Intelligent supervision system and method for urban construction | |
Zhou | Safety risks and preventive measures for construction supervision of construction projects |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190419 Address after: 410000 Room 401 B, Unit 1, West District, Science and Technology Park Project Incubation Center Building, Hunan University, Changsha High-tech Development Zone, Hunan Province Patentee after: Hunan Chujia Engineering Consulting Co., Ltd. Address before: 410000 Unit B of Changsha International Enterprise Center, 188 Yuhua District Environmental Protection Middle Road, Changsha City, Hunan Province Patentee before: Hunan Huashun Construction Project Management Co., Ltd. |
|