CN102251523A - 拔桩夹具 - Google Patents

拔桩夹具 Download PDF

Info

Publication number
CN102251523A
CN102251523A CN2011101494768A CN201110149476A CN102251523A CN 102251523 A CN102251523 A CN 102251523A CN 2011101494768 A CN2011101494768 A CN 2011101494768A CN 201110149476 A CN201110149476 A CN 201110149476A CN 102251523 A CN102251523 A CN 102251523A
Authority
CN
China
Prior art keywords
transverse tube
hollow
hollow transverse
stiffener
tubule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101494768A
Other languages
English (en)
Other versions
CN102251523B (zh
Inventor
李中瑞
占宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG DINGFENG INDUSTRIAL CO LTD
Original Assignee
ZHEJIANG DINGFENG INDUSTRIAL CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG DINGFENG INDUSTRIAL CO LTD filed Critical ZHEJIANG DINGFENG INDUSTRIAL CO LTD
Priority to CN 201110149476 priority Critical patent/CN102251523B/zh
Publication of CN102251523A publication Critical patent/CN102251523A/zh
Application granted granted Critical
Publication of CN102251523B publication Critical patent/CN102251523B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种拔桩夹具,所述的夹具整体呈T形,包括水平设置的中空横管与竖直设置的中空纵管,中空纵管的上下两端开口,且中空纵管的上端与中空横管连通,所述的中空纵管前、后侧板上由上到下设有多排预留孔,在中空横管的左半段内装有水平活动夹头,在中空横管的右半段内装有水平固定夹头。该夹具使得H型钢翼缘板、腹板上都有作用力,作用力面积大,减小集中应力,减少对桩的损伤;并且操作也十分方便。

Description

拔桩夹具
技术领域
本发明涉及一种夹具,特别涉及一种拔桩夹具。
背景技术
现阶段SMW工法应用在拔出H型钢桩时所用的夹具均为一字形,夹具作用力作用在型钢桩上的面积小,易将H型钢桩拉裂、拉断,损耗大;夹具压在千斤顶上,稳定性差,容易翻倒。
发明内容
本发明克服了上述现有技术中存在的不足,提供了一种作用力面积大,减小集中应力,减少对桩的损伤,稳定不易翻倒的拔桩夹具。
本发明的技术方案是这样实现的:
拔桩夹具,所述的夹具整体呈T形,包括水平设置的中空横管与竖直设置的中空纵管,中空纵管的上下两端开口,且中空纵管的上端与中空横管连通,所述的中空纵管前、后侧板上由上到下设有多排预留孔,在中空横管的左半段内装有水平活动夹头,在中空横管的右半段内装有水平固定夹头。
作为优选,在中空横管的左半段、右半段下方各设有一上拔千斤顶,上拔千斤顶的顶杆顶住中空横管的下端封头板。当中空纵管上的预留孔与H型钢桩翼缘板上的预留孔对准时,将销子塞入预留孔内,上拔千斤顶顶住T形夹具,将钢桩上拔。
因拔桩时受力较大,为防止夹具变形,作为优选,在中空横管与中空纵管的连接处设有加强板。使中空横管与中空纵管的连接处更加牢固,防止变形。
作为优选,在中空横管的左半段内由左到右间隔设有多个相互平行的用以安装、固定水平活动夹头的加劲板,所述的加劲板平行于中空横管的左端封头板,在相邻的加劲板之间设有多道加强筋,在最左侧的加劲板与中空横管的左端封头板之间也设有多道加强筋,所述的加强筋垂直于加劲板。中空横管左半段通过布置加劲板与加强筋来固定水平活动夹头,结构十分牢固。
作为优选,在中空横管的右半段内设有一道用以安装水平固定夹头的加劲板,中空横管右半段内的加劲板与中空横管的右端封头板平行,在中空横管右半段内的加劲板与中空横管的右端封头板之间设有多道加强筋,所述的加强筋垂直于加劲板。中空横管右半段通过布置加劲板与加强筋来固定水平固定夹头,结构十分牢固。
采用了上述技术方案的本发明的有益效果是:
1.采用全新形状夹具,H型钢翼缘板、腹板上都有作用力;
2.夹具作用力面积大,减小集中应力,减少对桩的损伤;
3.可将大部分作用力在H型钢翼缘板上,应力小,对桩损伤小;
4.夹具向下延伸长度大,起拔操作更方便;
5.夹具下部可直接立在压顶梁上,稳定不易翻倒。
附图说明
图1为本发明拔桩夹具的结构示意图;
图2为图1的A向视图;
图3为H型钢桩的结构示意图;
图4为水平固定夹头、水平活动夹头的安装结构示意图;
图5为夹具的工作状态示意图;
图6为将H型钢桩拔出时的状态示意图。
具体实施方式
本发明的具体实施方式如下:
实施例:一种拔桩夹具,如图1、2所示,所述的夹具1整体呈T形,包括水平设置的中空横管2与竖直设置的中空纵管3,中空纵管3的上下两端开口,且中空纵管3的上端与中空横管2连通,所述的中空纵管3前、后侧板上由上到下设有多排预留孔4,为配合夹具1工作,如图3所示,H型钢桩22是由腹板18及腹板18两侧的翼缘板19组成,在翼缘板19上也对应设有多排预留孔4。
如图4所示,在中空横管2的左半段内由左到右间隔设有多个相互平行的用以安装、固定水平活动夹头6的加劲板7,水平活动夹头6包括夹头10与千斤顶11,夹头10与千斤顶11的顶杆相连,千斤顶11安装在最左侧的加劲板上,所述的加劲板7平行于中空横管2的左端封头板8,在相邻的加劲板7之间设有多道加强筋9,在最左侧的加劲板与中空横管2的左端封头板之8间也设有多道加强筋9,所述的加强筋9垂直于加劲板7。
在中空横管2的右半段内设有一道用以安装水平固定夹头12的加劲板7,中空横管2右半段内的加劲板7与中空横管2的右端封头板13平行,在中空横管2右半段内的加劲板7与中空横管2的右端封头板13之间设有多道加强筋9,所述的加强筋9垂直于加劲板7。
如图5、图6所示,为配合水平活动夹头6、水平固定夹头12进行上拔工作,在中空横管2的左半段、右半段下方各设有一上拔千斤顶14,上拔千斤顶14的顶杆15顶住中空横管2的下端封头板16;上拔千斤顶14的下端立在压顶梁17上。因拔桩时力较大,为防止夹具变形,在中空横管2与中空纵管3的连接处设有加强板20,加强板20的两端分别与中空横管2、中空纵管3相连。
本发明的夹具工作过程如下:
如图5所示,先将拔桩夹具套在需拔除的H型钢桩外侧,立在压顶梁17上。用上拔千斤顶14将拔桩夹具上顶,使得夹具的中空纵管3前、后侧板上的下一排预留孔与H型钢桩翼缘板上的预留孔对齐,用销子21塞入预留孔内以便上拔桩。
用上拔千斤顶14继续将拔桩夹具上顶,使H型钢桩22上拔一定高度。将销子21拔出,松开上拔千斤顶14,将顶杆下降,使夹具下降后中空纵管3前、后侧板上的预留孔与H型钢桩翼缘板上的下一排预留孔对齐,用销子21塞入预留孔内以便上拔桩。用上拔千斤顶14继续将拔桩夹具上顶,使H型钢桩22上拔一定高度。
然后再将销子拔出,重复上述过程1-2次,如图6所示,由于H型钢桩22已被拔松,上拔阻力已比开始上拔时的阻力小得多,且此时H型钢桩22已被拔高,中空横管2内的水平活动夹头6、水平固定夹头12已能夹住H型钢桩22的腹板18,可用夹具内的水平活动夹头6、水平固定夹头12夹住H型钢桩22腹板18后用上拔千斤顶14上拔。

Claims (5)

1.一种拔桩夹具,其特征是:所述的夹具整体呈T形,包括水平设置的中空横管与竖直设置的中空纵管,中空纵管的上下两端开口,且中空纵管的上端与中空横管连通,所述的中空纵管前、后侧板上由上到下设有多排预留孔,在中空横管的左半段内装有水平活动夹头,在中空横管的右半段内装有水平固定夹头。
2.根据权利要求1所述的拔桩夹具,其特征是:在中空横管的左半段、右半段下方各设有一上拔千斤顶,上拔千斤顶的顶杆顶住中空横管的下端封头板。
3.根据权利要求1所述的拔桩夹具,其特征是:在中空横管与中空纵管的连接处设有加强板。
4.根据权利要求1所述的拔桩夹具,其特征是:在中空横管的左半段内由左到右间隔设有多个相互平行的用以安装、固定水平活动夹头的加劲板,所述的加劲板平行于中空横管的左端封头板,在相邻的加劲板之间设有多道加强筋,在最左侧的加劲板与中空横管的左端封头板之间也设有多道加强筋,所述的加强筋垂直于加劲板。
5.根据权利要求1所述的拔桩夹具,其特征是:在中空横管的右半段内设有一道用以安装水平固定夹头的加劲板,中空横管右半段内的加劲板与中空横管的右端封头板平行,在中空横管右半段内的加劲板与中空横管的右端封头板之间设有多道加强筋,所述的加强筋垂直于加劲板。
CN 201110149476 2011-06-01 2011-06-01 拔桩夹具 Active CN102251523B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110149476 CN102251523B (zh) 2011-06-01 2011-06-01 拔桩夹具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110149476 CN102251523B (zh) 2011-06-01 2011-06-01 拔桩夹具

Publications (2)

Publication Number Publication Date
CN102251523A true CN102251523A (zh) 2011-11-23
CN102251523B CN102251523B (zh) 2013-04-24

Family

ID=44979067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110149476 Active CN102251523B (zh) 2011-06-01 2011-06-01 拔桩夹具

Country Status (1)

Country Link
CN (1) CN102251523B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334432A (zh) * 2013-06-24 2013-10-02 上海宏信设备工程有限公司 H型钢起拔机
CN111809627A (zh) * 2020-07-17 2020-10-23 长安大学 一种多用途型钢静拔桩机
CN113756308A (zh) * 2021-09-13 2021-12-07 中铁隆工程集团有限公司 Smw工法h型钢回收辅助工装、回收方法及插拔方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3191682B2 (ja) * 1996-06-24 2001-07-23 調和工業株式会社 杭打抜機用のチャック装置、および、杭のチャック方法
KR20040101151A (ko) * 2004-11-09 2004-12-02 국성환 쐐기형 클램프가 내장된 에이치-빔 인출기
JP4060094B2 (ja) * 2002-02-28 2008-03-12 コジマテクノス株式会社 防護柵支柱の引抜装置
CN101624825A (zh) * 2009-07-31 2010-01-13 武汉京冶地基基础工程有限责任公司 静拔机
CN201459729U (zh) * 2009-07-31 2010-05-12 武汉京冶地基基础工程有限责任公司 H型钢夹持器
CN202273231U (zh) * 2011-06-01 2012-06-13 浙江鼎丰实业有限公司 一种拔桩夹具

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3191682B2 (ja) * 1996-06-24 2001-07-23 調和工業株式会社 杭打抜機用のチャック装置、および、杭のチャック方法
JP4060094B2 (ja) * 2002-02-28 2008-03-12 コジマテクノス株式会社 防護柵支柱の引抜装置
KR20040101151A (ko) * 2004-11-09 2004-12-02 국성환 쐐기형 클램프가 내장된 에이치-빔 인출기
CN101624825A (zh) * 2009-07-31 2010-01-13 武汉京冶地基基础工程有限责任公司 静拔机
CN201459729U (zh) * 2009-07-31 2010-05-12 武汉京冶地基基础工程有限责任公司 H型钢夹持器
CN202273231U (zh) * 2011-06-01 2012-06-13 浙江鼎丰实业有限公司 一种拔桩夹具

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334432A (zh) * 2013-06-24 2013-10-02 上海宏信设备工程有限公司 H型钢起拔机
CN103334432B (zh) * 2013-06-24 2015-07-29 上海宏信设备工程有限公司 H型钢起拔机
CN111809627A (zh) * 2020-07-17 2020-10-23 长安大学 一种多用途型钢静拔桩机
CN113756308A (zh) * 2021-09-13 2021-12-07 中铁隆工程集团有限公司 Smw工法h型钢回收辅助工装、回收方法及插拔方法

Also Published As

Publication number Publication date
CN102251523B (zh) 2013-04-24

Similar Documents

Publication Publication Date Title
CN202169644U (zh) 先张法预应力混凝土板桩整体式张拉台座
CN102251523B (zh) 拔桩夹具
CN103452313B (zh) 一种早拆独立支撑条带
CN209907228U (zh) 一种钢梁顶推导向装置
CN111697503A (zh) 一种水电安装用桥架吊装设备
CN202273231U (zh) 一种拔桩夹具
CN218376517U (zh) 一种隧洞加固支护装置
CN207513606U (zh) 一种用于盾构始发的反力装置
CN201588406U (zh) 顶板打孔支架
CN102979458B (zh) 一种岩壁梁斜面光爆凿孔导向定位装置
CN209873759U (zh) 一种移动式桩基施工平台
CN202129741U (zh) 一种倒拔桩夹具
CN213163904U (zh) 一种铁路垫板焊接工装夹具
CN107090830A (zh) 施打波浪桩设备及施工方法
CN107570640B (zh) 一种双箍筋弯焊一体机用钢筋防错位机构
CN213735095U (zh) 一种水利工程桩基施工用搬运装置
CN215672268U (zh) 隧道五级围岩导洞支撑机构
CN206379850U (zh) 磁轭压装推刀架拉孔装置
CN104589279A (zh) 一种平行闸板阀专用工具及拆装阀芯组件的方法
CN220643884U (zh) 大节段悬臂灌注造桥机上的斜拉索初次张拉施工平台
CN217080294U (zh) 用于建立临时通道的组合式爬梯
CN212153747U (zh) 箱型支撑与箱型横梁的连接节点结构
CN210959395U (zh) 一种蔬菜起垄覆膜滴灌移苗机
CN218479516U (zh) 一种适用于工字钢上搭设钢管脚手架的固定工具
CN204322009U (zh) 平行闸板阀专用工具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Li Zhongrui

Inventor after: Zhan Hong

Inventor after: Guo Yong

Inventor after: Zhu Huaifu

Inventor before: Li Zhongrui

Inventor before: Zhan Hong

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI ZHONGRUI ZHAN HONG TO: LI ZHONGRUI ZHAN HONG GUO YONG ZHU HUAIFU

C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 5 building 560, 310012 Xixi Road, Hangzhou, Zhejiang, 506

Applicant after: ZHEJIANG GEOFORE GEOTECHNICAL TECHNOLOGY CO., LTD.

Address before: 5 building 560, 310012 Xixi Road, Hangzhou, Zhejiang, 506

Applicant before: Zhejiang Dingfeng Industrial Co.,Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: ZHEJIANG DINGFENG INDUSTRIAL CO., LTD. TO: ZHEJIANG JIFENG GEOTECHNICAL TECHNOLOGY CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Pile extracting clamp

Effective date of registration: 20180608

Granted publication date: 20130424

Pledgee: Bank of Hangzhou Limited by Share Ltd science and Technology Branch

Pledgor: ZHEJIANG GEOFORE GEOTECHNICAL TECHNOLOGY CO., LTD.

Registration number: 2018330000141

PE01 Entry into force of the registration of the contract for pledge of patent right