CN102251523B - 拔桩夹具 - Google Patents
拔桩夹具 Download PDFInfo
- Publication number
- CN102251523B CN102251523B CN 201110149476 CN201110149476A CN102251523B CN 102251523 B CN102251523 B CN 102251523B CN 201110149476 CN201110149476 CN 201110149476 CN 201110149476 A CN201110149476 A CN 201110149476A CN 102251523 B CN102251523 B CN 102251523B
- Authority
- CN
- China
- Prior art keywords
- transverse tube
- hollow
- hollow transverse
- stiffener
- tubule
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 210000005239 tubule Anatomy 0.000 claims description 40
- 239000003351 stiffener Substances 0.000 claims description 34
- 230000003014 reinforcing effect Effects 0.000 claims description 17
- 230000002547 anomalous effect Effects 0.000 claims description 7
- 229910000831 Steel Inorganic materials 0.000 abstract description 19
- 239000010959 steel Substances 0.000 abstract description 19
- 238000000034 method Methods 0.000 description 2
- 235000008331 Pinus X rigitaeda Nutrition 0.000 description 1
- 235000011613 Pinus brutia Nutrition 0.000 description 1
- 241000018646 Pinus brutia Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110149476 CN102251523B (zh) | 2011-06-01 | 2011-06-01 | 拔桩夹具 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110149476 CN102251523B (zh) | 2011-06-01 | 2011-06-01 | 拔桩夹具 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102251523A CN102251523A (zh) | 2011-11-23 |
CN102251523B true CN102251523B (zh) | 2013-04-24 |
Family
ID=44979067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110149476 Active CN102251523B (zh) | 2011-06-01 | 2011-06-01 | 拔桩夹具 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102251523B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103334432B (zh) * | 2013-06-24 | 2015-07-29 | 上海宏信设备工程有限公司 | H型钢起拔机 |
CN111809627A (zh) * | 2020-07-17 | 2020-10-23 | 长安大学 | 一种多用途型钢静拔桩机 |
CN113756308A (zh) * | 2021-09-13 | 2021-12-07 | 中铁隆工程集团有限公司 | Smw工法h型钢回收辅助工装、回收方法及插拔方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3191682B2 (ja) * | 1996-06-24 | 2001-07-23 | 調和工業株式会社 | 杭打抜機用のチャック装置、および、杭のチャック方法 |
JP4060094B2 (ja) * | 2002-02-28 | 2008-03-12 | コジマテクノス株式会社 | 防護柵支柱の引抜装置 |
KR20040101151A (ko) * | 2004-11-09 | 2004-12-02 | 국성환 | 쐐기형 클램프가 내장된 에이치-빔 인출기 |
CN201459729U (zh) * | 2009-07-31 | 2010-05-12 | 武汉京冶地基基础工程有限责任公司 | H型钢夹持器 |
CN101624825B (zh) * | 2009-07-31 | 2011-02-09 | 中国一冶集团有限公司 | 静拔机 |
CN202273231U (zh) * | 2011-06-01 | 2012-06-13 | 浙江鼎丰实业有限公司 | 一种拔桩夹具 |
-
2011
- 2011-06-01 CN CN 201110149476 patent/CN102251523B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN102251523A (zh) | 2011-11-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202169644U (zh) | 先张法预应力混凝土板桩整体式张拉台座 | |
CN103175738A (zh) | 岩石拉伸-剪切试验系统 | |
CN203148781U (zh) | 岩石拉伸-剪切试验系统 | |
CN102251523B (zh) | 拔桩夹具 | |
CN103452313B (zh) | 一种早拆独立支撑条带 | |
CN203487640U (zh) | 逆作法梁柱连接t型节点 | |
CN202273231U (zh) | 一种拔桩夹具 | |
CN201616435U (zh) | 太阳能电池支架 | |
KR101080962B1 (ko) | 형강파일 인발기 | |
US20160218659A1 (en) | Pile, pile installation jig, method for installing the pile, and photovoltaic system using the piles | |
CN206020054U (zh) | 铁路货车的缓冲器压缩量测试工装 | |
CN218376517U (zh) | 一种隧洞加固支护装置 | |
CN207513606U (zh) | 一种用于盾构始发的反力装置 | |
CN209873759U (zh) | 一种移动式桩基施工平台 | |
CN107090830A (zh) | 施打波浪桩设备及施工方法 | |
CN202129741U (zh) | 一种倒拔桩夹具 | |
CN206829139U (zh) | 打桩用导向架 | |
CN215672268U (zh) | 隧道五级围岩导洞支撑机构 | |
CN213163904U (zh) | 一种铁路垫板焊接工装夹具 | |
CN220378313U (zh) | 回撤工作面掩护架的推移装置 | |
CN202471512U (zh) | 可捞式液压盲板拉力试验机 | |
CN213735095U (zh) | 一种水利工程桩基施工用搬运装置 | |
CN212153747U (zh) | 箱型支撑与箱型横梁的连接节点结构 | |
CN217080294U (zh) | 用于建立临时通道的组合式爬梯 | |
CN214626855U (zh) | 用于光伏支架的钢索牵拉结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Zhongrui Inventor after: Zhan Hong Inventor after: Guo Yong Inventor after: Zhu Huaifu Inventor before: Li Zhongrui Inventor before: Zhan Hong |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LI ZHONGRUI ZHAN HONG TO: LI ZHONGRUI ZHAN HONG GUO YONG ZHU HUAIFU |
|
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: 5 building 560, 310012 Xixi Road, Hangzhou, Zhejiang, 506 Applicant after: ZHEJIANG GEOFORE GEOTECHNICAL TECHNOLOGY CO., LTD. Address before: 5 building 560, 310012 Xixi Road, Hangzhou, Zhejiang, 506 Applicant before: Zhejiang Dingfeng Industrial Co.,Ltd. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: ZHEJIANG DINGFENG INDUSTRIAL CO., LTD. TO: ZHEJIANG JIFENG GEOTECHNICAL TECHNOLOGY CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Pile extracting clamp Effective date of registration: 20180608 Granted publication date: 20130424 Pledgee: Bank of Hangzhou Limited by Share Ltd science and Technology Branch Pledgor: ZHEJIANG GEOFORE GEOTECHNICAL TECHNOLOGY CO., LTD. Registration number: 2018330000141 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |