CN102233882A - Lead rail type dual-lead wheel rail transport system - Google Patents

Lead rail type dual-lead wheel rail transport system Download PDF

Info

Publication number
CN102233882A
CN102233882A CN2010101655286A CN201010165528A CN102233882A CN 102233882 A CN102233882 A CN 102233882A CN 2010101655286 A CN2010101655286 A CN 2010101655286A CN 201010165528 A CN201010165528 A CN 201010165528A CN 102233882 A CN102233882 A CN 102233882A
Authority
CN
China
Prior art keywords
wheel
transfer
lead
train
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010101655286A
Other languages
Chinese (zh)
Inventor
张科元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010101655286A priority Critical patent/CN102233882A/en
Publication of CN102233882A publication Critical patent/CN102233882A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention discloses a lead rail type dual-lead high speed railway system with cylindrical treads and independent wheels and a pavement type urban rail transportation system, wherein the lead rail type dual-lead high speed railway system with cylindrical treads and independent wheels is free from derail and rollover by strong wind, and the pavement type urban rail transportation system is a street pedestrian automatic line, solves heavy traffic problem in large cities by using a method for realizing massive industrial production by using automatic industrial production lines, has a distance of only 50-200 m between an entrance and an exit and a transport capacity equal to that of several subways, and is capable of realizing automatic transfer. According to the lead rail type dual-lead wheel rail transport system disclosed by the invention, leading directions and structures of wheel rails are changed since the railway is invented, so that a high speed railway which guarantees passenger-safety first has a structure which is different from that of a low speed railway, an original railway and a modern railway.

Description

Guide tracked dual guiding wheel track traffic system
Technical field
The present invention relates to traffic transporting technology, is a kind of guide tracked dual guiding steel wheel rail formula high speed rail system that does not derail and the footway formula City Rail Transit System that can change to automatically
Technical background
The military train of France's one row on December 12nd, 1917 is overstepped the limit 543 people's death at the tunnel portal place.
April 3 nineteen fifty-five, Mexico's one row train fell into valley, 300 people's death.
On October 6th, 1972, Mexico's one row derailing was caught fire, 208 people's death.
When I learnt design lathe and commercial production automation line in Xi'an Communications University in 1975, frequent oneself squeezing because allow others get on the bus earlier do not get on a bus; When researching and solving the urban traffic congestion, just know: only with wheel edge and rail top friction guiding and only with exceed wheel more than 2 centimetres the circular arc wheel rim and the arc surface at rail top prevent the train that wheel is derailed: not only can " overstep the limit " but also train " crawling " forward not stopping the friction that wigwag motion, steel wheel of train do not stop on the rail on the rail of ground when walking as snake! And unmanned platen and machine tool guideway; Not only do not allow " crawling ", its project organization has just been stopped the possibility of " overstepping the limit ".
The automobile that design is not overturned is very difficult; But, do not allow the train " derailing " that travels on fixing rail be easy to.
Even to this day, the manned train of 21st century, high speed railway train; Why also as original train with the friction guiding, not only allow that it " crawls " but also allows its harm humans life of " overstepping the limit " why!
For solve existing wheel-rail train two wheels be fixed on the axle can't differential, problem such as wheel-rail wear and tear strongly, is easily overstepped the limit and the high maintenance capacity of energy consumption is big; People are developing the independent wheel rolling stock always, but the bad always solution of the guiding problem of independent wheel.
At present, operate on the overpass High-speed Wheel railway that speed per hour is 350 kilometers; Its wheel track structure is the same substantially with the original low speed train of energy " overstepping the limit "; Not only can not guarantee not derail, more can't guarantee when the burst earthquake, not overstep the limit, do not overturn when happening suddenly hurricane.High speed train on overpass is overstepped the limit and to be rolled under the bridge if travel, and loses more serious.
For the transport solution congested problem, the urban track traffics such as having built subterranean railway that spends huge sums of a lot of cities, but the urban traffic blocking problem remains insurmountable world-famous puzzle together so far.
But in commercial production: single and mini-batch production can only mill with the very low car of capacity rating, full, mill waits general machine tool manual operation production (to be equivalent to the city motor bus in the present city traffic, private car, electric car, subway, taxicar, bicycle etc.), can be with semi-automatic conveyor line production when in batches big, only the available automatic production lines of ability is efficient when in enormous quantities, high quality, low cost, automated production; Big more (it is big more to be equivalent to Forecast of Urban Traffic Flow, crowded more) is welcome more in batches.
Summary of the invention
The objective of the invention is: with the alternative friction guiding that has the wheel rail railway now of Roll action-oriented, the guiding problem and the derailing problem guarantee passenger life security of existing railway, the method that utilization solves the commercial production automation line of commercial production problem in enormous quantities that solve independently rotating wheel from structure solve the city traffic congested problem.
The present invention increases track adjusting wheel and increases with existing rail directed parallel track adjusting wheel guiding on the ground and prevent that track adjusting wheel breaks away from the method that the guide tracked flute profile guided way of dual-side is given prominence on the base of guided way on the same steel wheel rail railway transport vehicle bogie truck that utilizes wheel rim and taper tread and traveling steel rail friction guiding of existing and original train, change the basic structure of existing railway track and wheel hub traffic system, the friction guiding of existing wheel rail railway is become the guiding of rolling, and two wheels on the existing railroad train and axle be fixed together can not differential not merely vertical lathe wheel construction make independent wheel construction into, the taper tread of existing wheel is made into cylindrical tread, the rail rail level that contacts with wheel tread is mounted to horizontal surface at linear portion, some contact the becoming line contact between the existing railway track and wheel hub, the existing steel wheel rail railway system that only can derail with wheel rim friction guiding is become guide tracked dual guiding, the dual guide tracked dual guiding that prevents that rolling stock from overstepping the limit, the high speed rail system of not overstepping the limit of independent wheel cylinder tread.
Guide tracked dual guiding wheel track traffic system is used the track switch that guide rail is arranged, still, because the track adjusting wheel of guide tracked dual guiding wheel track traffic system is higher than walking rail rail level, so the method that also can be used in track switch place disconnection guided way is used existing railway switch.
Guide tracked dual guiding wheel track traffic system wheel rim when cruising is that the safe spare guide frame does not only contact with rail with the track adjusting wheel guiding, only travels at existing track and locates no guided way because of track switch during by existing track switch and lead with wheel rim in novel guide tracked dual oriented vehicle.Increase the derailed high speed railway train length of dual guiding and just can improve capacity on a large scale.
The present invention can also adopt the guide tracked dual guiding wheel track traffic system that only the non-independent wheel of existing railway is transformed into independent rotary conic tread wheel, guide tracked dual guiding wheel track vehicle can be travelled on existing railroad track, and existing railroad train also can travel on guide tracked dual guiding wheel track traffic track.
The present invention can also adopt only increases by 4 track adjusting wheels on existing railroad train bogie truck, increase the flute profile guided way in existing railroad track both sides, disconnects the guide tracked dual guiding wheel track traffic system of guided way at the track switch place; Because wheel is the bogie truck side travel relatively, also gapped between running wheel wheel rim and the traveling steel rail, so guide tracked dual guiding wheel track traffic system not only can dually lead, track adjusting wheel does not contact with guided way when cruising but also can adopt; By the operation scheme operation of the existing railway system, the just existing High-speed Wheel railway system of track adjusting wheel and flute profile guided way ensures the safety facilities that must be equipped with that passenger's person is perfectly safe fully.
In the city, method with the commercial production automation line is designed to the derailed high speed railway track of dual guiding to go in ring, train and platform are lengthened to the same long annular with track from beginning to end, annular over long train from beginning to end is a stop spacing (1000 meters) on circular orbit, the platform that just becomes to overtake of a stop spacing (1000 meters) also is the footway, what also there was a platform function on the footway, street can be provided with small station that the passenger the imports and exports footway formula City Rail Transit System apart from the big dual guiding of capacity arbitrarily, and available shortening train length and the capacity of dwindling the method mediator trade formula City Rail Transit System of train width significantly reduce construction investment; Also can be on the endless track of footway formula City Rail Transit System synchronized operation multiple row the urban rail transit vehicles that can arbitrarily extend and shorten by the operation scheme operation of existing urban track traffic the same with existing track train.
The track adjusting wheel of footway formula City Rail Transit System or road wheel and track adjusting wheel also can be used rubber tire, it is characterized in that: the bogie truck bottom have the one group of guiding wheels bogie truck top that can lead separately also have one group can independent pilot the guiding wheels, can two groups during train driving track adjusting wheel dual guiding or only allow wherein one group of another group that leads is standby and anti-overturning track adjusting wheel simultaneously.
Having on the long platform of footway formula of footway formula City Rail Transit System gets on the bus from here can arrive the somewhere and just in time can arrive the sign in certain place in certain four corners park and shift direction; On each compartment of train of a stop spacing long (1000 meters), also there is this compartment to stop, just in time can be parked in a certain certain transfer place of four corners and can changes to the sign in certain certain place of direction in the somewhere;
Footway formula City Rail Transit System also can build up S. A. transfer footway formula City Rail Transit System; S. A. transfer footway formula City Rail Transit System at flyover crossing because circuit intersects 2 place's transfers place in each the grade separation angle that forms all picks and be positioned at an intersection angle, the transfer passenger's of two-layer two transfers place transfer car about being in about riding on the two-layer vehicle of both direction in length and breadth; Bilevel two transfers place circulation in a grade separation angle of transfer car is travelled; Article two, form 4 grade separation angle 8 place's transfers place when the circuit solid intersects.
The passenger is exactly the transfer train that circulates and travel between lower floor's longitudinal driving train transfer and upper strata cross running train transfer place in a grade separation angle from the train of the lower floor's longitudinal driving back platform another side of getting off, the passenger is after come into the transfer train of platform another side after the train of lower floor's longitudinal driving is got off, the transfer train reached the fixedly arc track that docks with movable rail after the transfer train rose to the cross running train station of last layer from lower floor's longitudinal driving platform earlier together with its following movable rail from movable rail, drive to along arc track on the liftable movable rail of one deck longitudinal driving station console under dropping on the horizontal running train platform, after the passenger of transfer cross running train gets off and gets off the passenger loading of transfer lower floor longitudinal driving train from horizontal train; The transfer train drops to lower floor from the upper strata again, drive to after the rising on the lower floor longitudinal driving railway platform limit again on the liftable movable rail of reposition along lower floor's arc track again, after the passenger of transfer longitudinal driving train got off and gets off to change to the passenger loading of cross running train from the longitudinal driving train, the transfer train rose to the cross running railway platform of last layer once more together with its following liftable movable rail.
Footway formula City Rail Transit System also can build up street pedestrian's automation line formula City Rail Transit System of automatic transfer; S. A. transfer needs the passenger to stand up to pick up from the seat in the railway car of longitudinal driving to come in the compartment of special transfer train after the retinue article are got off again, in the compartment of transfer train, come out of again, be sitting on the seat of cross running train in the railway car of the cross running into of going further;
Automatically the automatic transfer of street pedestrian's automation line formula City Rail Transit System of transfer resembles freight container traffic, the transfer passenger is sitting in can be on the train that both direction in length and breadth travels and in the general movable transfer compartment that loads and unloads on the special-purpose transfer train, and transfer place of getting on or off the bus of 8 places at flyover crossing place has the special-purpose crane in the general movable transfer of loading and unloading compartment.
Passenger and general transfer compartment together from the train of longitudinal driving by special-purpose crane lifting to special transfer train, again from transfer train lifting (transfer) to the train of cross running, change on the pedestrian's automation line of another street from a street pedestrian automation line;
On the special-purpose crane in special loading and unloading transfer compartment two row suspenders (suspension hook) are arranged, row are unloaded, and one equips car, before the transfer compartment of lower floor's longitudinal driving arrives transfer station; Existing unloading down from last layer cross running train waited for and installed to the transfer compartment that lower floor's longitudinal driving train gets on the entrucking suspender, after transfer compartment on lower floor's longitudinal driving train arrives at a station, the suspender of unloading unloads immediately will change to the transfer compartment that goes on the last layer cross running train, the entrucking suspender is loaded onto the transfer compartment of unloading the lower floor's longitudinal driving train that will change the outfit from last layer cross running train down immediately, and the suspender of unloading will be changed to the transfer compartment that the horizontal running train of last layer goes and installs on the transfer train that is parked on the liftable movable guiding rail unloading down from vertical train again.
Automatically transfer also can be used quick loading and unloading transfer compartment method: if original every parking once earlier from train unload 6 joint transfers can loading and unloading activity compartment after load onto 6 joint transfers more in situ can loading and unloading activity compartment, only change to 3 joint compartments when loading and unloading are changed to fast at every turn, three save the compartment vacancies in addition, in the 3 joint transfer compartments on unloading train, vacancy ON TRAINS loads onto 3 joint transfer compartments, loading and unloading are carried out simultaneously, and the vacancy that discharges the compartment drives to next transfer place and refills the compartment.
The also available linear motor driving of the present invention is characterized in that: be fixed on ground-surface linear motor stator electric and be positioned on the fixing linear motor rotor ON TRAINS, the attractive force between linear motor stator electric and the mover is become the upwards attractive force that alleviates the weight of train.
On June 6th, 1981, the hurricane row train that India Bihar nation is domestic scrapes in the river, has seized 800 people's life.
On June 3rd, 1998, the 101 people's death of derail accident have taken place in German ICE884 the high speed train that is left for Chinese guarantor by Munich when near the small town Ai Shede that moves to Hanover's northeastward.
Sri Lanka's derailing death by accident number that on December 26th, 2004, tsunami caused is estimated about 1700 people.
On April 25th, 2005, list more than 580 passenger's train generation derailment accident of Niqi City, Hyogo Prefecture, Japan one has 3 joints to overstep the limit in the 7 joint compartments, and rush in roadside block of flats bottom under the powerful inertia effect, and 107 people are murdered.
In morning on April 28th, 2008, the Chinese Jiaozhou-Jinan railway generation passenger train derailing collision major traffic accidents that topple cause 72 people's death, 416 people injured.
The invention solves the derailing problem that train has existed always since birth, can ensure that passenger safety, protection railway traffic exempt from derailing and damage vehicle and rail, stop the generation of operation accident.
The high speed railway train of 350 kilometers of speed per hours particularly; Should be structurally different with the common railway train, must be more safer than ordinary train, should use of the present invention guide tracked dual guiding railway traffic system!
The investment of building the High-speed Wheel traffic system is very big, overhead non-fragment orbit damages the back and repairs difficulty, the simplest embodiment of the present invention does not only influence safe track adjusting wheel that train travels, only increases by 2 in existing ground rail both sides and do not influence the safe guided way that existing train passes through increasing by 4 on the existing train bogie truck on existing track, be the safety component of existing bullet train guarantee passenger, train, track and the roadbed safety that must have.
Description of drawings
Fig. 1 is guide tracked dual guiding wheel track traffic system structural representation.
Fig. 2 is the guide tracked dual guiding wheel track traffic system structural representation with linear motor driving.
Fig. 3 is the footway formula City Rail Transit System scheme drawing of guide tracked dual guiding.
Fig. 4 is the automatic and S. A. transfer scheme drawing of City Rail Transit System.
Fig. 5 is the S. A. transfer structural representation of the special-purpose transfer of flyover crossing train at lower floor's longitudinal driving railway platform.
Fig. 6 is the S. A. transfer structural representation of the special-purpose transfer of flyover crossing train at upper strata cross running railway platform.
Fig. 7 is footway, the Xi'an formula urban track traffic line scheme drawing of revising according to Xi'an urban rapid railway arteries of communication.
Number in the figure: the flute profile guided way of the outstanding dual-side in 1 base, 2 track adjusting wheels, the 3 formula elastic rail fastenings that unroll, 4 live axles, 5 road wheels, 6 bogie trucks, 7 guided way cushions, 8 walking rails, 9 linear electric motors fixed poles (stator or rotor), 10 linear electric motors move the utmost point (rotor or stator), 11 footway formula urban railway transit trains, 12 shielded gates, the long platform stair of 13 turnover footway formulas, the long platform of 14 footway formulas, 15 movable rail, 16 transfer car hoist cylinders, 17 transfer car wheels, 18 chains, 19 pulleys, 20 cranes, 21 crane guide wheels, 22 transfer car compartments, 23 crane guide rails, 24 transfer car lower floor trapped orbits, 25 transfer car upper strata trapped orbits, the footway formula urban railway transit train of 26 cross runnings, horizontal footway, 27 upper stratas formula platform, the footway formula urban railway transit train of 28 longitudinal drivings, passenger's transfer place on 29 lower floors vertical footway formula platform.
The specific embodiment
One, No. two lines of Beijing Metro are crowded, and a subway is intended building in Beijing again below the Subway Line 1.
If one, No. two lines of Beijing Metro are transformed into footway formula subway traffic system; Just can improve capacity.
As shown in Figure 3, when enforcement is of the present invention in city traffic, can be the reduced width in compartment 11 to the same with mid-get car 1.5 meters wide, can grow because of the train on its closed circuit and to link to each other the same with circuit longly end to end, its capacity is the suitable capacity of several existing subways also; And 1.5 meters wide trains add that the circular tunnel of 5.4 meters of 2 meters wide footway formula platform 14 its overall widths and existing 4.3 meters wide rectangle subway tunnel and internal diameters is about the same wide; Only increase makes things convenient for the passenger to pass in and out the turnover exit of footway formula subway nearby, just can be transformed into footway formula subway traffic system shown in Figure 3 to existing city underground.
Footway formula subway platform 14 can have only 2 meters wide to be because the passenger is distributed on the total length of whole circuit, and its turnover exit spacing can be set to and has only 50 to 100 meters, the passenger need not mind how you go hundreds of rice and concentrate a place to get on or off the bus, and can attract the passenger who takes ground traffic tools to take underground pedestrian walk formula subway.
Complete shielded gate 12 shielding train and train noise must be arranged on the footway formula subway platform 14.
Footway formula subway is because of its whole piece circuit synchronized operation, and available transmission line of electricity automatic guidance train is realized driverless operation.
Because line of Beijing Metro is not a ring; Along the line increase the turnover exit by 100 meters or 200 meters spacings in, need be the line of turning back at two ends being transformed into belt or on circuit terminal point circus reentry line ground, also building an annular residential quarter or annular satellite city.

Claims (10)

1. guide tracked dual guiding wheel track traffic system, by car body, bogie truck, with fixed axle by the non-independent wheel of guiding wheel rim and taper tread be installed in ground and cooperate the traveling steel rail that leads of rubbing etc. to form with running wheel taper tread and wheel rim, it is characterized in that: track adjusting wheel is arranged on the bogie truck, guiding track adjusting wheel guiding is arranged on the ground and prevent that track adjusting wheel breaks away from the flute profile guided way of the outstanding dual-side in base of guided way, lead with guided way with track adjusting wheel during train driving and lead.
2. guide tracked dual guiding wheel track traffic system according to claim 1 is characterized in that: gapped between track adjusting wheel on the bogie truck and the ground guided way, lead with wheel rim and traveling steel rail during train driving.
3. according to claim 1 have guiding wheel rim and taper tread non-independent wheel be independently rotating wheel, it is characterized in that: gapped between wheel rim and the traveling steel rail, lead with track adjusting wheel during the train walking.
4. the independently rotating wheel that guiding wheel rim and taper tread are arranged according to claim 3, wheel tread is cylindrical, the traveling steel rail rail level is a horizontal surface at linear portion, it is characterized in that: gapped between wheel rim and the traveling steel rail, lead with track adjusting wheel during the train walking.
5. according to claim 1,2,3,4 described guide tracked dual guiding wheel track traffic systems, use linear motor driving, it is characterized in that: be fixed on ground-surface linear motor stator electric and be positioned on the fixing linear motor rotor ON TRAINS.
6. a passenger is in flyover crossing S. A. transfer method, it is characterized in that: 2 place's transfers place in each grade separation angle that flyover crossing forms owing to circuit intersects are all picked and are positioned at an intersection angle, ride in the transfer car of the transfer passenger of two-layer two transfers place about being on the two-layer vehicle of both direction in length and breadth up and down; Bilevel two transfers place circulation in a grade separation angle of transfer car is travelled.
7. a passenger changes to method automatically at flyover crossing, 2 place's transfers place in each grade separation angle that flyover crossing forms owing to circuit intersects are all picked and are positioned at an intersection angle, ride in the transfer car of the transfer passenger of two-layer two transfers place about being on the two-layer vehicle of both direction in length and breadth up and down; Bilevel two transfers place circulation in a grade separation angle of transfer car is travelled; It is characterized in that: the transfer passenger is sitting in the general movable transfer compartment that can load and unload on the vehicle that both direction in length and breadth travels and on the transfer car, and 2 place's transfers place each grade separation angle in all have the general movable special-purpose crane of changing to the compartment of loading and unloading.
8. the special-purpose crane in the general movable transfer of loading and unloading according to claim 7 compartment is characterized in that: two row suspenders are arranged on the crane, and row are unloaded, and one equips car, unload and entrucking can be carried out synchronously.
9. one kind is used claim 1,6,7 footway formula City Rail Transit System, its circuit goes in ring or the line of turning back at circuit two ends is annulars, vehicle folk prescription on the line comes and goes to circulation, and it is characterized in that: the platform of getting on or off the bus is the same with circuit long, the vehicle synchronized operation on the circuit.
10. the road wheel of footway according to claim 8 formula City Rail Transit System and track adjusting wheel are used rubber tire, it is characterized in that: one group of track adjusting wheel that can lead is separately arranged at the bogie truck bottom, and the guiding wheels of one group of energy independent pilot are also arranged at bogie truck top.
CN2010101655286A 2010-05-07 2010-05-07 Lead rail type dual-lead wheel rail transport system Pending CN102233882A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101655286A CN102233882A (en) 2010-05-07 2010-05-07 Lead rail type dual-lead wheel rail transport system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101655286A CN102233882A (en) 2010-05-07 2010-05-07 Lead rail type dual-lead wheel rail transport system

Publications (1)

Publication Number Publication Date
CN102233882A true CN102233882A (en) 2011-11-09

Family

ID=44885119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101655286A Pending CN102233882A (en) 2010-05-07 2010-05-07 Lead rail type dual-lead wheel rail transport system

Country Status (1)

Country Link
CN (1) CN102233882A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114872A (en) * 2012-12-11 2013-05-22 广东安元矿业技术服务有限公司 Steeply-inclined track lifting and transporting method
CN103523025A (en) * 2013-10-31 2014-01-22 戴长虹 Intercity aerial rail transit system
CN104074108A (en) * 2014-06-16 2014-10-01 刘国良 High-speed rail with trajectory
CN104590285A (en) * 2013-10-31 2015-05-06 戴长虹 Aerial monorail train traffic system
CN105083304A (en) * 2015-05-07 2015-11-25 芜湖科达新铭丰机电有限公司 Wheel of cutting conveying vehicle
CN105197051A (en) * 2015-10-16 2015-12-30 南车资阳机车有限公司 Anti-derailment rubber wheel for railway vehicle
CN106149943A (en) * 2015-04-27 2016-11-23 吴志勇 A kind of stacked slide switching apparatus for building with Wind-proof mechanism
CN107321010A (en) * 2017-06-29 2017-11-07 潍坊汇晟环保设备有限公司 A kind of three-dimensional scraping and sucking machine
WO2018054012A1 (en) * 2016-09-21 2018-03-29 比亚迪股份有限公司 Rail vehicle
WO2018054008A1 (en) * 2016-09-21 2018-03-29 比亚迪股份有限公司 Rail vehicle
CN108974020A (en) * 2017-05-31 2018-12-11 上海地捷科技有限公司 rail system
CN109484424A (en) * 2018-11-19 2019-03-19 中车长春轨道客车股份有限公司 A kind of independent wheel bogie of linear motor driving

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1417088A (en) * 1921-02-24 1922-05-23 Peyton L Mathews Railway
US1697636A (en) * 1927-10-26 1929-01-01 Horace M Dobbins Duplex monorail
US3906866A (en) * 1974-05-23 1975-09-23 Pullman Inc Traction power rail module
CN1599676A (en) * 2001-05-25 2005-03-23 瓦尔特·索博列夫斯基 Multipurpose vehicle for various types of travel ways
CN1784328A (en) * 2003-05-07 2006-06-07 浦项钢铁 Guideway and chassis system for wheel based rail running vehicle

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1417088A (en) * 1921-02-24 1922-05-23 Peyton L Mathews Railway
US1697636A (en) * 1927-10-26 1929-01-01 Horace M Dobbins Duplex monorail
US3906866A (en) * 1974-05-23 1975-09-23 Pullman Inc Traction power rail module
CN1599676A (en) * 2001-05-25 2005-03-23 瓦尔特·索博列夫斯基 Multipurpose vehicle for various types of travel ways
CN1784328A (en) * 2003-05-07 2006-06-07 浦项钢铁 Guideway and chassis system for wheel based rail running vehicle

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114872A (en) * 2012-12-11 2013-05-22 广东安元矿业技术服务有限公司 Steeply-inclined track lifting and transporting method
CN103523025A (en) * 2013-10-31 2014-01-22 戴长虹 Intercity aerial rail transit system
CN104590285A (en) * 2013-10-31 2015-05-06 戴长虹 Aerial monorail train traffic system
CN104074108A (en) * 2014-06-16 2014-10-01 刘国良 High-speed rail with trajectory
CN104074108B (en) * 2014-06-16 2016-07-20 刘国良 Trajectory high ferro
CN106149943A (en) * 2015-04-27 2016-11-23 吴志勇 A kind of stacked slide switching apparatus for building with Wind-proof mechanism
CN106149943B (en) * 2015-04-27 2019-01-04 吴志勇 A kind of stacked slide switching apparatus for building with Wind-proof mechanism
CN105083304A (en) * 2015-05-07 2015-11-25 芜湖科达新铭丰机电有限公司 Wheel of cutting conveying vehicle
CN105197051A (en) * 2015-10-16 2015-12-30 南车资阳机车有限公司 Anti-derailment rubber wheel for railway vehicle
WO2018054012A1 (en) * 2016-09-21 2018-03-29 比亚迪股份有限公司 Rail vehicle
WO2018054008A1 (en) * 2016-09-21 2018-03-29 比亚迪股份有限公司 Rail vehicle
US11279381B2 (en) * 2016-09-21 2022-03-22 Byd Company Limited Rail vehicle
US11285978B2 (en) 2016-09-21 2022-03-29 Byd Company Limited Rail vehicle
CN108974020A (en) * 2017-05-31 2018-12-11 上海地捷科技有限公司 rail system
CN107321010A (en) * 2017-06-29 2017-11-07 潍坊汇晟环保设备有限公司 A kind of three-dimensional scraping and sucking machine
CN107321010B (en) * 2017-06-29 2020-07-24 潍坊汇晟环保设备有限公司 Three-dimensional mud scraping and sucking machine
CN109484424A (en) * 2018-11-19 2019-03-19 中车长春轨道客车股份有限公司 A kind of independent wheel bogie of linear motor driving

Similar Documents

Publication Publication Date Title
CN102233882A (en) Lead rail type dual-lead wheel rail transport system
CN107161159B (en) Air bus system with elevator type car combination
US8375865B2 (en) Overhead suspended personal transportation and freight delivery surface transportation system
CN102951160A (en) Overhead rail transit system
CN102730011B (en) Monorail suspension type dual-power electric bus
CN201951460U (en) Suspension type rail transit system
RU2321510C2 (en) Transport system
CN101992780A (en) Air public transportation method
CN101581064B (en) Separated type highway with lanes
CN105523047A (en) Low-level suspension type single-rail railcar
US11364940B1 (en) Adaptive route rail system with passive switches
CN102730004A (en) Overhead type public traffic operation scheme
CN103043133A (en) Expressway clearer vehicle
CN208469803U (en) Rail system suitable for station
CN106828517B (en) Split type electric rail car
WO2011021213A2 (en) Elevated transport system
WO2008126101A1 (en) A track switching system for an elevated suspended coach transportation system
WO2016038621A1 (en) Traveling roads, conveyer belt roads and future railways improved
CN103264698A (en) Multifunctional composite rapid railway transport vehicle and system for carrying vehicles
NL1035873C (en) TRANSPORT SYSTEM WITH A TRACK HANGED AT A DISTANCE ABOVE A GROUND AND A NUMBER OF TRANSPORT UNIT MOVABLE.
CN106114529A (en) One-stop microlight-type electric urban Rail Transit System
CN108860175A (en) A kind of sky rail traction mechanism and its interior traffic method of standing
CN206327353U (en) Trolley electric car passenger conveyor system
CN212353963U (en) Frontier defense transportation patrol system
CN203611980U (en) Multifunctional composite fast track traffic vehicle and system capable of carrying vehicles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
DD01 Delivery of document by public notice

Addressee: Zhang Keyuan

Document name: the First Notification of an Office Action

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20111109