CN102198695A - 箱梁外膜之外侧模的纵向移动方法 - Google Patents

箱梁外膜之外侧模的纵向移动方法 Download PDF

Info

Publication number
CN102198695A
CN102198695A CN 201110097870 CN201110097870A CN102198695A CN 102198695 A CN102198695 A CN 102198695A CN 201110097870 CN201110097870 CN 201110097870 CN 201110097870 A CN201110097870 A CN 201110097870A CN 102198695 A CN102198695 A CN 102198695A
Authority
CN
China
Prior art keywords
side form
die
outside
girder
walking frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201110097870
Other languages
English (en)
Other versions
CN102198695B (zh
Inventor
徐建宏
吴承张
钱明剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 24th Bureau Group Co Ltd
Guixi Bridge Factory Co Ltd of China Railway 24th Bureau Group Co Ltd
Original Assignee
China Railway 24th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 24th Bureau Group Co Ltd filed Critical China Railway 24th Bureau Group Co Ltd
Priority to CN2011100978701A priority Critical patent/CN102198695B/zh
Publication of CN102198695A publication Critical patent/CN102198695A/zh
Application granted granted Critical
Publication of CN102198695B publication Critical patent/CN102198695B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明属于桥梁类,具体涉及一种用于箱梁施工的箱梁外膜之外侧模的纵向移动方法。所述外侧模利用液压式或机械式的升降装置完成其升降动作,其特征在于所述纵向移动方法采用如下步骤:在所述外侧模下方事先平行铺设好用于移模台车移动的移模双轨;从外膜上分离外侧模,收起千斤顶,利用所述的升降装置将所述外侧模下降落入移模台车上;最后利用卷扬机拖动移模台车,将外侧模拖拉至下一个制梁台座上。其优点是:采用人工采用卷杨机对外侧模进行纵移,减少制梁区内设备交叉作业的相互干扰影响;同时可以实现两个制梁台采用一套钢模,成本摊销增加一倍,不影响一个制梁台的周转速度,同时钢模数只需制梁台数的一半就可以满足工作需求,大大降低了制梁成本。

Description

箱梁外膜之外侧模的纵向移动方法
 
技术领域
本发明桥梁类,具体涉及一种用于箱梁施工的箱梁外膜之外侧模的纵向移动方法。
背景技术
目前国内外箱梁外侧模有相当多制梁场采用一个制梁台一套外侧模固定式,外侧模支撑在刚性基础上,用正、反扣螺旋升降进行安装及脱模,这样箱梁移至存梁台座上必须采用搬运机吊装提梁方式,虽表面上提高了工效,但增加搬运机与制梁区门吊之间相互干扰影响的概率,同时钢模摊销成本增大。而如今制梁单价在降造之后已无多少利润。
发明内容
本发明的目的是根据上述现有技术的不足之处,提供一种箱梁外膜之外侧模的纵向移动方法,该方法通过在外膜下方设置纵向移动装置,减少制梁区内设备交叉作业的相互干扰影响,同时可以实现一个制梁台采用一套钢模,成本摊销增加一倍。
本发明目的实现由以下技术方案完成:
一种箱梁外膜之外侧模的纵向移动方法,所述外侧模利用液压式或机械式的升降装置完成其升降动作,其特征在于所述纵向移动方法采用如下步骤:在所述外侧模下方事先平行铺设好用于移模台车移动的移模双轨;从外膜上分离外侧模,收起千斤顶,利用所述的升降装置将所述外侧模下降落入移模台车上;最后利用卷扬机拖动移模台车,将外侧模拖拉至下一个制梁台座上。
所述的移模台车中设置有两个走行架,两个走行架分别位于两根轨道上,每个走行架下方至少设置两部走行小车,用于走行架的支承和移动,走行小车位于轨道之上,两个走行架之间通过支承梁连接固定。
所述支承梁包括横向支承梁和斜撑支承梁,其中在所述走行架前、后端部分别设置横向支承梁,并沿与走行架垂直方向设置,在所述横向支承梁之间设置交叉放置的斜撑支承梁。
所述走行架的前端与横向支承梁上方平行设有导梁,用于所述移模台车内外侧平衡。
所述在走行架的前端设置有定位槽,用于导梁的定位安装。
所述的移梁台车在每条轨道上设置的数量可不止一台。
本发明的优点是,本发明采用人工采用卷杨机对外侧模进行纵移,减少制梁区内设备交叉作业的相互干扰影响,同时可以实现两个制梁台采用一套钢模,成本摊销增加一倍,不影响一个制梁台4-5天周期的周转速度,同时钢模数只需制梁台数的一半就可以满足工装需求,大大降低了制梁成本。
附图说明
附图1为本发明外膜及走行小车安装结构示意图;
附图2为本发明移模台车主视图;
附图3为本发明移模台车俯视图。
具体实施方式
以下结合附图通过实施例对本发明特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解:
如图1-3所示,标号1-3分别表示:外侧模1、螺旋千斤顶2、导梁3、走行架4、连接工字钢5、走行架6、连接工字钢7、斜撑角钢8、9、走行小车10、11、12、13。
参见附图:本实施例中移模台车中设置有两个走行架(走行架4、走行架6),走行架4和走行架6分别位于两根轨道上,走行架4和走行架6下方各自设置两部走行小车(分别是走行小车10、11、12、13),用于走行架的支承和移动,走行小车10、11、12、13位于轨道之上,走行架4和走行架6之间通过支承梁连接固定。支承梁包括横向支承梁和斜撑支承梁,其中在走行架4和走行架6前、后端部分别设置连接工字钢5和连接工字钢7,并沿与走行架垂直方向设置,在连接工字钢5和连接工字钢7之间设置交叉放置的斜撑角钢8、9。走行架4和走行架6的前端与连接工字钢5上方平行设有导梁3,同时在走行架4和走行架6的前端设置有定位槽,用于导梁3的定位安装。导梁3的作用有两个:一个是在安装、拆除侧模时,螺旋千斤顶作业受力横梁,保证侧模内、外侧平衡;另一个是在侧模纵向移动时,保证内、外导向轮走行一致。
结合上述的装置结构,以下对于本实施例的具体实施步骤进行详细描述:
1、安装模板前,要先把移模小车的走行小车10、11、12、13先安装好,摆在预先铺设轨道相应的位置。
2、安装前检查走行小车10、11、12、13的走行轮是否活动自如,把走行架4放在已铺设好的走行钢轨上。用螺栓把连接工字钢5和7与走行架4连接,然后安装斜撑角钢8、9,上螺栓,接下来把所有螺栓紧固,用卷尺检查安装后的尺寸,推动走行小车(10、11、12、13)在钢轨上滑动,检查是否能往来滑动,把导梁3放在限位糟里,注意两端连接孔,纵向间距小的一端在内侧;
3、拆外侧模1时,先拆底模与外侧模1的联结螺栓,收起螺旋千斤顶2,外侧模1的顶升油缸下降,纵移式外侧模1整体脱模落在四台移模走行小车10、11、12、13上,外侧模1的油缸带动模板横移,用卷扬机分别拖动单边整体外侧模在两条预先铺设好的轨道上拖拉到下一个制梁台座上,一般采用两个台座共用一套箱梁内外模。

Claims (6)

1.一种箱梁外膜之外侧模的纵向移动方法,所述外侧模利用液压式或机械式的升降装置完成其升降动作,其特征在于所述纵向移动方法采用如下步骤:在所述外侧模下方事先平行铺设好用于移模台车移动的移模双轨;从外膜上分离外侧模,收起千斤顶,利用所述的升降装置将所述外侧模下降落入移模台车上;最后利用卷扬机拖动移模台车,将外侧模拖拉至下一个制梁台座上。
2.根据权利要求1所述的一种箱梁外膜之外侧模的纵向移动方法,其特征在于所述的移模台车中设置有两个走行架,两个走行架分别位于两根轨道上,每个走行架下方至少设置两部走行小车,用于走行架的支承和移动,走行小车位于轨道之上,两个走行架之间通过支承梁连接固定。
3.根据权利要求2所述的一种箱梁外膜之外侧模的纵向移动方法,其特征在于所述支承梁包括横向支承梁和斜撑支承梁,其中在所述走行架前、后端部分别设置横向支承梁,并沿与走行架垂直方向设置,在所述横向支承梁之间设置交叉放置的斜撑支承梁。
4.根据权利要求2所述的一种箱梁外膜之外侧模的纵向移动方法,其特征在于所述走行架的前端与横向支承梁上方平行设有导梁,用于所述移模台车内外侧平衡。
5.根据权利要求4所述的一种箱梁外膜之外侧模的纵向移动方法,其特征在于所述在走行架的前端设置有定位槽,用于导梁的定位安装。
6.根据权利要求1所述的一种箱梁外膜之外侧模的纵向移动方法,其特征在于所述的移梁台车在每条轨道上设置的数量可不止一台。
CN2011100978701A 2011-04-19 2011-04-19 箱梁外模之外侧模的纵向移动方法 Active CN102198695B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100978701A CN102198695B (zh) 2011-04-19 2011-04-19 箱梁外模之外侧模的纵向移动方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100978701A CN102198695B (zh) 2011-04-19 2011-04-19 箱梁外模之外侧模的纵向移动方法

Publications (2)

Publication Number Publication Date
CN102198695A true CN102198695A (zh) 2011-09-28
CN102198695B CN102198695B (zh) 2012-11-14

Family

ID=44659812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100978701A Active CN102198695B (zh) 2011-04-19 2011-04-19 箱梁外模之外侧模的纵向移动方法

Country Status (1)

Country Link
CN (1) CN102198695B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102528910A (zh) * 2011-12-23 2012-07-04 中铁十九局集团第五工程有限公司 预制简支箱梁的模板系统
CN105014774A (zh) * 2015-08-05 2015-11-04 广东省水利水电第三工程局有限公司 预制箱梁模板
CN105568858A (zh) * 2015-12-26 2016-05-11 黑龙江省龙建路桥第三工程有限公司 大体积箱梁腹模板辅助振捣装置及振捣方法
CN105735141A (zh) * 2016-05-05 2016-07-06 中铁上海工程局集团有限公司 一种箱梁侧模滑移装置及其施工方法
CN105856392A (zh) * 2016-04-18 2016-08-17 中铁七局集团郑州工程有限公司 一种城轨u型梁外模开合方法
CN107268448A (zh) * 2017-07-28 2017-10-20 中铁十局集团第四工程有限公司 一种支架现浇混凝土连续梁的模板拆除及安装装置
CN108316156A (zh) * 2018-04-18 2018-07-24 中铁十九局集团第七工程有限公司 移动模板及其施工方法
CN114193607A (zh) * 2021-12-16 2022-03-18 中铁三局集团广东建设工程有限公司 一种预制箱梁可移动钢筋绑扎胎具
CN118269220A (zh) * 2024-06-04 2024-07-02 山东鲁中公路建设有限公司 一种预制t梁模板移动台座

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000017883A (ko) * 1999-12-27 2000-04-06 김근택 아이엘엠용 피씨박스거더 교량제작 거푸집 시스템 및 이를이용한 세그멘트 제작방법
CN101333801A (zh) * 2007-06-25 2008-12-31 中铁二十局集团有限公司 装配式支架原位现浇制梁施工方法
CN101509230A (zh) * 2009-03-10 2009-08-19 武汉众磊工程机械技术有限公司 叠梁下行式移动模架造桥机
CN201347538Y (zh) * 2008-12-04 2009-11-18 中铁大桥局股份有限公司 钢-混凝土组合梁的整体活动式支架
CN201406638Y (zh) * 2009-05-04 2010-02-17 中铁二十二局集团第六工程有限公司 滑移式混凝土现浇梁外模结构
CN101929130A (zh) * 2010-09-19 2010-12-29 中铁十二局集团有限公司 连续箱梁合拢段施工的挂篮装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20000017883A (ko) * 1999-12-27 2000-04-06 김근택 아이엘엠용 피씨박스거더 교량제작 거푸집 시스템 및 이를이용한 세그멘트 제작방법
CN101333801A (zh) * 2007-06-25 2008-12-31 中铁二十局集团有限公司 装配式支架原位现浇制梁施工方法
CN201347538Y (zh) * 2008-12-04 2009-11-18 中铁大桥局股份有限公司 钢-混凝土组合梁的整体活动式支架
CN101509230A (zh) * 2009-03-10 2009-08-19 武汉众磊工程机械技术有限公司 叠梁下行式移动模架造桥机
CN201406638Y (zh) * 2009-05-04 2010-02-17 中铁二十二局集团第六工程有限公司 滑移式混凝土现浇梁外模结构
CN101929130A (zh) * 2010-09-19 2010-12-29 中铁十二局集团有限公司 连续箱梁合拢段施工的挂篮装置

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102528910A (zh) * 2011-12-23 2012-07-04 中铁十九局集团第五工程有限公司 预制简支箱梁的模板系统
CN105014774A (zh) * 2015-08-05 2015-11-04 广东省水利水电第三工程局有限公司 预制箱梁模板
CN105568858A (zh) * 2015-12-26 2016-05-11 黑龙江省龙建路桥第三工程有限公司 大体积箱梁腹模板辅助振捣装置及振捣方法
CN105856392A (zh) * 2016-04-18 2016-08-17 中铁七局集团郑州工程有限公司 一种城轨u型梁外模开合方法
CN105735141A (zh) * 2016-05-05 2016-07-06 中铁上海工程局集团有限公司 一种箱梁侧模滑移装置及其施工方法
CN107268448A (zh) * 2017-07-28 2017-10-20 中铁十局集团第四工程有限公司 一种支架现浇混凝土连续梁的模板拆除及安装装置
CN108316156A (zh) * 2018-04-18 2018-07-24 中铁十九局集团第七工程有限公司 移动模板及其施工方法
CN108316156B (zh) * 2018-04-18 2023-10-03 中铁十九局集团广州工程有限公司 移动模板及其施工方法
CN114193607A (zh) * 2021-12-16 2022-03-18 中铁三局集团广东建设工程有限公司 一种预制箱梁可移动钢筋绑扎胎具
CN118269220A (zh) * 2024-06-04 2024-07-02 山东鲁中公路建设有限公司 一种预制t梁模板移动台座

Also Published As

Publication number Publication date
CN102198695B (zh) 2012-11-14

Similar Documents

Publication Publication Date Title
CN102198695B (zh) 箱梁外模之外侧模的纵向移动方法
CN201003145Y (zh) 上行自行式移动模架
CN101880006B (zh) 固定式回转起重机用滚装装置及滚装方法
CN101260650A (zh) 50m/1430t双幅整体箱梁架设工艺
CN101624164B (zh) 用于机组发电机定子的吊装工法及其专用机构
CN100424322C (zh) 全圆一次衬砌分离式导梁模板台架及其施工方法
CN109304795A (zh) T梁液压滑动模型及操作方法
CN104453951B (zh) 组合式地铁车站衬砌模板台车
CN106468041B (zh) 一种有关铺轨机行进过程自动变跨装置及变跨方法
CN203247031U (zh) 遮板运输吊装装置
CN103352425A (zh) 桥梁整体驮运的精确定位方法及定位装置
CN101885206A (zh) 高速铁路预制箱梁液压内模桁架式行走轨系统
CN202391104U (zh) 便捷式有轨滑模
CN202064281U (zh) 一种滑模模架
CN202401753U (zh) 一种滑模装置
CN203419675U (zh) 用于提梁机的行车轨道
CN206635657U (zh) 一种对称架梁式架桥机
CN206625845U (zh) 一种仰拱栈桥
CN106192761B (zh) 一种在桥隧狭短过渡段拆解移动模架的方法
CN202092861U (zh) 集成小车式电动葫芦试验台
CN202429920U (zh) 一种多小车双主梁龙门起重机
CN102001127B (zh) 组合箱梁液压内模
CN201776835U (zh) 高速铁路预制箱梁液压内模销装液压机构
CN207919265U (zh) 适用于钢桁梁桥上套轨板式无砟轨道铺板机
CN203346804U (zh) 桥梁整体驮运的精确定位装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant