CN102019998B - Erection embarking method of upper and lower water side cabins - Google Patents

Erection embarking method of upper and lower water side cabins Download PDF

Info

Publication number
CN102019998B
CN102019998B CN 201010582874 CN201010582874A CN102019998B CN 102019998 B CN102019998 B CN 102019998B CN 201010582874 CN201010582874 CN 201010582874 CN 201010582874 A CN201010582874 A CN 201010582874A CN 102019998 B CN102019998 B CN 102019998B
Authority
CN
China
Prior art keywords
cabin
waterside
segmentation
water side
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201010582874
Other languages
Chinese (zh)
Other versions
CN102019998A (en
Inventor
练博强
李家林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Guangzhou Huangpu Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Guangzhou Huangpu Shipbuilding Co Ltd filed Critical CSSC Guangzhou Huangpu Shipbuilding Co Ltd
Priority to CN 201010582874 priority Critical patent/CN102019998B/en
Publication of CN102019998A publication Critical patent/CN102019998A/en
Application granted granted Critical
Publication of CN102019998B publication Critical patent/CN102019998B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an erection embarking method of upper and lower water side cabins, comprising the following steps: 1) segmental manufacturing is carried out on a complete section at the bottom of a cargo compartment to form two bottom sections, and the two bottom sections are combined then docked and loaded; 2) a water side cabin is manufactured in a segmental way, segmentation is carried out on an upper water side cabin, and segmentation is carried out on a lower water side cabin, the subsection of the upper water side cabin and the subsection of the lower water side cabin are connected in a welding way, so as to form the complete section of upper and lower water side cabins at one side of the cargo compartment on the ground, and a cargo compartment support is arranged between the subsection of the upper water side cabin and the subsection of the lower water side cabin, the subsections of the upper water side cabin and the lower water side cabin are combined by two and docked and loaded, 3) an erection crane code is arranged on the complete section of the upper and lower water side cabins, the complete section of the upper and lower water side cabins is hoisted in a turning-over way, and is dry-docked and embarked to form cargo walls at two sides of the cargo compartment. According to the invention, vertical position welding between the subsection of the upper water side cabin and the subsection of the lower water side cabin is changed into downward welding when erection is carried out, working at height is changed into working on the ground, the working efficiency is improved, operation risks are reduced, and the cost is reduced.

Description

Method for loading is always organized in cabin, waterside, up and down
Technical field
The present invention relates to the shipbuilding technical field, is that method for loading is always organized in cabin, waterside, a kind of timber carrier up and down specifically.
Background technology
The total prescription formula of traditional bulge carrier major part is bottom 1 and the lift-launch that lies up after total group in twos of the total group 2 in cabin, lower waterside, cabin, upper waterside 3.As Fig. 1-3, when adopting this total prescription formula cabin, upper waterside complete cross section lie up when carrying with cabin, lower waterside complete cross section between lift-launch to stitch be cross joint 4, to scaffold erecting 5 at the outside plate place, be unfavorable for site operation, be difficult to the location during lift-launch, precision is not high, belong to aloft work, operating efficiency is not high, and operating risk is large, increased the ship building cost, how reducing shipbuilding cost is the difficult problem that each family's shipyard faces at present.
Summary of the invention
In order to overcome the shortcoming of the total prescription formula of tradition, the purpose of this invention is to provide a kind of effective raising operating efficiency, reduce operating risk, reduce the cabin, waterside up and down of ship building cost and always organize method for loading.
The present invention is that the technical solution problem is taked following technical scheme:
Method for loading is always organized in cabin, waterside, a kind of up and down, it is characterized in that cabin, waterside, described up and down always organizes method for loading and comprise the following steps:
1) the tank top complete cross section carries out division system and causes two bottom segmentations, and the lift-launch that lies up again after block assembly of two bottoms;
2) cabin, waterside division system is caused the cabin segmentation of upper waterside, the cabin segmentation of lower waterside, on the level land, the cabin segmentation of upper waterside and the cabin segmentation of lower waterside are welded to connect cabin, the waterside up and down complete cross section that consists of cargo hold one side, and install cargo hold and support between the cabin segmentation of upper waterside and the cabin segmentation of lower waterside, lift-launch again lies up after the cabin segmentation of upper waterside and the cabin segmentation of lower waterside are always organized in twos;
3) total group is installed and hangs code on the complete cross section of cabin, waterside, up and down, cabin, waterside, up and down complete cross section turnover hoisting lies up and carries two wing bulkheads that form cargo hold.
End face at cabin, the waterside up and down complete cross section of two wing bulkheads that consist of cargo hold in step 3) is equipped with the special-purpose overline bridge in location.
The outer upper of the upper waterside cabin segmentation of up and down cabin, waterside complete cross section is equipped with total group of hook that hangs code, in the inside portion of the lower waterside cabin segmentation of cabin, waterside, up and down complete cross section, total group of hook that hangs code is installed.
The cement buttress evenly is set on the level land step 2), the cabin segmentation of upper waterside and the cabin segmentation of lower waterside are placed on the cement buttress, and the cabin segmentation of lower waterside or on cabin, waterside section side be provided with the side of a ship outer support segmentation of cabin, waterside and the cabin segmentation of lower waterside be the level of state, the face of the cabin segmentation of upper waterside, the cabin segmentation of lower waterside and cement buttress consists of the outside plate of cabin, waterside, up and down complete cross section, and the attitude that crouches take this outside plate as basal plane is always organized.
The present invention compared with prior art has following advantage:
1) the present invention obtains the bottom segmentation because the bottom complete cross section carries out the segmentation manufacturing, and the location is fast when total group is carried, and precision is high;
2) segmentation of cabin, waterside is made: upper waterside cabin segmentation, the cabin segmentation of lower waterside, and be on the level land, the cabin segmentation of upper waterside and the cabin segmentation of lower waterside to be welded to connect cabin, the waterside up and down complete cross section that consists of cargo hold one side, just the weld seam between original upper cabin, waterside and cabin, lower waterside is become downhand welding by vertical position welding when cabin, waterside, up and down is always organized like this, become grading operation by aloft work, greatly improved operating efficiency, reduce operating risk, greatly reduced the ship building cost.
In a word, the present invention first lies up after total group by two bottom segmentations and carries and after upper waterside cabin segmentation first always organizes in twos with the cabin segmentation of lower waterside, then lift-launchs that lie up, and locates soon during the lift-launch of bottom block assembly like this, and precision is high; Cabin, waterside, up and down can become downhand welding to original vertical position welding when always organizing, and do on the aloft work level land, increases work efficiency, and reduces operating risk; Reduce costs, saved the expense that scaffolds erecting, every ship can reduce 300,000 yuan of the expenses of scaffold.
Description of drawings
Fig. 1 is the first step bottom segmentation schematic diagram that method for loading is always organized in cabin, waterside, prior art up and down;
Fig. 2 is that second step that method for loading is always organized in cabin, waterside, prior art up and down lies up and carries the vertical position welding schematic diagram;
Fig. 3 is that behind the total group in cabin, waterside, prior art up and down the 3rd stepping depressed place, total group is carried schematic diagram;
Fig. 4 is the bottom segmentation schematic diagram that method for loading is always organized in cabin, waterside, the present invention up and down;
Fig. 5 be cabin, waterside, the present invention up and down always organize method for loading on the level land, the cabin segmentation of upper waterside and the cabin segmentation of lower waterside are welded to connect schematic diagram;
Fig. 6 is total group lift-launch schematic diagram that method for loading is always organized in cabin, waterside, the present invention up and down;
Fig. 7 is that under cabin, waterside, the present invention up and down is always organized on method for loading, cabin, waterside complete cross section stands up front lifting schematic diagram;
Fig. 8 is that under cabin, waterside, the present invention up and down is always organized on method for loading, cabin, waterside complete cross section lifts the schematic diagram that lies up.
The specific embodiment
Below in conjunction with accompanying drawing, method for loading always being organized in cabin, the upper and lower waterside of the present invention is described further:
Method for loading is always organized in cabin, waterside, the present invention up and down, comprises the following steps:
1) the tank top complete cross section carries out the segmentation manufacturing, has realized that like this two bottom segmentations 8 always organizes, and total group when carrying the location soon, the purpose that precision is high and establishing, as shown in Figure 4;
2) segmentation of cabin, waterside is made: upper waterside cabin segmentation 9, lower waterside cabin segmentation 10;
3) on the level land, upper waterside cabin segmentation 9 and lower waterside cabin segmentation 10 being welded to connect is that downhand welding 11 consists of cabin, the waterside up and down complete cross section of cargo hold one side, and installs cargo hold support 7 between upper waterside cabin segmentation 9 and lower waterside cabin segmentation 10, as shown in Figure 5;
4) the total group is installed and hangs code 12 on the complete cross section of cabin, waterside, up and down, cabin, waterside, up and down complete cross section turnover hoisting lies up and carries the two wing bulkheads formation cargo holds that form cargo hold, and the attitude that crouches take outside plate as basal plane when total group is always organized, as shown in Figure 6.End face at cabin, the waterside up and down complete cross section of two wing bulkheads that consist of cargo hold is equipped with the special-purpose overline bridge 6 in location.
As shown in Fig. 7-8, in the outer upper of the upper waterside cabin segmentation of cabin, waterside, up and down complete cross section, total group of hook that hangs code is installed, in the inside portion of the lower waterside cabin segmentation of cabin, waterside, up and down complete cross section, total group of hook that hangs code is installed.
In addition, the cement buttress evenly is set on the level land, the cabin segmentation of upper waterside and the cabin segmentation of lower waterside are placed on the cement buttress, and the cabin segmentation of lower waterside or on cabin, waterside section side be provided with the side of a ship outer support segmentation of cabin, waterside and the cabin segmentation of lower waterside be the level of state, the face of the cabin segmentation of upper waterside, the cabin segmentation of lower waterside and cement buttress consists of the outside plate of cabin, waterside, up and down complete cross section, and the attitude that crouches take this outside plate as basal plane is always organized.
As carrying at cabin, waterside, 32000 tons of timber carrier up and down block assembly, from the above, by the lift-launch that lies up again after two bottom block assemblies, lift-launch again lies up after the cabin segmentation of upper waterside and the cabin segmentation of lower waterside are always organized in twos, when this total prescription formula bottom block assembly carries, the location is fast, and precision is high; Cabin, waterside, up and down can become downhand welding to original vertical position welding when always organizing, and do on the aloft work level land, increases work efficiency, and reduces operating risk; Reduce costs, saved the expense that scaffolds erecting, every ship can reduce 300,000 yuan of the expenses of scaffold.
Above content is in conjunction with concrete preferred implementation further description made for the present invention, can not assert that concrete enforcement of the present invention is confined to these explanations.For the general technical staff of the technical field of the invention, without departing from the inventive concept of the premise, can also make some simple deduction or replace, all should be considered as belonging to protection scope of the present invention.

Claims (4)

1. method for loading is always organized in cabin, waterside, a up and down, it is characterized in that cabin, waterside, described up and down always organizes method for loading and comprise the following steps:
1) the tank top complete cross section carries out division system and causes two bottom segmentations, and the lift-launch that lies up again after block assembly of two bottoms;
2) cabin, waterside division system is caused the cabin segmentation of upper waterside, the cabin segmentation of lower waterside, on the level land, the cabin segmentation of upper waterside and the cabin segmentation of lower waterside are welded to connect cabin, the waterside up and down complete cross section that consists of cargo hold one side, and install cargo hold and support between the cabin segmentation of upper waterside and the cabin segmentation of lower waterside, lift-launch again lies up after the cabin segmentation of upper waterside and the cabin segmentation of lower waterside are always organized in twos;
3) total group is installed and hangs code on the complete cross section of cabin, waterside, up and down, cabin, waterside, up and down complete cross section turnover hoisting lies up and carries two wing bulkheads that form cargo hold.
2. method for loading is always organized in cabin, waterside, up and down according to claim 1, it is characterized in that: the end face at cabin, the waterside up and down complete cross section of two wing bulkheads that consist of cargo hold in step 3) is equipped with the special-purpose overline bridge in location.
3. method for loading is always organized in cabin, waterside, up and down according to claim 1, it is characterized in that: the outer upper of the upper waterside cabin segmentation of up and down cabin, waterside complete cross section is equipped with total group of hook that hangs code, in the inside portion of the lower waterside cabin segmentation of cabin, waterside, up and down complete cross section, total group of hook that hangs code is installed.
4. method for loading is always organized in cabin, waterside, up and down according to claim 1, it is characterized in that: step 2) in the cement buttress evenly is set on the level land, the cabin segmentation of upper waterside and the cabin segmentation of lower waterside are placed on the cement buttress, and the cabin segmentation of lower waterside or on cabin, waterside section side be provided with the side of a ship outer support segmentation of cabin, waterside and the cabin segmentation of lower waterside be the level of state, the face of the cabin segmentation of upper waterside, the cabin segmentation of lower waterside and cement buttress consists of the outside plate of cabin, waterside, up and down complete cross section, and the attitude that crouches take this outside plate as basal plane is always organized.
CN 201010582874 2010-12-10 2010-12-10 Erection embarking method of upper and lower water side cabins Expired - Fee Related CN102019998B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010582874 CN102019998B (en) 2010-12-10 2010-12-10 Erection embarking method of upper and lower water side cabins

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010582874 CN102019998B (en) 2010-12-10 2010-12-10 Erection embarking method of upper and lower water side cabins

Publications (2)

Publication Number Publication Date
CN102019998A CN102019998A (en) 2011-04-20
CN102019998B true CN102019998B (en) 2013-06-05

Family

ID=43861870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010582874 Expired - Fee Related CN102019998B (en) 2010-12-10 2010-12-10 Erection embarking method of upper and lower water side cabins

Country Status (1)

Country Link
CN (1) CN102019998B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103507913A (en) * 2013-09-12 2014-01-15 南通明德重工有限公司 Design method for subsection division of chemical carrier
CN107140113B (en) * 2017-04-26 2019-04-19 广船国际有限公司 A kind of assemble method of the topside segmentation and turn of the bilge segmentation of oil carrier
CN108909938B (en) * 2018-06-28 2020-07-07 广船国际有限公司 Sectional construction method
CN109319041B (en) * 2018-10-10 2020-06-05 上海江南长兴造船有限责任公司 Method for turning over irregular U-shaped block of chemical tanker
CN110254623B (en) * 2019-06-28 2021-08-20 中船黄埔文冲船舶有限公司 Manufacturing method of submerged body segment
CN110550146A (en) * 2019-09-29 2019-12-10 广船国际有限公司 Construction method of ship garage or superstructure
CN111422320A (en) * 2020-04-16 2020-07-17 上海外高桥造船有限公司 Bulk carrier assembling method
CN111591391A (en) * 2020-05-20 2020-08-28 上海外高桥造船有限公司 Reinforcing device for reinforcing lower water tank sectional lower opening
CN111605679B (en) * 2020-05-28 2021-12-17 上海外高桥造船有限公司 Overall assembly process for side block of 40-million-ton ore sand ship
CN113212690A (en) * 2021-06-03 2021-08-06 中船黄埔文冲船舶有限公司 Ship bottom side cabin segmented assembly structure and assembly method
CN113401309B (en) * 2021-07-20 2022-06-07 中国船舶集团青岛北海造船有限公司 Segmented construction method for bottom side cabin of bulk cargo ship
CN113581408B (en) * 2021-08-11 2023-05-16 上海外高桥造船有限公司 Ship total section dividing method
CN113815809A (en) * 2021-09-30 2021-12-21 大连中远海运川崎船舶工程有限公司 C-shaped carrying process for cargo hold of bulk cargo ship

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1586979A (en) * 2004-07-19 2005-03-02 江南造船(集团)有限责任公司 General section gather-up butt joint method for regional shipbuilding
CN1955066A (en) * 2005-10-25 2007-05-02 大连新船重工有限责任公司 Shipmaking method of split building and dock closure
CN101092161A (en) * 2007-07-25 2007-12-26 上海外高桥造船有限公司 Method for final assembling transverse bulkhead and deck on ship

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2913347B2 (en) * 1991-06-12 1999-06-28 シンコウ株式会社 How to assemble a cabin with unit bath

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1586979A (en) * 2004-07-19 2005-03-02 江南造船(集团)有限责任公司 General section gather-up butt joint method for regional shipbuilding
CN1955066A (en) * 2005-10-25 2007-05-02 大连新船重工有限责任公司 Shipmaking method of split building and dock closure
CN101092161A (en) * 2007-07-25 2007-12-26 上海外高桥造船有限公司 Method for final assembling transverse bulkhead and deck on ship

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
JP特开平4-365693A 1992.12.17
散货船货舱区分段工艺划分的几种型式;梁有祥;《造船技术》;19921027(第152期);第11-13页 *
梁有祥.散货船货舱区分段工艺划分的几种型式.《造船技术》.1992,(第152期),11-13.

Also Published As

Publication number Publication date
CN102019998A (en) 2011-04-20

Similar Documents

Publication Publication Date Title
CN102019998B (en) Erection embarking method of upper and lower water side cabins
CN109625157B (en) Method for integrally constructing wing bridge sections of large container ship
CN204775829U (en) A protect apart from roof beam for container ship transverse bulkhead carries on fast
CN107244382A (en) The assemble method of lashing bridge and container ship
CN206233102U (en) A kind of packaged type faces side operation work platform
CN111017139A (en) Carrying operation method for ship bow-stern line type large area block
CN204124335U (en) A kind of cargo hold packaged type segmental hoisting frock
CN109625161A (en) A kind of method of construction of chemical tanker header region unit
CN104527923B (en) Cabin entering mounting method used for main push motor and adopting auxiliary mounting bracket
CN103171976B (en) Hoisting method for shipyard gantry crane
CN206590817U (en) A kind of Large Towers kind equipment self-unloading frock
CN212149193U (en) Ship reversible radar mast
CN201932344U (en) Cage device for ship side sectional folding operation
CN205241086U (en) Template hoist and mount and ann gun carriage of disassembling and using
CN207861722U (en) A kind of Simple water floating type gantry crane
CN102921994A (en) Ship stern boring platform
CN202247682U (en) Bridge crane for installing curtain board
CN202212755U (en) Water purifying tank installing tool
CN201722621U (en) Integral hoisting frame of pre-fabricated box beam
CN210134360U (en) Concrete tank car lift operation platform
CN208856786U (en) Hoisting tooling suitable for Turbo-charged Marine Boiler
CN103171972B (en) Tower frame assembling and lifting process
CN204162279U (en) Large ship lifting component bracing means
CN108930260A (en) The installation method of jack-up unit spud leg
CN207553617U (en) A kind of monoblock type shielded frame platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CSSC HUANGPU WENCHONG SHIP-BUILDING COMPANY LTD.

Free format text: FORMER NAME: CSSC GUANGZHOU SHIPBUILDING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Cheung Chau Street in Whampoa District of Guangzhou City, Guangdong Province, No. 188 510715

Patentee after: CSSC HUANGPU WENCHONG SHIPBUILDING Co.,Ltd.

Address before: Cheung Chau Street in Whampoa District of Guangzhou City, Guangdong Province, No. 188 510715

Patentee before: CSSC Guangzhou Huangpu Shipbuilding Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130605

Termination date: 20211210

CF01 Termination of patent right due to non-payment of annual fee