CN103171972B - Tower frame assembling and lifting process - Google Patents

Tower frame assembling and lifting process Download PDF

Info

Publication number
CN103171972B
CN103171972B CN201310065541.8A CN201310065541A CN103171972B CN 103171972 B CN103171972 B CN 103171972B CN 201310065541 A CN201310065541 A CN 201310065541A CN 103171972 B CN103171972 B CN 103171972B
Authority
CN
China
Prior art keywords
pylon
door machine
tower body
assembling
shackle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310065541.8A
Other languages
Chinese (zh)
Other versions
CN103171972A (en
Inventor
陈飞
钟炳贵
韦正实
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Zhenhua Heavy Equipment Manufacturing Co Ltd
Original Assignee
SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd filed Critical SHANGHAI ZHENHUA HEAVY INDUSTRY GROUP (NANTONG) Co Ltd
Priority to CN201310065541.8A priority Critical patent/CN103171972B/en
Publication of CN103171972A publication Critical patent/CN103171972A/en
Application granted granted Critical
Publication of CN103171972B publication Critical patent/CN103171972B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The invention discloses a tower frame assembling and lifting process which is characterized in that a tower frame is directly mounted on a field; and meanwhile, the top end of the tower frame is provided with a lifting lug for lifting, the mounted tower frame is lifted and corrected through matching two portal cranes, and the tower frame is finally mounted and fixed. With the adoption of the manner, the installation of the tower frame becomes simple and safe; and redundant working frames are not needed so that the manpower and the cost are saved and the working efficiency is improved.

Description

Pylon assembling hoisting
Technical field
The present invention relates to the technique of a kind of pylon assembling lifting, first at place assembling pylon, rear door machine coordinates righting to install.
Background technology
Ship loader is when installation, and the installation that pylon supports is very important.Pylon support is the running that can the skeleton ship loader of ship loader safe, and the technique of the installation supported with pylon and intensity have very large relation.Ship loader pylon mainly comprises the front support of door frame, door frame back brace, door frame left and right sides crossbeam and driver's cab supporting traverse four large parts, and it is directly each for pylon parts are hung assigned address on ship by door machine that traditional pylon is installed, and then directly carries out erecting and welding.Such method due to tower components volume large, weight is large, therefore troublesome poeration, and needs the support platform arranging other to install for engineering worker operation, and aerial work is dangerous large, operating difficulties.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of simple to operate, the pylon assembling hoisting that safety is high.
For solving the problems of the technologies described above, the technical solution adopted in the present invention is:
A kind of pylon assembling hoisting, is characterized in that comprising following steps:
1) assembling pylon in ground on the scene, support and back brace before first assembling pylon, then install upside left and right crossbeam and left and right, downside crossbeam, then install driver's cab support beam, inclined ladder and platform wouldn't be installed;
2) connect the hanger of side in one end respectively with two steel ropes, the other end of two steel ropes is connected by buckle together;
3) be separately fixed at the both sides, downside of pylon with another steel rope two ends, steel rope installed an activity shackle again;
4) First door machine suspension hook hooks and buckles unloading, and second door machine suspension hook hooks to unload in activity and buckle;
5) two door machines are hung oneself simultaneously and to be lifted by pylon;
6) when standing up, First door machine upwards slowly hangs, and second door machine is motionless;
7) when pylon raising height be greater than pylon self vertically height time, now second door machine slowly declines;
8) after tower body strengthening balancing, under tower body, place sleeper, then slowly tower body is placed on sleeper;
9) inclined ladder and platform are installed on tower body.
By such technique, directly first installed by tower body on the ground at barnyard, then sling after righting by door machine and install, ground on the scene fitting operation is convenient, and safety, increases work efficiency.
Accompanying drawing explanation
Fig. 1 is the pylon schematic diagram of pylon of the present invention assembling hoisting.
Fig. 2 is the lifting schematic diagram of pylon of the present invention assembling hoisting.
Fig. 3 is the schematic diagram after the lifting righting of pylon of the present invention assembling hoisting.
Fig. 4 is the tower components figure of pylon of the present invention assembling hoisting.
Fig. 5 is the pylon installation side view of pylon of the present invention assembling hoisting.
Detailed description of the invention
First install according to the structure of the pylon shown in Fig. 1 and Fig. 4 ground on the scene, first assemble front support 10 and the back brace 11 of pylon, then the left and right crossbeam 12 of upside and the left and right crossbeam 13 of downside are installed, finally install driver's cab support beam, inclined ladder 1 and platform 2 are not first installed, in order to avoid break when lifting righting.Then connect the hanger 3 of side in one end respectively with two steel ropes 4, then the other end shackle 7 of two steel ropes 4 links together.Be separately fixed at the both sides, downside of pylon again with another steel rope 8, steel rope installed an activity shackle 9 again, when door machine catches on shackle 9, automatically select suspension centre.
As shown in Figure 5, First door machine 5 suspension hook hooks in shackle 7, and second door machine 6 suspension hook hooks in shackle 9, and two door machines upwards slowly lift simultaneously and lifted by pylon.
As shown in Figure 2, when pylon stands up, First door machine 5 upwards slowly hangs, and second door machine 6 is motionless; When pylon to be greater than by the height above lifted pylon self vertically after height time, now second door machine 6 slowly declines.
As shown in Figure 3, after tower body strengthening balancing, under tower body, place sleeper, then slowly tower body is placed on sleeper.Finally inclined ladder and platform are installed on tower body.
By such process, direct ground on the scene installs pylon, and then settles after righting of slinging, and need not take falsework as usual, saved manpower and materials when installing like this, and ground safety is simple simultaneously, improves work efficiency, adds safety factor.

Claims (1)

1. a pylon assembling hoisting, is characterized in that comprising following steps:
1) assembling pylon in ground on the scene, support (10) and back brace (11) before first assembling pylon, then install left and right crossbeam, upside (12) and left and right, downside crossbeam (13), then install driver's cab support beam (14), inclined ladder (1) and platform (2) wouldn't be installed;
2) connect the hanger (3) of side in one end respectively with two steel ropes (4), the other end of two steel ropes (4) is linked together by shackle (7);
3) be separately fixed at the both sides, downside of pylon with another steel rope (8) two ends, steel rope installed an activity shackle (9) again;
4) First door machine (5) suspension hook hooks in shackle (7), and second door machine (6) suspension hook hooks in activity shackle (9);
5) two door machines (5,6) are hung oneself simultaneously and to be lifted by pylon;
6) when standing up, First door machine (5) upwards slowly hangs, and second door machine (6) is motionless;
7) when pylon raising height be greater than pylon self vertically height time, now second door machine (6) slowly declines;
8) after tower body strengthening balancing, under tower body, place sleeper, then slowly tower body is placed on sleeper;
9) inclined ladder (1) and platform (2) are installed on tower body.
CN201310065541.8A 2013-03-01 2013-03-01 Tower frame assembling and lifting process Active CN103171972B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310065541.8A CN103171972B (en) 2013-03-01 2013-03-01 Tower frame assembling and lifting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310065541.8A CN103171972B (en) 2013-03-01 2013-03-01 Tower frame assembling and lifting process

Publications (2)

Publication Number Publication Date
CN103171972A CN103171972A (en) 2013-06-26
CN103171972B true CN103171972B (en) 2015-06-17

Family

ID=48632261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310065541.8A Active CN103171972B (en) 2013-03-01 2013-03-01 Tower frame assembling and lifting process

Country Status (1)

Country Link
CN (1) CN103171972B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104627830A (en) * 2014-12-26 2015-05-20 大连中远船务工程有限公司 Hoisting method for large-scale flare tower of floating production, storage and unloading device ship
CN113511597B (en) * 2021-05-17 2023-08-22 上海振华重工(集团)股份有限公司 Hoisting method and hoisting system for door frame assembly

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101293599B (en) * 2007-04-27 2011-04-20 上海振华重工(集团)股份有限公司 Method for discharging boat to dock basin with dock yard trestle crane set
CN101429928B (en) * 2007-11-09 2011-09-14 中国海洋石油总公司 Integral hoisting method for wind generator set on the sea
EP2402278B1 (en) * 2010-06-29 2012-11-21 Siemens Aktiengesellschaft Arrangement for lifting a tower wall portion of a wind turbine and method for lifting a tower wall portion of a wind turbine
CN102182203B (en) * 2010-08-19 2015-11-25 江苏道达海上风电工程科技有限公司 A kind of steel row's formula anemometer tower foundation and anemometer tower structure
CN202322091U (en) * 2011-12-02 2012-07-11 华锐风电科技(集团)股份有限公司 Lifting equipment
CN102674136A (en) * 2012-05-09 2012-09-19 中国海洋石油总公司 Lifting method for large-scale tower equipment
CN202657825U (en) * 2012-05-18 2013-01-09 湖北省输变电工程公司 Device for lifting guyed tower in integrally assembled mode
CN202729605U (en) * 2012-06-19 2013-02-13 国家核电技术有限公司 Support device used in turning of large-scale workpiece
CN102817341B (en) * 2012-08-23 2014-09-03 中国十七冶集团有限公司 Construction method for segmented installation of offshore anemometer tower and combination of high-altitude manufactured parts for assembly

Also Published As

Publication number Publication date
CN103171972A (en) 2013-06-26

Similar Documents

Publication Publication Date Title
CN102019998B (en) Erection embarking method of upper and lower water side cabins
CN101693502B (en) Method for self-assembling and disassembling rear counterweight of crawler crane mainframe
CN201703776U (en) Inverted lifting device of storage tank
CN103171972B (en) Tower frame assembling and lifting process
CN103420281B (en) The attaching/detaching apparatus of hoisting crane and accessory structure thereof, method for dismounting and installation method
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN105060142A (en) Integrally mounted and transported luffing fly jib of crawler crane
CN103991800A (en) Roof surface crane for building
CN201901515U (en) Special lifting device for ship cabin cleaning machinery
CN105621225A (en) Automatic-disassembling lifting appliance for lifting forklift lifting system assembly
CN105883636A (en) 32T steel plate gantry crane part and component transfer technology
CN102587676A (en) Method for mounting internal girder structure of nuclear island at nuclear power station
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN208732495U (en) A kind of small gun carriage
CN101559903A (en) Cargo sling special for flabellum
CN205442374U (en) A can dismantle hoist automatically that is used for fork truck jack -up system assembly to hoist
CN212609006U (en) Hoisting tool for cooling pipeline of flexible direct-current converter valve
CN210658016U (en) Trolley for movably dismounting bridge guardrail template
CN203428743U (en) Hoisting device of non-road driving engineering machine
CN202766080U (en) Special lifting apparatus for fan blade
CN106081903B (en) A kind of bridge crane diving platform structure and its mounting process
CN204825670U (en) Inclined to one side hanging beam frame device is prevented turning round by eccentric case roof beam
CN103397772A (en) Hanging basket counterweight supporting structure
CN104709813A (en) Method for mounting blast furnace framework structure by utilizing transverse hoisting beam
CN205387444U (en) Overhead hoisting portal device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170309

Address after: Farm of Nantong Development Zone in Jiangsu Province, Nantong City, 226000 River Road No. 1

Patentee after: Nantong Zhenhua Heavy Equipment Manufacturing Co., Ltd.

Address before: 226010 Zhenhua Road, Nantong Development Zone, Jiangsu, Nantong, China, 1

Patentee before: Shanghai Zhenhua Heavy Industry Group (Nantong) Co., Ltd.

TR01 Transfer of patent right