CN202322091U - Lifting equipment - Google Patents
Lifting equipment Download PDFInfo
- Publication number
- CN202322091U CN202322091U CN2011204977756U CN201120497775U CN202322091U CN 202322091 U CN202322091 U CN 202322091U CN 2011204977756 U CN2011204977756 U CN 2011204977756U CN 201120497775 U CN201120497775 U CN 201120497775U CN 202322091 U CN202322091 U CN 202322091U
- Authority
- CN
- China
- Prior art keywords
- lifting
- hanging device
- expansion link
- hoisting crane
- crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- 239000000725 suspension Substances 0.000 abstract description 5
- 238000010248 power generation Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 abstract description 2
- 238000009434 installation Methods 0.000 description 10
- 238000005516 engineering process Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 3
- 230000009194 climbing Effects 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 239000007858 starting material Substances 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 239000003653 coastal water Substances 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000005684 electric field Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model provides lifting equipment, which is used for mounting an offshore wind power generation unit. The lifting equipment comprises a crane, wherein two bottom beams are extended on the same side of a base of the crane in a suspension mode; a space for accommodating a lifted object is formed between the two bottom beams; and a connecting device for connecting the bottom beams with the lifted object and a holding device for tightly holding the lifted object are arranged on the bottom beams. By the lifting equipment, the crane can climb and gradually lift the lifted object, so that the technical limit that the height of the lifted object must be smaller than that of the crane in the prior art is broken through; and compared with a mode that a large-sized offshore wind power generation unit must be lifted by a large-sized offshore lifting ship in the prior art, a scheme provided by the utility mode is low in cost and high in mounting efficiency and makes construction convenient.
Description
Technical field
The utility model relates to a kind of hoisting technology, relates in particular to a kind of hanging device that is used for high-power offshore wind farm unit.
Background technology
Wind energy is the novel renewable energy of the most ripe, the tool large-scale development condition of technology in the current clean energy resource field.Global wind power generation field is advanced by leaps and bounds over past ten years.Because the resource that landwid electric field can develop is fewer and feweri, the wind energy turbine set exploitation has appeared by land to the coastal waters Development Trend.Compare with the land wind-powered electricity generation, offshore wind farm has not land occupation resource, and wind energy resources is abundant, and near load center, numerous advantages such as dissolve easily are incorporated into the power networks.High-power offshore wind farm unit is usually up to more than 100 meters; As shown in Figure 1, the vertical axis of offshore wind farm unit is connected and composed by more piece tower tube 01 head and the tail, for common hoisting crane; No matter at sea the erection tower tube is saved on basis on-the-spot; Still will accomplish the lifting of head and the tail bonded assembly tower tube in the land and to marine basis, install, the hoisting crane oneself height all must can not fulfil assignment otherwise limited by its hoisting height greater than being hung the wind-powered electricity generation unit.
The lifting of sea turn unit at present adopts large-scale marine lift-on and lift-off ship that the blower fan that assembles is on the coast carried out integral hoisting; Or large-scale marine lifting operation platform hauled to the blower fan erecting stage; And fix with anchoring pile, utilize the large lifting equipment on this sea lifting operation platform to carry out marine on-site hoisting again according to the work pattern of land wind energy turbine set.
Because above-mentioned two kinds of lifting modes all need be employed large-scale marine lifting ship or special-purpose operation platform, construction cost is high.And such marine hanging device limited amount, the spendable time also usually can't guarantee, makes troubles to use, and labor time waiting hanging device, installation effectiveness is lower.
Therefore, if can study a kind of offshore wind farm unit from hoisting technology, the special-purpose hanging device in the above-mentioned large-scale sea of motionless usefulness, the on-site hoisting that just can accomplish the offshore wind farm unit easily and efficiently will have great economy and social value.
The utility model content
The utility model provides a kind of hanging device; Be used to overcome defective of the prior art; Solve the lifting of high-power offshore wind farm unit must use large-scale marine lifting ship or special-purpose operation platform cause cost high, lose time, problem such as installation effectiveness is lower, realize cost-cutting, rapid and convenient installation, raising installation effectiveness.
The hanging device that the utility model provides; Comprise hoisting crane; The homonymy of the said hoisting crane base two foundation beams that overhang; Be provided with between the two said bottom girders be used for ccontaining by the space of lifting object, said bottom girder be provided be used to connect bottom girder with by the connecting device of lifting object be used to hold tightly enclasp device by lifting object.
Wherein, said connecting device is the lifting rope more than two; Said lifting rope one end is separately fixed on the two said bottom girders; The said lifting rope other end is equipped with and is used to hang on the hook by on the lifting object.
Further, said lifting rope is four, and symmetry is located on the two said bottom girders.
Particularly, said enclasp device is plural expansion link; Said expansion link one end is separately fixed on the two said bottom girders; The said expansion link other end is equipped with and is used to hold the clamp by lifting object, and said clamp and said expansion link are hinged.
Wherein, said expansion link is four, and symmetry is located between the two said bottom girders.
Further, said bottom girder lower end is equipped with clump weight, and said clump weight is through the lower surface sliding block joint of slide rail and said bottom girder.
Wherein, said hanging device also comprises the actuating device that the said clump weight of driving moves on said slide rail.
The hanging device of the utility model through existing common hoisting crane is structurally improved, is provided with connecting device being overhung on two bottom girders of base the same side; Through connecting device with bottom girder with captiveed joint by lifting object; Utilize hanging of hoisting crane self to rise function and hoisting crane is hung rise on, through enclasp device hoisting crane is fixed on then and is realized climbing of hoisting crane on the lifting object, when mount high power offshore wind farm unit by lifting object; At first first segment tower tube is installed on the basis; Then the connecting device on the bottom girder is fixed on first segment tower tube top, hoisting crane is climbed and is fixed on first segment tower tube top, and then lift the second joint tower tube; Repeat said process; Can each be saved the tower tube and finish in the connection of vertical direction head and the tail, solve the technology that common hoisting crane oneself height must be complementary with hoisting height, prior art is used large-scale marine hanging device that the offshore wind farm unit is installed to have reduced cost of installation relatively; Simplify erection procedure, improved installation effectiveness.
Description of drawings
Fig. 1 is the front view of the offshore wind farm unit of prior art;
Fig. 2 is the front view of the utility model embodiment;
Fig. 3 is the birds-eye view of Fig. 2;
Fig. 4 is the right elevation of Fig. 2;
Fig. 5 is the running condition reference view one of the utility model embodiment;
Fig. 6 is the running condition reference view two of the utility model embodiment;
Fig. 7 is the running condition reference view three of the utility model embodiment;
Fig. 8 is the running condition reference view four of the utility model embodiment;
Fig. 9 is the running condition reference view five of the utility model embodiment;
Figure 10 is the running condition reference view six of the utility model embodiment.
The specific embodiment
Embodiment one
Shown in Fig. 2-4; The utility model provides a kind of hanging device; This hanging device comprises a hoisting crane 1; The homonymy of hoisting crane base 11 overhang be provided with between two foundation beams, 12, two bottom girders 12 be used for ccontaining by the space of lifting object, bottom girder 12 be provided be used to connect bottom girder 12 with by the connecting device of lifting object be used to hold tightly enclasp device by lifting object.
As the specific embodiment of present embodiment, wherein connecting device is the lifting rope 3 more than two; Lifting rope 3 one ends are separately fixed on two bottom girders 12, and lifting rope 3 other ends are equipped with and are used to hang on by the hook on the lifting object 31; If select the lifting rope 3 more than three for use, then lifting rope 3 does not steadily go up and down along conplane vertical direction with assurance hoisting crane 1 on same straight line with bottom girder 12 these fixing ends; Preferably, lifting rope 3 is four, and symmetry is located on two bottom girders 12, and is as shown in Figure 3.Enclasp device is plural expansion link 4; Expansion link 4 one ends are separately fixed on two bottom girders 12; Expansion link 4 other ends are equipped with and are used to hold the clamp 41 by lifting object, and clamp 41 is hinged with expansion link 4, are convenient to cooperating to regulate and hold angle according to the catch surface of clamp 41 and first segment tower tube 10 outer walls.Preferably, expansion link 4 is four, and symmetry is located between two bottom girders 12, and is as shown in Figure 3.Expansion link 4 can adopt hydraulic ram, and the cylinder body of hydraulic ram is fixed on the bottom girder 12, the hinged clamp 41 of the piston end of hydraulic ram, and the catch surface of clamp 41 cooperates with the first tower tube, 10 outer walls.As the preferred implementation of the foregoing description, as shown in Figure 3, the end relative fixed of expansion link 4 is on the medial surface of bottom girder 12, so that clamp 41 is more stable when clamping the tower tube.
The hanging device of the utility model realizes climbing function through existing common hoisting crane is structurally improved, and detailed process is shown in Fig. 5-10; At first the hoisting crane base is placed on the marine basis; The suspension hook of hoisting crane is hung on first segment tower tube top, and starter motor shrinks and suspension hook bonded assembly steel rope 13 is lifted on first segment tower tube 10 in the gap between two bottom girders 12; And first segment tower tube 10 bottoms are captiveed joint with marine basic 02; Then the hook 31 of fixing four lifting rope 3 ends on the bottom girder 12 is hung on the link of first segment tower tube 10 top perimeter (this moment, suspension hook still was hung on first segment tower tube top), at this starter motor and shrink steel rope 13 and make hoisting crane rise to the first tower tube, 10 tops, make the clamp 41 of its piston end be held in the outer wall of the first tower tube 10 through driving the hydraulic ram elongation then; Four clamps 41 are tightly held the first tower tube 10 tightly makes hoisting crane 1 overall fixed on the first tower tube 10; At the lifting second tower tube 20, circulate successively then, so to the last a joint tower tube installs; As required; The lifting function last joint tower tube tip position that climbs is installed cabin 03 and impeller 04 more successively, through elongation and suspension hook bonded assembly steel rope 13 hoisting crane is dropped on marine basic 02 plane more at last.Solved the not enough technical matters of common hoisting crane hoisting height, prior art uses large-scale marine hanging device installation offshore wind farm unit to reduce cost of installation relatively, has simplified erection procedure, has improved installation effectiveness.
Like Fig. 2, shown in 3, in order to make hoisting crane steady more safety in the process of climbing, be equipped with clump weight 5 in bottom girder 12 lower ends, clump weight 5 is through the lower surface sliding block joint of slide rail 6 with bottom girder 12.Concentrate on the line of centers of tower tube (shown in Fig. 6-10) in mobile center of gravity of regulating hoisting crane on the slide rail 6 through clump weight 5.Hanging device also comprises the actuating device (not shown) that driving clump weight 5 moves on slide rail 6; Driving clump weight through actuating device moves on slide rail; Convenient, for further promoting the automation mechanized operation of hanging device, proving installation can be set on hoisting crane its center-of-gravity position is detected; Make clump weight move to a suitable position through the computed in software accessory drive, the hoisting crane center of gravity just in time with tower tube central lines.
What should explain at last is: above embodiment is only in order to the technical scheme of explanation the utility model, but not to its restriction; Although the utility model has been carried out detailed explanation with reference to previous embodiment; Those of ordinary skill in the art is to be understood that: it still can be made amendment to the technical scheme that aforementioned each embodiment put down in writing, and perhaps part technical characterictic wherein is equal to replacement; And these are revised or replacement, do not make the scope of each embodiment technical scheme of essence disengaging the utility model of relevant art scheme.
Claims (7)
1. hanging device; Comprise hoisting crane; It is characterized in that; The homonymy of the said hoisting crane base two foundation beams that overhang, be provided with between the two said bottom girders be used for ccontaining by the space of lifting object, said bottom girder be provided be used to connect bottom girder with by the connecting device of lifting object be used to hold tightly enclasp device by lifting object.
2. hanging device according to claim 1 is characterized in that, said connecting device is the lifting rope more than two; Said lifting rope one end is separately fixed on the two said bottom girders; The said lifting rope other end is equipped with and is used to hang on the hook by on the lifting object.
3. hanging device according to claim 2 is characterized in that, said lifting rope is four, and symmetry is located on the two said bottom girders.
4. hanging device according to claim 1 is characterized in that, said enclasp device is plural expansion link; Said expansion link one end is separately fixed on the two said bottom girders; The said expansion link other end is equipped with and is used to hold the clamp by lifting object, and said clamp and said expansion link are hinged.
5. hanging device according to claim 4 is characterized in that, said expansion link is four, and symmetry is located between the two said bottom girders.
6. according to the arbitrary described hanging device of claim 1-5, it is characterized in that said bottom girder lower end is equipped with clump weight, said clump weight is through the lower surface sliding block joint of slide rail and said bottom girder.
7. hanging device according to claim 6 is characterized in that, said hanging device also comprises the actuating device that the said clump weight of driving moves on said slide rail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204977756U CN202322091U (en) | 2011-12-02 | 2011-12-02 | Lifting equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011204977756U CN202322091U (en) | 2011-12-02 | 2011-12-02 | Lifting equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202322091U true CN202322091U (en) | 2012-07-11 |
Family
ID=46434081
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011204977756U Withdrawn - After Issue CN202322091U (en) | 2011-12-02 | 2011-12-02 | Lifting equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202322091U (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103130106A (en) * | 2011-12-02 | 2013-06-05 | 华锐风电科技(集团)股份有限公司 | Lifting equipment |
CN103145051A (en) * | 2013-03-13 | 2013-06-12 | 杭州国电大力机电工程有限公司 | Separated hoisting device of offshore wind turbine generator, and installation method |
CN103171972A (en) * | 2013-03-01 | 2013-06-26 | 上海振华重工集团(南通)有限公司 | Tower frame assembling and lifting process |
CN107956984A (en) * | 2017-11-21 | 2018-04-24 | 合肥小小作为信息科技有限公司 | Adjustable type Suspenoing apparatus is used in a kind of electronic product installation |
CN108775196A (en) * | 2018-08-14 | 2018-11-09 | 国网江苏省电力有限公司 | Lifting and self-climbing combined mechanism for erecting power transmission tower |
FR3125504A1 (en) * | 2021-07-22 | 2023-01-27 | Dolfines | Process for the assembly or disassembly of a blade on an offshore wind turbine and platform equipped for the implementation of such a process. |
WO2024008663A1 (en) * | 2022-07-04 | 2024-01-11 | Dolfines | Method and system for mounting a blade on an offshore wind turbine |
-
2011
- 2011-12-02 CN CN2011204977756U patent/CN202322091U/en not_active Withdrawn - After Issue
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103130106A (en) * | 2011-12-02 | 2013-06-05 | 华锐风电科技(集团)股份有限公司 | Lifting equipment |
CN103130106B (en) * | 2011-12-02 | 2016-01-13 | 华锐风电科技(集团)股份有限公司 | Hanging device |
CN103171972A (en) * | 2013-03-01 | 2013-06-26 | 上海振华重工集团(南通)有限公司 | Tower frame assembling and lifting process |
CN103145051A (en) * | 2013-03-13 | 2013-06-12 | 杭州国电大力机电工程有限公司 | Separated hoisting device of offshore wind turbine generator, and installation method |
CN107956984A (en) * | 2017-11-21 | 2018-04-24 | 合肥小小作为信息科技有限公司 | Adjustable type Suspenoing apparatus is used in a kind of electronic product installation |
CN107956984B (en) * | 2017-11-21 | 2020-03-31 | 合肥小小作为信息科技有限公司 | Adjustable suspension device for mounting electronic product |
CN108775196A (en) * | 2018-08-14 | 2018-11-09 | 国网江苏省电力有限公司 | Lifting and self-climbing combined mechanism for erecting power transmission tower |
FR3125504A1 (en) * | 2021-07-22 | 2023-01-27 | Dolfines | Process for the assembly or disassembly of a blade on an offshore wind turbine and platform equipped for the implementation of such a process. |
WO2024008663A1 (en) * | 2022-07-04 | 2024-01-11 | Dolfines | Method and system for mounting a blade on an offshore wind turbine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202322091U (en) | Lifting equipment | |
CN103130106B (en) | Hanging device | |
CN103145051B (en) | Separated hoisting device of offshore wind turbine generator, and installation method | |
KR101013789B1 (en) | Offshore wind power generator installation method and device | |
CN103015445B (en) | Neritic zone wind energy turbine set is without changeover portion single-pile foundation construction and Fan Equipment mounting process | |
CN102491162B (en) | Hoisting equipment and hoisting methods | |
WO2011063596A1 (en) | Vessel for transporting and hoisting offshore wind generating set and transporting and lifting method | |
CN103939299B (en) | The split type mounting process of a kind of offshore wind turbine | |
CN102701083A (en) | Special equipment and method for replacing wind driven generator component | |
CN105417403A (en) | Method for installing ultrahigh ultra-large type floating crane in dock | |
CN101774511B (en) | Climbing type hoist and using method thereof | |
CN203112377U (en) | Marine wind power generator set split hoisting device | |
CN205257825U (en) | Offshore platform fan hoisting system | |
CN108946509A (en) | A kind of large-scale wind driven generator is from rising tower crane construction method | |
CN213566364U (en) | Single-column mast type device for transporting and installing multiple offshore wind turbine complete machines | |
CN103693170A (en) | Floating type offshore wind power assembly platform and method using floating type offshore wind power assembly platform for assembly offshore wind turbine | |
CN107218179B (en) | The construction method of offshore wind generating partial installation | |
CN102515035A (en) | Maintenance hoisting equipment for wind generation set | |
CN209434893U (en) | A kind of ship scene water bavin complementation electric system | |
CN216945817U (en) | Lifting hanging beam for mounting wind driven generator cabin | |
CN201694361U (en) | A special engineering ship for the overall transportation and installation of offshore wind turbines | |
CN116902175A (en) | Construction method of floating type offshore wind power equipment | |
CN201901538U (en) | Self-lifting fan-mounted crane and marine fan transporting and mounting equipment | |
CN214784139U (en) | Auxiliary single pile for mounting wind power tower | |
CN110217352B (en) | A wind power type offshore landing bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20120711 Effective date of abandoning: 20160113 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |