CN202212755U - Water purifying tank installing tool - Google Patents
Water purifying tank installing tool Download PDFInfo
- Publication number
- CN202212755U CN202212755U CN2011203725086U CN201120372508U CN202212755U CN 202212755 U CN202212755 U CN 202212755U CN 2011203725086 U CN2011203725086 U CN 2011203725086U CN 201120372508 U CN201120372508 U CN 201120372508U CN 202212755 U CN202212755 U CN 202212755U
- Authority
- CN
- China
- Prior art keywords
- clear water
- body frame
- water tanks
- main body
- frock
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model provides a water purifying tank installing tool. The water purifying tank installing tool comprises a base frame, a plurality of positioning blocks arranged on the main frame of the base frame, a main body framework and an installing cross beam, wherein the base frame comprises a main frame and an assistant frame which are connected with each other; the area which is surrounded by the plurality of positioning blocks, on the main frame corresponds to a water purifying tank; the main body framework is arranged on the assistant frame of the base frame and stretches towards the upper part of the base frame; an accommodating space capable of accommodating the water purifying tank is arranged between the main body framework and the base frame; and the installing cross beam is connected to the main body framework and is provided with a hoisting hole. By adopting the water purifying tank installing tool, the installing safety and reliability of the water purifying tank are improved, the installing time is greatly reduced, manpower and equipment resource are saved, the labor intensity of working staff is reduced, and excellent economic benefit is brought.
Description
Technical field
The utility model relates to mounting technique, relates in particular to a kind of clear water tanks frock is installed.
Background technology
At present, for the installation of clear water tanks on vehicle, there is not special-purpose frock.Generally speaking, when clear water tanks is installed, clear water tanks is placed on the fork truck, by fork truck the end doorway that clear water tanks is promoted to vehicle is got into vehicle again.Because the restriction of the hoisting depth of fork truck; When fork truck promotes clear water tanks; Need place two to three wooden block dishes in the clear water tanks bottom, clear water tanks has no the device of positioning and fixing on pallet, and the end doorway of vehicle is only than about the wide 50mm of clear water tanks; Therefore operating fork truck need be very careful slow, and needs the special messenger to protect.After clear water tanks gets into vehicle, need be installed in the top of vehicle.Because distance is about 2m between the installation sign indicating number of roof clear water tanks and the floor of vehicle; So need in advance hydraulic lift truck to be lifted to by the workman interior of vehicle; Then clear water tanks is lifted hydraulic lift truck; Operating hydraulically operated lift truck is promoted to the roof position with clear water tanks, with bolt the installation sign indicating number of clear water tanks and roof is fixed again, falls hydraulic lift truck then and carries away the compartment.
The installation process of whole clear water tanks; Need to use fork truck, wooden block dish, hydraulic lift truck, at least 4 workmans' cooperation; Whole process approximately at least 4 hours consuming time, and have very big potential safety hazard, huge to workman's physical demands; Take device resource for a long time, can't be used for the production of other operations.
The utility model content
The utility model embodiment provides a kind of clear water tanks that frock is installed, in order to solve the problem that exists in the prior art.
The utility model embodiment provides a kind of clear water tanks that frock is installed, and comprising:
Underframe comprises body frame connected to one another and subframe;
Be arranged on a plurality of locating pieces on the body frame of said underframe, the zone that said a plurality of locating pieces surround on body frame is corresponding with clear water tanks;
Be arranged on the subframe of said underframe and the main body frame that extends to the top of said underframe, the accommodation space that formation can ccontaining clear water tanks between said main body frame and the said underframe;
Be connected on the said main body frame, be provided with the installation crossbeam of hole for hoist.
Aforesaid clear water tanks is installed frock, is fixed with the buttress brace that is used to strengthen bonding strength between body frame and the subframe between said body frame and the said subframe.
Aforesaid clear water tanks is installed frock, is provided with the auxiliary buttress brace that is used to increase said main body frame strength and stiffness between said main body frame and the said subframe.
Aforesaid clear water tanks is installed frock, and said main body frame comprises horizontal segment connected to one another and vertical section, is provided with the gusset that is used to strengthen said main body frame strength and stiffness between said horizontal segment and said vertical section.
Aforesaid clear water tanks is installed frock, and said body frame upper surface is provided with the protection backing plate.
Aforesaid clear water tanks is installed frock, and said protection backing plate is provided with the groove that is used to prevent to damage by pressure said clear water tanks pipeline.
Aforesaid clear water tanks is installed frock, and the locating surface that said locating piece is used for contacting with clear water tanks is a plank.
Aforesaid clear water tanks is installed frock, and the one or more upper surfaces that are arranged on said body frame in the said locating piece also are provided with gusset between the back side mutually of locating piece and said locating surface and the said body frame.
Aforesaid clear water tanks is installed frock, the one or more lateral surfaces that are arranged on said body frame in the said locating piece.
Aforesaid clear water tanks is installed frock, and said body frame is an intersecting parallels, and said subframe is connected the one of which side.
The clear water tanks that the utility model provides is installed frock, has improved the security reliability that clear water tanks is installed, and reduces the set-up time significantly, practices thrift manpower and device resource, reduces working strength of workers, has produced extraordinary economic benefit.
Description of drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art; To do one to the accompanying drawing of required use in embodiment or the description of the Prior Art below introduces simply; Obviously, the accompanying drawing in describing below is some embodiment of the utility model, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 installs the structural representation of frock for the clear water tanks that the utility model embodiment provides.
The specific embodiment
For the purpose, technical scheme and the advantage that make the utility model clearer; To combine the accompanying drawing among the utility model embodiment below; Technical scheme among the utility model embodiment is carried out clear, intactly description; Obviously, described embodiment is the utility model part embodiment, rather than whole embodiment.Based on the embodiment in the utility model, those of ordinary skills are not making the every other embodiment that is obtained under the creative work prerequisite, all belong to the scope of the utility model protection.
Fig. 1 installs the structural representation of frock for the clear water tanks that the utility model embodiment provides, and is as shown in Figure 1, and this clear water tanks is installed frock and comprised: underframe 1 comprises body frame 11 connected to one another and subframe 12.Be arranged on a plurality of locating pieces 2 on the body frame 11 of underframe 1, zone that these locating pieces 2 surround on body frame 11 is corresponding with clear water tanks.Be arranged on the subframe 12 of underframe 1 main body frame 3 that extends to the top of underframe 1, the accommodation space that formation can ccontaining clear water tanks between this main body frame 3 and the underframe 1.Be connected on the main body frame 3, be provided with the installation crossbeam 4 of hole for hoist 41.Wherein, hole for hoist 41 can be for a plurality of.
Here need to prove that this clear water tanks is installed the steel square tube Welding Structure of the integral body employing high-quality of frock.Wherein, the structure of body frame 11 is as shown in Figure 1, can be preferably intersecting parallels, and four square tubes forming intersecting parallels can be welded to one another together.Preferably, four bases of the corresponding clear water tanks of mouth character segment at intersecting parallels center.Certainly, the structure of body frame 11 can also not done here and give unnecessary details being hollow, multi-form distortion such as round, star-like.The structure of subframe 12 is as shown in Figure 1, can be a beam.
For strengthening the bonding strength between body frame and the subframe, this clear water tanks is installed frock and can also be comprised: be fixed on the buttress brace 5 between body frame 11 and the subframe 12.Buttress brace 5 can be one, also can be many, and shown in Figure 1 one is schematically expression, does not limit the protection domain of the utility model.
For increasing the strength and stiffness of main body frame 3, this clear water tanks is installed frock and can also be comprised: be arranged on the auxiliary buttress brace 6 between main body frame 3 and the subframe 12.Need to prove that also auxiliary buttress brace 6 can also be arranged between main body frame 3 and the buttress brace 5, in order to the strength and stiffness of further increase main body frame 3.Auxiliary buttress brace 6 can be one, also can be many, and shown in Figure 1 three is schematically expression, does not limit the protection domain of the utility model.
Because the whole employing of frock is the steel square tube of high-quality, for preventing that frock is installed scratches the clear water tanks bottom surface, this clear water tanks is installed frock and can also be comprised: the protection backing plate 8 that is arranged on body frame 11 upper surfaces.This protection backing plate 8 can adopt material such as plank, effectively prevent the scuffing of colliding with to the clear water tanks surface.Further, can also further be provided with groove 81 on the protection backing plate 8, this groove 81 mainly is the pipeline slot milling that carries that is used for to the clear water tanks bottom, effectively to prevent to damage by pressure the pipeline that carries of this clear water tanks.When the position of groove 81 can be positioned at this erector and loads onto according to clear water tanks, it carried the particular location of pipeline and is provided with.Can be connected to each other through dormant bolt between protection backing plate 8 and the body frame 11.
For preventing to scratch the clear water tanks surface, the locating surface that this locating piece 2 is used for contacting with clear water tanks can be plank.Locating piece 2 can be divided into several kinds in the utility model embodiment; First kind of upper surface that can be arranged on body frame 11; The back side mutually of this locating piece 2 and locating surface is (when promptly installing clear water tanks; The one side of clear water tanks dorsad) can and body frame 11 between gusset 21 is set, this gusset 21 is used to strengthen the intensity of this first kind of locating piece 2.Second kind of lateral surface that can be arranged on body frame 11 promptly protrudes in body frame 11.Being provided with of above-mentioned several kinds of locating pieces 2 can be provided with according to the situation that clear water tanks is installed.The quantity of preferred locating piece 2 is no less than 4, and lays respectively on the corresponding body frame 11 in 4 bases of clear water tanks.
In conjunction with concrete clear water tanks installation process, the course of work of this clear water tanks being installed frock describes.The erector who at first under car, places the utility model embodiment to provide clear water tanks loads onto, and notices that clear water tanks bottom pipeline is placed on the groove of protection backing plate, in order to avoid damage pipeline by pressure.Should be noted that simultaneously clear water tanks is placed in the space of each locating piece qualification.Be connected with the hitch of overhead traveling crane on one or more in a plurality of holes for hoist that crossbeam is installed; Erector's load with placing whole the slinging of clear water tanks of installing in the frock, is winched to the top of vehicle top air conditioner mouth, slowly fall again; Attention will place the roof top with crossbeam is installed; When treating that clear water tanks arrives setting height(from bottom) basically, operation crown block makes frock level move to the installation site of clear water tanks, and the operator is connected fastening with the installation sign indicating number of roof clear water tanks with bolt.After the installation, operation crown block will be installed frock and withdraw from from main body frame one side, move back to the air louver place of roof, frock hung be back to the storage area.Overhead traveling crane used in the operation is controlled easy, laborsaving, safety as the indispensability lifting means in the workshop by personnel's manual operation button under the car voluntarily.
The clear water tanks that the utility model provides is installed frock, has improved the security reliability that clear water tanks is installed, and reduces the set-up time significantly, practices thrift manpower and device resource, reduces working strength of workers, has produced extraordinary economic benefit.
What should explain at last is: above embodiment is only in order to the technical scheme of explanation the utility model, but not to its restriction; Although the utility model has been carried out detailed explanation with reference to previous embodiment; Those of ordinary skill in the art is to be understood that: it still can be made amendment to the technical scheme that aforementioned each embodiment put down in writing, and perhaps part technical characterictic wherein is equal to replacement; And these are revised or replacement, do not make the spirit and the scope of each embodiment technical scheme of essence disengaging the utility model of relevant art scheme.
Claims (10)
1. a clear water tanks is installed frock, it is characterized in that, comprising:
Underframe comprises body frame connected to one another and subframe;
Be arranged on a plurality of locating pieces on the body frame of said underframe, the zone that said a plurality of locating pieces surround on body frame is corresponding with clear water tanks;
Be arranged on the subframe of said underframe and the main body frame that extends to the top of said underframe, the accommodation space that formation can ccontaining clear water tanks between said main body frame and the said underframe;
Be connected on the said main body frame, be provided with the installation crossbeam of hole for hoist.
2. clear water tanks according to claim 1 is installed frock, it is characterized in that, is fixed with the buttress brace that is used to strengthen bonding strength between body frame and the subframe between said body frame and the said subframe.
3. clear water tanks according to claim 1 is installed frock, it is characterized in that, is provided with the auxiliary buttress brace that is used to increase said main body frame strength and stiffness between said main body frame and the said subframe.
4. clear water tanks according to claim 1 is installed frock, it is characterized in that, said main body frame comprises horizontal segment connected to one another and vertical section, is provided with the gusset that is used to strengthen said main body frame strength and stiffness between said horizontal segment and said vertical section.
5. clear water tanks according to claim 1 is installed frock, it is characterized in that said body frame upper surface is provided with the protection backing plate.
6. clear water tanks according to claim 5 is installed frock, it is characterized in that said protection backing plate is provided with the groove that is used to prevent to damage by pressure said clear water tanks pipeline.
7. clear water tanks according to claim 1 is installed frock, it is characterized in that the locating surface that said locating piece is used for contacting with clear water tanks is a plank.
8. clear water tanks according to claim 7 is installed frock, it is characterized in that the one or more upper surfaces that are arranged on said body frame in the said locating piece also are provided with gusset between the back side mutually of locating piece and said locating surface and the said body frame.
9. according to each described clear water tanks of claim 1-7 frock is installed, it is characterized in that the one or more lateral surfaces that are arranged on said body frame in the said locating piece.
10. according to each described clear water tanks of claim 1-7 frock is installed, it is characterized in that said body frame is an intersecting parallels, said subframe is connected the one of which side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203725086U CN202212755U (en) | 2011-09-27 | 2011-09-27 | Water purifying tank installing tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203725086U CN202212755U (en) | 2011-09-27 | 2011-09-27 | Water purifying tank installing tool |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202212755U true CN202212755U (en) | 2012-05-09 |
Family
ID=46012025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203725086U Expired - Lifetime CN202212755U (en) | 2011-09-27 | 2011-09-27 | Water purifying tank installing tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202212755U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105178393A (en) * | 2015-06-29 | 2015-12-23 | 上海市安装工程集团有限公司 | Manufacturing method, hoisting method and installing method of water tank |
CN107900944A (en) * | 2017-11-09 | 2018-04-13 | 重庆栩鑫家用电器制造有限公司 | The quick assembly tool of stove |
CN107984211A (en) * | 2017-11-28 | 2018-05-04 | 重庆栩鑫家用电器制造有限公司 | The quick assembly tool and its assemble method of a kind of stove |
-
2011
- 2011-09-27 CN CN2011203725086U patent/CN202212755U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105178393A (en) * | 2015-06-29 | 2015-12-23 | 上海市安装工程集团有限公司 | Manufacturing method, hoisting method and installing method of water tank |
CN107900944A (en) * | 2017-11-09 | 2018-04-13 | 重庆栩鑫家用电器制造有限公司 | The quick assembly tool of stove |
CN107900944B (en) * | 2017-11-09 | 2024-04-09 | 南京迪一科技有限公司 | Quick assembly tooling for baking furnace |
CN107984211A (en) * | 2017-11-28 | 2018-05-04 | 重庆栩鑫家用电器制造有限公司 | The quick assembly tool and its assemble method of a kind of stove |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102019998B (en) | Erection embarking method of upper and lower water side cabins | |
CN201882763U (en) | Special carrying pole type beam of double-machine lifting crane | |
CN202212755U (en) | Water purifying tank installing tool | |
CN202046430U (en) | Dock pier trailer | |
CN204775859U (en) | A support device for crane wire rope wire rope handling | |
CN101109028A (en) | Method of upside-down mounting hydraulic pressure lifting of converter shell | |
CN206590817U (en) | A kind of Large Towers kind equipment self-unloading frock | |
CN202963332U (en) | Device for manufacturing pile foundation reinforcement cage by using simple portal frame | |
CN202953704U (en) | Cross beam for single-hook lifting steel plate | |
CN213738242U (en) | Horizontal installation utility tool for internal parts of large tower | |
CN202729590U (en) | Movable type gantry | |
CN101898622B (en) | Jig frame tooling component for longitudinal bulkhead segmented general assembling construction | |
CN202594676U (en) | Bridge deck system shielding plate installation gantry crane for passenger dedicated railway line | |
CN101537982B (en) | Underground orbital transfer hydraulic crane truck | |
CN202265829U (en) | Assembly type anti-falling inner support tray | |
CN202296886U (en) | Hoisting device for installing oversized radial gate of hydropower station | |
CN108642980B (en) | Construction method for quickly and integrally removing ballastless track slabs in operation railway roadbed maintenance in a nondestructive manner | |
CN204906129U (en) | Change vibrating motor's device | |
CN205170256U (en) | A there is rail loop wheel machine device for TBM tunnel construction | |
CN203833467U (en) | Movable large-diameter pipeline air opening alignment bracket | |
CN204038909U (en) | Mobile hoisting suspension bracket equipment | |
CN217201576U (en) | Bracket for storing and hoisting finished small-sized steel members | |
CN206108724U (en) | Simple and easy installing support device of long large -diameter pile base steel reinforcement cage self -control | |
CN205077876U (en) | Machine and stressing jack linkage are worn to restraint by prestress wire | |
CN204369434U (en) | Prefabricated non-slag rail plate air turning device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee | ||
CP01 | Change in the name or title of a patent holder |
Address after: 063035 Hebei province Fengrun District Tangshan City Road No. 3 factory Patentee after: CRRC TANGSHAN CO., LTD. Address before: 063035 Hebei province Fengrun District Tangshan City Road No. 3 factory Patentee before: Tangshan Railway Carriage Co., Ltd. |
|
CX01 | Expiry of patent term |
Granted publication date: 20120509 |
|
CX01 | Expiry of patent term |