CN105178393A - Manufacturing method, hoisting method and installing method of water tank - Google Patents
Manufacturing method, hoisting method and installing method of water tank Download PDFInfo
- Publication number
- CN105178393A CN105178393A CN201510368077.9A CN201510368077A CN105178393A CN 105178393 A CN105178393 A CN 105178393A CN 201510368077 A CN201510368077 A CN 201510368077A CN 105178393 A CN105178393 A CN 105178393A
- Authority
- CN
- China
- Prior art keywords
- water tank
- pedestal
- building
- platform
- bracing means
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a manufacturing method of a water tank, wherein the method comprises the following steps: 1, manufacturing a reinforcing device according to the dimension of a pre-customized water tank main body; and 2, manufacturing the water tank main body inside the reinforcing device so as to obtain a water tank. The invention also discloses a hoisting method of the water tank, wherein the method comprises the following steps: 11, connecting the water tank to a hoisting balance beam by virtue of a hoisting lug of the reinforcing device; and 12, hoisting the water tank to a base by virtue of a crane through the hoisting balance beam. The invention further discloses an installing method of the water tank, wherein the method comprises the following steps: 21, placing the water tank on the base; and 22, fixedly connecting the base to the reinforcing device. The water tank disclosed by the invention can be prefabricated in a factory; the water tank can be hoisted; and the water tank can be stably installed on a designated position.
Description
Technical field
The present invention relates to a kind of preparation method of water tank, also relate to a kind of hanging method and mounting method of water tank.
Background technology
Water tank, its shape can be three-dimensional case, cylinder or other shape.Its inside is provided with water storage chamber, for storing the water yield.Water tank, may be used for daily life and has supplied water, and also can provide water supply for fire-fighting, can also be used for middle water and collect water storage etc.Such as: the water tank of living water use is generally provided with the top layer of building.If mounting means conveniently, water tank is placed on the pedestal of the top layer of building, and do not take any fixation, wind load then due to the top layer of building is large, add rocking of the certain amplitude that the size of the by wind of building own produces, particularly be subject to the threat of the natural calamity such as typhoon and earthquake, water tank can be caused from the risk of falling from high altitude, then to building itself and its surrounding building, comprise parking to act and all cause potential safety hazard at the vehicle of this building periphery and activity the resident of building periphery.In addition, in highrise building, the constraint such as many by mechanical floor device category, architectural space is little, transport of materials is inconvenient, water tank often adopts on-the-spot splicing, its site operation difficulty is large and there is potential safety hazard, and splicing work is often carried out with other professional constructions intersection, be subject to the impact of duration, these factors all constitute a latent danger to the making quality of water tank.And traditional huge tanks is when lifting, flexible steel wire may extrude and scratch stainless sheet steel, causes the water tank in hoisting process be out of shape, therefore the larger water tank of volume is generally not suitable for employing integral hoisting, causes water tank low in the prefabricated degree of batch production; When direct splicing makes water tank, because material, artificial and resource all need the roof construction being transported to highrise building, the making of feed tank brings not convenient property again.
Summary of the invention
Technical problem to be solved by this invention is, overcomes above-mentioned technical problem, provides one can carry out prefabricated completing in factory, and is suitable for the preparation method of the water tank lifted.
In order to solve the problems of the technologies described above, technical scheme of the present invention is: a kind of preparation method of water tank, comprises the following steps:
Step 1, carries out the making of bracing means according to the size of pre-customized tank body;
Step 2, carries out the making of described tank body in described bracing means, to obtain water tank;
Wherein, described bracing means comprises the fixed platform for carrying tank body; the surrounding of described fixed platform upwards extends the reinforcing frame of the sidewall being fixedly installed protection tank body; described reinforcing frame comprises some the horizontal stiffeners and vertical stiffeners that are fixedly connected with, and described reinforcing frame is fixedly installed several hangers.
Compared with prior art, the preparation method of water tank of the present invention, first makes bracing means, in bracing means, then complete the making of tank body, to obtain water tank.Therefore, according to the water tank that the preparation method of water tank of the present invention obtains, can complete factory is directly prefabricated, carry out on-site consolidation without the need to the top layer artificial, material, equipment etc. being transported to building.When thus it also avoid field fabrication water tank, the generation with the situation of other cross influence of constructing, reduces the potential safety hazard of site operation.In addition, the present invention is provided with bracing means due to the periphery at tank body, therefore, during lifting, flexible steel wires etc. are directly fixedly connected on bracing means, and directly do not contact with tank body, therefore, compared with traditional water tank, during its lifting, can not be subject to the extruding of flexible steel wire or scratch and damage the situation of tank body, tank body is owing to being subject to the protection of bracing means, therefore, the situation of tank body distortion can not be produced; Therefore the water tank adopting the preparation method of water tank of the present invention to obtain, be applicable to lifting.
In order to solve the problems of the technologies described above, the present invention also provides a kind of hanging method of water tank, comprises the following steps:
Step 11, adopts hoisting balance beam to be connected by water tank by the hanger of described bracing means;
Step 12, adopts loop wheel machine to be lifted on pedestal by water tank by hoisting balance beam.
Further, the hanging method of water tank provided by the invention, when pedestal is arranged at the top layer of building, is also included in the step of the interim placement platform that the body of wall of building is fixedly installed, for placing water tank temporarily.
Further, the hanging method of water tank provided by the invention, arranges the step of platform spike between described interim placement platform and the body of wall of the building below it, for the described fixing interim placement platform of support.
Further, the hanging method of water tank provided by the invention, arranges the step of platform drag-line between the body of wall of the building of described interim placement platform above it, for the fixing described interim placement platform of reinforcement traction.
Further, the hanging method of water tank provided by the invention, before lifting, fills batten by between tank body and reinforcing frame.
The hanging method of water tank provided by the invention, can carry out safe being lifted into assigned address, such as, on the pedestal of building top layer to water tank.After being connected by water tank by hoisting balance beam, by loop wheel machine, water tank is lifted into assigned address, thus the object that realization lifts water tank.When lifting; because hoisting balance beam is directly fixedly connected on bracing means; and directly do not contact with tank body; therefore, compared with traditional water tank, during its lifting; the extruding of hoisting balance beam can not be subject to or scratch and damage the situation of tank body; tank body, owing to being subject to the protection of bracing means, therefore, can not produce the situation of tank body distortion.
In order to solve that water tank can be firm be arranged on building top layer etc. there is certain altitude position time, the present invention also provides a kind of mounting method of water tank, comprises the following steps:
Step 21, is placed into water tank on pedestal;
Step 22, is fixedly connected with water tank with pedestal; When pedestal is steel work, the fixed platform of bracing means is welded with pedestal; When pedestal is concrete structure, by lower margin expansion bolt, fixed platform is fixedly connected with pedestal.
Further, the mounting method of water tank provided by the invention, when pedestal is concrete structure, arranges spring washer and/or bevel washer, to be fixedly connected on pedestal by water tank between fixed platform and pedestal.
Compared with prior art, water tank to be fixed with pedestal by the fixed platform of bracing means to be connected by the present invention, compared with being directly placed on pedestal, has stronger steadiness with water tank bottom independent in prior art.And solve the problem that water tank bottom in prior art cannot be fixing with pedestal.After adopting the mounting method of water tank of the present invention to be installed by water tank, the impact of water tank by wind is less, and after being fixedly connected with, water tank and building are synchronously rock, therefore, to water tank topple over or the risk of falling from high altitude less; Evade building itself and its surrounding building, vehicle and the activity potential safety hazard the resident of building periphery.In addition, after water tank is fixedly connected with the pedestal of building, water tank and building are synchronized with the movement, therefore, to a certain extent, when building can sustain the threat of the natural calamity such as typhoon and earthquake, the water tank be arranged on the pedestal of building top layer also can sustain the threat of the natural calamity such as typhoon and earthquake.
Accompanying drawing explanation
Fig. 1 is the structural representation of the bracing means of one embodiment of the invention;
Fig. 2 is the structural representation of the fixed platform of one embodiment of the invention;
Fig. 3 is the structural representation of the water tank of one embodiment of the invention;
Fig. 4-5 is structural representations of the hoisting process of one embodiment of the invention;
Fig. 6 is the water tank of one embodiment of the invention and the mounting structure schematic diagram of pedestal;
Fig. 7 is the mounting structure schematic diagram of the pedestal of one embodiment of the invention.
Shown in figure: 10, water tank, 20, hoisting balance beam, 30, loop wheel machine, 40, pedestal, 50, building, 60, interim placement platform, 70, platform spike, 80, platform drag-line, 100, tank body, 200, bracing means, 210, fixed platform, 211, channel-section steel, 212, gusset plate, 213, expansion bolt, 220, reinforcing frame, 221, horizontal stiffener, 222, vertical stiffeners, 230, hanger, 300, lower margin expansion bolt, 301, spring washer, 302, bevel washer, 400, pad.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is described in detail:
Embodiment one
Please refer to Fig. 1 to Fig. 3, the present embodiment one provides a kind of preparation method of water tank, comprises the following steps:
Step 1, carries out the making of bracing means 200 according to the size of pre-customized tank body 100;
Step 2, carries out the making of described tank body 100 in described bracing means 200, to obtain water tank 10.
Wherein, described bracing means 200 comprises the fixed platform 210 for carrying tank body 100; the surrounding of described fixed platform 210 upwards extends the reinforcing frame 220 of the sidewall being fixedly installed protection tank body 100; described reinforcing frame 220 comprises some the horizontal stiffeners be fixedly connected with 221 and vertical stiffeners 222, and described reinforcing frame 220 is fixedly installed several hangers 230.
Wherein, described horizontal stiffener 221 and vertical stiffeners 222 are connected for bolt and/or weld.Wherein, the material alternate material intensity of reinforcing frame 220 is be greater than the carbon element alloy steel of Q275 or the steel of other low-alloy structural.Reinforcing frame 220 will meet 5 times that its intensity at least can bear the weight of tank body 100.The quantity of the hanger 230 of the present embodiment one is set to 6, and it has the effect of balanced power.In the present embodiment one, the pulling force of hanger 230 and rupture pull force are respectively 2 times and 10 times of tank body 100.
The preparation method of water tank of the present invention, first makes bracing means 200, in bracing means 200, then completes the making of tank body 100, to obtain water tank 10.The present invention is provided with bracing means 200 in the periphery of tank body 100 and bottom, for the protection of tank body 100, and arranges hanger 230 on bracing means 200, thus realizes the lifting object of water tank 10.When lifting, flexible steel wire or hoisting balance beam can not directly touch tank body 100, but by bracing means 200, water tank 10 is lifted into the position needing to install, due in hoisting process, flexible steel wire or hoisting balance beam can not directly extrude and cut to pieces clips tank body 100, therefore, the tank body 100 being lifted into assigned address can not be out of shape.In addition, the present invention is owing to being provided with bracing means 200, and therefore, the water tank 10 of the installation environment demand that can be prefabricated in the factory, carries out on-site consolidation without the need to the top layer artificial, material, equipment etc. being transported to building.When thus avoiding field fabrication water tank 10, the generation with the situation of other cross influence of constructing, reduces the potential safety hazard of site operation.Therefore artificial and material cost is also saved.The preparation method of water tank 10 of the present invention, can complete factory is directly prefabricated, and is applicable to lifting.
Please refer to Fig. 2, as preferably embodiment, water tank 10 provided by the invention, described fixed platform 210 comprises at least two channel-section steels be arranged in parallel 211, adopts expansion bolt 213 to be fixedly connected with at least two gusset plates 212 between adjacent two described channel-section steels 211.This kind of mode, has cost-saving effect.Wherein, described fixed platform 210, can also be greater than the steel plate of tank body 100 for its area.This kind of mode, has the effect of the loaded area increasing tank body 100.
Please refer to Fig. 3, as preferably embodiment, water tank 10 provided by the invention, leaves the gap of 5-10mm between described tank body 100 and reinforcing frame 200.This gap can prevent tank body 100 because of produced swell increment of expanding with heat and contract with cold.
Embodiment two
Please refer to Fig. 4, Fig. 5, the hanging method of the water tank 10 that the present embodiment two provides a kind of embodiment one to obtain, comprises the following steps:
Step 11, adopts hoisting balance beam 20 to be connected by water tank 10 by the hanger 230 of described bracing means 200;
Step 12, adopts loop wheel machine 30 to be lifted on pedestal 40 by water tank 10 by hoisting balance beam 20.
The hanging method of the water tank that the present embodiment two provides, can carry out safe being lifted into assigned address, such as, on the pedestal 40 of building top layer to water tank 10 of the present invention.After being connected by water tank 10 by hoisting balance beam 20, by loop wheel machine 30, water tank 10 is lifted into assigned address, thus the object that realization lifts water tank 10.Solving those skilled in the art cannot to the problem of the lifting of the water tank of prior art.When lifting; because hoisting balance beam 20 is directly fixedly connected on bracing means 200; and directly do not contact with tank body 100; therefore; compared with lifting with traditional water tank, can not be subject to the extruding of hoisting balance beam 20 or scratch and damage the situation of tank body 100, tank body 100 is owing to being subject to the protection of bracing means 200; therefore, the situation that tank body 100 is out of shape can not be produced.
Please refer to Fig. 5, as preferably embodiment, the hanging method of water tank provided by the invention, when pedestal 40 is arranged at the top layer of building 50, also be included in the step of the interim placement platform 60 that the body of wall of building 50 is fixedly installed, place water tank 10 for interim.Interim placement platform 60 can be used for transhipment water tank 10 to assigned address.
Please refer to Fig. 5, as preferably embodiment, the hanging method of water tank provided by the invention, arranges the step of platform spike 70 between interim placement platform 60 and the body of wall of the building below it 50, for the fixing interim placement platform 60 of support; And/or the step of platform drag-line 80 is set between the body of wall of the building 50 of interim placement platform 60 above it, for the fixing interim placement platform 60 of traction.Platform spike 70 and platform drag-line 80 all have the fixing effect strengthening interim placement platform.
As preferably embodiment, the hanging method of water tank provided by the invention, before lifting, fills batten by between tank body 100 and reinforcing frame 220.Batten can cushion in hoisting process, collides between tank body 100 and bracing means 200, and can avoid the generation to the abrasive situation of tank body such as hawser.
Embodiment three
Please refer to Fig. 6, Fig. 7, the mounting method of the water tank 10 that this enforcement three provides a kind of preparation method of water tank of embodiment one to obtain, comprises the following steps:
Step 21, is placed into water tank 10 on pedestal 40;
Step 22, is fixedly connected with water tank 10 with pedestal 40; When pedestal 40 is steel work, the fixed platform 210 of bracing means 200 is welded with pedestal 40; When pedestal 40 is concrete structure, by lower margin expansion bolt 300, fixed platform 210 is fixedly connected with pedestal 40.
Wherein, when pedestal 40 is concrete structure, need in fixed platform 210, to arrange through hole in advance, adopt lower margin expansion bolt 300 fixed platform 210 to be fixedly connected with pedestal 40, to be fixedly connected on pedestal 40 by water tank 10 through through hole.
Please refer to Fig. 7, as preferably embodiment, the mounting method of water tank of the present invention, when pedestal 40 is concrete structure, spring washer 301 and/or bevel washer 302 are set between fixed platform 210 and pedestal 40, to be fixedly connected on pedestal 40 by water tank 10.
The present embodiment three to be fixed with pedestal 40 by the fixed platform 210 of bracing means 200 by water tank 10 to be connected, and compared with being directly placed on pedestal, has stronger steadiness with water tank bottom independent in prior art.And solve the problem that water tank bottom in prior art cannot be fixing with pedestal.After adopting the mounting method of the water tank of the present embodiment three to be installed by the water tank 10 of embodiment one, the impact of water tank 10 by wind is less, and after being fixedly connected with, water tank 10 and building 50 are for synchronously rocking, therefore, to water tank 10 topple over or the risk of falling from high altitude less; Evade building 50 itself and its surrounding building, vehicle and the activity potential safety hazard the resident of building periphery.In addition, after water tank 10 is fixedly connected with the pedestal 40 of building 50, water tank 10 and building 50 are synchronized with the movement, therefore, to a certain extent, when building 50 can sustain the threat of the natural calamity such as typhoon and earthquake, the water tank 10 be arranged on the pedestal 40 of building 50 top layer also can sustain the threat of the natural calamity such as typhoon and earthquake.Therefore, the present embodiment three is specially adapted to the installation of the water tank of high-rise building.
Pedestal 40 can also weld with reinforcing frame 220 by the present embodiment three, and the distribution of pad 400 as shown in Figure 7.
The invention is not restricted to above-mentioned detailed description of the invention, all various changes done in the spirit and scope of claims of the present invention, all within protection scope of the present invention.
Claims (8)
1. a preparation method for water tank, is characterized in that, comprises the following steps:
Step 1, carries out the making of bracing means (200) according to the size of pre-customized tank body (100);
Step 2, carries out the making of described tank body (100) in described bracing means (200), to obtain water tank (10);
Wherein, described bracing means (200) comprises the fixed platform (210) for carrying tank body (100); the surrounding of described fixed platform (210) upwards extends the reinforcing frame (220) of the sidewall being fixedly installed protection tank body (100); described reinforcing frame (220) comprises some the horizontal stiffeners be fixedly connected with (221) and vertical stiffeners (222), and described reinforcing frame (220) is fixedly installed several hangers (230).
2. a hanging method for the water tank of the preparation method acquisition of water tank as claimed in claim 1, is characterized in that, comprise the following steps:
Step 11, adopts hoisting balance beam (20) to be connected by water tank (10) by the hanger (230) of described bracing means (200);
Step 12, adopts loop wheel machine (30) to be lifted on pedestal (40) by water tank (10) by hoisting balance beam (20).
3. the hanging method of water tank as claimed in claim 2, it is characterized in that, when pedestal (40) is arranged at the top layer of building (50), also be included in the step of the interim placement platform (60) that the body of wall of building (50) is fixedly installed, for placing water tank (10) temporarily.
4. the hanging method of water tank as claimed in claim 3, it is characterized in that, the step of platform spike (70) is set between described interim placement platform (60) and the body of wall of the building below it (50), for the fixing described interim placement platform (60) of support.
5. the hanging method of the water tank as described in claim 3 or 4, it is characterized in that, the step of platform drag-line (80) is set between the body of wall being positioned at the building (50) of described interim placement platform (60) above it, for the fixing described interim placement platform (60) of traction.
6. the hanging method of water tank as claimed in claim 2, is characterized in that, before lifting, also comprising the step by filling batten between tank body (100) and reinforcing frame (220).
7. a mounting method for the water tank of water tank preparation method acquisition as claimed in claim 1, is characterized in that, comprise the following steps:
Step 21, is placed into water tank (10) on pedestal (40);
Step 22, is fixedly connected with water tank (10) with pedestal (40); When pedestal (40) is for steel work, the fixed platform (210) of bracing means (200) is welded with pedestal (40); When pedestal (40) is for concrete structure, by lower margin expansion bolt (300), fixed platform (210) is fixedly connected with pedestal (40).
8. the mounting method of water tank as claimed in claim 7, it is characterized in that, when pedestal (40) is for concrete structure, spring washer (301) and/or bevel washer (302) are set between fixed platform (210) and pedestal (40), to be fixedly connected on pedestal (40) by water tank (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510368077.9A CN105178393B (en) | 2015-06-29 | 2015-06-29 | The manufacture method of water tank, hanging method, installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510368077.9A CN105178393B (en) | 2015-06-29 | 2015-06-29 | The manufacture method of water tank, hanging method, installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105178393A true CN105178393A (en) | 2015-12-23 |
CN105178393B CN105178393B (en) | 2017-03-15 |
Family
ID=54900780
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510368077.9A Active CN105178393B (en) | 2015-06-29 | 2015-06-29 | The manufacture method of water tank, hanging method, installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105178393B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105938121A (en) * | 2016-05-26 | 2016-09-14 | 中国建筑第八工程局有限公司 | Water injection apparatus of acoustic pipes in steel pipe concrete column, and water injection method thereof |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2497851A (en) * | 1945-09-13 | 1950-02-21 | Chicago Bridge & Iron Co | Lifter roof storage tank |
CN2047273U (en) * | 1989-02-20 | 1989-11-08 | 许运行 | Assembled water-supply tank |
CN2368882Y (en) * | 1999-04-26 | 2000-03-15 | 张庆发 | Assembled stainless steel water supplying tank |
CN201250050Y (en) * | 2008-07-08 | 2009-06-03 | 武汉钢铁(集团)公司 | Ladle lifter |
KR101043922B1 (en) * | 2011-03-31 | 2011-06-28 | (주)동일웰텍 | Method for manufacturing water tank with double layer welded using lifting device and water tank, method for repairing water tank composed of concrete using thereof |
CN202212755U (en) * | 2011-09-27 | 2012-05-09 | 唐山轨道客车有限责任公司 | Water purifying tank installing tool |
CN202378688U (en) * | 2011-11-24 | 2012-08-15 | 芜湖中集瑞江汽车有限公司 | Mounting structure for water tank of semi-trailer |
-
2015
- 2015-06-29 CN CN201510368077.9A patent/CN105178393B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2497851A (en) * | 1945-09-13 | 1950-02-21 | Chicago Bridge & Iron Co | Lifter roof storage tank |
CN2047273U (en) * | 1989-02-20 | 1989-11-08 | 许运行 | Assembled water-supply tank |
CN2368882Y (en) * | 1999-04-26 | 2000-03-15 | 张庆发 | Assembled stainless steel water supplying tank |
CN201250050Y (en) * | 2008-07-08 | 2009-06-03 | 武汉钢铁(集团)公司 | Ladle lifter |
KR101043922B1 (en) * | 2011-03-31 | 2011-06-28 | (주)동일웰텍 | Method for manufacturing water tank with double layer welded using lifting device and water tank, method for repairing water tank composed of concrete using thereof |
CN202212755U (en) * | 2011-09-27 | 2012-05-09 | 唐山轨道客车有限责任公司 | Water purifying tank installing tool |
CN202378688U (en) * | 2011-11-24 | 2012-08-15 | 芜湖中集瑞江汽车有限公司 | Mounting structure for water tank of semi-trailer |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105938121A (en) * | 2016-05-26 | 2016-09-14 | 中国建筑第八工程局有限公司 | Water injection apparatus of acoustic pipes in steel pipe concrete column, and water injection method thereof |
CN105938121B (en) * | 2016-05-26 | 2019-07-30 | 中国建筑第八工程局有限公司 | The water filling device of sound detecting pipe and the method for water filling in steel core concrete column |
Also Published As
Publication number | Publication date |
---|---|
CN105178393B (en) | 2017-03-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204311719U (en) | External hanging type scaffold | |
CN209538693U (en) | A kind of template single side bracing | |
CN104831939A (en) | Bolt ball welding ball mixed node large span cantilever grid structure construction method | |
CN101538936A (en) | Hydraulic slip-and-lift construction method for water tower, hydraulic slip-form device, lifting device and hanger rod connecting piece thereof | |
CN105804400A (en) | Hoisting construction method of curved truss | |
CN203487845U (en) | Spherical building with anti-disaster function | |
CN108590322A (en) | A kind of method of free-standing steel chimney upside-down method of hull-section construction assembling segmental hoisting | |
CN103352576A (en) | Externally expanding, assembling, converting and lifting method for medium/small span steel structure roof net rack | |
CN205077878U (en) | Unit type curtain plate hoisting device | |
CN209308175U (en) | A kind of factory building roof rack mounting structure | |
CN203143872U (en) | Mobile platform for elevator installation construction | |
CN109881587A (en) | King-tower upper beam bracket integral installation method under a kind of strong wind atmosphere | |
CN104060836B (en) | The lifting installation method of high curved surface rack | |
CN102061810B (en) | Construction method of safe flat net positioned on periphery of building | |
CN201908447U (en) | Lift-type horizontal safety net | |
CN211666206U (en) | Overhanging and landing dual-purpose scaffold | |
CN105178393A (en) | Manufacturing method, hoisting method and installing method of water tank | |
CN210884873U (en) | Installation hanging beam and lifting device of pipeline | |
CN107675792A (en) | Steel construction is encorbelmented gallery structure and construction method | |
CN106894437A (en) | Limited prestressing precast concrete foundation, communication tower building and construction method | |
CN103362315B (en) | Hanging bracket for hoisting pipeline integrally and construction method of hanging bracket | |
CN116044178A (en) | Installation method of large-inclination end screen with cantilever structure at upper part | |
CN201825635U (en) | Hoisting structure of power station boiler | |
CN204726947U (en) | Water tank | |
CN104944016A (en) | Water tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |