CN210884873U - Installation hanging beam and lifting device of pipeline - Google Patents

Installation hanging beam and lifting device of pipeline Download PDF

Info

Publication number
CN210884873U
CN210884873U CN201921477578.0U CN201921477578U CN210884873U CN 210884873 U CN210884873 U CN 210884873U CN 201921477578 U CN201921477578 U CN 201921477578U CN 210884873 U CN210884873 U CN 210884873U
Authority
CN
China
Prior art keywords
pipeline
hanging beam
hanging
beam body
fixing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921477578.0U
Other languages
Chinese (zh)
Inventor
魏成权
姜国斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Industrial Equipment Installation Co ltd
Original Assignee
Guangdong Industrial Equipment Installation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Industrial Equipment Installation Co ltd filed Critical Guangdong Industrial Equipment Installation Co ltd
Priority to CN201921477578.0U priority Critical patent/CN210884873U/en
Application granted granted Critical
Publication of CN210884873U publication Critical patent/CN210884873U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses an installation hanging beam and lifting device of pipeline relates to piping erection technical field, the installation hanging beam of pipeline include the hanging beam body, hanging beam body top has the pipeline loading end, the fixed subassembly of pipeline that a plurality of is used for fixed pipeline is arranged at hanging beam body top, hanging beam body both ends all are provided with the hole for hoist. The utility model discloses fixed pipeline in groups can be after ground installation, and the corresponding hole for hoist of rethread promotes, can repeat the turnover use, and the atress is reliable, makes things convenient for the hoist and mount in the floor to use, reaches convenient, safe effect.

Description

Installation hanging beam and lifting device of pipeline
Technical Field
The utility model relates to a piping erection technical field, in particular to installation hanging beam of pipeline still relates to the lifting device of a pipeline.
Background
In realizing the utility model discloses the in-process, the inventor finds that there is following problem at least among the prior art, at present, in the civil construction air conditioning system, for rational arrangement practices thrift the space, the main pipe of air conditioner water pipe adopts the mode of arranging in concentrated usually to arrange, then tens meters are few from the horizontal main pipe of air conditioner between air conditioner host computer room to the air conditioner shaft, then hundred meters more. The pipe diameter of the section of pipeline is large, the pipe section is heavy, the installation clearance is small, and the installation difficulty is large. The traditional installation method is that part of the hanging bracket is installed firstly, then expansion bolts are driven into the top plate to set temporary hanging points, each segmented steel pipe is lifted by a chain block, and the steel pipe is installed in place by the measures of inclination or oblique pulling of the steel pipe and the like.
However, the number of the temporary hoisting points is large, so that the potential safety hazard is large, and the work efficiency is low; the sectional steel pipes can not be directly lifted to be in place, and need to be in place through measures such as inclination or diagonal pulling, so that the labor intensity is high and the safety risk is high. At the present stage, along with the improvement of safety awareness, the acceleration of engineering construction progress and the great improvement of labor cost, how to realize the safe, reliable, convenient and quick installation of the basement air conditioner horizontal trunk pipe is a problem to be solved urgently.
Disclosure of Invention
The utility model discloses aim at solving one of the above-mentioned technical problem among the prior art to a certain extent at least. Therefore, the embodiment of the utility model provides an installation hanging beam of pipeline, the operation can be assembled on ground to the sectionalized unitized pipeline, and unified hoist and mount promotes, shifts most high altitude construction to ground, and whole promotion reaches convenient high efficiency, safe and reliable's effect moreover.
The embodiment of the utility model provides a still provide the lifting device of a pipeline.
According to the utility model discloses the embodiment of the first aspect provides an installation hanging beam of pipeline, including the hanging beam body, hanging beam body top has the pipeline loading end, the fixed subassembly of pipeline that a plurality of is used for fixed pipeline has been arranged at hanging beam body top, hanging beam body both ends all are provided with the hole for hoist.
According to the utility model discloses the embodiment of the first aspect, hanging beam body cross-section is the I shape, the hanging beam body includes upper limb listrium, web and lower flange listrium, the pipeline loading end does the up end of upper limb listrium, the hole for hoist is arranged respectively the web both ends.
According to the utility model discloses the embodiment of first aspect, each the hole for hoist is arranged web tip downside.
According to the utility model discloses an embodiment of the first aspect, each the reinforced subassembly is installed to the hole for hoist, reinforced subassembly is including fixing reinforcing plate on the web.
According to the utility model discloses an embodiment of first aspect, the fixed subassembly of pipeline is arranged on the upper limb listrium, each the fixed subassembly of pipeline includes the ferrule and a pair of fixed orifices corresponding with this ferrule, each the fixed orifices sets up on the upper limb listrium.
According to the utility model discloses the embodiment of the first aspect, each the subassembly is fixed to the pipeline crisscross distribution in proper order both sides around the upper flange board.
According to the utility model discloses the embodiment of first aspect, hanging beam body height is defined as an, and an is more than or equal to 400 mm.
According to the utility model discloses the embodiment of the second aspect provides a lifting device of pipeline, including at least two the embodiment of the first aspect installation hanging beam and a plurality of pipeline install the hoist device at the roof, each hoist device with corresponding hole for hoist position one-to-one, hoist device and corresponding the hole for hoist passes through the chain block and connects.
Based on the technical scheme, the embodiment of the utility model provides a following beneficial effect has at least: the pipeline loading end at the top of the hanging beam body is arranged in the group of horizontally arranged pipelines, the hanging beam body can be hoisted by hoisting equipment through hoisting holes at two ends of the hanging beam body, the hoisting pipelines are hoisted to the installation position in group, and the hanging beam body can be lowered after a support hanger for supporting the pipelines is installed. The utility model discloses fixed pipeline in groups can be after ground installation, and the corresponding hole for hoist of rethread promotes, can repeat the turnover use, and the atress is reliable, makes things convenient for the hoist and mount in the floor to use, reaches convenient, safe effect.
Drawings
In order to more clearly illustrate the technical solution in the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly described below. It is clear that the described figures represent only some embodiments of the invention, not all embodiments, and that a person skilled in the art can also derive other designs and figures from these figures without inventive effort.
FIG. 1 is a front view of a body of a suspension beam according to an embodiment of the present invention;
fig. 2 is a top view of a suspension beam body in an embodiment of the present invention;
FIG. 3 is a schematic structural view of the embodiment of the present invention in which the group of pipes are installed on the hanging beam body;
fig. 4 is the embodiment of the utility model provides an in the embodiment of the structure schematic diagram that the pipeline in groups puts in place through hanging beam body hoist and mount.
Detailed Description
This section will describe in detail the embodiments of the present invention, preferred embodiments of the present invention are shown in the attached drawings, which are used to supplement the description of the text part of the specification with figures, so that one can intuitively and vividly understand each technical feature and the whole technical solution of the present invention, but they cannot be understood as the limitation of the protection scope of the present invention.
In the description of the present invention, "a plurality" means two or more, and "more than", "less than", "more than", etc. are understood to exclude the present number, and "more than", "less than", "within", etc. are understood to include the present number unless otherwise specifically limited.
In the description of the present invention, unless explicitly defined otherwise, terms such as "set", "arrange", "install", "connect", "fix" and the like should be understood in a broad sense, and those skilled in the art can reasonably determine the specific meanings of the above terms in the present invention by combining the specific contents of the technical solutions.
Referring to fig. 1 to 3, the installation hanging beam of the pipeline of the embodiment of the present invention includes a hanging beam body 10, particularly, the cross section of the hanging beam body 10 is i-shaped, and the hanging beam body 10 includes an upper flange plate 11, a web plate 12 and a lower flange plate 13. In this embodiment, the suspension beam body 10 is a welded i-steel, and the thicknesses of the upper flange plate 11, the web plate 12 and the lower flange plate 13 are all 8 mm.
The top of the hanging beam body 10 has a pipeline bearing surface, which in this embodiment is the upper end surface of the upper flange plate 11, and the pipeline bearing surface is used for bearing the pipeline 41, as shown in fig. 3.
A plurality of pipe fixing assemblies for fixing the pipes are arranged on the top of the hanging beam body 10, specifically, the pipe fixing assemblies are arranged on the upper flange plate 11, each pipe fixing assembly comprises a pipe hoop 32 and a pair of fixing holes 31 corresponding to the pipe hoop 32, and each fixing hole 31 is arranged on the upper flange plate 11. In order to prevent the fixing holes 31 from affecting the stability of the suspension beam body 10, the pipeline fixing assemblies are sequentially distributed on the front and rear sides of the upper flange plate 11 in a staggered manner, as shown in fig. 2, two fixing holes 31 in one pipeline fixing assembly are both located on the rear side of the upper flange plate 11, and two fixing holes 31 in the adjacent pipeline fixing assembly are both located on the front side of the upper flange plate 11.
In addition, hoisting holes 21 are provided at both ends of the hoisting beam body 10, specifically, the hoisting holes 21 are respectively arranged at both ends of the web 12. Each lifting hole 21 is arranged at the lower side of the end part of the web plate, when the lifting device lifts the lifting beam body 10 through the lifting holes 21, due to the self installation height of the lifting equipment, the used lifting hook chain and other reasons, the lifting holes and the top plate have height difference, and the lifting height of the pipeline bearing surface can be indirectly improved due to the arrangement of the lifting holes 21 at the lower side of the end part of the web plate. Furthermore, the height of the hanging beam body 10 is defined as a, a is larger than or equal to 400mm, and the lifting height of the bearing surface of the pipeline can be indirectly increased by increasing the height of the hanging beam body 10. In this embodiment, the height a of the suspension beam body 10 is 400 mm.
Each lifting hole 21 is provided with a reinforcing component, and the reinforcing component comprises a reinforcing plate 22 fixed on the web plate, so that the structural strength of the lifting hole 21 can be increased.
Referring to fig. 4, the utility model discloses lifting device of pipeline, including the installation hanging beam and the hoist device 61 of installing at roof 51 of the installation hanging beam and the plurality of two at least foretell pipelines, each hoist device 61 and corresponding hole for hoist 21 position one-to-one, hoist device 61 is connected through chain block 62 with corresponding hole for hoist 21.
When the hoisting equipment of pipeline is used, a plurality of groups can be arranged and carried out simultaneously, each group has four pipelines, namely each group has four hoisting beam bodies 10, and the length of the pipeline 41 in each group is controlled within fifty meters. As shown in fig. 4, each group has 4 pipes 41, and the length of the suspension beam body 10 in this embodiment is 1950 mm.
Firstly, carrying out on-site paying-off, and determining the specific installation position of each hanging beam body 10; placing the hanging beam bodies 10 on the ground, wherein the distance between every two hanging beam bodies 10 is ten meters; assembling the pipelines 41 one by one on the upper flange plates 11 of the hanging beam bodies 10, and fixing the pipelines respectively by using pipe hoops 32; installing a hoisting device 61 on the top plate 51, installing each chain block 62 on the hoisting device 61 and connecting the corresponding hoisting holes 21, and then lifting each hanging beam body 10 in a group to form each pipeline 41 in a group; after the pipe is in place and secured to the hanger, each ferrule 7 is removed and each hanger beam body 10 is lowered to the ground.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art.

Claims (8)

1. The utility model provides an installation hanging beam of pipeline which characterized in that: the pipeline fixing device comprises a hanging beam body (10), wherein the top of the hanging beam body (10) is provided with a pipeline bearing surface, a plurality of pipeline fixing assemblies used for fixing pipelines are arranged at the top of the hanging beam body (10), and hoisting holes (21) are formed in two ends of the hanging beam body (10).
2. The pipe mounting hanger beam of claim 1, wherein: the cross-section of the hanging beam body (10) is I-shaped, the hanging beam body (10) comprises an upper flange plate (11), a web plate (12) and a lower flange plate (13), the pipeline bearing surface is the upper end surface of the upper flange plate (11), and the hoisting holes (21) are respectively arranged at two ends of the web plate (12).
3. The pipe mounting hanger beam of claim 2, wherein: each hoisting hole (21) is arranged at the lower side of the end part of the web.
4. The pipe mounting hanger beam of claim 2, wherein: and a reinforcing component is arranged in each hoisting hole (21), and comprises a reinforcing plate (22) fixed on the web plate (12).
5. A mounting hanger beam for a pipeline as claimed in claim 2 or 3 or 4, wherein: the pipe fixing assemblies are arranged on the upper flange plate (11), each pipe fixing assembly comprises a pipe hoop (32) and a pair of fixing holes (31) corresponding to the pipe hoop (32), and each fixing hole (31) is formed in the upper flange plate (11).
6. The pipe mounting hanger beam of claim 5, wherein: the pipeline fixing components are sequentially distributed on the front side and the rear side of the upper flange plate (11) in a staggered mode.
7. The pipe mounting hanger beam of claim 1, wherein: the height of the hanging beam body (10) is defined as a, and a is more than or equal to 400 mm.
8. The utility model provides a lifting device of pipeline which characterized in that: the pipeline installation hanging beam comprises at least two pipeline installation hanging beams as claimed in any one of claims 1 to 7 and a plurality of hanging devices (61) installed on a top plate (51), wherein each hanging device (61) corresponds to the corresponding hanging hole (21) in a one-to-one mode, and the hanging devices (61) are connected with the corresponding hanging holes (21) through chain blocks (62).
CN201921477578.0U 2019-09-05 2019-09-05 Installation hanging beam and lifting device of pipeline Active CN210884873U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921477578.0U CN210884873U (en) 2019-09-05 2019-09-05 Installation hanging beam and lifting device of pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921477578.0U CN210884873U (en) 2019-09-05 2019-09-05 Installation hanging beam and lifting device of pipeline

Publications (1)

Publication Number Publication Date
CN210884873U true CN210884873U (en) 2020-06-30

Family

ID=71314030

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921477578.0U Active CN210884873U (en) 2019-09-05 2019-09-05 Installation hanging beam and lifting device of pipeline

Country Status (1)

Country Link
CN (1) CN210884873U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112110336A (en) * 2020-09-21 2020-12-22 中国建筑第八工程局有限公司 Device for mounting steel beam on floor and construction method thereof
CN117645228A (en) * 2023-11-29 2024-03-05 广州市机电安装有限公司 Construction method for installing steel structure bracket and pipeline of air conditioner main machine room

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112110336A (en) * 2020-09-21 2020-12-22 中国建筑第八工程局有限公司 Device for mounting steel beam on floor and construction method thereof
CN112110336B (en) * 2020-09-21 2022-11-25 中国建筑第八工程局有限公司 Device for mounting steel beam on floor and construction method thereof
CN117645228A (en) * 2023-11-29 2024-03-05 广州市机电安装有限公司 Construction method for installing steel structure bracket and pipeline of air conditioner main machine room

Similar Documents

Publication Publication Date Title
CN100557168C (en) A kind of method for high altitude installation of large span steel truss
CN111042540A (en) Construction method for aerial butt joint of ground suspension cables of super-large-span prestressed pipe truss
CN204899238U (en) Unitized curtain wall plate hoist device
CN210884873U (en) Installation hanging beam and lifting device of pipeline
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN109081247A (en) A kind of hanging method of vestibule large-span steel girder
CN205077878U (en) Unit type curtain plate hoisting device
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN111395395A (en) Installation process of subway deep foundation pit cover excavation lower supporting system
CN202302300U (en) Combined pipeline mounting operation platform
CN206174481U (en) Jack -up instrument is used in fan hoist and mount of tuber pipe and suspension type installation
CN211141292U (en) Special bracket for integral hoisting of air pipe
CN104060838A (en) Grouping and air-pairing installation method for corridor
CN210289075U (en) Adjustable elevator shaft operating platform system that can have enough to meet need
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN210505201U (en) Equipment for hoisting reinforcing steel bars in batches
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN103015323B (en) Beam body hoisting device
CN221295881U (en) Hoisting system for pipeline installation
CN101709344B (en) Method for hoisting terrace for furnace top raw gas pipeline
CN205077879U (en) Unit type curtain plate hoisting device
CN205077876U (en) Machine and stressing jack linkage are worn to restraint by prestress wire
CN107780644B (en) Operation platform for elevator shaft construction and use method thereof
CN220732206U (en) Spliced suspension bracket structure for pipeline suspension construction
CN214884355U (en) A consolidate truss device for steel mesh frame hoist and mount point

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant