CN201722621U - Integral hoisting frame of pre-fabricated box beam - Google Patents

Integral hoisting frame of pre-fabricated box beam Download PDF

Info

Publication number
CN201722621U
CN201722621U CN2010202395756U CN201020239575U CN201722621U CN 201722621 U CN201722621 U CN 201722621U CN 2010202395756 U CN2010202395756 U CN 2010202395756U CN 201020239575 U CN201020239575 U CN 201020239575U CN 201722621 U CN201722621 U CN 201722621U
Authority
CN
China
Prior art keywords
shaped steel
main couple
row
integral hoisting
hoisting frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010202395756U
Other languages
Chinese (zh)
Inventor
李开顺
李志刚
汪德才
向兴
吴伟先
熊泽伦
朱乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
Shenzhen China Railway Second Bureau Engineering Co Ltd
Original Assignee
China Railway Erju Co Ltd
China Railway No 2 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd, China Railway No 2 Engineering Group Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN2010202395756U priority Critical patent/CN201722621U/en
Application granted granted Critical
Publication of CN201722621U publication Critical patent/CN201722621U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses an integral hoisting frame of a pre-fabricated box beam, which belongs to the field of bridge building hoisting devices. The utility model aims at providing the integral hoisting frame capable of hoisting and loading the whole body of a beam body steel bar of the pre-fabricated box beam and an inner mold into a mold. The integral hoisting frame comprises a main girder, a sub girder, a vertical pull rod, an inclined pull rod and a hoisting hook, wherein the main girder comprises an upper row and a lower row of I-shaped steel in parallel distribution in the vertical direction, the upper row and the lower row of I-shaped steel of the main girder are connected through the inclined pull rod and the vertical pull rod, the sub girder comprises two sections of I-shaped steel, the two sections of I-shaped steel are distributed at both sides of the lower row of the main girder and are connected with the I-shaped steel of the lower row of the main girder through a lower cross beam, the I-shaped steel of the lower row of the main girder, the sub girder and the lower cross beam are connected with a steel wire rope, and the hoisting hook is connected on the steel wire rope. The utility model has few construction work procedures, stable structure and small deformation of the beam body framework and the inner mold thereof, and is suitable for being popularized in the pre-fabrication of the bridge box beam.

Description

A kind of integral hoisting frame of prefabricated case beam
Technical field
The utility model relates to a kind of bridge construction lifting dress system, particularly a kind of mast-up of prefabricated case beam.
Background technology
At present, along with the develop rapidly of China's passenger dedicated railway line and inter-city rail transit engineering construction.In order to guarantee the high ride of track engineering lasting stability, the construction standard of passenger dedicated railway line is more and more higher, construction technical requirement is more and more newer, the construction quality management is more and more tighter.Elevated bridge is as the primary structure thing of Line for Passenger Transportation and inter-city rail transit engineering, the prefabricated quality of bridge is the key of passenger dedicated railway line and inter-city rail transit engineering construction, and the bridge reinforcement engineering is as the pass key control operation of bridge prefabrication, and the built-in fitting of bridge, prestress pipe location etc. is all finished in reinforced bar engineering.Guarantee that moderate finite deformation does not take place for cage of reinforcement, built-in fitting and prestress pipe coordinate in the process of reinforcing bar lifting, this is the key of reinforced bar engineering quality control on construction.Present prefabricated construction to the case beam, be after the reinforcing bar canopy carries out the processing of cage of reinforcement, to lift, the operation of after lifting is finished internal mold, colligation gluten, installation end mould being installed again, this job practices makes cage of reinforcement deform easily, and working procedure is many, and the cross-operation link is many, the work efficiency of construction is not high, construction quality can not be controlled effectively, increase equipment and artificial input, wasting manpower and material resources.
The utility model content
Goal of the invention of the present utility model is: at the problem of above-mentioned existence, provide a kind of working procedure few, simple to operate easily, safe and convenient can be gone into prefabricated case beam beam body reinforcing bar and internal mold integral hoisting the integral hoisting frame of mould.
The technical solution adopted in the utility model is as follows:
Integral hoisting frame of the present utility model, comprise main couple, jack truss, vertical connecting rod, diagonal member, suspension hook, it is characterized in that: described main couple comprises row, arranges the i shaped steel that parallel longitudinal distributes down, row or following row include at least 2 I shapes on the described main couple, be horizontally connected with top rail on the i shaped steel of arranging on the described main couple, connect by diagonal member, vertical connecting rod between the i shaped steel that described main couple is arranged up and down; Described jack truss comprises that 2 i shaped steels are distributed under the main couple row's both sides, and by lower transverse beam and main couple down row's i shaped steel be connected, be connected by the i shaped steel of arranging both sides on brace and the main couple; Described main couple row's i shaped steel, jack truss, lower transverse beam down is connected with wire rope, and described suspension hook is connected on the wire rope.
Because main couple adopts 4 and above i shaped steel to present row, arrange the parallel longitudinal distribution down, be connected to become stable triangular structure by vertical connecting rod, diagonal member, i shaped steel, make that main couple is the core part of the force of a stable frame construction frame as whole integral hoisting frame, owing to adopt i shaped steel, its carrying capacity that can bear is bigger, feasible construction is more safe, so can bear the needs of large-tonnage case beam lifting.Be positioned at the main couple both sides with two i shaped steels as jack truss, mainly be in order to satisfy the needs of the big facet off-centre of some box girder bodies, because the big facet off-centre of beam body causes beam body center of gravity line not overlap with beam body center line, certainly will make that like this center of main couple and mast-up is inconsistent, add the both sides of jack truss at main couple, can so that the center of gravity of beam body still in the scope of main couple; And add the both sides of jack truss at main couple, can make mast-up can lift the case beam steel structure of bigger cross-sectional area.Suspension hook makes on following row in main couple, jack truss, the lower transverse beam, mainly is in order to make in hoisting process, and the stress point of case beam evenly and disperse more helps the protection of beam body reinforcing bar, internal mold, end mould, avoids causing distortion because of stressed concentrating.
Described main couple is connected by suspension ring between row's i shaped steel, jack truss, lower transverse beam and the wire rope down.
Because row's i shaped steel, jack truss, lower transverse beam are connected down with main couple by suspension ring between the wire rope, make wire rope adjustable in suspension ring, when using, can be according to beam body and internal mold, adjust its length of steel wire rope, thereby make the integral hoisting frame be suitable for the different beam body of multiple structure.
In sum, owing to adopted technique scheme, the beneficial effects of the utility model are:
1. the integral hoisting frame carries out integral hoisting to beam body reinforcing bar, internal mold, end mould, has reduced the working procedure of case beam hoisting process;
2. the integral hoisting frame carries out the monolithic lifting to beam body reinforcing bar, internal mold, end mould, has reduced the distortion of beam body skeleton and internal mold thereof, makes the case beam more can satisfy the needs of construction works.
3. what the main couple of integral hoisting frame adopted is tower structure, makes the mast-up Stability Analysis of Structures, safe and convenient.
4. mast-up is to the integral hoisting of case beam, makes that multinomial operation can parallel operations, accelerated construction speed, and it is consuming time to have reduced engineering, has saved cost.
Description of drawings
Fig. 1 is the transversary schematic diagram of integral hoisting frame;
Fig. 2 is the plan view of integral hoisting frame;
Fig. 3 is the vertical structure schematic diagram of integral hoisting frame.
Mark among the figure: 1-main couple, 2-jack truss, 3-suspension ring, 4-brace, 5-vertical connecting rod, 6-diagonal member, 7-wire rope, 8-top rail, 9-lower transverse beam, 10-suspension hook.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is done detailed explanation.
In order to make the purpose of this utility model, technical scheme and advantage clearer,, the utility model is further elaborated below in conjunction with drawings and Examples.Should be appreciated that specific embodiment described herein only in order to explanation the utility model, and be not used in qualification the utility model.
As Fig. 1, Fig. 2, shown in Figure 3, the utility model comprises main couple 1, jack truss 2, vertical connecting rod 5, diagonal member 6, suspension hook 10, described main couple 1 comprises row, arrange the i shaped steel that parallel longitudinal distributes down, row or following row form by 4 I shapes on the described main couple 1, be horizontally connected with top rail 8 on row's the i shaped steel on the described main couple 1, pass through diagonal member 6 between the i shaped steel that described main couple 1 is arranged up and down, vertical connecting rod 5 connects, described main couple 1 constitutes a complete tower structure, constitutes stable triangular structure between three i shaped steels arbitrarily.Described jack truss comprises that 2 i shaped steels are distributed in the both sides of row under the main couple, and the i shaped steel of arranging down by lower transverse beam and main couple is connected, i shaped steel by row both sides on brace and the main couple is connected, and jack truss 2 and main couple 1 link together, and form a similar isosceles trapezoid.Be equipped with 192 suspension hooks 10 on the i shaped steel that described main couple is arranged down, jack truss 2, the lower transverse beam 9, described suspension hook 10 is a double hook, is connected with suspension ring 3 by wire rope 7.Be to be connected with 384 suspension hooks 10 on the main couple.Be equipped with outer cover on the end face of described mast-up and the side, this outer cover can adopt similar items such as iron sheet, copper sheet, plank, plastics to constitute, the effect that playing protects from the wind and rain keeps away sun.When needs use the integral hoisting frame of this prefabricated case beam, can suspension hook 10 be installed earlier according to beam body bar construction and internal mold thereof, difference according to position system, adjust the length of wire rope 7, the upper end of wire rope 7 is connected on the mast-up lower transverse beam 9, can adjust the position system of suspension ring 3 on lower transverse beam 9, adjust the center of gravity position system on the mast-up.The mast-up upper end is connected on the suspension hook of straddle truck by wire rope, and by gantry crane lifting integral hoisting frame, the hook 10 of integral hoisting frame has lifted box girder body and internal mold thereof, lifts the position system of appointment, reaches the purpose of integral hoisting.
The above only is preferred embodiment of the present utility model; not in order to restriction the utility model; all any modifications of within spirit of the present utility model and principle, being done, be equal to and replace and improvement etc., all should be included within the protection domain of the present utility model.

Claims (2)

1. the integral hoisting frame of a prefabricated case beam, comprise main couple (1), jack truss (2), vertical connecting rod (5), diagonal member (6), suspension hook (10), it is characterized in that: described main couple (1) comprises row, arranges the i shaped steel that parallel longitudinal distributes down, described main couple (1) is gone up row or is arranged down and includes at least 2 I shapes, described main couple (1) is gone up on the i shaped steel of arranging and is horizontally connected with top rail (8), connects by diagonal member (6), vertical connecting rod (5) between the i shaped steel that described main couple (1) is arranged up and down; Described jack truss (2) comprises that 2 i shaped steels are distributed in the both sides of row under the main couple (1), and is connected by the i shaped steel of row under lower transverse beam (9) and the main couple (1), and the i shaped steel of going up the row both sides by brace (4) and main couple (1) is connected; Described main couple (1) row's i shaped steel, jack truss (2), lower transverse beam (9) down is connected with wire rope (7), and described suspension hook (10) is connected on the wire rope (7).
2. the integral hoisting frame of prefabricated case beam as claimed in claim 1 is characterized in that: described main couple (1) is connected by suspension ring (3) between row's i shaped steel, jack truss (2), lower transverse beam (9) and the wire rope (7) down.
CN2010202395756U 2010-06-28 2010-06-28 Integral hoisting frame of pre-fabricated box beam Expired - Lifetime CN201722621U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202395756U CN201722621U (en) 2010-06-28 2010-06-28 Integral hoisting frame of pre-fabricated box beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202395756U CN201722621U (en) 2010-06-28 2010-06-28 Integral hoisting frame of pre-fabricated box beam

Publications (1)

Publication Number Publication Date
CN201722621U true CN201722621U (en) 2011-01-26

Family

ID=43490936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202395756U Expired - Lifetime CN201722621U (en) 2010-06-28 2010-06-28 Integral hoisting frame of pre-fabricated box beam

Country Status (1)

Country Link
CN (1) CN201722621U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110104555A (en) * 2019-05-14 2019-08-09 浙江大东吴集团建设有限公司 A kind of large span assembled T plate hoisting structure
CN113445530A (en) * 2021-06-11 2021-09-28 中国铁建港航局集团有限公司 Caisson steel bar hoisting and mounting process and hoisting frame
CN114852844A (en) * 2022-04-29 2022-08-05 四川省交通建设集团股份有限公司 Lifting hook for lifting box girder steel reinforcement framework

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110104555A (en) * 2019-05-14 2019-08-09 浙江大东吴集团建设有限公司 A kind of large span assembled T plate hoisting structure
CN113445530A (en) * 2021-06-11 2021-09-28 中国铁建港航局集团有限公司 Caisson steel bar hoisting and mounting process and hoisting frame
CN114852844A (en) * 2022-04-29 2022-08-05 四川省交通建设集团股份有限公司 Lifting hook for lifting box girder steel reinforcement framework

Similar Documents

Publication Publication Date Title
CN201512345U (en) Multifunctional integrated lifting frame
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN106744257B (en) A kind of kiloton adjustable combined sling, assemble method and the method for lifting caisson
CN201635012U (en) Bridge box girder erection machine
CN201172574Y (en) Precast beam reinforced bar hoisting rack
CN102134832B (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN201722621U (en) Integral hoisting frame of pre-fabricated box beam
CN103086276B (en) Construction method for hoisting bridge type crane in high-rise well tower type building
CN202164030U (en) Integrated box girder cradle
CN203461693U (en) Ultrahigh steel support leg for combined gantry crane with Bailey truss
CN101920913B (en) Self-propelled wide-span tower crane
CN201943006U (en) Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders
CN207047703U (en) A kind of beam piece prestressed stretch-draw jack easy device in place
CN205500636U (en) Water conservancy project component handling device
CN201817201U (en) Trolley slippage construction device
CN205170161U (en) Precast beam board framework of steel reinforcement hoist
CN209890066U (en) Box girder bottom web reinforcing bar lifting device
CN204112226U (en) A kind of holes connects does section assembling bridge manufacturing machine
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN208294101U (en) A kind of large-span steel girder mounting slip and promote coupling apparatus
CN207553617U (en) A kind of monoblock type shielded frame platform
CN207453439U (en) A kind of elevated hoistway operation platform of subsidiary movable inserted link
CN206815861U (en) Assembled outfeed platforms
CN206328690U (en) A kind of big discrepancy in elevation, large span stiff skeleton external wrapping concrete template construction equipment
CN204551271U (en) A kind of reinforcement type Hanging Basket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160105

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

Patentee after: China Railway No. 2 Engineering Group Co., Ltd.

Address before: 610041 high building, No. nine Hing Road, Chengdu hi tech Development Zone, Sichuan, 6

Patentee before: China Railway Erju Co., Ltd.

Patentee before: China Railway No. 2 Engineering Group Co., Ltd.

TR01 Transfer of patent right

Effective date of registration: 20180528

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: SHENZHEN ZHONGTIE ERJU ENGINEERING CO., LTD.

Patentee after: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee before: China Railway No. 2 Engineering Group Co., Ltd.

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: SHENZHEN ZHONGTIE ERJU ENGINEERING CO., LTD.

Patentee after: China Railway No. 2 Engineering Group Co., Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee before: SHENZHEN ZHONGTIE ERJU ENGINEERING CO., LTD.

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

Address after: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee after: SHENZHEN ZHONGTIE ERJU ENGINEERING CO., LTD.

Patentee after: China Railway No. 2 Engineering Group Co., Ltd.

Address before: No. 16, Jinniu District Road, Jinniu District Road, Chengdu, Sichuan

Co-patentee before: SHENZHEN ZHONGTIE ERJU ENGINEERING CO., LTD.

Patentee before: CHINA RAILWAY NO.2 BUREAU ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder
CX01 Expiry of patent term

Granted publication date: 20110126

CX01 Expiry of patent term