CN201172574Y - Precast beam reinforced bar hoisting rack - Google Patents

Precast beam reinforced bar hoisting rack Download PDF

Info

Publication number
CN201172574Y
CN201172574Y CNU2008200715362U CN200820071536U CN201172574Y CN 201172574 Y CN201172574 Y CN 201172574Y CN U2008200715362 U CNU2008200715362 U CN U2008200715362U CN 200820071536 U CN200820071536 U CN 200820071536U CN 201172574 Y CN201172574 Y CN 201172574Y
Authority
CN
China
Prior art keywords
mast
steel bar
precast beam
fixed
hanger frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200715362U
Other languages
Chinese (zh)
Inventor
刘金山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Thirteen Railway Construction Bureau Group Co ltd
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 13th Bureau Group Co Ltd filed Critical China Railway 13th Bureau Group Co Ltd
Priority to CNU2008200715362U priority Critical patent/CN201172574Y/en
Application granted granted Critical
Publication of CN201172574Y publication Critical patent/CN201172574Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

A precast beam steel bar hanger frame belongs to the bridge construction technical field, which is characterized in that the lower structural beams horizontally distributed in the hanger frame are longitudinally distributed and fixed with upper structural beams, the upper structure of the hanger frame is fixed with a stayed reinforce bars, several or tens of hooks are fixed on the lower structural beams via iron chains, the hooks and the iron chains are provided with line tightening devices therebetween. The precast beam steel bar hanger frame has the advantages that the utility model can hang objects at multipoint and adjust the force on the steel bar skeleton uniform via the line tightening devices, to effectively prevent the steel bar skeleton from deformation in hanging, the utility model can parallel process a plurality of operations, accelerate construction and save project cot.

Description

Precast beam reinforcing bar mast-up
Technical field
The utility model belongs to the bridge construction technical field.
Background technology
Background technology:
At present, along with the arrival of China Express Railway upsurge in construction.The construction criteria of passenger dedicated railway line and technical requirements are more much higher than general railway, and basic reason is because passenger dedicated railway line must guarantee that high-speed track has the high ride of lasting stability.Bridge is as the keystone configuration thing of railway line for passenger traffic, and comparing with the common railway bridge at the construction party mask has characteristics such as Bridge Sections is big, the beam body weight is big, construction requirement is tight.Just because of above characteristics, when construction, must guarantee the operation or work standard of each operation.And the built-in fitting on the railway line for passenger traffic beam body is more, must guarantee the accurate of reinforcement location during construction.Reinforcing bar usually produces bigger distortion when carrying out beam body framework of steel reinforcement lifting construction because the weight of reinforcing bar focuses on.Can not satisfy the construction criteria of railway line for passenger traffic.Causing has wasted great amount of manpower and material resources and has also caused simultaneously bigger economic loss.Existing construction method: be after the reinforcing bar canopy carries out the processing of framework of steel reinforcement, to lift, adopt the hoisting structure of interim assembly unit in the hoisting process.Its weak point is: carry out framework of steel reinforcement lifting discontinuity, force structure is non-adjustable, the bigger distortion of same generation during lifting operation.
Summary of the invention
The purpose of this utility model is:
A kind of precast beam reinforcing bar mast-up is provided, discontinuity when it has solved the framework of steel reinforcement lifting, force structure is non-adjustable, produces the problem of bigger distortion during lifting operation.
The technical solution of the utility model is:
On the mast-up understructure beam of laterally arranging, vertically arrange and be fixed with mast-up superstructure beam, have at mast-up superstructure internal fixation and tiltedly to draw reinforced rib, several distribute by iron chains to several ten suspension hooks and are fixed on the mast-up understructure beam, are provided with boomer between suspension hook and the iron chains.
The beneficial effects of the utility model are:
When lifting, carry out many suspension centre liftings, make framework of steel reinforcement stressed evenly, prevented that preferably framework of steel reinforcement is out of shape in hoisting process by regulating boomer; Make the multinomial operation can parallel working, accelerated construction speed, saved engineering cost.
Description of drawings
Fig. 1 is a reinforcing bar mast-up planar view;
Fig. 2 is a reinforcing bar mast-up skiagraph;
Fig. 3 is a reinforcing bar mast-up cross-sectional view;
Fig. 4 is a lifting top board reinforcing bar scheme drawing;
Fig. 5 is a lifting end web reinforcement scheme drawing.
The specific embodiment
Below in conjunction with accompanying drawing the utility model is described further:
As shown in Figure 1, 2, 3, the 1st, iron chains, the 2nd, strengthening rib, the 3rd, mast-up superstructure, the 4th, mast-up understructure, the 5th, boomer.
The reinforcing bar mast-up is welded by shaped steel and steel plate.
With the suspension ring that weld on the steel wire penetrating mast-up, gantry crane by steel rope with whole mast-up handling to framework of steel reinforcement top, iron chains end suspension hook on the mast-up is transferred to the reinforcing bar end face, hook reinforcing bar with suspension hook, and the connection between this place's reinforced steel (can adopt spot welding).After all being arranged in all suspension hooks on the framework of steel reinforcement, adjust iron chains length so that each iron chains is stressed evenly with boomer.By gantry crane framework of steel reinforcement is slowly hung and to send into mould.

Claims (1)

1, a kind of precast beam reinforcing bar mast-up, it is characterized in that: vertically arranging on the mast-up understructure beam of laterally arranging is fixed with mast-up superstructure beam, have at mast-up superstructure internal fixation and tiltedly to draw reinforced rib, several distribute by iron chains to several ten suspension hooks and are fixed on the mast-up understructure beam, are provided with boomer between suspension hook and the iron chains.
CNU2008200715362U 2008-03-19 2008-03-19 Precast beam reinforced bar hoisting rack Expired - Fee Related CN201172574Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200715362U CN201172574Y (en) 2008-03-19 2008-03-19 Precast beam reinforced bar hoisting rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200715362U CN201172574Y (en) 2008-03-19 2008-03-19 Precast beam reinforced bar hoisting rack

Publications (1)

Publication Number Publication Date
CN201172574Y true CN201172574Y (en) 2008-12-31

Family

ID=40199684

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200715362U Expired - Fee Related CN201172574Y (en) 2008-03-19 2008-03-19 Precast beam reinforced bar hoisting rack

Country Status (1)

Country Link
CN (1) CN201172574Y (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101554977B (en) * 2009-05-26 2011-04-13 山东丰汇设备技术有限公司 Automatic grab bucket crane for straw bundles
CN103010925A (en) * 2012-12-27 2013-04-03 陕西化建工程有限责任公司 Bundling and hoisting method of loop reactor
CN103007868A (en) * 2012-12-27 2013-04-03 陕西化建工程有限责任公司 Welding lifting lug type hoisting method of loop reactor
CN105460774A (en) * 2016-01-07 2016-04-06 惠生(南通)重工有限公司 Suspensory rigging for hoisting of land modules
CN105775990A (en) * 2016-05-13 2016-07-20 安徽合力股份有限公司 Lifting appliance of power transmission system assembly for flexible connection
CN106882697A (en) * 2017-02-28 2017-06-23 中国葛洲坝集团第工程有限公司 A kind of large scale structure reinforcing bar is without deformation suspender and hanging method
CN108557627A (en) * 2018-05-25 2018-09-21 浙江交工集团股份有限公司 The integral type suspender of prefabricated part hanging in bale handle station
CN111634793A (en) * 2020-04-26 2020-09-08 北京空间飞行器总体设计部 Hoisting device and hoisting method for satellite
CN112627539A (en) * 2020-12-09 2021-04-09 中国葛洲坝集团第一工程有限公司 Four-hole inverted siphon top plate double-layer steel bar lifting, positioning and fixing device and construction method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101554977B (en) * 2009-05-26 2011-04-13 山东丰汇设备技术有限公司 Automatic grab bucket crane for straw bundles
CN103010925A (en) * 2012-12-27 2013-04-03 陕西化建工程有限责任公司 Bundling and hoisting method of loop reactor
CN103007868A (en) * 2012-12-27 2013-04-03 陕西化建工程有限责任公司 Welding lifting lug type hoisting method of loop reactor
CN103010925B (en) * 2012-12-27 2014-10-15 陕西化建工程有限责任公司 Bundling and hoisting method of loop reactor
CN105460774A (en) * 2016-01-07 2016-04-06 惠生(南通)重工有限公司 Suspensory rigging for hoisting of land modules
CN105775990A (en) * 2016-05-13 2016-07-20 安徽合力股份有限公司 Lifting appliance of power transmission system assembly for flexible connection
CN106882697A (en) * 2017-02-28 2017-06-23 中国葛洲坝集团第工程有限公司 A kind of large scale structure reinforcing bar is without deformation suspender and hanging method
CN106882697B (en) * 2017-02-28 2018-05-04 中国葛洲坝集团第一工程有限公司 A kind of large scale structure reinforcing bar is without deformation suspender and hanging method
CN108557627A (en) * 2018-05-25 2018-09-21 浙江交工集团股份有限公司 The integral type suspender of prefabricated part hanging in bale handle station
CN111634793A (en) * 2020-04-26 2020-09-08 北京空间飞行器总体设计部 Hoisting device and hoisting method for satellite
CN112627539A (en) * 2020-12-09 2021-04-09 中国葛洲坝集团第一工程有限公司 Four-hole inverted siphon top plate double-layer steel bar lifting, positioning and fixing device and construction method

Similar Documents

Publication Publication Date Title
CN201172574Y (en) Precast beam reinforced bar hoisting rack
CN202080812U (en) Dedicated sling system for large-scaled reinforcing cage
CN201882763U (en) Special carrying pole type beam of double-machine lifting crane
CN201080597Y (en) Multifunctional cast-in-situ cantilever plate construction bracket
CN109291235A (en) A kind of steelframe, manufacturing method and application method improving T beam forms disassembly efficiency
CN207293909U (en) A kind of precast beam reinforced bar skeleton hanging apparatus
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN210635627U (en) Large-scale lifting machine for outer wall decoration
CN207497887U (en) A kind of dedicated unit for being used to lift ladle turret
CN201809042U (en) Lifting frame for lifting whole steel reinforcement framework of box beam
CN202164030U (en) Integrated box girder cradle
CN208197158U (en) A kind of reinforcing bar tire suspender of precast segment box beam
CN103979429A (en) Cantilever type portal crane
CN208440151U (en) A kind of prefabricated beam body template suspension appliance
CN102398849A (en) Method for moving whole crawler crane down to dock
CN201722621U (en) Integral hoisting frame of pre-fabricated box beam
CN203781677U (en) Trial mass device of crane
CN202953704U (en) Cross beam for single-hook lifting steel plate
CN209890066U (en) Box girder bottom web reinforcing bar lifting device
CN205170161U (en) Precast beam board framework of steel reinforcement hoist
CN210853369U (en) Protection device for vertical transportation building blocks of tower crane
CN203795318U (en) Integral hoisting system for rebar cage for large members
CN208294101U (en) A kind of large-span steel girder mounting slip and promote coupling apparatus
CN208413637U (en) A kind of crane hanger
CN208563132U (en) A kind of U-shaped aqueduct body arc internal model carriage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINESE RAILWAY CONSTRUCTION BRIDGE ENGINEERING BU

Free format text: FORMER NAME: CHINESE RAILWAY CONSTRUCTION 13TH BUREAU GROUP CO., LTD.

Owner name: CHINESE RAILWAY CONSTRUCTION 13TH BUREAU GROUP CO.

Free format text: FORMER NAME: CHINA RAILWAY 13TH BUREAU GROUP CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 130033 science and Technology Department, China Railway thirteen Bureau, No. 2138 East Ling Road, two district, Jilin, Changchun

Patentee after: China thirteen Railway Construction Bureau Group Co.,Ltd.

Address before: 130033 science and Technology Department, China Railway thirteen Bureau, No. 2138 East Ling Road, two district, Jilin, Changchun

Patentee before: CHINA RAILWAY 13TH BUREAU GROUP Co.,Ltd.

CP03 Change of name, title or address

Address after: The Central West 300300 Tianjin Airport Economic Zone No. 32

Patentee after: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING BUREAU GROUP Co.,Ltd.

Address before: 130033 science and Technology Department, China Railway thirteen Bureau, No. 2138 East Ling Road, two district, Jilin, Changchun

Patentee before: China thirteen Railway Construction Bureau Group Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081231

Termination date: 20160319

CF01 Termination of patent right due to non-payment of annual fee