CN109291235A - A kind of steelframe, manufacturing method and application method improving T beam forms disassembly efficiency - Google Patents

A kind of steelframe, manufacturing method and application method improving T beam forms disassembly efficiency Download PDF

Info

Publication number
CN109291235A
CN109291235A CN201811362043.9A CN201811362043A CN109291235A CN 109291235 A CN109291235 A CN 109291235A CN 201811362043 A CN201811362043 A CN 201811362043A CN 109291235 A CN109291235 A CN 109291235A
Authority
CN
China
Prior art keywords
stringer
steelframe
template
middle cross
upper beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811362043.9A
Other languages
Chinese (zh)
Inventor
袁明阳
张庆谱
覃燊宏
胡锐
邹沐恩
韦覃宇
周先声
李莘哲
周妤莲
王振琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Road and Bridge Engineering Group Co Ltd
Original Assignee
Guangxi Road and Bridge Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Road and Bridge Engineering Group Co Ltd filed Critical Guangxi Road and Bridge Engineering Group Co Ltd
Priority to CN201811362043.9A priority Critical patent/CN109291235A/en
Publication of CN109291235A publication Critical patent/CN109291235A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/04Discharging the shaped articles
    • B28B13/06Removing the shaped articles from moulds

Abstract

The invention discloses a kind of steelframe for improving T beam forms disassembly efficiency and safety, manufacturing method and application method belong to T beam ejection technique field.Steelframe of the invention includes: stringer part, upper beam part and middle cross beam part.Two upper beams are lifting beam, and welding opens up round-meshed steel plate to hanging steel rope thereon.To stablize when guaranteeing upper beam lifting, three tops reinforcement stringers are set and reinforce its rigidity, the connection between four diagonal braces reinforcement lifting beams and stringer is set.Middle cross beam plays load-bearing and limitation template displacement.There are four tooth blocks for each middle cross beam setting, and tooth block can block T beam forms when lifting by crane template, and the effective fixed form of cooperation bottom girder energy guarantees the stability of template when lifting template.The present invention can greatly improve the disassembly efficiency of T beam forms, and protection T beam forms is not damaged in disassembly process, while guaranteeing personal safety during formwork assembling and disassembling.

Description

A kind of steelframe, manufacturing method and application method improving T beam forms disassembly efficiency
Technical field
The invention belongs to T beam ejection technique fields, and in particular to it is a kind of improve T beam forms disassembly efficiency steelframe, its system Make method and application method.
Background technique
T beam as the important ring in rail traffic infrastructure construction, have save concrete, from heavy and light, across energy The features such as power is strong.Need to use mold, the punching block that mold is made of side form, bed die and end mould etc., weight in the pouring of T beam It is larger, it needs repeatedly to dismount mold during construction makes T beam.
Current existing Precast T-Beam formwork hoisting mainly in such a way that wirerope is directly hung in template to template into Row handling.Directly worker is needed repeatedly to mount and dismount during by the way of hanging in template in formwork assembling and disassembling using wirerope Wirerope, efficiency is very slow, low efficiency, and wirerope is directly tied up and is easy to draw bad template in template back arris.Simultaneously because side The weight of mould is larger, and template is easy to shake when directly tying up by the way of wirerope, and worker adjusts template position and fixed form When operational danger it is big.
Summary of the invention
The purpose of the present invention is to solve the above problem of the existing technology, provide a kind of simple with section steel manufacture The T beam forms of the practical big rigidity of double fulcrums dismounts steelframe, its manufacturing method and application method, the present invention and can greatly improve The disassembly efficiency of T beam forms, protection T beam forms is not damaged in disassembly process, while guaranteeing during formwork assembling and disassembling Personal safety.
In order to achieve the above objectives, this programme is achieved through the following technical solutions:
A kind of steelframe improving T beam forms disassembly efficiency, comprising:
Stringer part;
The one end of upper beam part, the upper beam part is connect with the one end of stringer part, and upper beam part and stringer part It is arranged in a mutually vertical manner;Suspension centre is provided on the upper beam part;
Middle cross beam part is vertically installed on stringer part, and wherein the middle cross beam and upper beam part cocurrent and parallel are arranged, it is described in Tooth plate is additionally provided on cross-member, the tooth plate is arranged towards upper beam part;The length of wherein the middle cross beam is not more than upper beam The length of part;
Bottom joist, the bottom joist are connect with stringer part bottom surface, and are located remotely from upper beam part one end.
Further, the stringer part includes at least two stringers, and each stringer is arranged in parallel;The upper beam part It corresponds and is arranged in a mutually vertical manner with stringer including at least two upper beams, the upper beam, and upper beam is arranged in the same direction Reinforcing is attached by pushing up reinforcing beam between the same side of stringer, each upper beam;Wherein the middle cross beam includes at least Two middle cross beams, wherein the middle cross beam are corresponded and are arranged in a mutually vertical manner with stringer.
Further, the suspension centre includes suspension centre steel plate, is provided with through-hole on the suspension centre steel plate.
Further, the steelframe of the raising T beam forms disassembly efficiency, further includes for reinforcing stringer part and upper beam The joint strengthening plate of part, the joint strengthening plate are set to the junction of stringer part and upper beam part.
Further, the steelframe of the raising T beam forms disassembly efficiency, further includes for reinforcing stringer part and upper beam The diagonal brace of part, one end of the diagonal brace are fixed on stringer part, and the other end is fixed on upper beam part.
Further, wherein the middle cross beam is set to the medium position of stringer part along its length.
The present invention also provides the manufacturing methods of the steelframe for improving T beam forms disassembly efficiency, include the following steps:
(1) channel steel Two bors d's oeuveres is welded, two limb legs of channel steel is made two to being fully welded after spelling using carbon-dioxide arc welding Root channel steel is combined closely, and skip welding technique is used when welding, obtains stringer;
(2) it regard stringer parallel arrangement as stringer part, is welded on the bottom surface of stringer as bottom joist using channel steel;
(3) every longeron end welds one of Two bors d's oeuveres channel steel as upper beam, and all upper beams are arranged in the same direction and position Two bors d's oeuveres channel steel is welded in the ipsilateral of stringer part, between upper beam as top reinforcing beam, upper beam and top reinforcing beam forms upper beam Part;
(4) one of Two bors d's oeuveres channel steel of welding forms middle cross beam part by middle cross beam as middle cross beam in the middle part of every stringer;
(5) one block of joint strengthening plate and twice steel plate diagonal brace are welded between upper beam and stringer;
(6) weld one piece of tooth plate on every middle cross beam, the processing of tooth plate can according to the size of T beam forms edge of a wing back cord into Row modification, enables tooth plate to catch on back cord;
(7) one block of suspension centre steel plate is welded on every upper beam, and several through-holes are bored on suspension centre steel plate as suspension centre;
(8) mode being fully welded is all made of between each component along contact position to be attached.
Further, the stringer, upper beam, middle cross beam, top reinforcing beam select 10# channel steel to be made, the bottom Joist is 16# channel steel.
It is specific as follows the present invention also provides two kinds of application methods of the steelframe for improving T beam forms disassembly efficiency:
The first application method, the application method are included the following steps: for the knockout course of T beam forms
S1, two wirerope are each passed through the suspension centre on the cross-member of steelframe, catch on wirerope simultaneously with gantry hanging hook Demoulding steelframe is sling, it is erected;
S2, under the cooperation of gantry crane, by steelframe middle cross beam part tooth plate hook on the back cord of T beam wing plate template, hook Keep hanging hook height in gantry motionless after firmly, unclamping the support of template bottom and connecting rod is in active state template, grasps Vertical gantry hanging hook is traversing, so that the side form and steelframe of T beam are displaced outwardly together, to separate with T beam beam body;
After S3, T beam forms leave beam body, gantry crane is lifted and is put to storage place.
Second of application method, the application method are included the following steps: for the installation process of T beam forms
A, two wirerope are each passed through the suspension centre on the cross-member of steelframe, catch on wirerope with gantry hanging hook and incited somebody to action Steelframe is sling, it is erected;
B, under the cooperation of gantry crane, the tooth plate on steelframe middle cross beam part is hooked on the back cord of T beam wing plate template, is caught on Template movement to designated position is adjusted form height and position by manipulation gantry crane later, after support pad is completed in template bottom, under Gantry crane suspension hook is dropped, hanger is made to be detached from template, traversing hanger removes template, completes template installation.
The utility model has the advantages that
Steelframe of the invention is made of stringer, middle cross beam, upper beam etc., simple and reliable for structure, is cooperated in use Gantry crane uses, and is hooked on the back cord of T beam wing plate template, T beam forms is removed, thus with T beam using the tooth plate on middle cross beam Beam body separation.Steelframe knockout course of the invention is safe and efficient, considerably reduces manual operation, improves working efficiency, simultaneously There is good protective effect to T beam forms, ensure that the presentation quality of precast beam.
The present invention is according to the dismounting principle and feature of T beam forms, by reasonably planning each scale of components of steelframe, using type Steel is manufactured as rapidoprint and in such a way that human weld processes, and manufacturing method is simple, and cost is relatively low, and manufactures The method that process uses skip welding, can reduce the temperature distortion of fashioned iron, guarantee the smooth manufacture of steelframe, improve row yielding.This hair Steelframe made of bright is safe and reliable, simple and durable.
Steelframe of the invention cannot be only used for the disassembly process of T beam forms, and can be also used for the installation of T beam forms Journey.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of a preferred embodiment of steelframe in the present invention;
Fig. 2 is the left view of a preferred embodiment of steelframe in the present invention;
Fig. 3 is the demoulding operation schematic diagram of a preferred embodiment of the invention;
Label in figure: 1- bottom joist, 2- stringer, 3- middle cross beam, 4- tooth plate, 5- upper beam, 6- joint strengthening plate, 7- are oblique Support, 8- suspension centre steel plate, 9- push up reinforcing beam, the gantry 10- hanging hook, 11-T beam forms.
Specific embodiment
With reference to the accompanying drawing and specific embodiment the invention will be further described.
Embodiment
A kind of steelframe improving T beam forms disassembly efficiency, as depicted in figs. 1 and 2, comprising:
Stringer part, the stringer part includes two stringers 2, and stringer 2 is arranged in parallel;
Upper beam part, the upper beam part include two upper beams 5, and the one end of upper beam 5 and the one end of stringer 2 connect It connects, two upper beams 5 are arranged in a mutually vertical manner with two one-to-one correspondence of stringer 2, and two upper beams 5 are set to two in the same direction and indulge The same side of beam 2 is attached reinforcing by three top reinforcing beams 9 between the upper beam 5;On the every upper beam 5 It is provided with one block of suspension centre steel plate 8, is provided with through-hole on the suspension centre steel plate 8;
Middle cross beam part, wherein the middle cross beam include two middle cross beams 3, and two middle cross beams 3 one-to-one correspondence is vertically arranged In the medium position of two stringers 2 along its length, wherein the middle cross beam 3 and 5 cocurrent and parallel of upper beam are arranged, it is every described in it is horizontal Tooth plate 4 is additionally provided on beam 3, the tooth plate 4 is arranged towards upper beam 5;The length of wherein the middle cross beam 3 is no more than upper beam 5 Length.
The demoulding steelframe further includes bottom joist 1, and the bottom joist 1 is connect with all 2 bottom surfaces of stringer, and is located remotely from 5 one end of upper beam, and bottom joist 1 is mutually perpendicular to stringer 2.
The demoulding steelframe further includes the joint strengthening plate 6 for reinforcing stringer 2 and upper beam 5, the joint strengthening plate 6 It is set to the junction of stringer 2 and upper beam 5.
The demoulding steelframe further includes the diagonal brace 7 for reinforcing stringer 2 and upper beam 5, and one end of the diagonal brace 7 is fixed on On stringer 2, the other end is fixed on upper beam 5.
In the steelframe of the present embodiment, to stablize when guaranteeing upper beam lifting, three top reinforcing beams is set and reinforce its rigidity, Four diagonal braces are set and have reinforced connection between stringer and upper beam;Middle cross beam therein plays load-bearing and limits the work of template displacement With;In the setting of each middle cross beam, there are four tooth blocks, and tooth block can block T beam forms when lifting by crane template, and cooperation bottom girder can be effective Fixed form guarantees the stability of template when lifting template.
The manufacturing method of the steelframe of above-mentioned raising T beam forms disassembly efficiency, includes the following steps:
Pretreatment: national standard 10# channel steel is cut into the length of 0.5m, 1m, 2m with abrasive machine;
(1) the 10# channel steel Two bors d's oeuveres of 2m long is welded, is carried out two limb legs of channel steel to after spelling using carbon-dioxide arc welding It is fully welded, it is ensured that two slots are just combined closely, while paying attention to using skip welding technique when welding, prevent channel steel hot-spot from generating change Shape, there are internal stress, obtain stringer;
(2) two stringer spacing 50cm are arranged, then is welded on two stringers for the 16# channel steel of 2m long as bottom joist Bottom;
(3) one road length 1m Two bors d's oeuveres 10# channel steel of welding is as upper beam at the top of every stringer, and every stringer middle part welding is together The Two bors d's oeuveres 10# channel steel of long 40cm is as middle cross beam;
(4) the Two bors d's oeuveres 10# channel steel of three 50cm long is welded between upper beam as top reinforcing beam, upper beam and stringer it Between weld one piece of 15cm × 15cm, the gusset plate of thickness 6mm and the steel plate diagonal brace of twice 45cm × 10cm, thickness 6mm;
(5) tooth plate of 5cm × 15cm is welded on every middle cross beam, tooth plate is made using 2cm thick steel plate;
(6) one block of suspension centre steel plate is welded on every upper beam, suspension centre steel plate uses the 2cm thick steel plate of 80cm × 10cm, The through-hole of 4 diameter 4cm is bored on it, and the spacing of adjacent through-holes is 15cm, and tapping equipment progress can be used in steel plate aperture;
(7) it is all made of welding along contact position between each component to be attached, it is desirable that be fully welded;
(8) processing of tooth plate can modify according to the size of template edge of a wing back cord, it is ensured that tooth plate can catch on back cord.
After processing is completed, appearance is paintable to be protected steelframe.
The first application method of the steelframe of T beam forms disassembly efficiency of the invention, the application method are for T beam form The knockout course of plate, as shown in figure 3, including the following steps:
S1, two wirerope are each passed through the through-hole on two blocks of suspension centre steel plates 8, catch on wirerope with gantry hanging hook 10 And sling steelframe, erect it;
S2, after each road pull rod of T beam forms 11 is unclamped in advance, will be on steelframe middle cross beam 3 under the cooperation of gantry crane Tooth plate 4 hooks on the back cord of T beam wing plate template, keeps hanging hook 10 height in gantry motionless after catching on, manipulates gantry hanging hook 10 is traversing, so that the side form and steelframe of T beam are displaced outwardly together, to separate with T beam beam body;
After S3, T beam forms leave beam body, gantry crane is lifted and is put to storage place, the bottom of steelframe during lifting Joist 1 plays the role of fixed form, prevents template from toppling during lifting.
Second of application method of the steelframe of T beam forms disassembly efficiency of the invention, the application method are for T beam form The installation process of plate, includes the following steps:
A, two wirerope are each passed through the suspension centre on the cross-member of steelframe, catch on wirerope with gantry hanging hook and incited somebody to action Steelframe is sling, it is erected;
B, under the cooperation of gantry crane, the tooth plate on steelframe middle cross beam part is hooked on the back cord of T beam wing plate template, is caught on Template movement to designated position is adjusted form height and position by manipulation gantry crane later, after support pad is completed in template bottom, under Gantry crane suspension hook is dropped, hanger is made to be detached from template, traversing hanger removes template, completes template installation.
Although the present invention is disclosed as above with preferred embodiment, so it is not intended to limiting the invention, any this field skill Art personnel, without departing from the spirit and scope of the present invention, when a little modification and perfect therefore of the invention protection model can be made It encloses to work as and subject to the definition of the claims.

Claims (10)

1. a kind of steelframe for improving T beam forms disassembly efficiency characterized by comprising
Stringer part;
The one end of upper beam part, the upper beam part is connect with the one end of stringer part, and upper beam part and stringer part are mutual It is vertically arranged;Suspension centre is provided on the upper beam part;
Middle cross beam part is vertically installed on stringer part, and wherein the middle cross beam and upper beam part cocurrent and parallel are arranged, wherein the middle cross beam Tooth plate is additionally provided on part, the tooth plate is arranged towards upper beam part;The length of wherein the middle cross beam is no more than upper beam part Length;
Bottom joist, the bottom joist are connect with stringer part bottom surface, and are located remotely from upper beam part one end.
2. a kind of steelframe for improving T beam forms disassembly efficiency as described in claim 1, it is characterised in that: the stringer part packet At least two stringers are included, and each stringer is arranged in parallel;The upper beam part includes at least two upper beams, the upper beam Correspond and be arranged in a mutually vertical manner with stringer, and upper beam is set to the same side of stringer in the same direction, each upper beam it Between by push up reinforcing beam be attached reinforcing;Wherein the middle cross beam includes at least two middle cross beams, wherein the middle cross beam and stringer one One corresponds to and is arranged in a mutually vertical manner.
3. a kind of steelframe for improving T beam forms disassembly efficiency as described in claim 1, it is characterised in that: the suspension centre includes Suspension centre steel plate is provided with through-hole on the suspension centre steel plate.
4. a kind of steelframe for improving T beam forms disassembly efficiency as described in claim 1, it is characterised in that: further include for adding Gu the joint strengthening plate of stringer part and upper beam part, the joint strengthening plate are set to the junction of stringer part and upper beam part.
5. a kind of steelframe for improving T beam forms disassembly efficiency as described in claim 1, it is characterised in that: further include for adding Gu the diagonal brace of stringer part and upper beam part, one end of the diagonal brace is fixed on stringer part, and the other end is fixed on upper beam part.
6. a kind of steelframe for improving T beam forms disassembly efficiency as described in claim 1, it is characterised in that: wherein the middle cross beam It is set to the medium position of stringer part along its length.
7. a kind of manufacturing method of the steelframe as described in claim any one of 1-6, which comprises the steps of:
(1) channel steel Two bors d's oeuveres is welded, two limb legs of channel steel is made to being fully welded after spelling by two slots using carbon-dioxide arc welding Steel is combined closely, and skip welding technique is used when welding, obtains stringer;
(2) it regard stringer parallel arrangement as stringer part, is welded on the bottom surface of stringer as bottom joist using channel steel;
(3) every longeron end welds one of Two bors d's oeuveres channel steel as upper beam, and all upper beams are arranged in the same direction and are located at vertical Beam it is ipsilateral, between upper beam weld Two bors d's oeuveres channel steel as top reinforcing beam, upper beam and top reinforcing beam form upper beam part;
(4) one of Two bors d's oeuveres channel steel of welding forms middle cross beam part by middle cross beam as middle cross beam in the middle part of every stringer;
(5) one block of joint strengthening plate and twice steel plate diagonal brace are welded between upper beam and stringer;
(6) four pieces of tooth plates are welded on every middle cross beam, the processing of tooth plate can be repaired according to the size of T beam forms edge of a wing back cord Change, tooth plate is enable to catch on fixed back cord;
(7) one block of suspension centre steel plate is welded on every upper beam, and several through-holes are bored on suspension centre steel plate as suspension centre;
(8) mode being fully welded is all made of between each component along contact position to be attached.
8. the manufacturing method of steelframe as claimed in claim 7, it is characterised in that: the stringer, upper beam, middle cross beam, top add Brutal selects 10# channel steel to be made, and the bottom joist is 16# channel steel.
9. the first application method of steelframe as described in claim 1, it is characterised in that: the application method is for T beam The knockout course of template, includes the following steps:
S1, two wirerope are each passed through the suspension centre on the cross-member of steelframe, catch on wirerope with gantry hanging hook and will takes off Mould steelframe is sling, it is erected;
S2, under the cooperation of gantry crane, by steelframe middle cross beam part tooth plate hook on the back cord of T beam wing plate template, catch on Keep hanging hook height in gantry motionless afterwards, unclamping the support of template bottom and connecting rod is in active state template, manipulation dragon Gantry crane hook is traversing, so that the side form and steelframe of T beam are displaced outwardly together, to separate with T beam beam body;
After S3, T beam forms leave beam body, gantry crane is lifted and is put to storage place.
10. second of application method of steelframe as described in claim 1, it is characterised in that: the application method is for T beam The installation process of template, includes the following steps:
A, two wirerope are each passed through the suspension centre on the cross-member of steelframe, catch on wirerope with gantry hanging hook and by steelframe It slings, erects it;
B, under the cooperation of gantry crane, the tooth plate on steelframe middle cross beam part is hooked on the back cord of T beam wing plate template, after catching on Gantry crane is manipulated by template movement to designated position, adjusts form height and position, after support pad is completed in template bottom, decline dragon Gantry crane suspension hook makes hanger be detached from template, and traversing hanger removes template, completes template installation.
CN201811362043.9A 2018-11-15 2018-11-15 A kind of steelframe, manufacturing method and application method improving T beam forms disassembly efficiency Pending CN109291235A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811362043.9A CN109291235A (en) 2018-11-15 2018-11-15 A kind of steelframe, manufacturing method and application method improving T beam forms disassembly efficiency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811362043.9A CN109291235A (en) 2018-11-15 2018-11-15 A kind of steelframe, manufacturing method and application method improving T beam forms disassembly efficiency

Publications (1)

Publication Number Publication Date
CN109291235A true CN109291235A (en) 2019-02-01

Family

ID=65143510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811362043.9A Pending CN109291235A (en) 2018-11-15 2018-11-15 A kind of steelframe, manufacturing method and application method improving T beam forms disassembly efficiency

Country Status (1)

Country Link
CN (1) CN109291235A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295545A (en) * 2019-06-03 2019-10-01 中铁大桥局集团有限公司 The erecting by overhang and its application method removed for upstroke movable framework side form
CN110306792A (en) * 2019-06-21 2019-10-08 中国十七冶集团有限公司 It is a kind of for assembling and disassembling the F type standard frame and construction method of moulding board of precast beam
CN110316650A (en) * 2019-06-21 2019-10-11 中铁十六局集团第四工程有限公司 A kind of Precast T-Beam L-type template suspension appliance

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04312804A (en) * 1991-04-11 1992-11-04 Tootasu:Kk Mold-extraction reversing apparatus for l-shaped retaining wall
CN201670648U (en) * 2010-07-15 2010-12-15 中铁七局集团第四工程有限公司 Template suspension appliance
CN206484700U (en) * 2017-02-09 2017-09-12 湖南五新模板有限公司 T beam hydraulic ejections mechanism

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04312804A (en) * 1991-04-11 1992-11-04 Tootasu:Kk Mold-extraction reversing apparatus for l-shaped retaining wall
CN201670648U (en) * 2010-07-15 2010-12-15 中铁七局集团第四工程有限公司 Template suspension appliance
CN206484700U (en) * 2017-02-09 2017-09-12 湖南五新模板有限公司 T beam hydraulic ejections mechanism

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110295545A (en) * 2019-06-03 2019-10-01 中铁大桥局集团有限公司 The erecting by overhang and its application method removed for upstroke movable framework side form
CN110306792A (en) * 2019-06-21 2019-10-08 中国十七冶集团有限公司 It is a kind of for assembling and disassembling the F type standard frame and construction method of moulding board of precast beam
CN110316650A (en) * 2019-06-21 2019-10-11 中铁十六局集团第四工程有限公司 A kind of Precast T-Beam L-type template suspension appliance
CN110316650B (en) * 2019-06-21 2021-10-01 中铁十六局集团第四工程有限公司 Prefabricated T roof beam L section mould board hoist

Similar Documents

Publication Publication Date Title
CN109291235A (en) A kind of steelframe, manufacturing method and application method improving T beam forms disassembly efficiency
CN201172574Y (en) Precast beam reinforced bar hoisting rack
CN201214597Y (en) Double beams double bogies gantry crane
CN210914947U (en) Hoisting and turning-over system suitable for large prefabricated stand board
CN207293909U (en) A kind of precast beam reinforced bar skeleton hanging apparatus
CN201770257U (en) Gripping tool for transport
CN103835294A (en) Concrete casting frame for construction of cast-in-place pile and using method
CN211028010U (en) Casting weight supporting device for wind power product casting
CN209552066U (en) A kind of demoulding steelframe improving T beam forms disassembly efficiency
CN203127986U (en) Adjustable lifting tool for T joist steel formwork of high-speed rail
CN213671726U (en) Sand box special for casting and molding wind power base castings
CN209890066U (en) Box girder bottom web reinforcing bar lifting device
CN207999067U (en) The steel column mould of liftable operation platform
CN209816682U (en) Bridge steel box girder aerial working operation platform
CN112573344B (en) Use method of hoisting and turning-over device for super-large concrete prefabricated stand plate
CN210658016U (en) Trolley for movably dismounting bridge guardrail template
CN206189862U (en) Firm cloth machine guide rail of movable
CN112777484A (en) Hoisting method of goods shelf
CN213569108U (en) Precast beam template hoist and mount system
CN203624795U (en) Hoisting tool for turbine motor
CN215326387U (en) Special lifting appliance for continuous casting dummy bar head of continuous casting machine
CN207903746U (en) A kind of device for Precast T-Beam framework of steel reinforcement integral hoisting
CN213202065U (en) Prefabricated T roof beam framework of reinforcement hoist and mount gallows
CN208249691U (en) High-speed rail plate framework of steel reinforcement suspender
CN211102482U (en) Pipe truss welding frock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190201