CN209890066U - Box girder bottom web reinforcing bar lifting device - Google Patents

Box girder bottom web reinforcing bar lifting device Download PDF

Info

Publication number
CN209890066U
CN209890066U CN201920699783.5U CN201920699783U CN209890066U CN 209890066 U CN209890066 U CN 209890066U CN 201920699783 U CN201920699783 U CN 201920699783U CN 209890066 U CN209890066 U CN 209890066U
Authority
CN
China
Prior art keywords
cross beam
hoisting
chords
box girder
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920699783.5U
Other languages
Chinese (zh)
Inventor
吴波
李远明
赵朝阳
王晓辉
李秋霜
王凯
刘鑫
侯建新
赵化韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Xiamen Engineering Co Ltd
CCCC First Highway Engineering Co Ltd
Original Assignee
CCCC First Highway Xiamen Engineering Co Ltd
CCCC First Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Xiamen Engineering Co Ltd, CCCC First Highway Engineering Co Ltd filed Critical CCCC First Highway Xiamen Engineering Co Ltd
Priority to CN201920699783.5U priority Critical patent/CN209890066U/en
Application granted granted Critical
Publication of CN209890066U publication Critical patent/CN209890066U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model belongs to the technical field of cast in situ concrete bridge frock, a box girder bottom web reinforcing bar lifting device is disclosed, including a plurality of parallel arrangement's hoist and mount unit, upper chord and lower chord fixed connection through parallel arrangement from top to bottom between a plurality of hoist and mount units, set up perpendicularly between upper chord, lower chord and the hoist and mount unit, the cross section of hoist and mount unit is isosceles trapezoid, and hoist and mount unit top surface still is equipped with a plurality of rings that lift by crane, the utility model has the advantages of simple structure, work is steady.

Description

Box girder bottom web reinforcing bar lifting device
Technical Field
The utility model belongs to the technical field of cast in situ concrete bridge frock, especially, relate to a box girder bottom web reinforcing bar lifting device.
Background
With the improvement of the mechanization degree of modern bridge construction and the requirements of energy conservation and emission reduction, in the construction of continuous cast-in-place concrete bridges in fields such as mudflats, canyons, urban viaducts, cross-river bridges, cross-sea bridges and the like, in order to accelerate the construction progress, the construction of a movable formwork is mostly adopted. The processing and installation of reinforcing steel bars are one of key processes for ensuring the quality and the progress of beam slabs, generally, a box girder framework reinforcing steel bar installing method is to draw scales on a template by using paint and lay the reinforcing steel bars along the scales, the construction process needs to wait for the installation of the reinforcing steel bars after the box girders are poured and the operations of tensioning, formwork walking, mold closing and mold adjusting are carried out, and the process flow tends to cause the phenomenon of work nesting caused by waiting; for effectively promoting the efficiency of construction, shorten construction period, through technical research, the ligature of the cast-in-place box girder steel reinforcement framework of moving die carrier adopts one set of box girder bottom web steel reinforcement segmental prefabrication assembly method: through preparation box girder framework of steel reinforcement ligature location bed-jig, adopt the mould location, wholly carry out the merogenesis ligature to end web framework of steel reinforcement, wait for stretch-draw and die carrier walking after the box girder is pour, the compound die, carry out the reinforcement during the accent mould, become parallel operation from the line production, reduce the nest worker phenomenon that waits for arousing, reach the purpose of accelerating the construction progress, and the end that the ligature is good, web framework of steel reinforcement takes place to warp and distort easily at the hoist transport to the moulding-bed in-process, hardly effectively guarantee box girder steel reinforcement installation qualification rate, and bring the hidden danger for construction safety and construction quality.
Disclosure of Invention
The utility model aims at providing a box breast web reinforcing bar lifting device can effectively ensure that cast-in-place box girder steel reinforcement framework does not take place to warp at the hoist and mount in-process and has guaranteed construction quality, increases construction safety, the steady safety of hoist and mount process.
In order to achieve the above purpose, the utility model adopts the technical scheme that:
the utility model provides a case web reinforcing bar lifting device, includes a plurality of parallel arrangement's hoist and mount unit, through upper chord and lower chord fixed connection of upper and lower parallel arrangement between a plurality of hoist and mount units, set up perpendicularly between upper chord, lower chord and the hoist and mount unit, the cross section of hoist and mount unit is isosceles trapezoid, and hoist and mount unit top surface still is equipped with a plurality of rings that lift by crane.
Furthermore, the hoisting unit comprises a first cross beam and a second cross beam which are arranged in parallel from top to bottom, the length of the first cross beam is smaller than that of the second cross beam, the first cross beam and the second cross beam are fixedly connected through a plurality of first supporting rods, the first supporting rods and the first cross beam are vertically arranged, the end parts of the first cross beam and the second cross beam are further provided with connecting waist beams, and the waist beams at the first cross beam, the second cross beam and the two end parts form an isosceles trapezoid hoisting unit.
Further, still be equipped with a plurality of down tube between first crossbeam and the second crossbeam, the upper chord is fixed to be welded in first crossbeam bottom, the lower chord is fixed to be welded in second crossbeam bottom, still is equipped with the second bracing piece between the upper chord lower chord, second bracing piece top and upper chord fixed connection, second bracing piece lower part and second crossbeam fixed connection.
Furthermore, the lifting ring is arranged at the top of the first cross beam, and a rib plate is arranged between the lifting ring and the first cross beam.
Furthermore, the number of the upper chords and the number of the lower chords are three, the three upper chords are evenly arranged along the length direction of the first cross beam, and the lower chords and the upper chords are arranged in a one-to-one correspondence mode from top to bottom.
Furthermore, nine hoisting units are provided and are uniformly arranged along the length direction of the upper chord.
The utility model has the advantages that:
1. the hoisting tool for hoisting the reinforcing steel bars of the box girder bottom web plate is more stable, safe and reliable in hoisting the reinforcing steel bars integrally, and can effectively avoid deformation and distortion of a reinforcing steel bar framework in the hoisting process;
2. the box girder bottom web plate steel bar hoisting tool is made into a two-layer truss structure, and the defects that the combined beam hoisting tool is small in self rigidity and easy to deform are overcome. The function of materials can be fully exerted, the materials are saved, the self weight is reduced, and the rigidity is increased;
3. the device has strong practicability and simple structure and is convenient to popularize.
Drawings
Fig. 1 is a schematic view of the structure of the present invention.
Fig. 2 is a schematic side view of the present invention.
1. A lower chord; 2. a second cross member; 3. a diagonal bar; 4. a first support bar; 5. an upper chord; 6. a first cross member; 7. a rib plate; 8. a hoisting ring; 9. a second support bar; 10. a wale.
Detailed Description
As shown in the figure, the box girder bottom web plate steel bar hoisting tool comprises a plurality of hoisting units which are arranged in parallel, the hoisting units are fixedly connected through upper chords 5 and lower chords 1 which are arranged in parallel from top to bottom, the number of the hoisting units is nine, the nine hoisting units are uniformly arranged along the length direction of the upper chords 5, the upper chords 5 and the lower chords 1 are vertically arranged with the hoisting units, the cross sections of the hoisting units are isosceles trapezoids, the top surfaces of the hoisting units are also provided with a plurality of hoisting hanging rings 8, the hanging rings 8 are arranged at the top of a first cross beam 6, rib plates 7 are further arranged between the hanging rings 8 and the first cross beam 6 to disperse stress, the hanging rings 8 are provided with chain block lifting hooks, and the chain block lifting hooks are connected with hoisting equipment; further, the hoisting unit comprises a first cross beam 6 and a second cross beam 2 which are arranged in parallel up and down, the length of the first cross beam 6 is smaller than that of the second cross beam 2, the first cross beam 6 is fixedly connected with the second cross beam 2 through a plurality of first supporting rods 4, the first supporting rods 4 are vertically arranged with the first cross beam 6, the end parts of the first cross beam 6 and the second cross beam 2 are also provided with connecting waist beams 10, and the first cross beam 6, the second cross beam 2 and the waist beams 10 at the two end parts form an isosceles trapezoid hoisting unit; further, for the purpose of more stable overall structure, a plurality of diagonal rods 3 are further arranged between the first cross beam 6 and the second cross beam 2, the upper chord 5 is fixedly welded at the bottom of the first cross beam 6, the lower chord 1 is fixedly welded at the bottom of the second cross beam 2, a second support rod 9 is further arranged between the upper chord 5 and the lower chord 1, the top of the second support rod 9 is fixedly connected with the upper chord 5, and the lower part of the second support rod 9 is fixedly connected with the second cross beam 2; further, the number of the upper chords 5 and the number of the lower chords 1 are three, the three upper chords 5 are uniformly arranged along the length direction of the first cross beam 6, and the lower chords 1 and the upper chords 5 are arranged in a one-to-one correspondence manner.
During the concrete use, with the back web steel reinforcement skeleton ligature on the hoist, place the chain block lifting hook in the crane ring, penetrate the plug of diameter 25mm on the steel reinforcement cage surface during lifting with the dispersion concentrated power, can lift by crane girder body muscle can also play the suspension bridge gluten, start the driving and can steadily lift by crane the steel reinforcement cage.

Claims (6)

1. The utility model provides a case breast web reinforcing bar lifting device which characterized in that: the hoisting unit comprises a plurality of hoisting units which are arranged in parallel, the hoisting units are fixedly connected through upper chords and lower chords which are arranged in parallel from top to bottom, the upper chords, the lower chords and the hoisting units are vertically arranged, the cross sections of the hoisting units are isosceles trapezoids, and the top surfaces of the hoisting units are also provided with a plurality of hoisting rings.
2. The box girder bottom web reinforcing bar lifting tool according to claim 1, wherein: the hoisting unit comprises a first cross beam and a second cross beam which are arranged in parallel from top to bottom, the length of the first cross beam is smaller than that of the second cross beam, the first cross beam and the second cross beam are fixedly connected through a plurality of first supporting rods, the first supporting rods and the first cross beam are vertically arranged, the end portions of the first cross beam and the second cross beam are further provided with connecting waist beams, and the waist beams at the first cross beam, the second cross beam and the two end portions form an isosceles trapezoid hoisting unit.
3. The box girder bottom web reinforcing steel bar hoisting tool of claim 2, characterized in that: still be equipped with a plurality of down tube between first crossbeam and the second crossbeam, the upper chord is fixed to be welded in first crossbeam bottom, lower chord is fixed to be welded in second crossbeam bottom, still is equipped with the second bracing piece between the upper chord lower chord, second bracing piece top and upper chord fixed connection, second bracing piece lower part and second crossbeam fixed connection.
4. A box girder bottom web reinforcing bar lifting tool according to claim 3, wherein: the lifting ring is arranged at the top of the first cross beam, and a rib plate is arranged between the lifting ring and the first cross beam.
5. A box girder bottom web reinforcing bar lifting tool according to claim 4, wherein: the number of the upper chords and the number of the lower chords are three, the three upper chords are evenly arranged along the length direction of the first cross beam, and the lower chords and the upper chords are arranged in a one-to-one correspondence mode from top to bottom.
6. A box girder bottom web reinforcing bar lifting tool according to claim 5, wherein: nine hoisting units are provided and are uniformly arranged along the length direction of the upper chord.
CN201920699783.5U 2019-05-16 2019-05-16 Box girder bottom web reinforcing bar lifting device Expired - Fee Related CN209890066U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920699783.5U CN209890066U (en) 2019-05-16 2019-05-16 Box girder bottom web reinforcing bar lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920699783.5U CN209890066U (en) 2019-05-16 2019-05-16 Box girder bottom web reinforcing bar lifting device

Publications (1)

Publication Number Publication Date
CN209890066U true CN209890066U (en) 2020-01-03

Family

ID=69020794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920699783.5U Expired - Fee Related CN209890066U (en) 2019-05-16 2019-05-16 Box girder bottom web reinforcing bar lifting device

Country Status (1)

Country Link
CN (1) CN209890066U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110217684A (en) * 2019-05-16 2019-09-10 中交一公局厦门工程有限公司 Box girder bottom web reinforcing bar lifting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110217684A (en) * 2019-05-16 2019-09-10 中交一公局厦门工程有限公司 Box girder bottom web reinforcing bar lifting device

Similar Documents

Publication Publication Date Title
CN109267490B (en) Long guide beam type movable formwork and construction method thereof
CN113752379B (en) Concrete T beam prefabrication construction method adopting secondary tensioning process and movable pedestal
CN201172574Y (en) Precast beam reinforced bar hoisting rack
CN101324055A (en) Lifting equipment and method of box girder integral steel reinforcement framework
CN101781878A (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
CN105088970B (en) Construction method of corrugated steel web PC box girder cable-stayed bridge
CN116289620A (en) Box girder steel bar part combined type conveying device and method
CN111893889A (en) Main bridge closure section construction method
CN209890066U (en) Box girder bottom web reinforcing bar lifting device
CN210766433U (en) Trapezoidal hanging basket structure
CN201511439U (en) System for integrally binding and hoisting box girder steel reinforcement framework
CN108360395B (en) Basket is hung in construction of bridge long and large section case roof beam, concrete case roof beam construction structure of hanging basket, steel case roof beam construction structure of hanging basket
CN215593730U (en) Hanging basket for parasitic support with beam plate on wide body of cable-stayed bridge with cantilever pouring double-side box
CN201588172U (en) Integral single-tower non-dorsal-cord cable-stayed-bridge king tower lifting template
CN212406744U (en) Template platform truck is filled to high-speed railway tunnel center ditch secondary
CN113882280A (en) Construction method of steel-concrete mixed combined continuous rigid frame bridge
CN209923791U (en) Workpiece for cross-line construction of formwork suspension casting combined system
CN110217684A (en) Box girder bottom web reinforcing bar lifting device
CN209816682U (en) Bridge steel box girder aerial working operation platform
CN209760038U (en) Be used for precast concrete T roof beam roof plate reinforcing bar integral hoisting truss
CN201245817Y (en) Hoisting equipment for box girder integral steel reinforcement framework
CN219931602U (en) Cantilever plate formwork system used under suspension system
CN219972937U (en) Construction assembly type bracket for bottom die of solid section at top of hollow pier
CN217350381U (en) Box girder steel reinforcement framework lifting device
CN218880610U (en) Steel-concrete longitudinal combination continuous beam body and bridge deck construction structure for full-hanging basket construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200103