CN110217684A - A kind of box beam bottom web reinforcement lifting device - Google Patents
A kind of box beam bottom web reinforcement lifting device Download PDFInfo
- Publication number
- CN110217684A CN110217684A CN201910410488.8A CN201910410488A CN110217684A CN 110217684 A CN110217684 A CN 110217684A CN 201910410488 A CN201910410488 A CN 201910410488A CN 110217684 A CN110217684 A CN 110217684A
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- boom
- lifting
- lifting elements
- web reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 24
- 229930091051 Arenine Natural products 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 10
- 238000000034 method Methods 0.000 description 10
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 5
- 239000000725 suspension Substances 0.000 description 4
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 210000003205 muscle Anatomy 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 108010068370 Glutens Proteins 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 210000002219 extraembryonic membrane Anatomy 0.000 description 1
- 235000021312 gluten Nutrition 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000011007 installation qualification Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
Abstract
The invention belongs to cast-in-place concrete bridge tooling technical fields, disclose a kind of box beam bottom web reinforcement lifting device, including several lifting elements disposed in parallel, it is fixedly connected by upper and lower top boom disposed in parallel with lower boom between multiple lifting elements, it is vertically arranged between the top boom, lower boom and lifting elements, the cross section of the lifting elements is isosceles trapezoid, and lifting elements top surface is additionally provided with multiple lifting hanging rings, the advantages of present invention has structure simple, stable working.
Description
Technical field
The invention belongs to cast-in-place concrete bridge tooling technical field more particularly to a kind of box beam bottom web reinforcement slingers
Tool.
Background technique
With the requirement of promotion and the energy-saving and emission-reduction of modern bridge construction mechanization degree, in beach, valley, overhead road of city
When bridge, construction across the continuous cast-in-place concrete bridge in the places such as river, bridge spanning the sea, in order to accelerate construction progress, movement is mostly used
Mould bases construction.Steel bar meter and installation are to ensure that one of the critical process of beam slab quality and progress, general installs case beam framework steel
Muscle method is to finish scale with paint in template, places reinforcing bar along scale, this working procedure must be after box girder webs
After the walking of to be tensioned and mould bases, molding, mode transfer, reinforcement installation operation can be carried out, this continuous productive process be bound to cause because etc.
Work holdup phenomenon to be caused;For effective lifting construction efficiency, shortens the completion time of project, pass through technical research, box
The binding of framework of steel reinforcement, using the segmented precast assembly method of a set of box beam bottom web reinforcement: by making steel bar framework of box beam
Binding positioning moulding bed, is positioned using mould, whole to carry out merogenesis binding to bottom web reinforcement skeleton, the waiting after box girder webs
It draws and mould bases walks, molds, carries out reinforcing bar binding during mode transfer, become parallel operations from continuous productive process, reduce caused by waiting
Work holdup phenomenon achievees the purpose that accelerate construction progress, and the bottom that has bound, web reinforcement skeleton hold during being hoisted to fetal membrane
It easily deforms and distorts, be difficult that box beam reinforcement installation qualification rate is effectively ensured, and bring to construction safety and construction quality
Hidden danger.
Summary of the invention
The object of the present invention is to provide a kind of box beam bottom web reinforcement lifting devices, can effectively ensure cast-in-situ box girder reinforcing bar
Skeleton does not deform in hoisting process ensure that construction quality, increase construction safety, and hoisting process is steadily safe.
In order to achieve the above objectives, the technical solution adopted by the present invention is that:
A kind of box beam bottom web reinforcement lifting device, including several lifting elements disposed in parallel lead between multiple lifting elements
Top boom disposed in parallel up and down is crossed to be fixedly connected with lower boom, it is vertical between the top boom, lower boom and lifting elements to set
It sets, the cross section of the lifting elements is isosceles trapezoid, and lifting elements top surface is additionally provided with multiple lifting hanging rings.
Further, the lifting elements include upper and lower first crossbeam and second cross beam disposed in parallel, first crossbeam
Length is less than the length of second cross beam, is fixedly connected between first crossbeam and second cross beam by multiple first support bars, described
It is vertically arranged between first support bar and first crossbeam, the first crossbeam end and second cross beam end are additionally provided with connection waist
Beam, the first crossbeam, second cross beam, both ends waist rail composition isosceles trapezoid lifting elements.
Further, multiple braces are additionally provided between the first crossbeam and second cross beam, the top boom is fixedly welded
In first crossbeam bottom, the lower boom, which is fixedly welded between second cross beam bottom, top boom lower boom, is additionally provided with second
Strut, the second support bar top are fixedly connected with top boom, and second support bar lower part is fixedly connected with second cross beam.
Further, the hanging ring is set at the top of first crossbeam, and gusset is additionally provided between hanging ring and first crossbeam.
Further, the quantity of the top boom and lower boom be three, three top booms along first crossbeam length
Direction is uniformly arranged, and lower boom is arranged in a one-to-one correspondence up and down with top boom position.
Further, the lifting elements are nine, and nine lifting elements are uniformly arranged along top boom length direction.
Present invention has the advantage that
1, box beam bottom web reinforcement lifting device lifting reinforcing bar is integrally more stable, safe and reliable, can effectively avoid in hoisting process
Middle framework of steel reinforcement is deformed and is distorted;
2, box beam bottom web reinforcement lifting device is made into two-tier truss structure, and it is small to make up combination beam suspender stiffness by itself, easily-deformable
Defect.The effect of material can be given full play to, material is saved, mitigates self weight, increases rigidity;
3, the present apparatus is practical, and structure is simply convenient for promoting.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the present invention.
Fig. 2 is side structure schematic view of the invention.
1, lower boom;2, second cross beam;3, brace;4, first support bar;5, top boom;6, first crossbeam;7, gusset;8,
Hanging ring;9, second support bar;10, waist rail.
Specific embodiment
As shown, a kind of box beam bottom web reinforcement lifting device, including several lifting elements disposed in parallel, it is multiple
It being fixedly connected by upper and lower top boom 5 disposed in parallel with lower boom 1 between lifting elements, the lifting elements are nine, nine
A lifting elements are uniformly arranged along 5 length direction of top boom, vertical between the top boom 5, lower boom 1 and lifting elements to set
It sets, the cross section of the lifting elements is isosceles trapezoid, and lifting elements top surface is additionally provided with multiple lifting hanging rings 8, and the hanging ring 8 is set
In 6 top of first crossbeam, it is additionally provided with gusset 7 between hanging ring 8 and first crossbeam 6, plays the role of stress dispersion, is set on hanging ring 8
There is chain block suspension hook, chain block suspension hook is connect with lifting appliance;Further, the lifting elements include setting in parallel up and down
The first crossbeam 6 and second cross beam 2 set, the length of first crossbeam 6 are less than the length of second cross beam 2, first crossbeam 6 and the second cross
It is fixedly connected, is vertically arranged between the first support bar 4 and first crossbeam 6, institute by multiple first support bars 4 between beam 2
It states 6 end of first crossbeam and 2 end of second cross beam and is additionally provided with connection waist rail 10, the first crossbeam 6, second cross beam 2, both ends
Waist rail 10 form isosceles trapezoid lifting elements;Further, in order to which overall structure is more stable, 6 He of first crossbeam
Multiple braces 3 are additionally provided between second cross beam 2, the top boom 5 is fixedly welded in 6 bottom of first crossbeam, and the lower boom 1 is solid
Surely it is welded in 2 bottom of second cross beam, second support bar 9,9 top of second support bar are additionally provided between 5 lower boom 1 of top boom
It is fixedly connected with top boom 5,9 lower part of second support bar is fixedly connected with second cross beam 2;Further, the top boom 5 is under
The quantity of chord member 1 is three, and three top booms 5 are uniformly arranged along the length direction of first crossbeam 6, lower boom 1 and top boom 5
Position is arranged in a one-to-one correspondence up and down.
When specifically used, after in the binding to suspender of bottom web reinforcement skeleton, chain block suspension hook is placed in hanging ring
Interior, the plug for penetrating diameter 25mm in surface of reinforcing cage when lifting can lift by crane beam body muscle but also play suspension bridge to disperse concentrated force
Gluten, starting driving can steadily sling steel reinforcement cage.
Claims (6)
1. a kind of box beam bottom web reinforcement lifting device, it is characterised in that: multiple to hang including several lifting elements disposed in parallel
It is fixedly connected by upper and lower top boom disposed in parallel with lower boom between dress unit, the top boom, lower boom and lifting are single
It is vertically arranged between member, the cross section of the lifting elements is isosceles trapezoid, and lifting elements top surface is additionally provided with multiple lifting hanging rings.
2. box beam bottom web reinforcement lifting device as described in claim 1, it is characterised in that: the lifting elements include up and down
First crossbeam and second cross beam disposed in parallel, the length of first crossbeam are less than the length of second cross beam, first crossbeam and second
It is fixedly connected between crossbeam by multiple first support bars, is vertically arranged between the first support bar and first crossbeam, it is described
First crossbeam end and second cross beam end are additionally provided with connection waist rail, the first crossbeam, second cross beam, both ends waist rail group
At the lifting elements of isosceles trapezoid.
3. box beam bottom web reinforcement lifting device as claimed in claim 2, it is characterised in that: the first crossbeam and the second cross
Multiple braces are additionally provided between beam, the top boom is fixedly welded in first crossbeam bottom, and the lower boom is fixedly welded in
Two crossbeam bottoms, are additionally provided with second support bar between top boom lower boom, at the top of the second support bar with top boom is fixed connects
It connects, second support bar lower part is fixedly connected with second cross beam.
4. box beam bottom as claimed in claim 3 web reinforcement lifting device, it is characterised in that: the hanging ring is set to first crossbeam
Top is additionally provided with gusset between hanging ring and first crossbeam.
5. box beam bottom web reinforcement lifting device as claimed in claim 4, it is characterised in that: the top boom and lower boom
Quantity be three, three top booms are uniformly arranged along the length direction of first crossbeam, lower boom with it is next on top boom position
One is correspondingly arranged.
6. box beam bottom web reinforcement lifting device as claimed in claim 5, it is characterised in that: the lifting elements are nine,
Nine lifting elements are uniformly arranged along top boom length direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910410488.8A CN110217684A (en) | 2019-05-16 | 2019-05-16 | A kind of box beam bottom web reinforcement lifting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910410488.8A CN110217684A (en) | 2019-05-16 | 2019-05-16 | A kind of box beam bottom web reinforcement lifting device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110217684A true CN110217684A (en) | 2019-09-10 |
Family
ID=67821157
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910410488.8A Pending CN110217684A (en) | 2019-05-16 | 2019-05-16 | A kind of box beam bottom web reinforcement lifting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110217684A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112176876A (en) * | 2020-09-30 | 2021-01-05 | 中交第三航务工程局有限公司 | Prefabricating and hoisting process for single-box three-chamber large-section suspension casting box girder web steel bar |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09249377A (en) * | 1996-03-13 | 1997-09-22 | Unyusho Daini Kowan Kensetsukyoku | Reinforcement unit lifting device |
CN201512345U (en) * | 2009-10-09 | 2010-06-23 | 中铁二局股份有限公司 | Multifunctional integrated lifting frame |
EP2784238A2 (en) * | 2013-03-26 | 2014-10-01 | Rainhard Nordbrock | Cross member and method for mounting |
CN204529069U (en) * | 2015-01-30 | 2015-08-05 | 中铁三局集团有限公司 | Prefabricated case beam steel bar overall hoisting device |
CN109110629A (en) * | 2018-10-12 | 2019-01-01 | 中铁六局集团广州工程有限公司 | A kind of hoisting device for reinforcement cage |
CN208648548U (en) * | 2018-08-17 | 2019-03-26 | 中铁三局集团广东建设工程有限公司 | A kind of suspender for handling U-shaped beam reinforcement cages |
CN209890066U (en) * | 2019-05-16 | 2020-01-03 | 中交一公局厦门工程有限公司 | Box girder bottom web reinforcing bar lifting device |
-
2019
- 2019-05-16 CN CN201910410488.8A patent/CN110217684A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09249377A (en) * | 1996-03-13 | 1997-09-22 | Unyusho Daini Kowan Kensetsukyoku | Reinforcement unit lifting device |
CN201512345U (en) * | 2009-10-09 | 2010-06-23 | 中铁二局股份有限公司 | Multifunctional integrated lifting frame |
EP2784238A2 (en) * | 2013-03-26 | 2014-10-01 | Rainhard Nordbrock | Cross member and method for mounting |
CN204529069U (en) * | 2015-01-30 | 2015-08-05 | 中铁三局集团有限公司 | Prefabricated case beam steel bar overall hoisting device |
CN208648548U (en) * | 2018-08-17 | 2019-03-26 | 中铁三局集团广东建设工程有限公司 | A kind of suspender for handling U-shaped beam reinforcement cages |
CN109110629A (en) * | 2018-10-12 | 2019-01-01 | 中铁六局集团广州工程有限公司 | A kind of hoisting device for reinforcement cage |
CN209890066U (en) * | 2019-05-16 | 2020-01-03 | 中交一公局厦门工程有限公司 | Box girder bottom web reinforcing bar lifting device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112176876A (en) * | 2020-09-30 | 2021-01-05 | 中交第三航务工程局有限公司 | Prefabricating and hoisting process for single-box three-chamber large-section suspension casting box girder web steel bar |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201172574Y (en) | Precast beam reinforced bar hoisting rack | |
CN101324055A (en) | Lifting equipment and method of box girder integral steel reinforcement framework | |
CN109267491A (en) | A kind of mobile formwork and its construction method | |
CN109267490A (en) | A kind of long nose-girder type mobile formwork and its construction method | |
CN208844424U (en) | Multifunctional assembled construction trolley | |
CN105464456A (en) | Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter | |
CN110217684A (en) | A kind of box beam bottom web reinforcement lifting device | |
CN203795311U (en) | Multi-leg high pier and slip form construction device | |
CN206887771U (en) | A kind of small across footpath plate-beam construction platform structure | |
CN208167536U (en) | A kind of operation platform removed for bridge temporary support | |
CN109137747A (en) | A kind of flexible suspension for long-span arch bridge main girder construction | |
CN209144661U (en) | Mould bases for bridge construction | |
CN209066293U (en) | A kind of flexible suspension for long-span arch bridge main girder construction | |
CN209890066U (en) | Box girder bottom web reinforcing bar lifting device | |
CN208197158U (en) | A kind of reinforcing bar tire suspender of precast segment box beam | |
CN203613464U (en) | Slip form construction cargo transportation device | |
CN202323783U (en) | Hanging device for mid-span closure section hanging basket | |
CN109778719A (en) | A kind of multi-purpose type Hanging Basket and the cantilever pouring construction method using the multi-purpose type Hanging Basket | |
CN213061742U (en) | Integral hoisting device for continuous beam web plate reinforcing steel bars | |
CN107881926A (en) | A kind of combined cradle and its construction method with full circle swinging loop wheel machine | |
CN211173029U (en) | A liftable platform structure for chimney reinforcement construction | |
CN203613461U (en) | Slip form construction lifting system | |
CN208219546U (en) | A kind of pile cover integral inverted hangs bottom system | |
CN206735623U (en) | Framework of steel reinforcement hanging apparatus | |
CN219792145U (en) | Hanging bracket device for hoisting prefabricated T-beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |