CN110217684A - A kind of box beam bottom web reinforcement lifting device - Google Patents

A kind of box beam bottom web reinforcement lifting device Download PDF

Info

Publication number
CN110217684A
CN110217684A CN201910410488.8A CN201910410488A CN110217684A CN 110217684 A CN110217684 A CN 110217684A CN 201910410488 A CN201910410488 A CN 201910410488A CN 110217684 A CN110217684 A CN 110217684A
Authority
CN
China
Prior art keywords
crossbeam
boom
lifting
lifting elements
web reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910410488.8A
Other languages
Chinese (zh)
Inventor
吴波
李远明
赵朝阳
王晓辉
李秋霜
王凯
刘鑫
侯建新
赵化韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Group Co Ltd
CCCC First Highway Xiamen Engineering Co Ltd
Original Assignee
CCCC First Highway Engineering Group Co Ltd
CCCC First Highway Xiamen Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Group Co Ltd, CCCC First Highway Xiamen Engineering Co Ltd filed Critical CCCC First Highway Engineering Group Co Ltd
Priority to CN201910410488.8A priority Critical patent/CN110217684A/en
Publication of CN110217684A publication Critical patent/CN110217684A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means

Abstract

The invention belongs to cast-in-place concrete bridge tooling technical fields, disclose a kind of box beam bottom web reinforcement lifting device, including several lifting elements disposed in parallel, it is fixedly connected by upper and lower top boom disposed in parallel with lower boom between multiple lifting elements, it is vertically arranged between the top boom, lower boom and lifting elements, the cross section of the lifting elements is isosceles trapezoid, and lifting elements top surface is additionally provided with multiple lifting hanging rings, the advantages of present invention has structure simple, stable working.

Description

A kind of box beam bottom web reinforcement lifting device
Technical field
The invention belongs to cast-in-place concrete bridge tooling technical field more particularly to a kind of box beam bottom web reinforcement slingers Tool.
Background technique
With the requirement of promotion and the energy-saving and emission-reduction of modern bridge construction mechanization degree, in beach, valley, overhead road of city When bridge, construction across the continuous cast-in-place concrete bridge in the places such as river, bridge spanning the sea, in order to accelerate construction progress, movement is mostly used Mould bases construction.Steel bar meter and installation are to ensure that one of the critical process of beam slab quality and progress, general installs case beam framework steel Muscle method is to finish scale with paint in template, places reinforcing bar along scale, this working procedure must be after box girder webs After the walking of to be tensioned and mould bases, molding, mode transfer, reinforcement installation operation can be carried out, this continuous productive process be bound to cause because etc. Work holdup phenomenon to be caused;For effective lifting construction efficiency, shortens the completion time of project, pass through technical research, box The binding of framework of steel reinforcement, using the segmented precast assembly method of a set of box beam bottom web reinforcement: by making steel bar framework of box beam Binding positioning moulding bed, is positioned using mould, whole to carry out merogenesis binding to bottom web reinforcement skeleton, the waiting after box girder webs It draws and mould bases walks, molds, carries out reinforcing bar binding during mode transfer, become parallel operations from continuous productive process, reduce caused by waiting Work holdup phenomenon achievees the purpose that accelerate construction progress, and the bottom that has bound, web reinforcement skeleton hold during being hoisted to fetal membrane It easily deforms and distorts, be difficult that box beam reinforcement installation qualification rate is effectively ensured, and bring to construction safety and construction quality Hidden danger.
Summary of the invention
The object of the present invention is to provide a kind of box beam bottom web reinforcement lifting devices, can effectively ensure cast-in-situ box girder reinforcing bar Skeleton does not deform in hoisting process ensure that construction quality, increase construction safety, and hoisting process is steadily safe.
In order to achieve the above objectives, the technical solution adopted by the present invention is that:
A kind of box beam bottom web reinforcement lifting device, including several lifting elements disposed in parallel lead between multiple lifting elements Top boom disposed in parallel up and down is crossed to be fixedly connected with lower boom, it is vertical between the top boom, lower boom and lifting elements to set It sets, the cross section of the lifting elements is isosceles trapezoid, and lifting elements top surface is additionally provided with multiple lifting hanging rings.
Further, the lifting elements include upper and lower first crossbeam and second cross beam disposed in parallel, first crossbeam Length is less than the length of second cross beam, is fixedly connected between first crossbeam and second cross beam by multiple first support bars, described It is vertically arranged between first support bar and first crossbeam, the first crossbeam end and second cross beam end are additionally provided with connection waist Beam, the first crossbeam, second cross beam, both ends waist rail composition isosceles trapezoid lifting elements.
Further, multiple braces are additionally provided between the first crossbeam and second cross beam, the top boom is fixedly welded In first crossbeam bottom, the lower boom, which is fixedly welded between second cross beam bottom, top boom lower boom, is additionally provided with second Strut, the second support bar top are fixedly connected with top boom, and second support bar lower part is fixedly connected with second cross beam.
Further, the hanging ring is set at the top of first crossbeam, and gusset is additionally provided between hanging ring and first crossbeam.
Further, the quantity of the top boom and lower boom be three, three top booms along first crossbeam length Direction is uniformly arranged, and lower boom is arranged in a one-to-one correspondence up and down with top boom position.
Further, the lifting elements are nine, and nine lifting elements are uniformly arranged along top boom length direction.
Present invention has the advantage that
1, box beam bottom web reinforcement lifting device lifting reinforcing bar is integrally more stable, safe and reliable, can effectively avoid in hoisting process Middle framework of steel reinforcement is deformed and is distorted;
2, box beam bottom web reinforcement lifting device is made into two-tier truss structure, and it is small to make up combination beam suspender stiffness by itself, easily-deformable Defect.The effect of material can be given full play to, material is saved, mitigates self weight, increases rigidity;
3, the present apparatus is practical, and structure is simply convenient for promoting.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the present invention.
Fig. 2 is side structure schematic view of the invention.
1, lower boom;2, second cross beam;3, brace;4, first support bar;5, top boom;6, first crossbeam;7, gusset;8, Hanging ring;9, second support bar;10, waist rail.
Specific embodiment
As shown, a kind of box beam bottom web reinforcement lifting device, including several lifting elements disposed in parallel, it is multiple It being fixedly connected by upper and lower top boom 5 disposed in parallel with lower boom 1 between lifting elements, the lifting elements are nine, nine A lifting elements are uniformly arranged along 5 length direction of top boom, vertical between the top boom 5, lower boom 1 and lifting elements to set It sets, the cross section of the lifting elements is isosceles trapezoid, and lifting elements top surface is additionally provided with multiple lifting hanging rings 8, and the hanging ring 8 is set In 6 top of first crossbeam, it is additionally provided with gusset 7 between hanging ring 8 and first crossbeam 6, plays the role of stress dispersion, is set on hanging ring 8 There is chain block suspension hook, chain block suspension hook is connect with lifting appliance;Further, the lifting elements include setting in parallel up and down The first crossbeam 6 and second cross beam 2 set, the length of first crossbeam 6 are less than the length of second cross beam 2, first crossbeam 6 and the second cross It is fixedly connected, is vertically arranged between the first support bar 4 and first crossbeam 6, institute by multiple first support bars 4 between beam 2 It states 6 end of first crossbeam and 2 end of second cross beam and is additionally provided with connection waist rail 10, the first crossbeam 6, second cross beam 2, both ends Waist rail 10 form isosceles trapezoid lifting elements;Further, in order to which overall structure is more stable, 6 He of first crossbeam Multiple braces 3 are additionally provided between second cross beam 2, the top boom 5 is fixedly welded in 6 bottom of first crossbeam, and the lower boom 1 is solid Surely it is welded in 2 bottom of second cross beam, second support bar 9,9 top of second support bar are additionally provided between 5 lower boom 1 of top boom It is fixedly connected with top boom 5,9 lower part of second support bar is fixedly connected with second cross beam 2;Further, the top boom 5 is under The quantity of chord member 1 is three, and three top booms 5 are uniformly arranged along the length direction of first crossbeam 6, lower boom 1 and top boom 5 Position is arranged in a one-to-one correspondence up and down.
When specifically used, after in the binding to suspender of bottom web reinforcement skeleton, chain block suspension hook is placed in hanging ring Interior, the plug for penetrating diameter 25mm in surface of reinforcing cage when lifting can lift by crane beam body muscle but also play suspension bridge to disperse concentrated force Gluten, starting driving can steadily sling steel reinforcement cage.

Claims (6)

1. a kind of box beam bottom web reinforcement lifting device, it is characterised in that: multiple to hang including several lifting elements disposed in parallel It is fixedly connected by upper and lower top boom disposed in parallel with lower boom between dress unit, the top boom, lower boom and lifting are single It is vertically arranged between member, the cross section of the lifting elements is isosceles trapezoid, and lifting elements top surface is additionally provided with multiple lifting hanging rings.
2. box beam bottom web reinforcement lifting device as described in claim 1, it is characterised in that: the lifting elements include up and down First crossbeam and second cross beam disposed in parallel, the length of first crossbeam are less than the length of second cross beam, first crossbeam and second It is fixedly connected between crossbeam by multiple first support bars, is vertically arranged between the first support bar and first crossbeam, it is described First crossbeam end and second cross beam end are additionally provided with connection waist rail, the first crossbeam, second cross beam, both ends waist rail group At the lifting elements of isosceles trapezoid.
3. box beam bottom web reinforcement lifting device as claimed in claim 2, it is characterised in that: the first crossbeam and the second cross Multiple braces are additionally provided between beam, the top boom is fixedly welded in first crossbeam bottom, and the lower boom is fixedly welded in Two crossbeam bottoms, are additionally provided with second support bar between top boom lower boom, at the top of the second support bar with top boom is fixed connects It connects, second support bar lower part is fixedly connected with second cross beam.
4. box beam bottom as claimed in claim 3 web reinforcement lifting device, it is characterised in that: the hanging ring is set to first crossbeam Top is additionally provided with gusset between hanging ring and first crossbeam.
5. box beam bottom web reinforcement lifting device as claimed in claim 4, it is characterised in that: the top boom and lower boom Quantity be three, three top booms are uniformly arranged along the length direction of first crossbeam, lower boom with it is next on top boom position One is correspondingly arranged.
6. box beam bottom web reinforcement lifting device as claimed in claim 5, it is characterised in that: the lifting elements are nine, Nine lifting elements are uniformly arranged along top boom length direction.
CN201910410488.8A 2019-05-16 2019-05-16 A kind of box beam bottom web reinforcement lifting device Pending CN110217684A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910410488.8A CN110217684A (en) 2019-05-16 2019-05-16 A kind of box beam bottom web reinforcement lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910410488.8A CN110217684A (en) 2019-05-16 2019-05-16 A kind of box beam bottom web reinforcement lifting device

Publications (1)

Publication Number Publication Date
CN110217684A true CN110217684A (en) 2019-09-10

Family

ID=67821157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910410488.8A Pending CN110217684A (en) 2019-05-16 2019-05-16 A kind of box beam bottom web reinforcement lifting device

Country Status (1)

Country Link
CN (1) CN110217684A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112176876A (en) * 2020-09-30 2021-01-05 中交第三航务工程局有限公司 Prefabricating and hoisting process for single-box three-chamber large-section suspension casting box girder web steel bar

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09249377A (en) * 1996-03-13 1997-09-22 Unyusho Daini Kowan Kensetsukyoku Reinforcement unit lifting device
CN201512345U (en) * 2009-10-09 2010-06-23 中铁二局股份有限公司 Multifunctional integrated lifting frame
EP2784238A2 (en) * 2013-03-26 2014-10-01 Rainhard Nordbrock Cross member and method for mounting
CN204529069U (en) * 2015-01-30 2015-08-05 中铁三局集团有限公司 Prefabricated case beam steel bar overall hoisting device
CN109110629A (en) * 2018-10-12 2019-01-01 中铁六局集团广州工程有限公司 A kind of hoisting device for reinforcement cage
CN208648548U (en) * 2018-08-17 2019-03-26 中铁三局集团广东建设工程有限公司 A kind of suspender for handling U-shaped beam reinforcement cages
CN209890066U (en) * 2019-05-16 2020-01-03 中交一公局厦门工程有限公司 Box girder bottom web reinforcing bar lifting device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09249377A (en) * 1996-03-13 1997-09-22 Unyusho Daini Kowan Kensetsukyoku Reinforcement unit lifting device
CN201512345U (en) * 2009-10-09 2010-06-23 中铁二局股份有限公司 Multifunctional integrated lifting frame
EP2784238A2 (en) * 2013-03-26 2014-10-01 Rainhard Nordbrock Cross member and method for mounting
CN204529069U (en) * 2015-01-30 2015-08-05 中铁三局集团有限公司 Prefabricated case beam steel bar overall hoisting device
CN208648548U (en) * 2018-08-17 2019-03-26 中铁三局集团广东建设工程有限公司 A kind of suspender for handling U-shaped beam reinforcement cages
CN109110629A (en) * 2018-10-12 2019-01-01 中铁六局集团广州工程有限公司 A kind of hoisting device for reinforcement cage
CN209890066U (en) * 2019-05-16 2020-01-03 中交一公局厦门工程有限公司 Box girder bottom web reinforcing bar lifting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112176876A (en) * 2020-09-30 2021-01-05 中交第三航务工程局有限公司 Prefabricating and hoisting process for single-box three-chamber large-section suspension casting box girder web steel bar

Similar Documents

Publication Publication Date Title
CN201172574Y (en) Precast beam reinforced bar hoisting rack
CN101324055A (en) Lifting equipment and method of box girder integral steel reinforcement framework
CN109267491A (en) A kind of mobile formwork and its construction method
CN109267490A (en) A kind of long nose-girder type mobile formwork and its construction method
CN208844424U (en) Multifunctional assembled construction trolley
CN105464456A (en) Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter
CN110217684A (en) A kind of box beam bottom web reinforcement lifting device
CN203795311U (en) Multi-leg high pier and slip form construction device
CN206887771U (en) A kind of small across footpath plate-beam construction platform structure
CN208167536U (en) A kind of operation platform removed for bridge temporary support
CN109137747A (en) A kind of flexible suspension for long-span arch bridge main girder construction
CN209144661U (en) Mould bases for bridge construction
CN209066293U (en) A kind of flexible suspension for long-span arch bridge main girder construction
CN209890066U (en) Box girder bottom web reinforcing bar lifting device
CN208197158U (en) A kind of reinforcing bar tire suspender of precast segment box beam
CN203613464U (en) Slip form construction cargo transportation device
CN202323783U (en) Hanging device for mid-span closure section hanging basket
CN109778719A (en) A kind of multi-purpose type Hanging Basket and the cantilever pouring construction method using the multi-purpose type Hanging Basket
CN213061742U (en) Integral hoisting device for continuous beam web plate reinforcing steel bars
CN107881926A (en) A kind of combined cradle and its construction method with full circle swinging loop wheel machine
CN211173029U (en) A liftable platform structure for chimney reinforcement construction
CN203613461U (en) Slip form construction lifting system
CN208219546U (en) A kind of pile cover integral inverted hangs bottom system
CN206735623U (en) Framework of steel reinforcement hanging apparatus
CN219792145U (en) Hanging bracket device for hoisting prefabricated T-beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination