CN208167536U - A kind of operation platform removed for bridge temporary support - Google Patents

A kind of operation platform removed for bridge temporary support Download PDF

Info

Publication number
CN208167536U
CN208167536U CN201721336575.6U CN201721336575U CN208167536U CN 208167536 U CN208167536 U CN 208167536U CN 201721336575 U CN201721336575 U CN 201721336575U CN 208167536 U CN208167536 U CN 208167536U
Authority
CN
China
Prior art keywords
bridge floor
bridge
operating platform
temporary support
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721336575.6U
Other languages
Chinese (zh)
Inventor
柏庆宝
郭广磊
李志文
张铮
吴曼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Cross-Channel Bridge South Engineering Co Ltd
Road and Bridge International Co Ltd
Original Assignee
Middle Cross-Channel Bridge South Engineering Co Ltd
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Cross-Channel Bridge South Engineering Co Ltd, Road and Bridge International Co Ltd filed Critical Middle Cross-Channel Bridge South Engineering Co Ltd
Priority to CN201721336575.6U priority Critical patent/CN208167536U/en
Application granted granted Critical
Publication of CN208167536U publication Critical patent/CN208167536U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of operation platforms removed for bridge temporary support, belong to technical field of bridge construction, it constructs for highway simple support-continuous girder, solves the problems, such as that the dismounting of prior art Bridge temporary support needs using large scale equipment or sets up scaffold difficulty.Including movable stand and operating platform;Movable stand is arranged on bridge floor, including a pedestal, 4 traveling wheels are arranged in base bottom, top surface is provided with hoist engine, a vertical bar is respectively set in pedestal two sides, two vertical bar upper ends are connected by cross bar, and cross bar is equipped with fixed pulley, and the traction rope of hoist engine is extended to below bridge floor around after fixed pulley by the wet seam preformed hole in bridge floor center;Operating platform is located at below bridge floor, and hoist engine lifting rope is connected by the two sides of shoulder pole girder and operating platform, and operating platform both ends extend respectively into bridge floor two sides, and are separately connected a ladder.The utility model can safely and fast complete the dismounting work of temporary support without heavy mechanical equipment.

Description

A kind of operation platform removed for bridge temporary support
Technical field
The utility model relates to technical field of bridge construction, especially highway simple support-continuous girder work progress In, temporary support removes operation platform used in work after completing system transform.
Background technique
The structural system of simple supported-to-continuous girder bridge is since its speed of application is fast, at low cost, short time limit, simple process, work Sequence is few to be most widely used in highway engineering construction field.Superstructure common form has prestress box beam and T beam, plate-girder, beam Plate uses temporary support when installing first, removes after system transform completion, then by temporary support.Its system transform is continuous One of beam construction key process, and it is then system transform core work that temporary support, which is removed,.Due to bridge top pier top Cast-in-Situ Segment It has constructed completion with wet seam, it is usually to use truck crane that construction personnel can not directly remove temporary support from bridge floor to bent cap top Or set up scaffold under bridge and carry out interim production Demolition Construction, but truck crane is taken a lot of work arduously, construction cost is high, and sometimes under bridge Do not have the condition of current truck crane;Scaffold construction low efficiency is set up, and part bridge zone does not have scaffold building condition, because This temporary support remove be presently, there are construction difficult problem.
Summary of the invention
The utility model provides a kind of bridge construction spelling for the problem for lacking security platform when removing temporary support Formula temporary support removes platform, can guarantee safety, quickly remove temporary support, completes bridge conversion.
The technical solution of the utility model is as follows:
A kind of operation platform removed for bridge temporary support, it is characterised in that:Including movable stand and operating platform; The movable stand is arranged on bridge floor, including a pedestal, and 4 traveling wheels are arranged in the base bottom, and base top surface is provided with A vertical bar is respectively set in hoist engine, pedestal two sides, and two vertical bar upper ends are connected by cross bar, and the cross bar is equipped with fixed pulley, institute The traction rope of hoist engine is stated around sagging after the fixed pulley, the pull rod reserved when lower end is poured by the wet seam in bridge floor center Hole extends to below bridge floor;The operating platform is located at below bridge floor, and hoist engine traction rope lower end passes through shoulder pole girder connection 4 Root lifting rope, 4 lifting ropes are connect with the two sides of operating platform respectively, and the operating platform both ends extend respectively into bridge floor two sides, and It is separately connected a ladder.
The utility model structure is simple, and stress is clear, easy to process, and temporary support can be completed without heavy mechanical equipment Dismounting work.To mountain area simply supported beam, temporary support is removed using the utility model, 1.5 can be saved relative to using truck crane A machine-team (25 tons of truck cranes) and 6 man-days, economic benefit are obvious.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model direction across bridge;
Fig. 2 be the utility model along bridge to structural schematic diagram.
Specific embodiment
As shown in Figure 1 and Figure 2, the utility model includes movable stand and operating platform, and the movable stand is arranged in bridge floor On, including a pedestal 1,1 bottom of the pedestal setting, 4 traveling wheels 2,1 top surface of pedestal is provided with hoist engine 3, pedestal two sides point One vertical bar 4 is not set, and two vertical bars, 4 upper end is connected by cross bar 5, and the cross bar 5 is equipped with fixed pulley 6, and the hoist engine 3 is led Messenger 7 bypasses sagging after the fixed pulley 6, and reserved tie rod hole extends to bridge when lower end is poured by the wet seam in bridge floor center 8 lower section of face;The operating platform 9 is located at 8 lower section of bridge floor, and 7 lower end of hoist engine traction rope connects 4 by shoulder pole girder 10 and hangs 11,4 lifting ropes 11 of rope are connect with the two sides of operating platform 9 respectively, and 9 both ends of operating platform extend respectively into bridge floor two sides, And it is separately connected a ladder 12.
When the utility model is used, first completing the assembly of operating platform 9 at bridge bottom, movable stand is mobile by traveling wheel Hole site is reserved to the wet seam in bridge floor center, and hoist engine traction rope and preformed hole increase limit to just anchoring traveling wheel afterwards Measure.
After the decentralization to ground of traction rope 7, by 10 attended operation platform of shoulder pole girder, it is flat then to start hoist engine promotion operation Platform 9 is to appropriate height.
Construction personnel from the two sides of bridge floor by under vertical ladder 12 in operating platform 9, carrying out temporary support and remove to make Industry.
After operation, construction personnel is back to bridge floor, hoist engine lowering operation platform to ground, solution along vertical ladder Except connecting with operating platform, then movable stand is moved to next setting construction.
To guarantee construction safety, after operating platform is promoted in place, a shelf bracket can be connected in 12 upper end of ladder 13, the shelf bracket 13 is flexibly connected by pin shaft with ladder, and is supported on bridge floor 8.
Independent lifting rope stress switchs to both sides shelf bracket and the common stress of intermediate lifting rope when total is by being promoted at this time, only People can be gone up after shelf bracket support in two sides falls on position by, which having, starts to remove operation to operating platform, improves the construction of total Safety.

Claims (2)

1. a kind of operation platform removed for bridge temporary support, it is characterised in that:Including movable stand and operating platform;Institute It states movable stand to be arranged on bridge floor, including a pedestal, 4 traveling wheels are arranged in the base bottom, and base top surface is provided with volume Machine is raised, a vertical bar is respectively set in pedestal two sides, and two vertical bar upper ends are connected by cross bar, and the cross bar is equipped with fixed pulley, described The traction rope of hoist engine bypasses sagging, the tie rod hole reserved when lower end is poured by the wet seam in bridge floor center after the fixed pulley It extends to below bridge floor;The operating platform is located at below bridge floor, and hoist engine traction rope lower end connects 4 by shoulder pole girder Lifting rope, 4 lifting ropes are connect with the two sides of operating platform respectively, and the operating platform both ends extend respectively into bridge floor two sides, and divide A ladder is not connected.
2. the operation platform according to claim 1 removed for bridge temporary support, it is characterised in that:On the ladder One shelf bracket of end connection, the shelf bracket is flexibly connected by pin shaft with ladder, and is supported on bridge floor.
CN201721336575.6U 2017-10-16 2017-10-16 A kind of operation platform removed for bridge temporary support Active CN208167536U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721336575.6U CN208167536U (en) 2017-10-16 2017-10-16 A kind of operation platform removed for bridge temporary support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721336575.6U CN208167536U (en) 2017-10-16 2017-10-16 A kind of operation platform removed for bridge temporary support

Publications (1)

Publication Number Publication Date
CN208167536U true CN208167536U (en) 2018-11-30

Family

ID=64385770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721336575.6U Active CN208167536U (en) 2017-10-16 2017-10-16 A kind of operation platform removed for bridge temporary support

Country Status (1)

Country Link
CN (1) CN208167536U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111485569A (en) * 2020-04-24 2020-08-04 中交路桥建设有限公司 Method for removing temporary bearing platform in water by blasting method
CN112554082A (en) * 2020-12-04 2021-03-26 贵州大通路桥工程建设有限公司 Method for hoisting newly-added pile foundation reinforcement cage in narrow space under bridge reinforcement bridge
CN114809571A (en) * 2022-04-22 2022-07-29 中国建筑第二工程局有限公司 Method for lifting high-altitude operation platform by adopting carrying pole beam

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111485569A (en) * 2020-04-24 2020-08-04 中交路桥建设有限公司 Method for removing temporary bearing platform in water by blasting method
CN112554082A (en) * 2020-12-04 2021-03-26 贵州大通路桥工程建设有限公司 Method for hoisting newly-added pile foundation reinforcement cage in narrow space under bridge reinforcement bridge
CN114809571A (en) * 2022-04-22 2022-07-29 中国建筑第二工程局有限公司 Method for lifting high-altitude operation platform by adopting carrying pole beam
CN114809571B (en) * 2022-04-22 2023-09-19 中国建筑第二工程局有限公司 Method for lifting high-altitude operation platform by adopting shoulder pole beam

Similar Documents

Publication Publication Date Title
CN102251483B (en) Construction method for hoisting concrete-filled steel tube lattice bridge pier through self-lifting attached crane
CN208167536U (en) A kind of operation platform removed for bridge temporary support
CN101537976B (en) Dual-tower-mast giant self-lifting crane and following-carrying lifting method thereof
CN105226560B (en) A kind of crossing frame and its construction method
CN105239510A (en) Dismounting beam support used for high pier small-radius curve cast-in-situ box beam and construction method
CN107201719B (en) Viaduct anti-collision wall template hoisting transfer machine and anti-collision wall construction method
CN110468743B (en) Movable hanging bracket for transformation of old bridge pier cap and construction method
CN203855899U (en) Non-counterweight self-balance movable die carrier
CN205934735U (en) A operation platform for stretch -draw of cantilever bent cap
CN204875821U (en) Steel cofferdam structure is used in construction of high pile platform of bridge
CN206955494U (en) A kind of hoisting frame for being used for nose girder supporting leg under 900 tons of nose-girder bridging machines
CN108545629B (en) Utilize the construction method of tower crane lifting girder truss
CN111519545A (en) Pier and capping beam integrated construction platform and construction method thereof
CN111021205A (en) Concrete anti-collision guardrail formwork device and manufacturing method
CN202729645U (en) Tower crane with elevator
CN201943006U (en) Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders
CN214329956U (en) Ring rail hoisting device for curtain wall installation
CN202023149U (en) Hanging basket used in construction
CN107988910A (en) A kind of upstroke movable framework template overall pulling down method
CN201144134Y (en) Double herringbone hoisting derrick mast
CN204040442U (en) A kind of integral lifting elevator hoistways operating platform
CN213653209U (en) Integrated construction movable platform for bridge flange plate
CN107881926A (en) A kind of combined cradle and its construction method with full circle swinging loop wheel machine
CN210507161U (en) Novel outer hanging anticollision barrier construction dolly
CN102587299A (en) Construction method for transforming hanging point to remove support crossbeam spanning bridge or railway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant