A kind of U-shaped aqueduct body arc internal model carriage
Technical field
The utility model relates to a kind of U-shaped aqueduct body arc internal model carriages, especially a kind of to be used for hydraulic engineering
In bigger aqueduct concrete structure arc internal model carriage, belong to sliding form apparatus innovative technology.
Background technique
In construction of hydro project, structure is complicated for U-shaped aqueduct body, and template installation procedure is cumbersome, existing template installation
Following problem can be encountered: 1) slot body internal model is arcuate structure, and length reaches 15 meters or more the difficulties for just having carrying;If 2) shorten
The length of customization steel form just needs muti-piece template to connect, so that seam is more, support is also difficult, and is easy to appear account mould, becomes
The mass defects such as shape, gap spillage.If necessary to solve the problems, such as two above simultaneously, place restriction is suffered from, if purchase
High-end movable formwork device is few, and then hundreds of thousands, more then millions of members, higher cost, enterprise are difficult to undertake high be constructed into
This.
Summary of the invention
The purpose of this utility model is that considering the above problem and providing a kind of carriage of arc internal model, solves and remove
Transport hardly possible, repeated work, seam it is more, by place restriction and it is at high cost the problems such as, while reducing the labor intensity of worker, structure is simple
It is single, it is convenient and practical, it is high-efficient.
The utility model is a kind of U-shaped aqueduct body arc internal model carriage, includes supporting plate, the first elevator horse
It reaches, suspension hook, horizontal straining beam, track, the second hoist motor, go and hang, wherein the both ends of horizontal straining beam are fixed on the aqueduct slot poured
On body concrete and mounted template, steel form on the inside of slot body is installed on the inside of aqueduct body concrete, supporting plate is connect with horizontal straining beam,
Track is installed on supporting plate, and in orbit, the second hoist motor driving row is hung on track to be moved the installing of the second hoist motor,
First hoist motor is connect by bolt with track, and row hanging is on the first hoist motor, and suspension hook hangs over row and hangs on, the first elevator
Motor is hung by row and suspension hook slings steel form on the inside of slot body.
The U-shaped aqueduct body arc internal model carriage of the utility model, overall process are artificial electric operating, are reduced
The labor intensity of worker improves working efficiency, accelerates construction progress, save the cost is ingenious in design, convenient and practical, energy conservation and environmental protection.
Detailed description of the invention
The structural schematic diagram of Fig. 1 the utility model;
Fig. 2 is the sectional view of Fig. 1;
The partial enlarged view of Fig. 3 the utility model.
Specific embodiment
Embodiment:
The structural schematic diagram of the utility model is as shown in Figure 1, 2, and the U-shaped aqueduct body arc internal model of the utility model is sliding
Dynamic device, include supporting plate 2, the first hoist motor 4, suspension hook 5, horizontal straining beam 6, track 7, the second hoist motor 9, row hang 10,
Steel strand wires 11, shaft 12, wherein the both ends of horizontal straining beam 6 are fixed on the aqueduct body concrete 13 poured and mounted template
On, the inside of aqueduct body concrete 13 is installed with steel form 14 on the inside of slot body, and supporting plate 2 is connect with horizontal straining beam 6, and track 7 is installed in
On supporting plate 2, the second hoist motor 9 is installed on track 7, and the second hoist motor 9 driving row hangs 10 and moves on track 7, the
One hoist motor 4 is connect by bolt 3 with track 7, and row hangs 10 and hangs on the first hoist motor 4, and suspension hook 5 hangs over row and hangs on 10,
First hoist motor 4 by row hang 10 and suspension hook 5 sling steel form 14 on the inside of slot body.
In the present embodiment, steel form 14 is U-shaped steel template on the inside of above-mentioned slot body, to be divided into two pieces, it is therefore an objective to easy to accomplish
Demoulding, as soon as mould is not torn open, therefore steel form 14 will be split into two halves on the inside of slot body, be easy for tearing open, torn open and led to again if it is entirety
Shaft 12 is crossed to link together, then move together it is next across.
Rail wheel is installed on above-mentioned track 7.Above-mentioned track 7 is the track of I-shaped steel plate production.In the present embodiment, on
Track 7 is stated to make of 28 reinforced I-shaped steel plates.
In addition, above-mentioned 2 two sides of supporting plate are additionally provided with stiffener 1, one end of stiffener 1 and horizontal straining beam 6 are welded, stiffener 1
One end and supporting plate 2 weld.
In the present embodiment, above-mentioned horizontal straining beam 6 makes of the square steel of 200*200mm, every 5m set be fixed on together outer side mode (at
Type groove body C30 concrete -13) on, for supporting the track 7 of I-shaped steel plate production.Above-mentioned first hoist motor 4, the second elevator horse
Electric block is used up to 9.Above-mentioned row suspension hook 5 is connect using steel strand wires 11 with steel form 14 on the inside of slot body.
The working principle of the utility model is: reaching form removal requirement to concrete strength after prosthomere slot body concrete placings
When, slot body external mold is first removed to next across being installed;The length of the track 7 of driving is the length of two cross-slot bodies, with interval
5m mono- horizontal straining beam 6 is fixed, and horizontal straining beam 6 is supported directly on the slot body being poured and on mounted external mold, to slot body steel
Muscle complete binding after, track 7 go to it is next across;First by prosthomere slot body internal model stalk partial demolition, then with the capable elevator hung on
Motor lifts the arc part of steel form 14 on the inside of slot body, utilizes the steel track low-speed running for being mounted on the horizontal straining beam bottom of slot body
To next section of storehouse surface, the movement of arc formwork is realized.