CN201080597Y - Multifunctional cast-in-situ cantilever plate construction bracket - Google Patents

Multifunctional cast-in-situ cantilever plate construction bracket Download PDF

Info

Publication number
CN201080597Y
CN201080597Y CNU2007201022484U CN200720102248U CN201080597Y CN 201080597 Y CN201080597 Y CN 201080597Y CN U2007201022484 U CNU2007201022484 U CN U2007201022484U CN 200720102248 U CN200720102248 U CN 200720102248U CN 201080597 Y CN201080597 Y CN 201080597Y
Authority
CN
China
Prior art keywords
straining beam
pulley
wire rope
slide block
horizontal load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201022484U
Other languages
Chinese (zh)
Inventor
蒋临安
付国伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007201022484U priority Critical patent/CN201080597Y/en
Application granted granted Critical
Publication of CN201080597Y publication Critical patent/CN201080597Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model relates to a multi-functional cast-in-situ cantilever slab construction bracket, belonging to a multi-functional construction bracket facility used for bearing, lifting, turning and integrative conveying during aloft work. The technical proposal of the utility model is that the multi-functional cast-in-situ cantilever slab construction bracket includes a plurality of supporting cushion blocks, a plurality of pulleys or pulley blocks, a wire rope, a guide chain and an anchoring suspender, a level bearing beam, an upper pull rod, an upper pull beam, a lower pull beam, a lower pull rod, a slide block and a slide channel, wherein, one end of the upper pull rod is connected with the back end of the level bearing beam; the other end of the upper pull rod is connected with the middle part of the upper pull beam; the tail end of the upper pull beam is hinged with the front end crown face of the level bearing beam; the slide channel is arranged on the middle-front part of the upper pull beam, with the slide block placed in the sliding runner; one end of the lower pull rod is connected with the slide block and the other end of the lower pull rod is connected with the middle part of the lower pull beam; the tail end of the lower pull beam is hinged with the lower part of the upper pull beam.

Description

Multi-functional cast-in-place outrigger base construction bracket
Technical field
The utility model relates to a kind of multi-functional cast-in-place outrigger base construction bracket, and it belongs to a kind of multi-functional construction bracket equipment of load-bearing, lifting, upset and the whole Transporting of member when being applicable to work high above the ground.
Background technology
Special line for passenger trains is safe and reliable, freight volume is big, efficiency is high, and economic results in society are remarkable, is the target of China railways passenger traffic development.Line for Passenger Transportation adopts the prefabricated method of setting up of 32m span simple supported box beam to construct in a large number.Because case back plate width surpasses tunnel clearance, must therefore need a kind of equipment that can satisfy fixing and load-bearing, dismounting and the movement requirement of high-altitude cast-in-situ concrete construction formwork box beam erection back in place at the cast-in-place frange plate in bridge location high-altitude.But existing construction equipment can't satisfy above-mentioned requirements, needs the new special construction apparatus of development.
Summary of the invention
The purpose of this utility model is to solve above-mentioned technological difficulties, and a kind of simple in structure, easy to use and little multi-functional cast-in-place outrigger base construction bracket that takes up room is provided.
The utility model for the technical scheme that solves above-mentioned technological difficulties and adopt is: multi-functional cast-in-place outrigger base construction bracket, it comprises some lip blocks, several pulleys or assembly pulley, wire rope, leads chain and anchoring suspension rod, and wherein: it also comprises horizontal load-bearing crossbeam, upper connecting rod, last straining beam, following straining beam, lower link, slide block and slideway; One end of upper connecting rod connects with the rear end of horizontal load-bearing crossbeam, and the other end of upper connecting rod connects with the middle part of last straining beam; The end face of the tail end of last straining beam and horizontal load-bearing crossbeam front end is hinged, middle front part at last straining beam is provided with slideway, and slide block is contained in the slideway, and an end of lower link connects with slide block, the other end of lower link connects with the middle part of following straining beam, and the afterbody of following straining beam and the bottom of last straining beam are hinged; First pulley or assembly pulley are contained in the rear portion of horizontal load-bearing crossbeam, and second pulley or assembly pulley are contained in the centre of straining beam, and the 3rd pulley or assembly pulley are contained in down the middle front part of straining beam; One end of first wire rope is connected with a hook of leading chain, and another hook of leading chain connects with the rear end of horizontal load-bearing crossbeam, and the other end of first wire rope is connected with template with the 3rd pulley or assembly pulley through second pulley or assembly pulley; One end of second wire rope is connected with the middle and lower part of last straining beam, and the other end of second wire rope is connected with second hook of leading chain through first pulley or assembly pulley.
Because the utility model has adopted technique scheme, its three girder steels are formed double hinge system, by the secondary rotation realization member lifting and the turn over function of girder steel; Form two stable triangular structures by two pull bars and three girder steels, form load-carrying members, the weight-bearing function when realizing construction; Its dynamical system that promotes with upset be around three on the girder steel assembly pulley or pulley, wire rope, lead chain and jack.Therefore, compare, the utlity model has simple in structure, easy to use and take up room advantage such as little with background technology.Have when can satisfy the construction of cast-in-place frange plate by Beam transportation vehicle, concrete transportation tank car, and the first time, assembly unit was finished after, (shift, cross the tunnel between via hole, bridge) in the use and no longer need the characteristics of large-scale loop wheel machine cooperation.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
The specific embodiment
Below in conjunction with drawings and Examples the utility model is described in further detail.
As shown in Figure 1, multi-functional cast-in-place outrigger base construction bracket in the present embodiment, it comprises some lip blocks 15,17, several pulleys 8,11,18, wire rope 2,10, leads chain 4,19 and anchoring suspension rod 16, and wherein: it also comprises horizontal load-bearing crossbeam 1, upper connecting rod 3, last straining beam 7, following straining beam 13, lower link 9, slide block 5 and slideway 6; One end of upper connecting rod 3 connects with the rear end of horizontal load-bearing crossbeam 1, and the other end of upper connecting rod 3 connects with the middle part of last straining beam 7; The end face of the tail end of last straining beam 7 and horizontal load-bearing crossbeam 1 front end is hinged, middle front part at last straining beam 7 is provided with slideway 6, slide block 5 is contained in the slideway 6, one end of lower link 9 connects with slide block 5, the other end of lower link 9 connects with the middle part of following straining beam 13, and the bottom of the afterbody of following straining beam 13 and last straining beam 7 is hinged; First pulley 18 is contained in the rear portion of horizontal load-bearing crossbeam 1, and second pulley 8 is contained in the centre of straining beam 7, and the 3rd pulley 11 is contained in down the middle front part of straining beam 13; One end of first wire rope 10 is connected with a hook of leading chain 4, another hook of leading chain 4 connects with the rear end of horizontal load-bearing crossbeam 1, the other end of first wire rope 10 is connected with template 14 with the 3rd pulley 11 through second pulley 8, one end of second wire rope 2 is connected with the middle and lower part of last straining beam 7, the other end of second wire rope 2 is connected with second hook of leading chain 19 through first pulley 18, and second another hook of leading chain 19 can draw with 19 pairs on the chain of leading on earth anchor or symmetrical another construction bracket.Horizontal load-bearing crossbeam 1 is contained in by anchoring rod 16 on the edge of box beam flange plate, and lip block 15,17 is contained between horizontal load-bearing crossbeam 1 and the box beam flange plate, to level up horizontal load-bearing crossbeam 1; One end of template 14 is hinged with the front end of following straining beam 13, and suspension rod 12 is located at down the anterior of straining beam 13 and template 14 and following straining beam 13 are connected together.Above-mentioned support needs to form more than two a cover and uses, common load-bearing, collaborative work.
Pulley in the foregoing description can also replace with assembly pulley.

Claims (1)

1. multi-functional cast-in-place outrigger base construction bracket, it comprises some lip blocks, several pulleys or assembly pulley, wire rope, leads chain and anchoring suspension rod, it is characterized in that: further comprising horizontal load-bearing crossbeam, upper connecting rod, last straining beam, following straining beam, lower link, slide block and slideway; One end of upper connecting rod connects with the rear end of horizontal load-bearing crossbeam, and the other end of upper connecting rod connects with the middle part of last straining beam; The end face of the tail end of last straining beam and horizontal load-bearing crossbeam front end is hinged, middle front part at last straining beam is provided with slideway, and slide block is contained in the slideway, and an end of lower link connects with slide block, the other end of lower link connects with the middle part of following straining beam, and the afterbody of following straining beam and the bottom of last straining beam are hinged; First pulley or assembly pulley are contained in the rear portion of horizontal load-bearing crossbeam, and second pulley or assembly pulley are contained in the centre of straining beam, and the 3rd pulley or assembly pulley are contained in down the middle front part of straining beam; One end of first wire rope is connected with a hook of leading chain, and another hook of leading chain connects with the rear end of horizontal load-bearing crossbeam, and the other end of first wire rope is connected with template with the 3rd pulley or assembly pulley through second pulley or assembly pulley; One end of second wire rope is connected with the middle and lower part of last straining beam, and the other end of second wire rope is connected with second hook of leading chain through first pulley or assembly pulley.
CNU2007201022484U 2007-08-13 2007-08-13 Multifunctional cast-in-situ cantilever plate construction bracket Expired - Fee Related CN201080597Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201022484U CN201080597Y (en) 2007-08-13 2007-08-13 Multifunctional cast-in-situ cantilever plate construction bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201022484U CN201080597Y (en) 2007-08-13 2007-08-13 Multifunctional cast-in-situ cantilever plate construction bracket

Publications (1)

Publication Number Publication Date
CN201080597Y true CN201080597Y (en) 2008-07-02

Family

ID=39614272

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201022484U Expired - Fee Related CN201080597Y (en) 2007-08-13 2007-08-13 Multifunctional cast-in-situ cantilever plate construction bracket

Country Status (1)

Country Link
CN (1) CN201080597Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425141A (en) * 2011-08-25 2012-04-25 中国水电顾问集团华东勘测设计研究院 Large cantilever superposing member and construction method thereof
CN104372746A (en) * 2014-12-12 2015-02-25 大连鑫硕建筑劳务有限公司 Prefabricated post-tensioning-method simply-supported T-girder concrete injection formwork support and mounting process thereof of railway bridge
CN105755958A (en) * 2016-03-03 2016-07-13 中铁二十局集团第四工程有限公司 Special bracket for construction of whole bilateral post-poured flange plate and application method thereof
CN106223202A (en) * 2016-08-24 2016-12-14 中铁六局集团有限公司 2209 beam flange plate cast-in-situ construction methods
CN106245534A (en) * 2016-08-31 2016-12-21 中交二航局第三工程有限公司 Bridge is encorbelmented side walk slab's template system and construction method
CN110067210A (en) * 2019-06-12 2019-07-30 中交第四公路工程局有限公司 The construction system and construction method of bridge flange plate

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425141A (en) * 2011-08-25 2012-04-25 中国水电顾问集团华东勘测设计研究院 Large cantilever superposing member and construction method thereof
CN102425141B (en) * 2011-08-25 2014-08-13 中国水电顾问集团华东勘测设计研究院 Large cantilever superposing member and construction method thereof
CN104372746A (en) * 2014-12-12 2015-02-25 大连鑫硕建筑劳务有限公司 Prefabricated post-tensioning-method simply-supported T-girder concrete injection formwork support and mounting process thereof of railway bridge
CN104372746B (en) * 2014-12-12 2016-02-17 大连鑫硕建筑劳务有限公司 The prefabricated post stretching Simple T-Girders note concrete form support of railroad bridge and mounting process thereof
CN105755958A (en) * 2016-03-03 2016-07-13 中铁二十局集团第四工程有限公司 Special bracket for construction of whole bilateral post-poured flange plate and application method thereof
CN106223202A (en) * 2016-08-24 2016-12-14 中铁六局集团有限公司 2209 beam flange plate cast-in-situ construction methods
CN106223202B (en) * 2016-08-24 2018-06-19 中铁六局集团有限公司 2209 beam flange plate cast-in-situ construction methods
CN106245534A (en) * 2016-08-31 2016-12-21 中交二航局第三工程有限公司 Bridge is encorbelmented side walk slab's template system and construction method
CN106245534B (en) * 2016-08-31 2018-03-16 中交二航局第三工程有限公司 Bridge is encorbelmented side walk slab's template system and construction method
CN110067210A (en) * 2019-06-12 2019-07-30 中交第四公路工程局有限公司 The construction system and construction method of bridge flange plate
CN110067210B (en) * 2019-06-12 2024-04-05 中交第四公路工程局有限公司 Construction system and construction method for bridge flange plate

Similar Documents

Publication Publication Date Title
CN100543235C (en) The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN202936736U (en) Cable-stayed bridge composite beam construction bridge floor crane
CN103243663B (en) Construction process for using bridge girder erection machine to remove T-shaped cantilever continuous rigid frame box girders
CN201943007U (en) Constant amplitude frame beam crane capable of being used in combination with movable support frame
CN201250064Y (en) Front launching nose type bridge girder erection machine for bridge erection
CN201080597Y (en) Multifunctional cast-in-situ cantilever plate construction bracket
CN101250856B (en) Echelon cradle as well as construction method thereof
CN101659082B (en) System for integral binding and integral hoisting of steel bar framework of box beam and construction method thereof
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN109653105A (en) Box girder bridge cantilever construction main truss cradle system and its application method
CN111717797A (en) Double-machine cooperative hoisting system and method for overpass railway deep cutting highway bridge under construction
CN102134832B (en) Movable support and movable support assisted method for erecting steel box beams through non-variable amplitude frame beam crane
CN103669217A (en) Hanging basket with rear fulcrum and transverse moving method for integral range replacement of hanging basket with rear fulcrum
CN102286931B (en) Deck moving support system (MSS) bridge fabrication machine specially for construction of double-T-shaped bridge
CN203080416U (en) Bridge girder erection machine
CN208533370U (en) A kind of Bridge Erector of large span steel reinforced concrete combination beam erection construction
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN209652772U (en) Box girder bridge cantilever construction main truss cradle system
CN209957262U (en) Double-layer hoisting point lifting frame for integral lifting and translation of steel gallery
CN201511439U (en) System for integrally binding and hoisting box girder steel reinforcement framework
CN208501523U (en) It is a kind of novel for setting up the Bridge Erector for spelling wide beam
CN207497887U (en) A kind of dedicated unit for being used to lift ladle turret
CN201943006U (en) Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders
CN209307881U (en) A kind of Diamond-Shape Form Traveler having both steel truss continuous rigid frame lower node lifting function of putting more energy into
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080702

Termination date: 20100813