CN208501523U - It is a kind of novel for setting up the Bridge Erector for spelling wide beam - Google Patents

It is a kind of novel for setting up the Bridge Erector for spelling wide beam Download PDF

Info

Publication number
CN208501523U
CN208501523U CN201820823440.0U CN201820823440U CN208501523U CN 208501523 U CN208501523 U CN 208501523U CN 201820823440 U CN201820823440 U CN 201820823440U CN 208501523 U CN208501523 U CN 208501523U
Authority
CN
China
Prior art keywords
traversing
girder
wide beam
crane
travelling crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820823440.0U
Other languages
Chinese (zh)
Inventor
王亮
宋鹏伟
王艳芳
宋志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU HUAZHONG CONSTRUCTION MACHINERY CO Ltd
Original Assignee
ZHENGZHOU HUAZHONG CONSTRUCTION MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU HUAZHONG CONSTRUCTION MACHINERY CO Ltd filed Critical ZHENGZHOU HUAZHONG CONSTRUCTION MACHINERY CO Ltd
Priority to CN201820823440.0U priority Critical patent/CN208501523U/en
Application granted granted Critical
Publication of CN208501523U publication Critical patent/CN208501523U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model relates to a kind of novel for setting up the Bridge Erector for spelling wide beam, it includes hoisting overhead travelling crane, the hoisting overhead travelling crane two sides are provided with the girder with cantilever, traversing secondary overhead traveling crane is provided on the girder with cantilever, described girder one end with cantilever is provided with oblique pull mechanism, traversing main overhead traveling crane is provided in the middle part of the hoisting overhead travelling crane, vertical shift running mechanism is provided with below the hoisting overhead travelling crane, the hoisting overhead travelling crane is arranged on crane's major girder, it is provided with below the vertical shift running mechanism and spells wide beam traverse displacement unit, the spelling wide beam traverse displacement unit is arranged above main line box beam, the spelling wide beam traverse displacement unit includes traversing load-sharing girder, the traversing hydraulic system of pushing tow is provided with above the traversing load-sharing girder, loading roller trolley is additionally provided on the traversing load-sharing girder, anchoring mechanism is provided in front of the traversing load-sharing girder;The utility model has the advantages that structurally reasonable, highly-safe, stability is good, strong operability.

Description

It is a kind of novel for setting up the Bridge Erector for spelling wide beam
Technical field
The utility model belongs to technical field of bridge construction, and in particular to a kind of novel for setting up the bridge formation for spelling wide beam Machine.
Background technique
Erection for spelling wide beam, generally takes two kinds of methods, first is that Bridge Erector is laterally moved to avris bridge pier on bridge floor, but It is that the Bridge Erector of large-tonnage, large span is influenced by bridge pier bearing capacity, the load acted on bridge pier is too big, so that rubbing The bridge pier of wiping type can sink under noticeable effort, or even other harm such as pier slope can occur;Another kind is traversing in pier top Beams of concrete, the premise of this method is spelling wide beam bridge pier and main line bridge pier is one and pier coping portion and beams of concrete lower part There are enough spaces that traversing boom device is set, but the highway beam of large-tonnage spells wide beam bridge pier and main pier is all only pier, and And beam bottom space is very narrow.
Bridge Erector sets up and spells wide beam, especially large-tonnage, the spelling wide beam of large span two-wire twin beams is set up, and is for two-wire After the completion of two width of twin beams or so is set up, it need to also meet in the case where the wide erect-position of bridge machine equipment is not traversing and set up the spelling of 2 width single lines A kind of large-sized multifunction bridging equipment of wide beam;Therefore it provides one kind is structurally reasonable, highly-safe, stability is good, operability The strong novel Bridge Erector for setting up spelling wide beam is necessary.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, and provide it is a kind of it is structurally reasonable, highly-safe, Stability is good, strong operability novel for setting up the Bridge Erector for spelling wide beam.
Purpose of the utility model is realized as follows: a kind of novel for setting up the Bridge Erector for spelling wide beam, it includes Weight overhead traveling crane, the hoisting overhead travelling crane two sides are provided with the girder with cantilever, and traversing secondary overhead traveling crane is provided on the girder with cantilever, Described girder one end with cantilever is provided with oblique pull mechanism, and the oblique pull mechanism other end is connected with king-tower, and the king-tower is fixed It is arranged on hoisting overhead travelling crane, traversing main overhead traveling crane is provided in the middle part of the hoisting overhead travelling crane, is provided with vertical shift below the hoisting overhead travelling crane Running mechanism, the hoisting overhead travelling crane are arranged on crane's major girder, and it is traversing that spelling wide beam is provided with below the vertical shift running mechanism Device, the spelling wide beam traverse displacement unit are arranged above main line box beam, and the spelling wide beam traverse displacement unit includes traversing load-sharing girder, institute It states and is provided with the traversing hydraulic system of pushing tow above traversing load-sharing girder, be additionally provided with loading roller trolley on the traversing load-sharing girder, Anchoring mechanism is provided in front of the traversing load-sharing girder.
The girder with cantilever and hoisting overhead travelling crane are bolt rigid connection.
The king-tower is to be bolted with hoisting overhead travelling crane, and the oblique pull mechanism and hoisting overhead travelling crane are articulated connection.
It is connected between the vertical shift running mechanism and hoisting overhead travelling crane for flexural pivot, traveling is driven using motor reducer mode.
The traversing main overhead traveling crane and traversing secondary overhead traveling crane are all made of motor reducer mode and drive, and are equipped with longitudinal fine tuning thereon System.
The anchoring mechanism fixed traversing load-sharing girder and main line box beam by way of screw rod, nut connection.
The traversing load-sharing girder top is provided with flute profile slideway structure, forms a sliding slave with loading roller trolley Structure.
The traversing hydraulic system of pushing tow is made of pipe bending cylinder and pumping plant, and pipe bending cylinder and loading roller trolley are hinged Connection.
The utility model has the beneficial effects that the spelling wide beam Bridge Erector of the utility model, makes full use of space and existing resource, In hoisting overhead travelling crane two sides in the case where two overhead traveling cranes of overhanging cantilever and configuration, so that it may complete the frame that left and right sides large-tonnage spells wide beam If the design of hoisting overhead travelling crane structure is simple, stress is clear, when two width of left and right spell wide beam conversion, assists without crane, succinct easily behaviour Make, hanging beam operation procedure is simple and easy to do, and stability is good, securely and reliably.
The spelling wide beam traverse displacement unit of the utility model, structure is simple, is convenient for synchronously control, easy to maintenance, manufacturing cost is low, Versatile, the spelling wide beam of the right and left, which is set up, can be completed using a set of traverse displacement unit to the work of the right and left feeding beam, should The traverse displacement unit of engineering method has similar engineering problem very big compared with traditional safer, economic, reliable, strong operability Promotion prospect.
By spelling wide beam traverse displacement unit to hoisting overhead travelling crane feeding beam, and back overhead traveling crane sets up and spells wide beam in place, solves big ton Position, large span, friction-type bridge pier set up the problem that wide beam is spelled in left and right, with safe, steady, at low cost, arrangement of mechanism is compact, main The advantages that wide beam can take into account erection is spelled in line beam and left and right;The utility model have it is structurally reasonable, highly-safe, stability is good, The advantages of strong operability.
Detailed description of the invention
Fig. 1 is that the utility model is a kind of novel for setting up the structural schematic diagram for spelling the Bridge Erector Bridge Erector of wide beam.
Fig. 2 is that the utility model is a kind of novel for setting up the structural schematic diagram for spelling the Bridge Erector hoisting overhead travelling crane of wide beam.
Fig. 3 is that the utility model is a kind of novel for setting up the structural representation for spelling the Bridge Erector spelling wide beam traverse displacement unit of wide beam Figure.
In figure: 1, hoisting overhead travelling crane 2, crane's major girder 3, spelling wide beam traverse displacement unit 4, main line box beam 5, spelling wide beam 6, king-tower 101, the girder 102 with cantilever, vertical shift running mechanism 103, traversing main overhead traveling crane 104, oblique pull mechanism 105, traversing secondary overhead traveling crane 301, traversing load-sharing girder 302, the traversing hydraulic system 303 of pushing tow, loading roller trolley 304, Anchoring mechanism.
Specific embodiment
The utility model is described further with reference to the accompanying drawing.
Embodiment 1
As shown in Figure 1-3, a kind of novel for setting up the Bridge Erector for spelling wide beam, it includes hoisting overhead travelling crane 1, the lifting day 1 two sides of vehicle are provided with the girder 101 with cantilever, and traversing secondary overhead traveling crane 105, the band are provided on the girder 101 with cantilever 101 one end of girder of cantilever is provided with oblique pull mechanism 104, and 104 other end of oblique pull mechanism is connected with king-tower 6, the king-tower 6 It is fixed on hoisting overhead travelling crane 1, traversing main overhead traveling crane 103,1 lower section of hoisting overhead travelling crane is provided in the middle part of the hoisting overhead travelling crane 1 It is provided with vertical shift running mechanism 102, the hoisting overhead travelling crane 1 is arranged on crane's major girder 2, under the vertical shift running mechanism 102 Side, which is provided with, spells wide beam traverse displacement unit 3, and the spelling wide beam traverse displacement unit 3 is arranged above main line box beam 4, and the spelling wide beam is traversing Device 3 includes traversing load-sharing girder 301, is provided with the traversing hydraulic system 302 of pushing tow, the cross above the traversing load-sharing girder 301 It moves on load-sharing girder 301 and is additionally provided with loading roller trolley 303, be provided with anchoring mechanism 304 in front of the traversing load-sharing girder 301.
The spelling wide beam Bridge Erector of the utility model, makes full use of space and existing resource, overhanging outstanding in hoisting overhead travelling crane two sides In the case where two overhead traveling cranes of arm and configuration, so that it may complete the erection that left and right sides large-tonnage spells wide beam, the design of hoisting overhead travelling crane structure Simply, stress is clear, when two width of left and right spell wide beam conversion, assists without crane, and succinct easy to operate, hanging beam operation procedure is easy easily Row, stability is good, securely and reliably.
The spelling wide beam traverse displacement unit of the utility model, structure is simple, is convenient for synchronously control, easy to maintenance, manufacturing cost is low, Versatile, the spelling wide beam of the right and left, which is set up, can be completed using a set of traverse displacement unit to the work of the right and left feeding beam, should The traverse displacement unit of engineering method has similar engineering problem very big compared with traditional safer, economic, reliable, strong operability Promotion prospect.
By spelling wide beam traverse displacement unit to hoisting overhead travelling crane feeding beam, and back overhead traveling crane sets up and spells wide beam in place, solves big ton Position, large span, friction-type bridge pier set up the problem that wide beam is spelled in left and right, with safe, steady, at low cost, arrangement of mechanism is compact, main The advantages that wide beam can take into account erection is spelled in line beam and left and right;The utility model have it is structurally reasonable, highly-safe, stability is good, The advantages of strong operability.
Embodiment 2
As shown in Figure 1-3, a kind of novel for setting up the Bridge Erector for spelling wide beam, it includes hoisting overhead travelling crane 1, the lifting day 1 two sides of vehicle are provided with the girder 101 with cantilever, and traversing secondary overhead traveling crane 105, the band are provided on the girder 101 with cantilever 101 one end of girder of cantilever is provided with oblique pull mechanism 104, and 104 other end of oblique pull mechanism is connected with king-tower 6, the king-tower 6 It is fixed on hoisting overhead travelling crane 1, traversing main overhead traveling crane 103,1 lower section of hoisting overhead travelling crane is provided in the middle part of the hoisting overhead travelling crane 1 It is provided with vertical shift running mechanism 102, the hoisting overhead travelling crane 1 is arranged on crane's major girder 2, under the vertical shift running mechanism 102 Side, which is provided with, spells wide beam traverse displacement unit 3, and the spelling wide beam traverse displacement unit 3 is arranged above main line box beam 4, and the spelling wide beam is traversing Device 3 includes traversing load-sharing girder 301, is provided with the traversing hydraulic system 302 of pushing tow, the cross above the traversing load-sharing girder 301 It moves on load-sharing girder 301 and is additionally provided with loading roller trolley 303, be provided with anchoring mechanism 304 in front of the traversing load-sharing girder 301, The girder 101 with cantilever and hoisting overhead travelling crane 1 are bolt rigid connection, and the king-tower 6 is to be bolted with hoisting overhead travelling crane 1, The oblique pull mechanism 104 is articulated connection with hoisting overhead travelling crane 1, is flexural pivot between the vertical shift running mechanism 102 and hoisting overhead travelling crane 1 Connection, traveling are driven using motor reducer mode, and the traversing main overhead traveling crane 103 and traversing secondary overhead traveling crane 105 are all made of motor and subtract Fast machine mode drives, and is equipped with longitudinal micro-tensioning system thereon, and the anchoring mechanism 304 is consolidated by way of screw rod, nut connection Fixed traversing load-sharing girder 301 and main line box beam 4, traversing 301 top of load-sharing girder is provided with flute profile slideway structure, with loading roller Trolley 303 forms a sliding vice mechanism, and the traversing hydraulic system 302 of pushing tow is made of pipe bending cylinder and pumping plant, pushing tow oil Cylinder and loading roller trolley 303 are articulated connection.
Girder 101 of the utility model Bridge Erector by two sides with cantilever, vertical shift running mechanism 102, traversing main overhead traveling crane 103, The compositions such as traversing pair overhead traveling crane 105, firm oblique pull mechanism 104, the two sides of hoisting overhead travelling crane 1 are cantilever designs, are able to achieve except master The spelling wide beam 5 of the outer the right and left of line box beam 4 is set up;It is provided with tower oblique pull mechanism 104 on girder 101 with cantilever, effectively increases The rigidity of big girder is, it can be achieved that the more secondary wide beams 5 of spelling in left and right are set up, and less increase the lifting altitude of traversing main overhead traveling crane 103, greatly The stability of complete machine is improved greatly;Hoisting overhead travelling crane 1 is provided with traversing main overhead traveling crane 103, traversing secondary overhead traveling crane 105, and two trolleies remove Suspender can cross crane's major girder 2 and come hoisting overhead travelling crane cantilever girder side, can lift and spell wide beam 5 and set up in place, double outstanding Arm, 1 stress of hoisting overhead travelling crane of double cross traveling trolleys is clear, structure is simple, it is generous, novel, economical and practical to stablize.
Wide beam traverse displacement unit 3 is spelled, the good 4 beam body top of main line box beam of frame is individually positioned in, mainly by traversing load-sharing girder 301, the traversing hydraulic system 302 of pushing tow, loading roller trolley 303, anchoring mechanism 304 etc. form;Spell wide beam erection process: left and right The erection of main line box beam 4 finishes, and entire Bridge Erector station is motionless in situ, and beam car feeds to Bridge Erector and spells wide beam 5, hoisting overhead travelling crane 1 Traversing main 103 bale handle of overhead traveling crane in front and back, starts the vertical shift running mechanism 102 of overhead traveling crane, and travel to and fall beam position, will spell wide beam 5 and falls in It spells on wide beam traverse displacement unit 3, boom hole 304 anchor of anchoring mechanism of the traversing load-sharing girder 301 and main line box beam 4 of wide beam 5 will be spelled Gu starting the traversing hydraulic system 302 of pushing tow, the traversing other end to spelling wide beam traverse displacement unit 3 of wide beam 5 will be spelled, hoisting overhead travelling crane 1 Traversing pair overhead traveling crane 105, which lifts, spells wide beam 5, and carries it to spelling and fall beam on wide bridge pier, similarly spells according to inner to external application Bridge Erector The erection of wide beam;The utility model has the advantages that structurally reasonable, highly-safe, stability is good, strong operability.

Claims (8)

1. a kind of novel for setting up the Bridge Erector for spelling wide beam, it includes hoisting overhead travelling crane, it is characterised in that: the hoisting overhead travelling crane two Side is provided with the girder with cantilever, and traversing secondary overhead traveling crane, described girder one end with cantilever are provided on the girder with cantilever It is provided with oblique pull mechanism, the oblique pull mechanism other end is connected with king-tower, and the king-tower is fixed on hoisting overhead travelling crane, described It is provided with traversing main overhead traveling crane in the middle part of hoisting overhead travelling crane, is provided with vertical shift running mechanism, the hoisting overhead travelling crane below the hoisting overhead travelling crane It is arranged on crane's major girder, is provided with below the vertical shift running mechanism and spells wide beam traverse displacement unit, the traversing dress of the spelling wide beam It installs above main line box beam, the spelling wide beam traverse displacement unit includes traversing load-sharing girder, setting above the traversing load-sharing girder There is the traversing hydraulic system of pushing tow, loading roller trolley is additionally provided on the traversing load-sharing girder, is set in front of the traversing load-sharing girder It is equipped with anchoring mechanism.
2. one kind according to claim 1 is novel for setting up the Bridge Erector for spelling wide beam, it is characterised in that: the band cantilever Girder and hoisting overhead travelling crane be bolt be rigidly connected.
3. one kind according to claim 1 it is novel for sets up spell wide beam Bridge Erector, it is characterised in that: the king-tower and Hoisting overhead travelling crane is to be bolted, and the oblique pull mechanism and hoisting overhead travelling crane are articulated connection.
4. one kind according to claim 1 is novel for setting up the Bridge Erector for spelling wide beam, it is characterised in that: the vertical shift is walked It is connected between row mechanism and hoisting overhead travelling crane for flexural pivot, traveling is driven using motor reducer mode.
5. one kind according to claim 1 is novel for setting up the Bridge Erector for spelling wide beam, it is characterised in that: the traversing master Overhead traveling crane and traversing secondary overhead traveling crane are all made of motor reducer mode and drive, and are equipped with longitudinal micro-tensioning system thereon.
6. one kind according to claim 1 is novel for setting up the Bridge Erector for spelling wide beam, it is characterised in that: the anchorage machine Structure fixed traversing load-sharing girder and main line box beam by way of screw rod, nut connection.
7. one kind according to claim 1 is novel for setting up the Bridge Erector for spelling wide beam, it is characterised in that: described traversing point Carrier beam top is provided with flute profile slideway structure, forms a sliding vice mechanism with loading roller trolley.
8. one kind according to claim 1 is novel for setting up the Bridge Erector for spelling wide beam, it is characterised in that: the pushing tow is horizontal It moves hydraulic system to be made of pipe bending cylinder and pumping plant, pipe bending cylinder and loading roller trolley are articulated connection.
CN201820823440.0U 2018-05-30 2018-05-30 It is a kind of novel for setting up the Bridge Erector for spelling wide beam Expired - Fee Related CN208501523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820823440.0U CN208501523U (en) 2018-05-30 2018-05-30 It is a kind of novel for setting up the Bridge Erector for spelling wide beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820823440.0U CN208501523U (en) 2018-05-30 2018-05-30 It is a kind of novel for setting up the Bridge Erector for spelling wide beam

Publications (1)

Publication Number Publication Date
CN208501523U true CN208501523U (en) 2019-02-15

Family

ID=65294509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820823440.0U Expired - Fee Related CN208501523U (en) 2018-05-30 2018-05-30 It is a kind of novel for setting up the Bridge Erector for spelling wide beam

Country Status (1)

Country Link
CN (1) CN208501523U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158486A (en) * 2019-05-05 2019-08-23 郑州新大方重工科技有限公司 It is a kind of to set up the Bridge Erector and construction method for spelling wide beam
WO2023010644A1 (en) * 2021-08-04 2023-02-09 中铁上海工程局集团有限公司 Synchronous transporting and erecting construction method for small-space multi-bridge parallel section box girder

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110158486A (en) * 2019-05-05 2019-08-23 郑州新大方重工科技有限公司 It is a kind of to set up the Bridge Erector and construction method for spelling wide beam
WO2023010644A1 (en) * 2021-08-04 2023-02-09 中铁上海工程局集团有限公司 Synchronous transporting and erecting construction method for small-space multi-bridge parallel section box girder

Similar Documents

Publication Publication Date Title
CN201003145Y (en) Upward and self-walking type mobile die carrier
CN105421249A (en) Novel dragging- hoisting combined type hanging basket structure and construction method
CN205223872U (en) Drag and hang novel string of basket structure of convolution
CN109653105A (en) Box girder bridge cantilever construction main truss cradle system and its application method
CN107747282B (en) On across both wired old bridge overall pulling down methods
CN110396931A (en) A kind of excessively cable-styled erection crane of center double plane cable stayed bridge and its construction method
CN208501523U (en) It is a kind of novel for setting up the Bridge Erector for spelling wide beam
CN103194977B (en) Integration of transporting and building formula Bridge Erector sets up first hole case beam front launching nose machine installation method
CN201933415U (en) Highway and railway twin-girder bridge erection machine
CN204343172U (en) A kind of Bridge Erector
CN201080597Y (en) Multifunctional cast-in-situ cantilever plate construction bracket
CN201972096U (en) Cross-tunnel lower guide beam type fixed-point hoisting bridge girder erection machine
CN105735142A (en) Bridge girder erection machine for prestressed concrete bridge precast section span-by-span splicing construction
CN201317627Y (en) Double nose girder bridging machine
CN209652772U (en) Box girder bridge cantilever construction main truss cradle system
CN209686254U (en) A kind of folding retractable support leg device
CN201972099U (en) Through type hanging basket in bridge construction
CN208183540U (en) Erection crane is used in steel box-girder installation
CN207919265U (en) Suitable for covering rail plate-type ballastless track plate paver on steel truss girder bridge
CN102926330A (en) Installation method of hanging basket suitable for bridge construction
CN202688892U (en) Special groove-erecting machine for erecting water conservancy aqueduct
CN205711767U (en) Bridge Erector for Prestressed Concrete Bridges prefabricated subsection construction of splicing span by span
CN208748535U (en) A kind of twin beams walking bridging machine that box beam erection is set a roof beam in place with compatible high-speed rail list two-wire
CN201817777U (en) Cantilever crane structure of highway bridge erecting machine
CN204112226U (en) A kind of holes connects does section assembling bridge manufacturing machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190215