CN206815861U - Assembled outfeed platforms - Google Patents
Assembled outfeed platforms Download PDFInfo
- Publication number
- CN206815861U CN206815861U CN201720515823.7U CN201720515823U CN206815861U CN 206815861 U CN206815861 U CN 206815861U CN 201720515823 U CN201720515823 U CN 201720515823U CN 206815861 U CN206815861 U CN 206815861U
- Authority
- CN
- China
- Prior art keywords
- mobile jib
- chassis
- outfeed platforms
- assembled
- fence
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 22
- 239000010959 steel Substances 0.000 claims abstract description 22
- 239000000725 suspension Substances 0.000 claims description 5
- 240000007594 Oryza sativa Species 0.000 claims 1
- 235000007164 Oryza sativa Nutrition 0.000 claims 1
- 235000009566 rice Nutrition 0.000 claims 1
- 238000009435 building construction Methods 0.000 abstract description 3
- 238000003780 insertion Methods 0.000 abstract description 3
- 230000037431 insertion Effects 0.000 abstract description 3
- 238000009434 installation Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 238000007599 discharging Methods 0.000 description 7
- 239000000463 material Substances 0.000 description 4
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model belongs to high-building construction field, solves the problems such as existing installation difficulty is big, cost is high when existing outfeed platforms are transported between upper and lower floor height, and then provide a kind of assembled outfeed platforms, including chassis, fence and the bottom plate being layed on chassis, chassis includes two parallel mobile jibs, some cross bars are vertically connected between mobile jib, one end insertion of mobile jib is connected in the embedded bar ring of floor, and the other end is encorbelmented;Some sleeves upward are vertically connected with mobile jib, some vertical steel pipes are connected with fence, steel pipe grafting corresponding with sleeve coordinates.The platform can be based on existing common outfeed platforms and convert, detachable is chassis, gusset column and several parts of tail end fence, it is artificial after dismounting to carry the transhipment that floor up and down can be achieved, it is not necessary to configure other tower crane devices and Motorized lift device, cost of manufacture and computing cost are low.
Description
Technical field
The utility model belongs to high-building construction field, and in particular to a kind of assembled outfeed platforms.
Background technology
, it is necessary to reach the lower floor's form removal and branch of some strength from concrete in skyscraper building construction process
Timbering material, and by the operation side of its handling to top layer.Existing means of transportation mainly has two kinds, and a kind of is frequently with fixed
Steel outfeed platforms, often construct one layer, the mode allocated and transported with tower crane to last layer is successively had enough to meet the need upwards;Another kind is used as specially
Electronic lifting outfeed platforms shown in profit 201420265582.1.First way can increase and decrease the freight volume of tower crane, cause to build
Cost increase;The second way needs to be equipped with lowering or hoisting gear, will also result in cost increase, and hang for higher building, lifting
The installation difficulty of beam is larger, and integral construction progress can be impacted.
The content of the invention
The utility model in order to solve when existing outfeed platforms are transported between upper and lower floor height existing installation difficulty it is big, into
The problems such as this is high, and then provide a kind of assembled outfeed platforms.
The utility model adopts the following technical scheme that:
A kind of assembled outfeed platforms, including chassis, fence and the bottom plate being layed on chassis, chassis are equal including two
Capable mobile jib, some cross bars are vertically connected between mobile jib, one end insertion of mobile jib is connected in the embedded bar ring of floor, separately
Encorbelment one end;Some sleeves upward are vertically connected with mobile jib, some vertical steel pipes, steel pipe and sleeve are connected with fence
Corresponding grafting coordinates.
The fence includes two pieces of sidebars and one piece of tail column, and sidebar and tail column top are bolted.
Gear pin down, with floor side end face contact is vertically connected with the mobile jib, keeps off the mobile jib portion of outside of foot
Point encorbelment, inner side primary stem portion is placed on floor.
The mobile jib side is provided with some suspension ring.
The width of the chassis is no more than 2 meters, and fence height is no more than 1.2 meters.
The setting spacing of the sleeve is no more than 1 meter.
The length that the mobile jib clamping is placed on floor is no less than 2 meters.
The utility model has the advantages that:
1st, the platform can be based on existing common outfeed platforms and convert, and be detachably chassis, gusset column and tail end fence
Several parts, it is artificial after dismounting to carry the transhipment that floor up and down can be achieved, it is not necessary to configure other tower crane devices and electric up-down
Device, cost of manufacture and computing cost are low;
2nd, it is bolted between fence, is grafting between fence and chassis, is also slotting between chassis mobile jib and floor
Connect, disassembly process is convenient, easily operated;
3rd, can be in office because being to realize connection by embedded bar ring and gear pin between the application outfeed platforms chassis and floor
Movement is installed and used between meaning floor or between any floor up and down, the major structure of construction that is particularly suitable for use in pour after the completion of apply
Work.
Brief description of the drawings
Fig. 1 is structural front view of the present utility model;
Fig. 2 is structural side view of the present utility model;
Fig. 3 is structure top view of the present utility model;
Fig. 4 is the structural representation of chassis;
In figure:1- reinforced steel bar rings, 2- floors, 3- chassis, 4- fences, 5- mobile jibs, 6- suspension ring, 7- cross bars, 8- gears pin, 9- sets
Cylinder.
Embodiment
With reference to accompanying drawing, specific embodiment of the present utility model is described further:
The utility model can be based on the processing transformation of common discharging platform and form, and overall dimensions and common discharging platform difference are not
Greatly;Consider the transport of discharging platform and easy to maintenance, discharging platform is designed as assembly type;Consider the maintenance of original discharging platform
Security, it can safeguard that railing carries out iron sheet parcel to border.
Assembled outfeed platforms described in the utility model use material to include 18# I-steel, the steel pipes of φ 48 × 2.75, φ
50 × 2.75 steel pipes, 48 nuts, 10# channel-section steels, 4mm steel plates, yellow paint, φ 20 reinforcing bar and frame plate, its structure such as Fig. 1,2,3
It is shown, including chassis 3 and fence 4, chassis 3 includes two parallel I-steel mobile jibs 5, if being vertically welded between mobile jib 5
Stable Undercarriage structure is integrally formed in dry channel-section steel cross bar 7, mobile jib and cross bar, and one end insertion of mobile jib 5 is connected in the pre-buried of floor
In reinforced steel bar ring 1, the other end is encorbelmented;Some sleeves 9 upward are vertically connected with mobile jib 5, are connected with fence 4 some vertical
Steel pipe, steel pipe coordinate with 9 corresponding grafting of sleeve.The fence 4 is formed by steel plate and steel-pipe welding, steel pipe as connecting rod,
Including two pieces of sidebars and one piece of tail column, sidebar and tail column top are bolted.Then the discharging platform is detachably into chassis, two
Block gusset column and a tail column, the part after dismounting at most only need two people to be carried.
After chassis and fence are completed, the thick scaffold boards of 5cm are laid on chassis to be used.
Gear pin down, with floor side end face contact is vertically connected with the mobile jib, keeps off the mobile jib portion of outside of foot
Point encorbelment, inner side primary stem portion is placed on floor, utilize the reinforced steel bar ring limitation platform upset kept off on pin and floor.
The mobile jib side is provided with some suspension ring, pulls up steel wire rope in suspension ring and is fixed on superstructure, ensures discharging
The resistance to overturning of platform.
The width of the chassis is no more than 2 meters, and fence height is no more than 1.2 meters, the dimensions with current outfeed platforms
Difference is little, and the actual demand for being based primarily upon bearing capacity and scene determines, tail end fence top can also design V-type mouth, convenient to see
Examine and set up transport material.
The setting spacing of the sleeve is no more than 1 meter, the i.e. spacing of grafting points of engagement, and the distance is unsuitable excessive, otherwise encloses
Column easily rocks, and one should not design overstocked, and one is waste of material easily occur, and one is that grafting point is excessive, may be gone out
The phenomenon that now part grafting point can not be aligned.
The length that the mobile jib clamping is placed on floor is no less than 2 meters, if the segment distance is too short, easily occurs encorbelmenting
Long, moment of flexure is excessive, potential safety hazard occurs.
Claims (7)
- A kind of 1. assembled outfeed platforms, it is characterised in that:Including chassis(3), fence(4)Be layed in chassis(3)On bottom Plate, chassis(3)Including two parallel mobile jibs(5), mobile jib(5)Between be vertically connected with some cross bars(7), mobile jib(5)'s The embedded bar ring for being connected in floor is inserted in one end(1)Interior, the other end is encorbelmented;Mobile jib(5)On be vertically connected with it is some upward Sleeve(9), fence(4)On be connected with some vertical steel pipes, steel pipe and sleeve(9)Corresponding grafting coordinates.
- 2. assembled outfeed platforms according to claim 1, it is characterised in that:The fence(4)Including two pieces of sidebars and One piece of tail column, sidebar and tail column top are bolted.
- 3. assembled outfeed platforms according to claim 2, it is characterised in that:The mobile jib(5)On be vertically connected with court Under, with the gear pin of floor side end face contact(8), keep off pin(8)The primary stem portion in outside is encorbelmented, inner side primary stem portion is placed in building On plate.
- 4. assembled outfeed platforms according to claim 3, it is characterised in that:The mobile jib(5)Side is provided with some Suspension ring(6).
- 5. assembled outfeed platforms according to claim 4, it is characterised in that:The chassis(3)Width be no more than 2 Rice, fence(4)Highly it is no more than 1.2 meters.
- 6. assembled outfeed platforms according to claim 5, it is characterised in that:The sleeve(9)Setting spacing do not surpass Cross 1 meter.
- 7. assembled outfeed platforms according to claim 6, it is characterised in that:The mobile jib(5)Clamping is placed on floor Length be no less than 2 meters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720515823.7U CN206815861U (en) | 2017-05-10 | 2017-05-10 | Assembled outfeed platforms |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720515823.7U CN206815861U (en) | 2017-05-10 | 2017-05-10 | Assembled outfeed platforms |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206815861U true CN206815861U (en) | 2017-12-29 |
Family
ID=60755564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720515823.7U Expired - Fee Related CN206815861U (en) | 2017-05-10 | 2017-05-10 | Assembled outfeed platforms |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206815861U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110805289A (en) * | 2019-11-18 | 2020-02-18 | 广西途辉建筑工程有限公司 | Plug-in type discharging platform and construction method |
-
2017
- 2017-05-10 CN CN201720515823.7U patent/CN206815861U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110805289A (en) * | 2019-11-18 | 2020-02-18 | 广西途辉建筑工程有限公司 | Plug-in type discharging platform and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103243930B (en) | System and method for modularized construction of super high-rise steel structures | |
CN103352429B (en) | Bracket reverse drawing loads the stretch-draw preloading method of prepressing device | |
CN206859068U (en) | A kind of Cable-stayed Bridge Pylon sill segmental timbering structure | |
CN101761031B (en) | Continuous and perpendicular lifting apparatus for large segmental bridge floor beam | |
CN106744257A (en) | A kind of method of kiloton adjustable combined sling, assemble method and lifting caisson | |
CN105317205B (en) | The construction method and equipment therefor of a kind of elevator | |
CN201420385Y (en) | Overhanging type unloading platform for building construction | |
CN104973517B (en) | A kind of electronic gantry platform that installs for sintering machine head device and its using method | |
CN108862081A (en) | A kind of chain block crane boom and the application in the adjusting of beam steel protective layer thickness | |
CN205417623U (en) | Machine is transported to long step material | |
CN103086276B (en) | Construction method for hoisting bridge type crane in high-rise well tower type building | |
CN206815861U (en) | Assembled outfeed platforms | |
CN103523665A (en) | Transport device and method for gantry crane | |
CN203373666U (en) | Bracket pull-counter loading prepressing device | |
CN206346500U (en) | Compact simplified arm extending type straddle truck | |
CN201943006U (en) | Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders | |
CN201722621U (en) | Integral hoisting frame of pre-fabricated box beam | |
CN206051351U (en) | Hang a kind of purlin for assembling and disassembling construction for bridge-collision-avoidance wall form | |
CN201128882Y (en) | Lifting and supporting brackets integrated construction device for bridge arch rib | |
CN107792802A (en) | A kind of small members movement and mounting system and method | |
CN206385750U (en) | A kind of mixed structure precast stair | |
CN206108724U (en) | Simple and easy installing support device of long large -diameter pile base steel reinforcement cage self -control | |
CN201843089U (en) | Vertical lifting bin for overhauling overpass ramp bridge | |
CN204551265U (en) | A kind of frame type combination sky crane link | |
CN105084229B (en) | Roof crane and application to roof-midspan longitudinal steel beam hoisting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20200515 Address after: 030006 Shanxi Province, Taiyuan city district and State Road two West Lane No. 8 Patentee after: SHANXI GUANGYE CONSTRUCTION ENGINEERING Co.,Ltd. Address before: 030012 No. 7 sports North Street, Shanxi, Taiyuan Patentee before: CHINA SHANXI SIJIAN GROUP Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171229 |