CN105084229B - Roof crane and application to roof-midspan longitudinal steel beam hoisting - Google Patents
Roof crane and application to roof-midspan longitudinal steel beam hoisting Download PDFInfo
- Publication number
- CN105084229B CN105084229B CN201510468835.4A CN201510468835A CN105084229B CN 105084229 B CN105084229 B CN 105084229B CN 201510468835 A CN201510468835 A CN 201510468835A CN 105084229 B CN105084229 B CN 105084229B
- Authority
- CN
- China
- Prior art keywords
- roofing
- longitudinal direction
- girder steel
- span centre
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 76
- 239000010959 steel Substances 0.000 title claims abstract description 76
- 239000004567 concrete Substances 0.000 claims description 11
- 238000009408 flooring Methods 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 5
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 239000000725 suspension Substances 0.000 claims description 3
- 238000009435 building construction Methods 0.000 abstract description 3
- 239000000463 material Substances 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 240000009087 Crescentia cujete Species 0.000 description 1
- 235000005983 Crescentia cujete Nutrition 0.000 description 1
- 235000009797 Lagenaria vulgaris Nutrition 0.000 description 1
- 240000000233 Melia azedarach Species 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 241001282153 Scopelogadus mizolepis Species 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to a roof crane and application to roof-midspan longitudinal steel beam hoisting, which belongs to the technical field of building construction. The roof crane can be formed by using local materials on roof site, each roof-midspan longitudinal steel beam can be hoisted in sequence on a roof through the crane and is mounted. The roof-midspan longitudinal steel beam can be demounted after being mounted, and rod pieces can be recycled, so that the investment of the cost per large and medium machine per team can be effectively reduced, the expense of other measure cost can be saved, and meanwhile the time limit for a project can also be effectively ensured.
Description
Technical field
The present invention relates to technical field of building construction, more particularly to large span, the big scale of construction, multi storied factory building installation steel roof joist
Reinforced concrete frame structure Factory Building construction technology.
Background technology
At present, with the continuous development of social process of industrialization, the land resource needed for industrial premises is built is more in short supply,
This requires that the construction of Factory Building must develop towards multilamellar.Multi storied industrial factory building typically adopts reinforced concrete frame structure, steel
The form that structure colored steel roof combines.Compared with steel-structure factory building, with floor space it is little, large and medium-sized machinery can be born
The characteristics of equipment heavy load.
When the industrial premises roofing of Multistory reinforced conceete frame Structure carries out steel beam lifting, generally using large-tonnage
Truck crane lifts steel roof joist along Factory Building surrounding, or the less truck crane of tonnage is hoisted to into flooring according to girder steel weight enters again
The lifting of row steel roof joist.
In view of above-mentioned hanging method, if being lifted from large-tonnage truck crane, is then first had to Factory Building surrounding
Truck crane track route enters professional etiquette and carries out necessary process to road foundation so as to meet the requirement of bearing capacity, while also
Pay high One-Shift Costs;If carrying out steel beam lifting operation from truck crane is hoisted to into flooring, when there is flooring
Concrete cast-in-place slab Lack of support is so that when bearing truck crane and carrying out lifting operation, this needs to take necessity to floor concrete again
Reinforcement measure, this undoubtedly also can development that is very uneconomical and can affecting other subsequent handlings.
The content of the invention
For the construction difficult problem of Multistory reinforced conceete frame Structure factory building roof hoisting steel beam, the present invention proposes a kind of structure
Make simple, processing and fabricating it is easy, from heavy and light, small volume, convenient lifting construction equipment of walking.
The present invention includes being provided with the base of U-shaped framework, and at least four groups universal wheels are connected below base, solid on base
Determine load-bearing vertical rod, in the upper end of vertical rod electric block is connected.
The present invention makes and draws materials extensive, cheap, can gather materials on the spot assembling at roofing scene, with traditional lifting mode phase
Than, the input of big-and-middle-sized mechanical one-shift expense had both effectively been reduced, the expenditure of other measure costs can be saved again, while the duration also obtains
Effective guarantee is arrived.The base of U-shaped framework is particularly provided with, movement of the whole loop wheel machine on roofing can be significantly facilitated.
The loop wheel machine both can conveniently lift roofing span centre longitudinal direction girder steel, roofing end bay longitudinal direction girder steel, and bundled purlin can be lifted again, can
Man-hour is greatly shortened, labor intensity is reduced.
Further, the base for being provided with U-shaped framework of the present invention includes two mobile jibs being parallel to each other, in two masters
First connecting rod, second connecting rod and third connecting rod are respectively welded in the plane of bar and between two mobile jibs, three connecting rods are mutually put down
OK, three connecting rods and two mobile jibs are respectively perpendicular arrangement, and second connecting rod is arranged between first connecting rod and third connecting rod, and described
The U-shaped plane cavity that stretch into can roofing column is surrounded between one connecting rod and two mobile jibs;The universal wheel is connected to
The lower section of two mobile jibs.This is simple and reasonable for structure, and the center of gravity for making whole loop wheel machine is maintained at middle part, improves during handling
The stability of loop wheel machine.
The load-bearing vertical rod includes a main vertical rod and two auxiliary vertical rods, and the lower end of the main vertical rod is welded on first connecting rod
Middle part, the lower end of two auxiliary vertical rods is respectively welded on second connecting rod, the main vertical rod and two auxiliary vertical rods be parallel to each other and
Perpendicular to the plane that two mobile jibs are located, between the main vertical rod and two auxiliary vertical rods some connecting rods are welded;In main vertical rod
Upper end overhanging type weld a cantilever steel girder, the electric block is connected on the cantilever steel girder.
In order to strengthen two auxiliary vertical rods, or even the support strength of whole load-bearing vertical rod, the present invention is also in the auxiliary vertical rod per root
Two differing heights on weld with one end of bracing piece respectively, the other end of each bracing piece is respectively welded at corresponding mobile jib
On.
Further, also some connecting rods can also be welded between two bracing pieces of same auxiliary vertical rod welding.
In order to further improve bonding strength, the present invention welds the first little Lian also between first connecting rod and second connecting rod
Bar, welds the second small rod between second connecting rod and third connecting rod.
It is another object of the present invention to propose application of the above loop wheel machine in the steel beam lifting of roofing span centre longitudinal direction, i.e. user
Method.
Comprise the following steps:
1)Assemble to form the unpowered walking loop wheel machine of the steel roof joist construction in roofing;
2)By universal wheel by the loop wheel machine horizontal sliding in the roofing column lower section of roofing span centre to be installed longitudinal direction girder steel, and make
The roofing column is located in the base of the U-shaped framework of the loop wheel machine, rotates the base of the loop wheel machine, makes base with the room
The axial direction of the vertical concrete beam above the column of face is in 45 ± 20 ° of angle;
3)The base of the loop wheel machine is paved by cushion block, makes universal wheel leave flooring plane;
4)Steel roof joist to be lifted is held on into the base top of the loop wheel machine;
5)Fastening is fixed at the middle part of the roofing span centre longitudinal direction girder steel to be lifted unload first;
6)Fastening positioned at the middle part of roofing span centre longitudinal direction girder steel to be lifted is unloaded into first to dock with the suspension hook of electric block,
In roofing span centre longitudinal direction, the two ends of girder steel each connect a bearing of body in the air control pull rope;
7)Start electric block, and by pulling two bearing of body in the air to control pull rope in roofing, make roofing span centre longitudinal direction
Standing to the vertical promotion along the roofing column to the pre-embedded bolt top beyond the roofing column upper top for girder steel, keeps
A piece bearing of body in the air controls the pulling force of pull rope, and another bearing of body in the air is controlled into the free end of pull rope from the roofing column
Top vertical concrete beam top pass through after, then make roofing span centre longitudinal direction steel by drawing the bearing of body in the air and controlling pull rope
Beam rotates in the horizontal plane, until roofing span centre longitudinal direction girder steel is perpendicular with vertical concrete beam;
8)Two bearing of body in the air control pull ropes of loopback and electric block, by the bolt hole in the middle part of the girder steel of roofing span centre longitudinal direction
The pre-embedded bolt of the roofing column upper top is directed at, the bolt hole in the middle part of the girder steel of pre-embedded bolt insertion roofing span centre longitudinal direction is made
It is interior, the fixed installation of roofing span centre longitudinal direction girder steel and the roofing column is completed immediately;
9)Remove the two ends company that first, dismounting and roofing span centre longitudinal direction girder steel are unloaded in the fastening on the girder steel of the roofing span centre longitudinal direction
The bearing of body in the air for connecing is controlled after the cushion block below pull rope, the base of the dismounting loop wheel machine, removes the loop wheel machine.
The inventive method is simple, rationally, order lifting and complete can be carried out to every roofing span centre longitudinal direction girder steel on roofing
Into installation.Also dismountable after installing, each rod member is recyclable to reuse the throwing for both effectively having reduced big-and-middle-sized mechanical one-shift expense
Enter, the expenditure of other measure costs can be saved again, while the duration has also obtained effective guarantee.
In addition, in step 3)In, electric block is more than load-bearing vertical rod outer side edges away from room with the distance of load-bearing vertical rod outer side edges
The distance at face column farthest post angle.Its objective is:Electric block has one section of safe distance with roofing column outer corners, it is ensured that steel
Beam does not collide roofing column when lifting.
Description of the drawings
Fig. 1 is that loop wheel machine of the present invention is bowed to schematic diagram.
Fig. 2 is stood to schematic diagram for Fig. 1's.
Loop wheel machine direction view of bowing in place when Fig. 3 is lifting roofing longitudinal direction span centre girder steel.
Specific embodiment
First, assemble to form the unpowered walking loop wheel machine of steel roof joist construction in roofing:
As shown in Figure 1, 2, the invention is provided with the mobile jib 1, first connecting rod that is parallel to each other by two of the base of U-shaped framework
2nd, second connecting rod 3, third connecting rod 4, the first small rod 5 and the second small rod 6 are constituted.In the plane of two mobile jibs 1 and in two
First connecting rod 2, second connecting rod 3 and third connecting rod 4 are respectively welded between root mobile jib 1, three connecting rods 2,3,4 are parallel to each other, three
Connecting rod 2,3,4 is also respectively perpendicular arrangement with two mobile jibs 1, and the first small rod 5 is welded between first connecting rod 2 and second connecting rod 3,
The second small rod 6 is welded between second connecting rod 3 and third connecting rod 4.
The U-shaped plane cavity that stretch into can roofing column is surrounded between first connecting rod 2 and two mobile jibs 1.
Symmetrically connect four universal wheels 7 in the lower section of two mobile jibs 1.
Load-bearing vertical rod includes a main vertical rod 8 and two auxiliary vertical rods 9, and the lower end of main vertical rod 8 passes through steel sheet plate weld
At the middle part of first connecting rod 2, the lower end of two auxiliary vertical rods 9 is welded on second connecting rod 3 respectively by two block piece shape steel plates, main vertical
Bar 8 and two auxiliary vertical rods 9 are parallel to each other, and are respectively perpendicular to the plane that two mobile jibs 1 are located.It is auxiliary vertical in main vertical rod 8 and two
Weld some connecting rods 10 between bar 9 also densely coveredly.
A cantilever steel girder 11 is welded in the upper end overhanging type of main vertical rod 8, it is electronic by hook connection on cantilever steel girder
Calabash 12.
Two bracing pieces 13, the upper end point of each bracing piece 13 are respectively welded between the auxiliary vertical rod 9 per root and corresponding mobile jib 1
It is not welded on two differing heights of auxiliary vertical rod 9, the lower end of each bracing piece 13 is respectively welded on corresponding mobile jib 1.With
Some connecting rods 14 are also welded between two bracing pieces 13 of the same welding of auxiliary vertical rod 9.
2nd, the application example of loop wheel machine:
1st, examination is hung:Load is 2 times of single girder steel maximum weight, and crane gear is using 10t electric blocks and Φ 20mm
Steel wire rope.Girder steel is transported to into base top with self-control horizontal transport car to put steadily, steel wire rope is slowly put down, is fastened with first is unloaded
And carry out examination and carry, check loop wheel machine triangle steel tube column, base deformation, confirm it is safe and punctual after slowly sling, hang bottom
The ㎜ of seat surface 200~300 simultaneously holds lotus 10 minutes or so, checks again for loop wheel machine triangle steel tube column and base deformation, it is ensured that
Loop wheel machine has enough bearing capacitys and security reliability.
2nd, by universal wheel by loop wheel machine horizontal sliding in the roofing column lower section of roofing span centre to be installed longitudinal direction girder steel, and make described
Roofing column is located in the base of the U-shaped framework of the loop wheel machine, rotates the base of the loop wheel machine, makes base vertical with the roofing
The axial direction of the vertical concrete beam above post is in 45 ± 20 ° of angle.
3rd, the base of the loop wheel machine is paved by flitch, makes universal wheel leave flooring plane.And make electric block and hold
Again the distance of vertical rod outer side edges is more than roofing column and the distance at load-bearing vertical rod center.
The 4th, steel roof joist to be lifted is held on the base top of loop wheel machine.
5th, fix fastening at the middle part of roofing span centre longitudinal direction girder steel to be lifted and unload first.
6th, the fastening positioned at the middle part of roofing span centre longitudinal direction girder steel to be lifted is unloaded into first to dock with the suspension hook of electric block,
In roofing span centre longitudinal direction, the two ends of girder steel each connect a bearing of body in the air control pull rope.
7th, start electric block, and by pulling two bearing of body in the air to control pull rope in roofing, make roofing span centre longitudinal direction
Standing to the vertical promotion along the roofing column to the pre-embedded bolt top beyond the roofing column upper top for girder steel, keeps
A piece bearing of body in the air controls the pulling force of pull rope, and another bearing of body in the air is controlled into the free end of pull rope from the roofing column
Top vertical concrete beam top pass through after, then make roofing span centre longitudinal direction steel by drawing the bearing of body in the air and controlling pull rope
Beam rotates in the horizontal plane, until roofing span centre longitudinal direction girder steel is perpendicular with vertical concrete beam.
8th, two bearing of body in the air control pull ropes of loopback and electric block, slightly lower section roofing span centre longitudinal direction girder steel, by roofing
Bolt hole in the middle part of the girder steel of span centre longitudinal direction is directed at the pre-embedded bolt of the roofing column upper top, make pre-embedded bolt insertion roofing across
In bolt hole in the middle part of middle longitudinal girder steel, the fixed installation of roofing span centre longitudinal direction girder steel and the roofing column is completed immediately.
9th, first is unloaded in the fastening removed on the girder steel of the roofing span centre longitudinal direction, is removed and is connected with the two ends of roofing span centre longitudinal direction girder steel
The bearing of body in the air control pull rope for connecing, removes the cushion block below the base of the loop wheel machine, then removes the loop wheel machine, into next
The lifting of block face span centre longitudinal direction girder steel.
Claims (2)
1. a kind of application of roofing loop wheel machine in the girder steel of lifting roofing span centre longitudinal direction, the roofing loop wheel machine includes being provided with U-shaped frame
The base of frame, connects at least four groups universal wheels below base, and load-bearing vertical rod is fixed on base, connects in the upper end of load-bearing vertical rod
Connect electric block;It is characterized in that comprising the following steps:
1)Assemble to form the roofing loop wheel machine in roofing;
2)By universal wheel by roofing loop wheel machine horizontal sliding in the roofing column lower section of roofing span centre to be installed longitudinal direction girder steel, and make
The roofing column is located in the base of the U-shaped framework of the roofing loop wheel machine, rotates the base of the roofing loop wheel machine, makes base
With the angle that the axial direction of the vertical concrete beam above the roofing column is in 45 ± 20 °;
3)The base of the roofing loop wheel machine is paved by cushion block, makes universal wheel leave flooring plane;
4)Roofing span centre longitudinal direction girder steel to be lifted is held on into the base top of the roofing loop wheel machine;
5)Fastening is fixed at the middle part of the roofing span centre longitudinal direction girder steel to be lifted unload first;
6)Fastening positioned at the middle part of roofing span centre longitudinal direction girder steel to be lifted is unloaded into first to dock with the suspension hook of electric block, in room
The two ends of face span centre longitudinal direction girder steel each connect a bearing of body in the air control pull rope;
7)Start electric block, and by pulling two bearing of body in the air to control pull rope in roofing, make roofing span centre longitudinal direction girder steel
Stand to the vertical promotion along the roofing column to beyond the roofing column upper top pre-embedded bolt top, keep one
Bearing of body in the air controls the pulling force of pull rope, and another bearing of body in the air is controlled into the free end of pull rope from the top of the roofing column
After the vertical concrete beam top in portion passes through, then roofing span centre longitudinal direction girder steel is set to exist by drawing bearing of body in the air control pull rope
Rotate on horizontal plane, until roofing span centre longitudinal direction girder steel is perpendicular with vertical concrete beam;
8)Two bearing of body in the air control pull ropes of loopback and electric block, by the bolt hole alignment in the middle part of the girder steel of roofing span centre longitudinal direction
The pre-embedded bolt of the roofing column upper top, makes in the bolt hole in the middle part of the girder steel of pre-embedded bolt insertion roofing span centre longitudinal direction, with
Complete the fixed installation of roofing span centre longitudinal direction girder steel and the roofing column;
9)Remove the fastening on the girder steel of the roofing span centre longitudinal direction to unload first, remove what is be connected with the two ends of roofing span centre longitudinal direction girder steel
After cushion block below bearing of body in the air control pull rope, the base of the dismounting roofing loop wheel machine, the roofing loop wheel machine is removed.
2. application according to claim 1, it is characterised in that in step 3)In, electric block and load-bearing vertical rod outer side edges
Distance is more than distance of the load-bearing vertical rod outer side edges away from roofing column farthest post angle.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510468835.4A CN105084229B (en) | 2015-08-04 | 2015-08-04 | Roof crane and application to roof-midspan longitudinal steel beam hoisting |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510468835.4A CN105084229B (en) | 2015-08-04 | 2015-08-04 | Roof crane and application to roof-midspan longitudinal steel beam hoisting |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN105084229A CN105084229A (en) | 2015-11-25 |
| CN105084229B true CN105084229B (en) | 2017-05-17 |
Family
ID=54565694
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510468835.4A Expired - Fee Related CN105084229B (en) | 2015-08-04 | 2015-08-04 | Roof crane and application to roof-midspan longitudinal steel beam hoisting |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN105084229B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105110203A (en) * | 2015-08-04 | 2015-12-02 | 江苏扬州建工建设集团有限公司 | Roof crane and application thereof in hoisting roof side-span longitudinal steel beams |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB586486A (en) * | 1944-08-09 | 1947-03-20 | Wilson James | Portable hydraulic jack crane |
| CN101927963A (en) * | 2009-06-23 | 2010-12-29 | 上海海星阀门总厂 | Lift-press lock catch foldable crane |
| CN105110203A (en) * | 2015-08-04 | 2015-12-02 | 江苏扬州建工建设集团有限公司 | Roof crane and application thereof in hoisting roof side-span longitudinal steel beams |
-
2015
- 2015-08-04 CN CN201510468835.4A patent/CN105084229B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN105084229A (en) | 2015-11-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101886468B (en) | Construction method of suspension type template support in high-position conjoined structure | |
| CN103086279B (en) | Vertical transportation construction method for building construction | |
| CN205772984U (en) | A kind of hanging apparatus of monolithic steel truss | |
| CN110747736B (en) | Integrated device of rigid frame with integrated spreader and construction method of hoisting reinforcement cage | |
| CN115583584A (en) | Unequal-height double-fulcrum full-rotation type light truss hoisting device and construction method | |
| CN103086276B (en) | A construction method for hoisting a bridge crane in a high-rise well-tower-type building | |
| CN205205685U (en) | Span wire pier is function portal device at most | |
| CN103132702A (en) | Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method | |
| CN215055466U (en) | Discharging platform for high-rise building | |
| CN108518071B (en) | Installation method of double-layer large-span steel structure corridor | |
| CN107299713A (en) | A kind of circular cone roofing integrally-lifting steel truss and its construction | |
| CN105084229B (en) | Roof crane and application to roof-midspan longitudinal steel beam hoisting | |
| CN215717067U (en) | Construction platform suitable for concrete composite shear wall structure | |
| CN219840354U (en) | Aerial work platform for installing suspended ceiling in ultra-high steel structure | |
| CN216515179U (en) | Movable trolley for mounting and dismounting bridge guardrail template | |
| CN110980507A (en) | Lifting lug structure for hoisting thin-wall circular tube tower module | |
| CN217299872U (en) | Shaft hydraulic comprehensive distribution platform | |
| CN215331380U (en) | Rail type suspension platform | |
| CN105110203A (en) | Roof crane and application thereof in hoisting roof side-span longitudinal steel beams | |
| CN211998555U (en) | Construction structure of super high-rise inner climbing tower crane | |
| CN210659321U (en) | Trolley structure for binding concrete reinforcing steel bars | |
| CN216235766U (en) | High-rise building steel vestibule hoisting device | |
| CN209536777U (en) | A kind of porous thin-walled square chest hanging apparatus | |
| CN206917297U (en) | A kind of large-span steel girder upper air installing system in place | |
| CN204980935U (en) | Unpowered walking loop wheel machine of roofing girder steel construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170517 |