CN207453439U - A kind of elevated hoistway operation platform of subsidiary movable inserted link - Google Patents

A kind of elevated hoistway operation platform of subsidiary movable inserted link Download PDF

Info

Publication number
CN207453439U
CN207453439U CN201720783380.XU CN201720783380U CN207453439U CN 207453439 U CN207453439 U CN 207453439U CN 201720783380 U CN201720783380 U CN 201720783380U CN 207453439 U CN207453439 U CN 207453439U
Authority
CN
China
Prior art keywords
inserted link
girder
movable inserted
operation platform
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720783380.XU
Other languages
Chinese (zh)
Inventor
邓同泉
雷入云
罗斌
牛强华
刘亮杰
巩延龙
陈淀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd, China Construction Fifth Engineering Bureau Co Ltd Dongguan Branch filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201720783380.XU priority Critical patent/CN207453439U/en
Application granted granted Critical
Publication of CN207453439U publication Critical patent/CN207453439U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of elevated hoistway operation platforms of subsidiary movable inserted link, it is characterised in that:The frame that is connected including bottom platform, with the bottom platform, the protective layer for being arranged on the frame roof, the mesa base includes horizontal girder arranged in a crossed manner, longitudinal girder, the frame includes the upright bar being connected at the horizontal girder, longitudinal girder crossed node, be fixed in the upright bar and with the vertically disposed transverse and longitudinal secondary beam of the upright bar, movable inserted link is additionally provided at the both ends of the horizontal girder, simple structure, it is easy to make, it is economical and practical, easy to maintain the characteristics of.

Description

A kind of elevated hoistway operation platform of subsidiary movable inserted link
Technical field
The utility model is related to building structure construction field more particularly to a kind of elevated electricity of subsidiary movable inserted link Stair shaft operating platform.
Background technology
At present, with the rapid development of modern architecture industry, city is on the middle and senior level, high-rise building is increasing, it is on the middle and senior level, In high-rise building, elevator be mostly as one of major safety risks in engineering project, for the generation of reduction security incident, Ensure that engineering is smoothly completed, it is necessary to pay attention to the protection to elevator.There are mainly two types of traditional elevator well construction operating platforms:The One kind is then to set up the mode system of steel pipe frame using fastener and common steel tube on it by the pre-buried I-steel in shear wall Operate platform;The second way is by every layer of elevator both sides embedded bar, reinforcing bar one side embedment floor face, one side It is embedded in shear wall, is then laid with wooden a tree, used in making timber for boats on it and the mode of template makes operating platform.
But there are following defects for existing above two construction of lift well operating platform:The first:Set up steel pipe posture It is pre-buried to need repeatedly to carry out I-steel for high-rise, high-rise building for operating platform, also needed after the completion of construction to I-steel into Row is cut off, time-consuming to take material;It is required for closing elevator by embedded bar formula operating platform, because of every layer for second Protection is, it is necessary to substantial amounts of reinforcing bar, wooden a tree, used in making timber for boats and template, used reinforcing bar need to could be cut off after the completion of structure, Zhi Nengzuo To take material processing, the cost input and image appearance for adding project cannot be guaranteed.
Utility model content
For overcome the deficiencies in the prior art, the purpose of this utility model is to provide a kind of subsidiary movable inserted link can Hoisting type hoistway operation platform has the characteristics that easy to operate, economical and practical, easy to maintain.
The purpose of this utility model adopts the following technical scheme that realization:
A kind of elevated hoistway operation platform of subsidiary movable inserted link, puts down including bottom platform, with the bottom The frame of platform connection, the protective layer for being arranged on the frame roof, the bottom platform include horizontal girder arranged in a crossed manner, indulge To girder, the frame includes the upright bar being connected at the horizontal girder, longitudinal girder crossed node, is fixed on the upright bar It is upper and with the vertically disposed transverse and longitudinal secondary beam of the upright bar, be additionally provided with movable inserted link at the both ends of the horizontal girder.
Further, be equipped with jack on the movable inserted link and the horizontal girder, the movable inserted link and It is fixed after receptacle alignment on the transverse direction girder by bolt.
Further, the inside of movable inserted link one end insertion horizontal girder, the other end is respectively at being fixed on On shear wall or it is positioned on structural plane.
Further, jack at least two on the movable inserted link, including the first jack, the second jack, the horizontal stroke At least one crossbeam jack is equipped with to girder, jack is fixed with the crossbeam jack by bolt on the movable inserted link.
Further, the horizontal girder is 3.
Further, longitudinal girder is 2.
Further, the transverse and longitudinal secondary beam is 3.
Further, the horizontal girder, longitudinal girder, the upright bar pass through the company of welding using square steel tube material It connects.
Further, the horizontal girder, longitudinal girder are led to using the side of 100*100, the upright bar and transverse and longitudinal secondary beam Led to using the side of 50*50, the movable inserted link is led to using the side of 80*80.
Compared with prior art, the beneficial effects of the utility model are:
(1) simple structure, easy to make, uniform specification realize modularization assembling.
(2) it can realize and be used in turn in engineering, reduce waste of material, reduce construction cost, meet green construction hair Exhibition trend.
(3) there is good light-weight bearing capacity, heap putting material that can be appropriate improves effective using face of construction site Product improves site safety civilized construction image.
(4) securely and reliably, use scope is wide, high unity, and image appearance is good.
Description of the drawings
Fig. 1 is the utility model lateral plan;
Fig. 2 is the utility model front view;
Fig. 3 is the cooperation figure of transverse direction girder and movable inserted link when the utility model promotes state;
The cooperation figure of transverse direction girder and movable inserted link when Fig. 4 is utility model works state;
In figure:1st, movable inserted link;2nd, longitudinal girder;3rd, horizontal girder;4th, upright bar;5th, transverse and longitudinal secondary beam;6th, top is prevented Shield;7th, bolt;8th, the first jack;9th, the second jack;10th, structural plane.
Specific embodiment
In the following, with reference to attached drawing and specific embodiment, the utility model is described further, it is necessary to explanation is, On the premise of not colliding, it can be formed in any combination between various embodiments described below or between each technical characteristic new Embodiment.
As shown in Figures 1 to 4, a kind of elevated hoistway operation platform of subsidiary movable inserted link, puts down including bottom Platform, the frame being connected with the bottom platform, the protective layer 6 for being arranged on the frame roof, the bottom platform include intersecting The horizontal girder 3 of setting, longitudinal girder 2, horizontal girder 3, longitudinal girder 2 form basic stress frame, the frame include with The upright bar 4 connected at the transverse direction girder 3,2 crossed node of longitudinal girder is fixed in the upright bar 4 and hangs down with the upright bar 4 The transverse and longitudinal secondary beam 5 directly set, transverse and longitudinal secondary beam 5 are responsible for power transmission, are additionally provided with movable inserted link 1 at the both ends of horizontal girder 3, often A transverse direction girder 3 is set there are two movable inserted link 1, while movable inserted link 1 can be freely movable and fixed in horizontal girder 3, The inside of the horizontal girder 3 of the movable movable insertion in 1 one end of inserted link, other end is movable end, wherein the movable inserted link 1 in one side On the inside of movable end insertion shear wall (being not drawn into figure), pre-buried small wooden box is to prevent movable inserted link after casting concrete wherein 1 can not transfer to;Movable 1 movable end of inserted link of opposite side is placed directly on structural plane 10;Jack is extremely on the movable inserted link 1 It it is less two, including the first jack 8, the second jack 9, the transverse direction girder 3 is equipped at least one crossbeam jack, the activity Jack is fixed with the crossbeam jack by bolt 7 on formula inserted link 1, hoistway operation can be put down according to the size of different elevators Platform carries out accommodation, and utilization rate is high, wide adaptability.
Preferably, horizontal girder, longitudinal girder, upright bar, transverse and longitudinal secondary beam using square steel tube material, pass through the company of welding It connects, horizontal girder, longitudinal girder are led to using the side of 100*100, and upright bar and transverse and longitudinal secondary beam are led to using the side of 50*50, movable Inserted link 1 is led to using the side of 80*80, and selected material is satisfied by existing code requirement, and easy to make, uniform specification realizes modularization Assembling, it is preferred that horizontal girder is 3, and longitudinal girder is 2, and transverse and longitudinal secondary beam is 3, high unity, simple structure.
During normal operating conditions:First jack 8 of movable inserted link 1 with the crossbeam of horizontal girder 3 is alignd, and uses bolt 7 are fixed, and wherein on the inside of movable 1 movable end of inserted link in one side insertion shear wall, pre-buried small wooden box is to prevent from pouring wherein Movable inserted link 1 can not be transferred to after concrete;Movable 1 movable end of inserted link of opposite side is placed directly on structural plane 10;It is promoted During state:By the receptacle alignment of the second jack 9 and horizontal girder of movable inserted link 1, and fixed with bolt 7, it will using tower crane It is transported to last layer flooring, then the stretching of movable inserted link is adjusted to normal operating conditions, repeats normal operating conditions with carrying Cycle of states is risen until main structure body construction is completed.
It can be seen that a kind of the elevated of subsidiary movable inserted link provided by the utility model from above-mentioned lifting process Hoistway operation platform is fairly simple, conveniently using operating, and can repeatedly use, time saving, laborsaving, save material, reduces Construction cost, it is not damaged to building, it is future architecture industry safety devices developing direction.
The above embodiment is only the preferred embodiment of the utility model, it is impossible to be protected with this to limit the utility model Scope, the variation of any unsubstantiality that those skilled in the art is done on the basis of the utility model and replacing belongs to In the utility model scope claimed.

Claims (9)

1. a kind of elevated hoistway operation platform of subsidiary movable inserted link, it is characterised in that:Including bottom platform and institute It states the frame of bottom platform connection, be arranged on the protective layer of the frame roof, the bottom platform includes horizontal stroke arranged in a crossed manner To girder, longitudinal girder, the frame includes the upright bar being connected at the horizontal girder, longitudinal girder crossed node, fixed In the upright bar and with the vertically disposed transverse and longitudinal secondary beam of the upright bar, be additionally provided at the both ends of the horizontal girder movable Inserted link.
2. a kind of elevated hoistway operation platform of subsidiary movable inserted link according to claim 1, feature exist In:Jack is equipped on the movable inserted link and the horizontal girder, on the movable inserted link and the horizontal girder Receptacle alignment after fixed by bolt.
3. a kind of elevated hoistway operation platform of subsidiary movable inserted link according to claim 1, feature exist In:The inside of movable inserted link one end insertion horizontal girder, the other end is respectively at being fixed on shear wall or place In on structural plane.
4. a kind of elevated hoistway operation platform of subsidiary movable inserted link according to claim 2, feature exist In:Jack at least two on the movable inserted link, including the first jack, the second jack, the transverse direction girder is equipped with extremely Lack a crossbeam jack, jack is fixed with the crossbeam jack by bolt on the movable inserted link.
5. a kind of elevated hoistway operation platform of subsidiary movable inserted link according to claim 1, feature exist In:The transverse direction girder is 3.
6. a kind of elevated hoistway operation platform of subsidiary movable inserted link according to claim 1, feature exist In:The longitudinal direction girder is 2.
7. a kind of elevated hoistway operation platform of subsidiary movable inserted link according to claim 1, feature exist In:The transverse and longitudinal secondary beam is 3.
8. a kind of elevated hoistway operation platform of subsidiary movable inserted link according to claim 1, feature exist In:The transverse direction girder, longitudinal girder, the upright bar are using square steel tube material, by being welded to connect.
9. a kind of elevated hoistway operation platform of subsidiary movable inserted link according to claim 1, feature exist In:The transverse direction girder, longitudinal girder are led to using the side of 100*100, and the upright bar and transverse and longitudinal secondary beam use the side of 50*50 Logical, the movable inserted link is led to using the side of 80*80.
CN201720783380.XU 2017-06-30 2017-06-30 A kind of elevated hoistway operation platform of subsidiary movable inserted link Active CN207453439U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720783380.XU CN207453439U (en) 2017-06-30 2017-06-30 A kind of elevated hoistway operation platform of subsidiary movable inserted link

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720783380.XU CN207453439U (en) 2017-06-30 2017-06-30 A kind of elevated hoistway operation platform of subsidiary movable inserted link

Publications (1)

Publication Number Publication Date
CN207453439U true CN207453439U (en) 2018-06-05

Family

ID=62246426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720783380.XU Active CN207453439U (en) 2017-06-30 2017-06-30 A kind of elevated hoistway operation platform of subsidiary movable inserted link

Country Status (1)

Country Link
CN (1) CN207453439U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736595A (en) * 2018-12-29 2019-05-10 中国建筑第五工程局有限公司 A kind of assembled steel stair

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109736595A (en) * 2018-12-29 2019-05-10 中国建筑第五工程局有限公司 A kind of assembled steel stair

Similar Documents

Publication Publication Date Title
CN103243930B (en) System and method for modularized construction of super high-rise steel structures
CN106744257A (en) A kind of method of kiloton adjustable combined sling, assemble method and lifting caisson
CN201334769Y (en) Attached type lifting scaffold with double guide rails
CN203173644U (en) Multifunctional lifting shaft working platform system
CN106567542A (en) Super high-rise double tower building steel structure corridor assembling method
CN207453439U (en) A kind of elevated hoistway operation platform of subsidiary movable inserted link
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN208072990U (en) CONSTRUCTION OPERATIONS platform
CN203547125U (en) Column type overall steel platform hydraulic creeping formwork
CN203475801U (en) Telescopic steel platform for elevator shaft
CN207312994U (en) Power station major diameter surge shaft steel lining cantilevered annular track boom hoisting
CN214783820U (en) Lifting point reinforced overweight underground continuous wall reinforcement cage
CN201722621U (en) Integral hoisting frame of pre-fabricated box beam
CN205990773U (en) A kind of construction discharging platform
CN205369875U (en) A operation protection platform collet for in shaft
CN204781892U (en) Modular can promote elevartor shaft operation platform
CN203715136U (en) Tool for hoisting lifting hole cover plate in nuclear power plant
CN208648531U (en) A kind of aerated blocks cage with protective cover
CN208023970U (en) Construction discharging platform
CN203594215U (en) High-altitude large-area work platform semi-automatic lifting apparatus
CN203499232U (en) Attached lifting scaffold
CN205531262U (en) Steel construction construction platform can rise automatically
CN203345968U (en) Tower crane
CN206784891U (en) A kind of prefabricated hoistway operation platform
CN202081639U (en) Steel truss tool type supporting structure for concrete framework industrial building templates

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant