CN206233102U - A kind of packaged type faces side operation work platform - Google Patents
A kind of packaged type faces side operation work platform Download PDFInfo
- Publication number
- CN206233102U CN206233102U CN201621325735.2U CN201621325735U CN206233102U CN 206233102 U CN206233102 U CN 206233102U CN 201621325735 U CN201621325735 U CN 201621325735U CN 206233102 U CN206233102 U CN 206233102U
- Authority
- CN
- China
- Prior art keywords
- operating platform
- platform
- packaged type
- support body
- operation work
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model is related to a kind of packaged type to face side operation work platform, it includes support body, horizontally disposed overhanging beam and operating platform, the bottom of the support body is provided with road wheel, its bottom is provided with saddle weight away from side side is faced, the support body upper end is fixedly connected with described overhanging beam one end, the other end of overhanging beam is connected by vertically arranged tie-beam with operating platform, and the operating platform is provided with charging conduit, and the operating platform is formed around facing frontier defense guardrail.Operation work platform more traditional nacelle construction in side is faced using packaged type obtained in above-mentioned technical proposal, the conventional construction methods such as outrigger is set up easily, and recycling number of times is high, saves construction cost;The side job platform that faces of the present utility model is provided with road wheel, is easy to the mobile demand so as to adapt to different construction locations, easy to use, raising efficiency of construction.
Description
Technical field
The utility model is related to a kind of construction equipment built and face side operation, more particularly to a kind of packaged type to face side operation
Workbench.
Background technology
Often there is superelevation in science of bridge building, skyscraper and face side and encorbelment operation, in superelevation and face side and encorbelment work at present
During industry, operating platform is set up using steel pipe frame, circular disk rack OR gate formula frame more, and the mode of road wheel is installed in platform lower, put down
Platform sets up complexity, and mobile difficult by field condition restriction, many places cannot use, and need to be layered and individually set up, while
Outer the choosing of construction faces border area domain, it is easy to cause danger, labor strength is big, operational risk is high.It is existing independent hydraulically controlled abroad
Lifting operation platform, but cannot outward choose operation, it is impossible to meet the requirement faced outside side and choose construction.
Utility model content
The purpose of this utility model is to overcome present in current technology not enough and defect, there is provided one kind is mobile flexibly,
The packaged type of convenient construction faces side operation work platform.
To achieve the above object, the technical scheme that the utility model is used is:A kind of packaged type faces side work operations
Platform, including support body, horizontally disposed overhanging beam and operating platform, the bottom of the support body are provided with road wheel, its bottom away from
Face side side and be provided with saddle weight, the support body upper end is fixedly connected with described overhanging beam one end, the other end of overhanging beam is by vertical
The tie-beam of setting is connected with operating platform, and the operating platform is provided with charging conduit, and the operating platform is formed around facing frontier defense
Guardrail.
Above-mentioned packaged type faces side operation work platform, and also including the walking rail for road wheel walking, the walking rail is consolidated
It is scheduled on bridge floor.
In the above-mentioned technical solutions, outside is fixed with protection network on the guard rail.
In the above-mentioned technical solutions, described operating platform upper surface surrounding is fixed with side plate, and the height of the side plate is low
In the height of guard rail, surrounding side wall inner surfaces and operating platform upper surface form the charging conduit.
The beneficial effects of the utility model are:The more traditional nacelle construction of the utility model, set up the traditional constructions such as outrigger
Method is easy, and recycling number of times is high, saves construction cost;The side job platform that faces of the present utility model is provided with road wheel, just
Easy to use, improve efficiency of construction in the mobile demand so as to the adapt to different construction locations and above-mentioned side job platform that faces
Operating platform is provided with charging conduit and guard rail outside is provided with protection network, the instrument that prevents from being used in work progress, produces
Blanking etc. falls, and improves job security.
Brief description of the drawings
Fig. 1 is the main structure diagram that the utility model packaged type faces side operation work platform;
Fig. 2 is the right side structural representation that the utility model packaged type faces side operation work platform.
The meaning that label is represented in figure as:1st, operating platform, 2, tie-beam, 3, overhanging beam, 4, support body, 5, saddle weight, 6,
Road wheel, 7, face frontier defense guardrail, 8, charging conduit, 9, walking rail, 10, bridge floor.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described in further detail to the utility model:
Embodiment 1:Referring to Fig. 1 and Fig. 2, a kind of packaged type faces side operation work platform, including support body 4, horizontally disposed
Overhanging beam 3 and operating platform 1, the bottom of the support body 4 is provided with road wheel 6, and its bottom is provided with saddle weight away from side side is faced
5, the upper end of support body 4 is fixedly connected with the one end of the overhanging beam 3, the other end of overhanging beam 3 by vertically arranged tie-beam 2 with
Operating platform 1 is connected, and the operating platform 1 is provided with charging conduit 8, and the operating platform is formed around facing frontier defense guardrail 7.
Position causes that the utility model is more moved easily, and above-mentioned packaged type faces side operation work platform and also includes for going
The walking rail of wheel walking is walked, the walking rail is fixed on bridge floor.
In order to produce junk in work progress, danger is caused to lower section at construction, outside is fixed with anti-on the guard rail
Protecting wire net.
Described operating platform upper surface surrounding is fixed with side plate, the height of the height less than guard rail of the side plate, four
Cycle side plate inner surface and operating platform upper surface form the charging conduit.
Support body, overhanging beam and the tie-beam that the utility model faces side operation work platform are welded using square steel tube,
Wherein, it is respectively provided with diagonal brace formation truss structure on the support body and overhanging beam.In addition, guard rail of the present utility model uses angle steel
Or pipe is welded.
The utility model is exemplarily described above in conjunction with accompanying drawing, it is clear that the utility model is implemented not to be received
The limitation of aforesaid way, as long as employing changing for the various unsubstantialities that method design of the present utility model and technical scheme are carried out
Enter, or it is not improved by it is of the present utility model design and technical scheme directly apply to other occasions, in the utility model
Protection domain within.
Claims (4)
1. a kind of packaged type faces side operation work platform, including support body, horizontally disposed overhanging beam and operating platform, its feature
It is:The bottom of the support body is provided with road wheel, and its bottom is provided with saddle weight away from side side is faced, and the support body upper end is outer with described
Beam one end is fixedly connected, and the other end of overhanging beam is connected by vertically arranged tie-beam with operating platform, and the operation is flat
Platform is provided with charging conduit, and the operating platform is formed around facing frontier defense guardrail.
2. packaged type according to claim 1 faces side operation work platform, it is characterised in that:Also include supplying road wheel row
The walking rail walked, the walking rail is fixed on bridge floor.
3. packaged type according to claim 1 faces side operation work platform, it is characterised in that:Outside on the guard rail
It is fixed with protection network.
4. packaged type according to claim 1 faces side operation work platform, it is characterised in that:On described operating platform
Surface surrounding is fixed with side plate, the height of the height less than guard rail of the side plate, on surrounding side wall inner surfaces and operating platform
Surface forms the charging conduit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621325735.2U CN206233102U (en) | 2016-12-06 | 2016-12-06 | A kind of packaged type faces side operation work platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621325735.2U CN206233102U (en) | 2016-12-06 | 2016-12-06 | A kind of packaged type faces side operation work platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206233102U true CN206233102U (en) | 2017-06-09 |
Family
ID=58979310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621325735.2U Active CN206233102U (en) | 2016-12-06 | 2016-12-06 | A kind of packaged type faces side operation work platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206233102U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107298392A (en) * | 2017-08-25 | 2017-10-27 | 黄河科技学院 | Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket |
CN107858924A (en) * | 2017-10-26 | 2018-03-30 | 中铁大桥局集团第八工程有限公司 | Extension type construction platform and the bridge for being provided with the construction platform |
CN110067201A (en) * | 2019-03-15 | 2019-07-30 | 上海建工七建集团有限公司 | A kind of movable type tensioning platform and its application method |
CN110195411A (en) * | 2019-04-04 | 2019-09-03 | 中铁大桥局集团第六工程有限公司 | A kind of self-propelled bridge formwork Mobile workbench |
CN111305534A (en) * | 2020-03-20 | 2020-06-19 | 东平县住房和城乡建设局 | Building secondary structure and face limit operation and use safe device of ascending a height |
CN111691293A (en) * | 2020-05-21 | 2020-09-22 | 株洲时代新材料科技股份有限公司 | Bridge beam supports inspection device |
-
2016
- 2016-12-06 CN CN201621325735.2U patent/CN206233102U/en active Active
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107298392A (en) * | 2017-08-25 | 2017-10-27 | 黄河科技学院 | Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket |
CN107298392B (en) * | 2017-08-25 | 2019-09-13 | 黄河科技学院 | Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket |
CN107858924A (en) * | 2017-10-26 | 2018-03-30 | 中铁大桥局集团第八工程有限公司 | Extension type construction platform and the bridge for being provided with the construction platform |
CN107858924B (en) * | 2017-10-26 | 2023-12-12 | 中铁大桥局集团第八工程有限公司 | Bridge provided with telescopic construction platform |
CN110067201A (en) * | 2019-03-15 | 2019-07-30 | 上海建工七建集团有限公司 | A kind of movable type tensioning platform and its application method |
CN110195411A (en) * | 2019-04-04 | 2019-09-03 | 中铁大桥局集团第六工程有限公司 | A kind of self-propelled bridge formwork Mobile workbench |
CN111305534A (en) * | 2020-03-20 | 2020-06-19 | 东平县住房和城乡建设局 | Building secondary structure and face limit operation and use safe device of ascending a height |
CN111691293A (en) * | 2020-05-21 | 2020-09-22 | 株洲时代新材料科技股份有限公司 | Bridge beam supports inspection device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206233102U (en) | A kind of packaged type faces side operation work platform | |
CN204530433U (en) | Steel pipe pile foundation combination steel trestle | |
CN202081641U (en) | Hanging mold used for floor prepared hole | |
CN107974944A (en) | A kind of Y types road-cum-rail bridge floorings hanging apparatus and hanging method | |
CN206268721U (en) | Tower crane placer base on a kind of creeping formwork machine | |
CN203487803U (en) | Safety protection structure for elevator shaft construction | |
CN108004929A (en) | A kind of H-type road-cum-rail bridge floorings hanging apparatus and hanging method | |
CN106544959B (en) | The construction method of king-tower lifting segment and bridge main tower saddle containing saddle | |
CN103552800A (en) | Translation method of large-scale canned equipment | |
CN202000265U (en) | Concrete construction formwork for high pier of bridge | |
CN102287193A (en) | Special hanging scaffold for sleeve-building inner shaft wall in shaft sinking of vertical shaft | |
CN106080965B (en) | A kind of method for supporting and device always organized for ship topside curved section | |
CN205654063U (en) | Tower crane concrete cap's safety protection platform is demolishd in high altitude | |
CN102587377B (en) | Drop hammer type pile sinking device and pile sinking method thereof | |
CN108252218A (en) | A kind of large span cable-carried arch bridge steel lagging jack external wrapping concrete bed die slide device | |
CN104612412B (en) | A kind of construction method of steel construction escape way | |
CN203795459U (en) | Foundation structure of tower crane for high-altitude roofs | |
CN202181898U (en) | Special hanging scaffold for sleeving and building inner-layer well wall in shaft sinking construction of vertical shaft | |
CN205976546U (en) | Rail transport device for inclined working face | |
CN205348729U (en) | A instrument formula operation protection platform for in shaft | |
CN204357138U (en) | Simple steel structure hoisting frame | |
CN204778385U (en) | Track fixed structure of single track calabash | |
CN202809639U (en) | Construction elevator girder steel basis | |
CN207003829U (en) | Working space concrete filled steel tube cylinder design structure | |
CN206360382U (en) | A kind of new discharging platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |