CN107298392A - Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket - Google Patents

Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket Download PDF

Info

Publication number
CN107298392A
CN107298392A CN201710741813.XA CN201710741813A CN107298392A CN 107298392 A CN107298392 A CN 107298392A CN 201710741813 A CN201710741813 A CN 201710741813A CN 107298392 A CN107298392 A CN 107298392A
Authority
CN
China
Prior art keywords
plate
frame
arm
pulley
horizontal frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710741813.XA
Other languages
Chinese (zh)
Other versions
CN107298392B (en
Inventor
路素青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanghe Science and Technology College
Original Assignee
Huanghe Science and Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Science and Technology College filed Critical Huanghe Science and Technology College
Priority to CN201710741813.XA priority Critical patent/CN107298392B/en
Publication of CN107298392A publication Critical patent/CN107298392A/en
Application granted granted Critical
Publication of CN107298392B publication Critical patent/CN107298392B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/202Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from below, e.g. by floors of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C2700/00Cranes
    • B66C2700/03Cranes with arms or jibs; Multiple cranes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Movable Scaffolding (AREA)

Abstract

Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket, including being arranged on upper overall support frame, the vertical frame on the right side of overpass and the horizontally disposed job platform being arranged on below overpass in rectangular shape on the right side of the bridge floor of overpass, the steel wire rope wound on hoist engine and the to the right arm of stretching and cantilever, hoist engine is provided with the top of support frame hook assembly is connected with by arm;The right side of upper horizontal frame on the upside of vertical frame with being fixedly connected, and the downside of vertical frame on the right side of job platform with being fixedly connected.Each spare and accessory parts of the invention use the structure of separable assembled, with with dress, fixed property is good on the bridge floor of overpass, and can be moved along bridge floor, installs convenient and swift, the present invention is vdiverse in function, both can be with hoisting heavy, and the bottom surface of overpass can be constructed, it sufficiently lower the labor intensity of workman in road construction, operating efficiency is improved, and it is more safe and reliable.

Description

Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket
Technical field
The invention belongs to road and bridge construction technical field, and in particular to a kind of urban viaduct construction in later period is with multi-functional lifting With hanging basket combination unit.
Background technology
Overpass has become more and more in present traffic route, because overpass typically outmatches common ground On road, it is to avoid some crossroads etc., the unobstructed degree of road can be improved, overpass is in bridge floor in mixed pure land pouring construction After the completion of the upper surface of overpass is carried out mating formation and bituminous paving and such as stringing, pipe laying are carried out to bottom surface, plastered Deng construction, under bridge floor and bridge between construction appliance, construction material transport it is quite inconvenient, it is former to construction appliance and construction at present The mode transported above and below material be usually push using workman be loaded with the stroller of construction appliance and raw material of constructing from upper bridge mouthful or Lower bridge mouthful is transported, hundreds of meters at least, far then several kilometers of distance, but also want climb and fall, and labor strength is big, and And also influence the raising of operating efficiency;In addition, it is logical to carry out such as stringing, pipe laying, the construction such as plaster for overpass bottom surface Often to set job platform in bottom surface restocking, job platform volume is larger, this not only assemble it is cumbersome, and with the change of construction area Change the frequent movement needed, movement is got up very inconvenient.
The content of the invention
The present invention can be moved and can be to overpass to solve weak point of the prior art there is provided one kind along overpass Constructed and lifting operation can be carried out, mitigate labor strength, improve the strong city of operating efficiency, security reliability in bottom surface City's overpass construction in later period is combined the unit with multi-functional lifting and hanging basket.
In order to solve the above technical problems, the present invention is adopted the following technical scheme that:Urban viaduct construction in later period is with multi-functional Lift by crane and combined the unit with hanging basket, including it is in the support frame of rectangular shape, position to be arranged on upper entirety on the right side of the bridge floor of overpass Vertical frame and the horizontally disposed job platform being arranged on below overpass on the right side of overpass, support frame include lower water Flat frame, lower horizontal frame bottom is provided with support wheel, lower horizontal frame and is vertically installed with column, and column upper end is fixedly installed Have and be provided with along the longitudinal direction at the top of at least two support beams, support beam along left and right water at the top of upper horizontal frame, upper horizontal frame It is to be provided with one in cantilever design, every support beam to be used to fix arm on the right side of arm square to an arm is provided with Manual positioning mechanism, front side horizontal, which is provided with installing plate, installing plate, at the top of upper horizontal frame is provided with hoist engine, and arm is right End is fixedly installed on first pulley frame, first pulley frame is rotatably connected to the first fixed cunning by horizontally disposed first pulley axle Wheel, arm rear lateral portion is fixedly installed steel wire rope locking member at neighbouring first fixed pulley, and arm front side portion is in upper horizontal frame Top is fixedly installed on second pulley frame, second pulley frame is rotatably connected to second by the second pulley axle vertically set It is provided with the top of fixed pulley, upper horizontal frame on rear side of arm on stand, hoist engine and is wound with steel wire rope, the drawing end of steel wire rope Sequentially pass through after the second fixed pulley, the first fixed pulley and steel wire rope locking member by U-shaped fix be scheduled in stand, on steel wire rope The hook assembly for hanging weight is provided between first fixed pulley and steel wire rope locking member;
Air exhauster, cylinder, compressed air reservoir, exhausting motor and sucker, the master of exhausting motor are provided with lower horizontal frame The spindle drive connection of axle and air exhauster, cylinder is arranged in vertical, and sucker is located at below lower horizontal frame and sucker is opened Mouth down is set, and the lower end of cylinder at the top of sucker by terminal pad with being connected, and the lower port edge of sucker is provided with abrasive rubber Connected at ring, the top center of sucker with the suction opeing of air exhauster, the air outlet of air exhauster is connected with three-way pipe, the of three-way pipe The first air-valve and gas pressure charging valve are provided with one discharge pipe, air outlet and the compressed air reservoir of first discharge pipe connect Connect, compressed air reservoir is connected with cylinder by tracheae and air-valve assembly, is provided with second discharge pipe of three-way pipe Two air-valves;
The right side of upper horizontal frame on the upside of vertical frame with being fixedly connected, the bottom of upper horizontal frame and the left side of vertical frame Between be provided with the deep floor of triangular structure, the downside of vertical frame on the right side of job platform with being fixedly connected, job platform The front side at top and rear side are provided with the high outside and low outside raker beam being obliquely installed between the left side of vertical frame;
Lower ear plate is provided with the right side of vertical frame, arm bottom right side is provided with upper ear plate, set between lower ear plate and upper ear plate It is equipped with the hound that left low right high dip is set.
Being equipped with first pulley frame above the first fixed pulley is used for the first alignment pin of Anti-rope drop.
Hook assembly includes movable pulley, the 3rd pulley yoke and suspension hook, and movable pulley is rotatably connected on the by the 3rd pulley spindle On three pulley yokes, the 3rd pulley yoke bottom is provided with two the second alignment pins being located at below movable pulley for Anti-rope drop, the 3rd Pulley yoke bottom is fixedly installed in the middle part of flat board, flat board and is provided with circular hole in the horizontal direction, and suspension hook top is stretched into and rotates connection In circular hole, suspension hook upper end is fixedly installed the limited block above flat board, and limited block is more than circular hole.
Steel wire rope locking member includes U-shaped plate, clapboard, the 3rd alignment pin and the 4th alignment pin, top, the bottom of U-shaped plate Open with left side, the forward upper of U-shaped plate on rear side of arm with being fixedly connected, and the 3rd alignment pin is located above the 4th alignment pin, 3rd alignment pin and the 4th alignment pin are along the longitudinal direction horizontal through U-shaped plate, distance of the 3rd alignment pin apart from U-shaped plate bottom More than the 4th alignment pin apart from the distance of U-shaped plate bottom, clapboard is in structure wide at the top and narrow at the bottom, and clapboard is extend into U-shaped plate And contacted on the left of clapboard with the 3rd alignment pin and the 4th alignment pin top pressure, steel wire rope is worn from bottom to top along U-shaped plate inner bottom part U-shaped plate is crossed, the rear side of clapboard is contacted by steel wire rope with U-shaped plate bottom top pressure, the inwall of the trailing flank of clapboard and U-shaped plate It is provided with the anti-skidding form friction pattern that steel wire rope is closely crimped.
Manual positioning mechanism includes front vertical plate, back vertical plate, lock nut, handlebar, U-shaped packing ring, lower bearing pin and upper pin, Front vertical plate and back vertical plate are vertically set on support top surface of the beam, front vertical plate and back vertical plate respectively positioned at the front side of arm and rear side, Back vertical plate is rotatably connected to pressing plate by hinge;
Middle part on front side of the lower mounting groove of front side, rear side and top opening, pressing plate is offered in the middle of front vertical plate upper end to offer The guide groove of top, bottom and front side opening, lower bearing pin through lower mounting groove and is rotatably connected on pressing plate along the longitudinal direction, The external diameter of lower bearing pin is more than the external diameter of lock nut, and radial direction of the lock nut along lower bearing pin passes through lower bearing pin and and lower bearing pin Threaded connection, the centre of handlebar leading section offers the upper mounting groove of bottom and front side opening, and lock nut upper end is located at In upper mounting groove, upper pin through lock nut and is rotatably connected on handlebar right part, the external diameter of upper pin in left-right direction Less than the external diameter of lock nut, U-shaped packing ring bottom is fixedly connected on pressing plate upper surface and directly over guide groove, U-shaped packing ring It is penetrating up and down and front side is open, it is corresponding in turn to above and below upper mounting groove, the endoporus of U-shaped packing ring, guide groove and lower mounting groove;Lock spiral shell When bar is in plumbness, lock nut is sequentially located at mounting groove, U-shaped packing ring, guide groove and lower mounting groove from top to bottom Inside, the outline of the leading section of handlebar from front side surface top to bottom is in what is gradually increased around the center line of upper pin Reducing globoidal structure, U-shaped bead top is provided with the deep-slotted chip breaker of identical and press fit corresponding with reducing globoidal structure.
Pressing plate lower surface is provided with the block rubber that several are used to compress arm upper surface;Handle rod rear end is folded upward at shape Into the portion that upwarps, pressing plate upper surface is provided with the elastic pressuring plate that can be horizontally rotated by fastening bolt, and elastic pressuring plate front end is provided with Handheld Division is provided with location hook with upwarping portion's top pressure press fit, elastic pressuring plate.
It is provided between the front side and support beam upper surface of front vertical plate, between the rear side of back vertical plate and support beam upper surface Stiffener plate.
The left surface top being rotatably connected on wheel carrier, wheel carrier with bridge floor guardrail base is provided with the right side of lower horizontal frame bottom Press contacts and along the left limit wheel that moves of medial surface of bridge floor guardrail base;
Coaxial be provided with driven sprocket, lower horizontal frame of one support wheel of lower horizontal frame bottom left is provided with motor Drive sprocket is provided with reductor, the power output shaft of motor reducer, drive sprocket passes through chain drive with driven sprocket Connection.
Vertical frame left upper portion is provided with least three right limit wheels, right limit wheel along the longitudinal direction on sustained height It is in rolling contact with overpass right flank.
Vertical frame lower left side is provided with least two layers of guardrail pipe below overpass bridge floor along anterior-posterior horizontal direction, Job platform is welded into the framework of rectangle by shaped steel and is made in frame roof laying checkered steel plate, and job platform upper surface is left Side is hinged with guard rail by hinge, and guard rail is in plumbness, and the upper right of guard rail passes through support bar and raker beam Connection, support bar two ends are respectively with guard rail and raker beam by bearing pin grafting, along Vertical Square between raker beam right side and platform To being provided with guard rail rod.
Using above-mentioned technical proposal, the present invention is in work in use, because bridge floor is very smooth after casting concrete , compressed air reservoir is cylinders providing power, and cylinder driving sucker is pressed on bridge floor, thus can be steady by support frame Quietly it is fixed on bridge floor, so as to avoid the gravity for the weight that the suspension hook of arm right-hand member lifted by crane too big and tilt support frame To influence safe construction.The right side of overpass is reached on the right side of arm, if the present invention is arranged on the left side of overpass bridge floor, direction Correspondence adjustment.Arm can be made using square steel tube, and square steel tube is avoided rotating, and suspension hook is mounted into weight(Construction appliance Or construction raw material), manipulating hoist engine can downwards transport from overpass by weight or be lifted into weight on overpass from ground. During weight is transported upwards, when weight maintains an equal level with overpass bridge floor soon, hand-held one end of workman on overpass is provided with drawing The stock of hook hooks suspension hook to Zola, and after weight is moved to above the bridge floor of overpass, several workmans take weight from suspension hook It is lower.When weight transports beginning downwards, the weight on bridge floor is first suspended on suspension hook, and suspension hook is hooked using the stock with drag hook, First weight is lifted up by manipulation hoist engine, weight is left after bridge floor, then manipulate hoist engine by weight slowly to whereabouts, stock Suspension hook is slowly moved to the left to stable state, in this process, weight can be stablized slowly using the stock with drag hook Fall, it is to avoid weight, which is fiercely rocked, produces greater impact influence safety work on arm.
While being lifted or transferring weight, the front side portion or rear lateral portion of job platform are provided with hanging ladder suspender member, applied Workman person hangs hanging ladder on hanging ladder suspender member, and workmen just can be by, on job platform, passing through manipulation on hanging ladder Hoist engine will construct apparatus and material lift to job platform top, and weight is placed into construction by workmen on job platform On platform.Workmen carries out construction operation on platform to overhead pars basilaris pontis.
It can be raised every the air pressure in a period of time, sucker, start exhausting motor, close the first air-valve, open the second air-valve, Air exhauster in sucker to being evacuated, so that the absorption affinity enhancing of sucker, it is ensured that the security of construction.
When after the completion of one of bridge floor place lifting weight, it is necessary to mobile job platform and arm position when, cylinder Sucker is lifted up, motor reducer starts, driving support wheel is moved on bridge floor, and left limit wheel is also along bridge floor guardrail base Left surface, after moving into place, motor reducer stop, cylinder again sucker be pressed onto on bridge floor by the present invention positioning.
In lifting weight operation process, left limit wheel also functions to stronger supporting role, it is to avoid support frame is to Right deviation Tiltedly.Each equipment gravity of itself on lower horizontal frame also functions to the effect of balance crane arm sling arm lifting operation.
When air pressure is inadequate in compressed air reservoir, cause the driveability of cylinder to weaken, sucker can be prevented from firmly Ground is adsorbed onto on bridge floor, now needs to close the second airduct, opens the first air-valve, and air exhauster is empty to compression by gas boosting valve Gas storage in gas air accumulator.
Hound is used for the effect of the arm intensity of supporting cantilever operation, and right limit wheel not only acts as guiding and moved along overpass Dynamic effect, and play when lifting weight, the effect that vertical frame keeps stable is limited, and basis branch is provided for hound Support.
Guard rail on the left of job platform can disassemble support bar in the not used time, and guard rail then is turned into operation horizontal On platform, so it is easy to remove or be transferred to the left of overpass from overpass by the present invention and is constructed.
Deep floor plays a part of strengthening the bonding strength between vertical frame and upper horizontal frame, and raker beam plays increasing The effect of strong intensity between vertical frame and job platform, improves the safety coefficient constructed on job platform.
Raker beam and support bar are respectively provided with the opposite sides of job platform, while playing booster action, are also functioned to anti- Shield is acted on.
Due to job platform(Hanging basket in theme)To provide operation for workmen, therefore, job platform with, it is vertical Framework is with upper horizontal frame by the way of being fixedly connected., can be by arm when needing only to overhead pars basilaris pontis construction operation And all parts on upper horizontal frame are dismantled.
One end of steel wire rope is pulled by hoist engine in the present invention, and the other end of steel wire rope passes through U-shaped plate, with one U-shaped card will be stuck in stand through one end of the steel wire rope of U-shaped plate, is prevented looseness of steel wire ropes, is played a part of ultimate insurance, so The 3rd alignment pin and the 4th alignment pin are installed in insertion on U-shaped plate afterwards, and clapboard is from top to bottom inserted into U-shaped plate, used Hammer is pounded downwards to be contacted on the left of the upper end of clapboard, clapboard with the 3rd alignment pin and the 4th alignment pin top pressure, clapboard Rear side is contacted by steel wire rope with U-shaped plate bottom top pressure.Because the trailing flank of clapboard and the inwall of U-shaped plate are provided with steel wire The anti-skidding form friction pattern that rope is closely crimped, steel wire rope stress pulls down clapboard, can so make steel wire rope firmly locked.
Arm in the present invention can carry out the regulation of length, operable manual positioning machine during regulation according to actual position Structure, unclamps arm, then moves arm in left-right direction.The movable length of arm in place after, then manipulate manual positioning mechanism lock Tight arm, specific manipulation process is:Hand-held handle bar is rotated up by rotating shaft of lower bearing pin, when lock nut turns to vertical configuration During state, handlebar right part is located above U-shaped packing ring, and another hand presses down on pressing plate, make the block rubber of pressing plate lower surface to Under press handlebar, then rotary handle bar drive lock nut rotation, because lock nut is threadedly coupled with lower bearing pin, lock The rotation of screw rod just moves down the right part of handlebar, when handlebar right part and U-shaped washer contacts and rotate manually When handlebar is relatively elaborate, the hand of pressing pressing plate is unclamped, pressing handlebar makes handlebar line centered on upper pin turn to left down It is dynamic, make handlebar left end bottom and pressing plate upper surface, because the outline of the right part of handlebar is surrounded in upper pin Heart line is from right upper portion to left lower in the reducing globoidal structure gradually increased, as handlebar turns left, handlebar The outline of right part will be by U-shaped packing ring gradually clamping platen, and several block rubbers that pressing plate lower surface is set will enter One step presses the upper surface of arm, so that arm is fixed.The last Handheld Division pulled again with hand on elastic pressuring plate, driving Elastic pressuring plate line centered on fastening bolt horizontally rotates, and when touching when upwarping portion of handlebar left end, elastic pressure is put forward upwards Piece, makes the location hook of elastic pressuring plate tightly suppress the portion that upwarps of handlebar downwards, so can ensure that handlebar positioning is motionless.
Because U-shaped bead top is provided with the deep-slotted chip breaker of identical and press fit corresponding with reducing globoidal structure, this One structure really can will not move forward the U-shaped packing ring of disengaging by handlebar lock stud in the case of motionless, so that pressing plate is firm Ground presses arm, arm is kept integrative-structure with support frame, so as to play good security reliability.
Stiffener plate plays a part of enhancing front vertical plate, bonding strength between back vertical plate and support beam, it is ensured that positioning arm Reliability.In addition, two square steel tube side-by-sides, can be welded as a whole by the intensity in order to increase arm, i.e. lifting capacity.Certainly, Appropriate adjustment the distance between front vertical plate and back vertical plate is so needed to place two square steel tubes.
In summary, reasonable in design, simple in construction, each spare and accessory parts of the invention use the structure of separable assembled, with With dress, with certain lifting capacity, fixed property is good on the bridge floor of overpass, and can be moved along bridge floor, the side of installing Just it is quick, especially for arm, for the ease of carrying and depositing, dismounting is frequently necessary to after use, can be by manualling locate machine Structure is locked and dismantled, and not only security reliability is strong, and quite convenient and swift.In a word, the present invention is vdiverse in function, both can be with Hoisting heavy, and the bottom surface of overpass can be constructed, the labor intensity of workman in road construction is sufficiently lower, is carried High operating efficiency, and it is more safe and reliable.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the enlarged drawing of support frame in Fig. 1;
Fig. 3 is the top view of arm in Fig. 1;
Fig. 4 is the enlarged drawing at A in Fig. 1;
Fig. 5 is the enlarged drawing at B in Fig. 3
Fig. 6 is the left view of manual positioning mechanism in Fig. 1;
Fig. 7 is C direction views in Fig. 6.
Embodiment
As shown in Fig. 1-Fig. 7, urban viaduct construction in later period of the invention is combined the unit with multi-functional lifting and hanging basket, bag Include and be arranged on the upper overall support frame 1 in rectangular shape, hanging down positioned at the right side of overpass 68 on the right side of the bridge floor of overpass 68 Straight framework 69 and the horizontally disposed job platform 70 for being arranged on the lower section of overpass 68, support frame 1 include lower horizontal frame 47, The lower bottom of horizontal frame 47, which is provided with support wheel 2, lower horizontal frame 47, is vertically installed with column 48, and the upper end of column 48 is fixed and set Horizontal frame 53 is equipped with, the upper top of horizontal frame 53 is provided with least two support beams 3, the top of support beam 3 along the longitudinal direction Left and right horizontal direction is provided with an arm 4, the right side of arm 4 is to be provided with a use in cantilever design, every support beam 3 In the manual positioning mechanism 5 of fixed arm 4, the upper top front side horizontal of horizontal frame 53, which is provided with installing plate 6, installing plate 6, to be set Hoist engine 7 is equipped with, the right-hand member of arm 4 is fixedly installed on first pulley frame 8, first pulley frame 8 to be slided by horizontally disposed first Wheel shaft is rotatably connected to the first fixed pulley 9, and the rear lateral portion of arm 4 is fixedly installed steel wire rope locking at neighbouring first fixed pulley 9 Part 10, the front side portion of arm 4 is fixedly installed on second pulley frame 11, second pulley frame 11 in the upper top of horizontal frame 53 passes through edge Vertically arranged second pulley axle is rotatably connected to the second fixed pulley 12, and the upper top of horizontal frame 53 is provided with the rear side of arm 4 Steel wire rope 14 is wound with stand 13, hoist engine 7, the drawing end of steel wire rope 14 sequentially passes through the second fixed pulley 12, first and slided calmly It is fixed on after wheel 9 and the locking member 10 of steel wire rope 14 by U-shaped card 15 in stand 13, in the first fixed pulley 9 and steel on steel wire rope 14 The hook assembly for hanging weight is provided between the locking member 10 of cord 14;
Air exhauster 50, cylinder 51, compressed air reservoir 52, exhausting motor 54 and sucker 55 are provided with lower horizontal frame 47, The main shaft of exhausting motor 54 is connected with the spindle drive of air exhauster 50, and cylinder 51 is arranged in vertical, and sucker 55 is located at lower water The lower section of flat frame 47 and the opening down setting of sucker 55, the lower end of cylinder 51 are connected by terminal pad 56 with the top of sucker 55, The lower port edge of sucker 55 is provided with abrasive rubber ring, the top center of sucker 55 and is connected with the suction opeing of air exhauster 50, The air outlet of air exhauster 50 is connected with three-way pipe 57, first discharge pipe of three-way pipe 57 and is provided with the first air-valve 58 and gas Pressure charging valve 59, the air outlet of first discharge pipe is connected with compressed air reservoir 52, compressed air reservoir 52 and cylinder 51 Connected by tracheae and air-valve assembly, the second air-valve 60 is provided with second discharge pipe of three-way pipe 57.
The right side of upper horizontal frame 47 is fixedly connected with the upside of vertical frame 69, the bottom of upper horizontal frame 47 with it is vertical The deep floor 71 of triangular structure, downside and the right side of job platform 70 of vertical frame 69 are provided between the left side of framework 69 It is fixedly connected, the front side at the top of job platform 70 and rear side are provided with high outside and low outside inclination between the left side of vertical frame 69 The raker beam 72 of setting;
The right side of vertical frame 69 is provided with lower ear plate 73, and arm bottom right side is provided with upper ear plate 74, lower ear plate 73 and upper ear The hound 75 that left low right high dip is set is provided between plate 74.
Be equipped with first pulley frame 8 is used for the first alignment pin 16 of Anti-rope drop positioned at the top of the first fixed pulley 9.
Hook assembly includes movable pulley 17, the 3rd pulley yoke 18 and suspension hook 19, and movable pulley 17 is rotated by the 3rd pulley spindle It is connected on the 3rd pulley yoke 18, the bottom of the 3rd pulley yoke 18, which is provided with two and is located at the lower section of movable pulley 17, is used for the of Anti-rope drop Two alignment pins 20, the bottom of the 3rd pulley yoke 18 is fixedly installed flat board 21 in the horizontal direction, and the middle part of flat board 21 is provided with circular hole, hung The top of hook 19 is stretched into and is rotatably connected in circular hole, and the upper end of suspension hook 19 is fixedly installed the limited block 22 positioned at the top of flat board 21, Limited block 22 is more than circular hole.
The locking member 10 of steel wire rope 14 includes U-shaped plate 23, clapboard 24, the 3rd alignment pin 25 and the 4th alignment pin 26, U-shaped plate 23 top, bottom and left side are open, and the forward upper of U-shaped plate 23 is fixedly connected with the rear side of arm 4, the 3rd alignment pin 25 In the top of the 4th alignment pin 26, the 3rd alignment pin 25 and the 4th alignment pin 26 are along the longitudinal direction horizontal through U-shaped plate 23, the 3rd Distance of the alignment pin 25 apart from the U-shaped bottom of plate 23 is more than distance of the 4th alignment pin 26 apart from the U-shaped bottom of plate 23, and clapboard 24 is in Structure wide at the top and narrow at the bottom, clapboard 24 is extend into U-shaped plate 23 and the left side of clapboard 24 is fixed with the 3rd alignment pin 25 and the 4th The position top pressure of pin 26 contact, steel wire rope 14 passes through U-shaped plate 23 from bottom to top along the U-shaped inner bottom part of plate 23, and the rear side of clapboard 24 passes through Steel wire rope 14 is contacted with the U-shaped bottom top pressure of plate 23, and the inwall of the trailing flank of clapboard 24 and U-shaped plate 23 is provided with steel wire rope 14 The anti-skidding form friction pattern closely crimped.
Manual positioning mechanism 5 includes front vertical plate 27, back vertical plate 28, lock nut 29, handlebar 30, U-shaped packing ring 31, lower pin Axle 32 and upper pin 33, front vertical plate 27 and back vertical plate 28 are vertically set on the top surface of support beam 3,28 points of front vertical plate 27 and back vertical plate Not Wei Yu arm 4 front side and rear side, back vertical plate 28 is rotatably connected to pressing plate 35 by hinge 34;
The lower mounting groove 36 of front side, rear side and top opening, the front side of pressing plate 35 middle part are offered in the middle of the upper end of front vertical plate 27 The guide groove 37 of top, bottom and front side opening is offered, lower bearing pin 32 through lower mounting groove 36 and is rotated along the longitudinal direction It is connected on pressing plate 35, the external diameter of lower bearing pin 32 is more than the external diameter of lock nut 29, radial direction of the lock nut 29 along lower bearing pin 32 Direction is threadedly coupled through lower bearing pin 32 and with lower bearing pin 32, and the centre of the leading section of handlebar 30 offers bottom and front side and opened The upper mounting groove 38 of mouth, the upper end of lock nut 29 is located in upper mounting groove 38, and upper pin 33 passes through lock nut in left-right direction 29 and the right part of handlebar 30 is rotatably connected on, the external diameter of upper pin 33 is less than the external diameter of lock nut 29, the U-shaped bottom of packing ring 31 It is fixedly connected on the upper surface of pressing plate 35 and directly over guide groove 37, U-shaped packing ring is penetrating about 31 and front side is open, it is upper to install Groove 38, the endoporus of U-shaped packing ring 31, guide groove 37 and lower mounting groove are corresponding in turn to about 36;Lock nut 29 is in plumbness When, lock nut 29 is sequentially located at the inside of mounting groove 38, U-shaped packing ring 31, guide groove 37 and lower mounting groove 36 from top to bottom, The outline of the leading section of handlebar 30 from front side surface top to bottom is in gradually to increase around the center line of upper pin 33 Reducing globoidal structure 39, the U-shaped top of packing ring 31 is provided with the arc of identical and press fit corresponding with reducing globoidal structure 39 Groove 40.
The lower surface of pressing plate 35 is provided with the block rubber 41 that several are used to compress the upper surface of arm 4;The rear end of handlebar 30 to On be bent to form the portion of upwarping 42, the upper surface of pressing plate 35 is provided with the elastic pressuring plate 43 that can be horizontally rotated, bullet by fastening bolt 49 The property front end of tabletting 43 is provided with and upwarped on the location hook 44 of the top pressure press fit of portion 42, elastic pressuring plate 43 and is provided with Handheld Division 45。
Between the front side and the upper surface of support beam 3 of front vertical plate 27, between the rear side of back vertical plate 28 and the upper surface of support beam 3 It is provided with stiffener plate 46.
It is provided with wheel carrier 61, wheel carrier 61 and is rotatably connected to and bridge floor guardrail base 62 on the right side of the lower bottom of horizontal frame 47 Left surface top pressure is contacted and along the left limit wheel 63 that moves of medial surface of bridge floor guardrail base 62;
Coaxial be provided with driven sprocket 64, lower horizontal frame 47 of one support wheel 2 of the lower bottom left of horizontal frame 47 sets Be equipped with motor reducer 65, the power output shaft of motor reducer 65 and be provided with drive sprocket 66, drive sprocket 66 with it is driven Sprocket wheel 64 is connected by chain 67.
The left upper portion of vertical frame 69 is provided with least three right limit wheels 76, right limit along the longitudinal direction on sustained height Position wheel 76 is in rolling contact with the right flank of overpass 68.
The lower left side of vertical frame 69 is provided with least two layers of shield below the bridge floor of overpass 68 along anterior-posterior horizontal direction Column pipe 77, job platform 70 is welded into the framework of rectangle by shaped steel and is made in frame roof laying checkered steel plate, operation horizontal The upper surface of platform 70 passes on left hinge 78 and is hinged with guard rail 79, and guard rail 79 is in plumbness, and the top of guard rail 79 is right Side is connected by support bar 80 with raker beam 72, and the two ends of support bar 80 are inserted with guard rail 79 and raker beam 72 by bearing pin respectively Connect, guard rail rod 81 has been arranged in vertical between the right side of raker beam 72 and platform.
The present invention is in work in use, because bridge floor is very smooth, compressed air reservoir after casting concrete 52 be that cylinder 51 provides power, and the driving sucker 55 of cylinder 51 is pressed on bridge floor, thus can be steadily fixed by support frame 1 On bridge floor, so as to avoid the gravity for the weight that the suspension hook 19 of the right-hand member of arm 4 lifted by crane too big and support frame 1 is sticked up shadow Ring safe construction.The right side of arm 4 reaches the right side of overpass 68, if the present invention is arranged on the left side of the bridge floor of overpass 68, side To correspondence adjustment.Arm 4 can be made using square steel tube, and square steel tube is avoided rotating, and suspension hook 19 is mounted into weight(Construction Utensil or construction raw material), weight from overpass 68 can downwards transport or from ground weight is lifted into height by manipulation hoist engine 7 On bridge formation 68.During weight is transported upwards, when weight maintains an equal level with the bridge floor of overpass 68 soon, the workman on overpass 68 is hand-held The stock that one end is provided with drag hook hooks suspension hook 19 to Zola, after weight is moved to above the bridge floor of overpass 68, several workmans Weight is removed from suspension hook 19.When weight transports beginning downwards, the weight on bridge floor is first suspended on suspension hook 19, uses band The stock of drag hook hooks suspension hook 19, first manipulates hoist engine 7 and is lifted up weight, weight is left after bridge floor, then manipulate elevator Machine 7 is by weight slowly to whereabouts, and suspension hook 19 is slowly moved to the left to stable state by stock, in this process, uses band The stock of drag hook can stablize weight and slowly fall, it is to avoid weight, which is fiercely rocked, produces greater impact influence safety work on arm 4 Industry
While being lifted or transferring weight, the front side portion or rear lateral portion of job platform 70 are provided with hanging ladder suspender member 82, applied Workman person hangs hanging ladder on hanging ladder suspender member 82, and workmen just can be by, on job platform 70, passing through on hanging ladder Hoist engine 7 is manipulated by construction apparatus and material lift to the top of job platform 70, workmen is on job platform 70 by weight It is placed on operation platform.Workmen carries out construction operation on platform to the bottom of overpass 68.
Every a period of time, the air pressure in sucker 55 can be raised, and start exhausting motor 54, close the first air-valve 58, open the Two air-valves 60, air exhauster 50 in sucker 55 to being evacuated, so that the absorption affinity enhancing of sucker 55, it is ensured that the safety of construction Property.
When after the completion of one of bridge floor place lifting weight, it is necessary to mobile job platform 70 and arm 4 position when, gas Sucker 55 is lifted up by cylinder 51, and motor reducer 65 starts, and driving support wheel 2 is moved on bridge floor, the also edge of left limit wheel 63 The left surface of bridge floor guardrail base 62, after moving into place, motor reducer 65 stops, and cylinder 51 is pressed onto sucker 55 on bridge floor again By present invention positioning.
In lifting weight operation process, left limit wheel 63 also functions to stronger supporting role, it is to avoid support frame 1 is to the right Tilt.Each equipment gravity of itself on lower horizontal frame 47 also functions to the effect of the balance cantilever lifting operation of arm 4.
When air pressure is inadequate in compressed air reservoir 52, causes the driveability of cylinder 51 to weaken, sucker 55 can be made not It can firmly be adsorbed onto on bridge floor, now need to close the second airduct, open the first air-valve 58, air exhauster 50 passes through gas boosting The gas storage into compressed air reservoir 52 of valve 59.
Hound 75 is used for the effect of the arm semi-finals degree of supporting cantilever operation, and right limit wheel 76 not only acts as guiding along height The effects of the movement of bridge formation 68, and play when lifting weight, the effect that vertical frame 69 keeps stabilization is limited, and be hound 75 provide base support.
The guard rail 79 in the left side of job platform 70 can disassemble support bar 80 in the not used time, then overturn guard rail 79 Onto job platform 70, so it is easy to remove or be transferred to the left of overpass from overpass by the present invention and is constructed.
Deep floor 71 plays a part of strengthening the bonding strength between vertical frame 69 and upper horizontal frame 47, raker beam 72 play a part of intensity between enhancing vertical frame 69 and job platform 70, improve the safety constructed on job platform 70 Coefficient.
Raker beam 72 and support bar 80 are respectively provided with the opposite sides of job platform 70, while playing booster action, Play protective action.
Due to job platform 70(Hanging basket in theme)To provide operation for workmen, therefore, job platform 70 with, Vertical frame 69 is with upper horizontal frame 47 by the way of being fixedly connected.When needing only to overhead pars basilaris pontis construction operation, All parts on arm and upper horizontal frame 47 can be dismantled.
One end of steel wire rope 14 is pulled by hoist engine 7 in the present invention, and the other end of steel wire rope 14 passes through U-shaped plate 23, it will be stuck in a U-shaped card 15 through one end of the steel wire rope 14 of U-shaped plate 23 in stand 13, prevent steel wire rope 14 from loosening, risen To the effect of ultimate insurance, then the 3rd alignment pin 25 and the 4th alignment pin 26, clapboard 24 are installed in insertion on U-shaped plate 23 From top to bottom it is inserted into U-shaped plate 23, pounds the upper end of clapboard 24 downwards using hammer, the left side of clapboard 24 is positioned with the 3rd Pin 25 and the contact of the top pressure of the 4th alignment pin 26, the rear side of clapboard 24 are contacted by steel wire rope 14 with the U-shaped bottom top pressure of plate 23.By The anti-skidding form friction pattern that steel wire rope 14 is closely crimped, steel wire rope are provided with the trailing flank of clapboard 24 and the inwall of U-shaped plate 23 14 stress pull down clapboard 24, so steel wire rope 14 can be made firmly locked.
Arm 4 in the present invention can carry out the regulation of length, operable manual positioning during regulation according to actual position Mechanism 5, unclamps arm 4, then moves arm 4 in left-right direction.The movable length of arm 4 in place after, then manipulate manual positioning Mechanism 5 locks arm 4, and specific manipulation process is:Hand-held handle bar 30 is rotated up with lower bearing pin 32 for rotating shaft, works as lock nut 29 when turning to plumbness, and the right part of handlebar 30 is located at the U-shaped top of packing ring 31, and another hand presses down on pressing plate 35, made The block rubber 41 of the lower surface of pressing plate 35 presses handlebar 30 downwards, and then rotary handle bar 30 drives lock nut 29 to rotate, by It is threadedly coupled in lock nut 29 with lower bearing pin 32, the rotation of lock nut 29 just moves down the right part of handlebar 30, When the right part of handlebar 30 is contacted with U-shaped packing ring 31 and rotation handlebar 30 is relatively elaborate manually, pressing pressing plate 35 is unclamped Hand, pressing handlebar 30 line centered on upper pin 33 of handlebar 30 is rotated to left down, make the left end bottom of handlebar 30 with The upper surface of pressing plate 35, due to handlebar 30 right part outline around upper pin 33 center line from right upper portion to Left lower is in the reducing globoidal structure 39 gradually increased, as handlebar 30 turns left, outside the right part of handlebar 30 Profile will be by U-shaped packing ring 31 gradually clamping platen 35, and several block rubbers 41 that the lower surface of pressing plate 35 is set will enter one Step presses the upper surface of arm 4, so that arm 4 is fixed.The last Handheld Division 45 pulled again with hand on elastic pressuring plate 43, The driving line centered on fastening bolt 49 of elastic pressuring plate 43 horizontally rotates, when touching when upwarping portion 42 of the left end of handlebar 30, Elastic pressuring plate 43 is carried upwards, makes what the location hook 44 of elastic pressuring plate 43 tightly suppressed handlebar 30 downwards to upwarp portion 42, so can be true Guarantor's handlebar 30 positions motionless.
Because the U-shaped top of packing ring 31 is provided with the deep-slotted chip breaker of identical and press fit corresponding with reducing globoidal structure 39 40, this structure really can will not move forward the U-shaped packing ring 31 of disengaging by the lock stud in the case of motionless of handlebar 30, so that Pressing plate 35 securely presses arm 4, arm 4 is kept integrative-structure with support frame 1, so as to play good security reliability.
Stiffener plate 46 plays a part of enhancing front vertical plate 27, bonding strength between back vertical plate 28 and support beam 3, it is ensured that fixed The reliability of position arm 4.In addition, two square steel tube side-by-sides can be welded as one by the intensity in order to increase arm 4, i.e. lifting capacity Body.Certainly, appropriate adjustment the distance between front vertical plate 27 and back vertical plate 28 is so needed to place two square steel tubes.
The present embodiment not makees any formal limitation to shape, material, structure of the present invention etc., every according to this hair Any simple modification, equivalent variations and modification that bright technical spirit is made to above example, belong to the technology of the present invention side The protection domain of case.

Claims (10)

1. urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket, it is characterised in that:It is overhead including being arranged on Upper entirety is in the support frame of rectangular shape, the vertical frame on the right side of overpass on the right side of the bridge floor of bridge and is arranged on overhead Horizontally disposed job platform below bridge, support frame includes lower horizontal frame, and lower horizontal frame bottom is provided with support wheel, Column is vertically installed with lower horizontal frame, column upper end is fixedly installed at the top of horizontal frame, upper horizontal frame along front and rear It is outstanding that direction, which is provided with the top of at least two support beams, support beam and is provided with along left and right horizontal direction on the right side of an arm, arm, Front side at the top of a manual positioning mechanism for being used to fix arm, upper horizontal frame is provided with arm configuration, every support beam It is horizontally disposed with to have and hoist engine is provided with installing plate, installing plate, arm right-hand member is fixedly installed first pulley frame, first pulley frame Upper to be rotatably connected to the first fixed pulley by horizontally disposed first pulley axle, arm rear lateral portion is consolidated at neighbouring first fixed pulley Surely steel wire rope locking member is provided with, arm front side portion is fixedly installed second pulley frame, second pulley above upper horizontal frame It is rotatably connected at the top of the second fixed pulley, upper horizontal frame and is set on rear side of arm by the second pulley axle vertically set on frame It is equipped with stand, hoist engine and is wound with steel wire rope, the drawing end of steel wire rope sequentially passes through the second fixed pulley, the first fixed pulley and steel Fixed and be scheduled in stand by U-shaped after cord locking member, set on steel wire rope between the first fixed pulley and steel wire rope locking member There is the hook assembly for hanging weight;
Air exhauster, cylinder, compressed air reservoir, exhausting motor and sucker, the master of exhausting motor are provided with lower horizontal frame The spindle drive connection of axle and air exhauster, cylinder is arranged in vertical, and sucker is located at below lower horizontal frame and sucker is opened Mouth down is set, and the lower end of cylinder at the top of sucker by terminal pad with being connected, and the lower port edge of sucker is provided with abrasive rubber Connected at ring, the top center of sucker with the suction opeing of air exhauster, the air outlet of air exhauster is connected with three-way pipe, the of three-way pipe The first air-valve and gas pressure charging valve are provided with one discharge pipe, air outlet and the compressed air reservoir of first discharge pipe connect Connect, compressed air reservoir is connected with cylinder by tracheae and air-valve assembly, is provided with second discharge pipe of three-way pipe Two air-valves;
The right side of upper horizontal frame on the upside of vertical frame with being fixedly connected, the bottom of upper horizontal frame and the left side of vertical frame Between be provided with the deep floor of triangular structure, the downside of vertical frame on the right side of job platform with being fixedly connected, job platform The front side at top and rear side are provided with the high outside and low outside raker beam being obliquely installed between the left side of vertical frame;
Lower ear plate is provided with the right side of vertical frame, arm bottom right side is provided with upper ear plate, set between lower ear plate and upper ear plate It is equipped with the hound that left low right high dip is set.
2. urban viaduct construction in later period according to claim 1 is combined the unit with multi-functional lifting and hanging basket, its feature It is:Being equipped with first pulley frame above the first fixed pulley is used for the first alignment pin of Anti-rope drop.
3. urban viaduct construction in later period according to claim 1 is combined the unit with multi-functional lifting and hanging basket, its feature It is:Hook assembly includes movable pulley, the 3rd pulley yoke and suspension hook, and movable pulley is rotatably connected on the 3rd cunning by the 3rd pulley spindle On wheel carrier, the 3rd pulley yoke bottom is provided with two the second alignment pins being located at below movable pulley for Anti-rope drop, the 3rd pulley Frame bottom is fixedly installed in the middle part of flat board, flat board and is provided with circular hole in the horizontal direction, and suspension hook top is stretched into and is rotatably connected on circle In hole, suspension hook upper end is fixedly installed the limited block above flat board, and limited block is more than circular hole.
4. urban viaduct construction in later period according to claim 1 is combined the unit with multi-functional lifting and hanging basket, its feature It is:Steel wire rope locking member includes U-shaped plate, clapboard, the 3rd alignment pin and the 4th alignment pin, top, bottom and the left side of U-shaped plate Side is open, and the forward upper of U-shaped plate on rear side of arm with being fixedly connected, and the 3rd alignment pin is located above the 4th alignment pin, and the 3rd Alignment pin and the 4th alignment pin are along the longitudinal direction horizontal through U-shaped plate, and distance of the 3rd alignment pin apart from U-shaped plate bottom is more than 4th alignment pin is apart from the distance of U-shaped plate bottom, and clapboard is in structure wide at the top and narrow at the bottom, and clapboard is extend into U-shaped plate and wedge Contacted on the left of shape plate with the 3rd alignment pin and the 4th alignment pin top pressure, steel wire rope is along U-shaped plate inner bottom part from bottom to top through U-shaped Plate, the rear side of clapboard is contacted by steel wire rope with U-shaped plate bottom top pressure, and the inwall of the trailing flank of clapboard and U-shaped plate is all provided with It is equipped with the anti-skidding form friction pattern that steel wire rope is closely crimped.
5. urban viaduct construction in later period according to claim 1 is combined the unit with multi-functional lifting and hanging basket, its feature It is:Manual positioning mechanism includes front vertical plate, back vertical plate, lock nut, handlebar, U-shaped packing ring, lower bearing pin and upper pin, preceding Riser and back vertical plate are vertically set on support top surface of the beam, front vertical plate and back vertical plate respectively positioned at the front side of arm and rear side, after Riser is rotatably connected to pressing plate by hinge;
Middle part on front side of the lower mounting groove of front side, rear side and top opening, pressing plate is offered in the middle of front vertical plate upper end to offer The guide groove of top, bottom and front side opening, lower bearing pin through lower mounting groove and is rotatably connected on pressing plate along the longitudinal direction, The external diameter of lower bearing pin is more than the external diameter of lock nut, and radial direction of the lock nut along lower bearing pin passes through lower bearing pin and and lower bearing pin Threaded connection, the centre of handlebar leading section offers the upper mounting groove of bottom and front side opening, and lock nut upper end is located at In upper mounting groove, upper pin through lock nut and is rotatably connected on handlebar right part, the external diameter of upper pin in left-right direction Less than the external diameter of lock nut, U-shaped packing ring bottom is fixedly connected on pressing plate upper surface and directly over guide groove, U-shaped packing ring It is penetrating up and down and front side is open, it is corresponding in turn to above and below upper mounting groove, the endoporus of U-shaped packing ring, guide groove and lower mounting groove;Lock spiral shell When bar is in plumbness, lock nut is sequentially located at mounting groove, U-shaped packing ring, guide groove and lower mounting groove from top to bottom Inside, the outline of the leading section of handlebar from front side surface top to bottom is in what is gradually increased around the center line of upper pin Reducing globoidal structure, U-shaped bead top is provided with the deep-slotted chip breaker of identical and press fit corresponding with reducing globoidal structure.
6. urban viaduct construction in later period according to claim 5 is combined the unit with multi-functional lifting and hanging basket, its feature It is:Pressing plate lower surface is provided with the block rubber that several are used to compress arm upper surface;Handle rod rear end is folded upward at being formed Upwarp portion, pressing plate upper surface is provided with the elastic pressuring plate that can be horizontally rotated by fastening bolt, elastic pressuring plate front end be provided with Upwarp and be provided with Handheld Division on the location hook of portion's top pressure press fit, elastic pressuring plate.
7. urban viaduct construction in later period according to claim 6 is combined the unit with multi-functional lifting and hanging basket, its feature It is:Be provided between the front side and support beam upper surface of front vertical plate, between the rear side of back vertical plate and support beam upper surface plus Strengthening tendons plate.
8. urban viaduct construction in later period according to claim 1 is combined the unit with multi-functional lifting and hanging basket, its feature It is:The left surface top pressure being rotatably connected on wheel carrier, wheel carrier with bridge floor guardrail base is provided with the right side of lower horizontal frame bottom Contact and along the left limit wheel that moves of medial surface of bridge floor guardrail base;
Coaxial be provided with driven sprocket, lower horizontal frame of one support wheel of lower horizontal frame bottom left is provided with motor Drive sprocket is provided with reductor, the power output shaft of motor reducer, drive sprocket passes through chain drive with driven sprocket Connection.
9. urban viaduct construction in later period according to claim 1 is combined the unit with multi-functional lifting and hanging basket, its feature It is:Vertical frame left upper portion is provided with least three right limit wheels along the longitudinal direction on sustained height, right limit wheel with Overpass right flank is in rolling contact.
10. urban viaduct construction in later period according to claim 1 is combined the unit with multi-functional lifting and hanging basket, its feature It is:Vertical frame lower left side is provided with least two layers of guardrail pipe below overpass bridge floor along anterior-posterior horizontal direction, makees Industry platform is welded into the framework of rectangle by shaped steel and is made in frame roof laying checkered steel plate, on the left of job platform upper surface Guard rail is hinged with by hinge, guard rail is in plumbness, and the upper right of guard rail is connected by support bar and raker beam Connect, support bar two ends are respectively with guard rail and raker beam by bearing pin grafting, on the right side of raker beam between platform vertically It is provided with guard rail rod.
CN201710741813.XA 2017-08-25 2017-08-25 Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket Expired - Fee Related CN107298392B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710741813.XA CN107298392B (en) 2017-08-25 2017-08-25 Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710741813.XA CN107298392B (en) 2017-08-25 2017-08-25 Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket

Publications (2)

Publication Number Publication Date
CN107298392A true CN107298392A (en) 2017-10-27
CN107298392B CN107298392B (en) 2019-09-13

Family

ID=60132158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710741813.XA Expired - Fee Related CN107298392B (en) 2017-08-25 2017-08-25 Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket

Country Status (1)

Country Link
CN (1) CN107298392B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195411A (en) * 2019-04-04 2019-09-03 中铁大桥局集团第六工程有限公司 A kind of self-propelled bridge formwork Mobile workbench
CN110550566A (en) * 2019-08-24 2019-12-10 天津大学青岛海洋技术研究院 installation equipment of reaction tower

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203475323U (en) * 2013-08-21 2014-03-12 中交二公局第一工程有限公司 Half-range open type movable working trolley
CN204780624U (en) * 2015-07-08 2015-11-18 中铁武汉电气化局集团第一工程有限公司 Crane span structure installation auxiliary device
CN205188839U (en) * 2015-12-02 2016-04-27 中国建筑第七工程局有限公司 Movably -assembled anti -collision bridge wall construction hanging basket
CN205474876U (en) * 2016-01-11 2016-08-17 广西交通科学研究院 A hang basket for detecting safeguard anchor head under bridge jib and suspension cable
CN205741924U (en) * 2016-05-17 2016-11-30 中国水利水电第五工程局有限公司 A kind of Collison fence for bridge is with moving dolly
CN205893930U (en) * 2016-07-19 2017-01-18 中交一航局第三工程有限公司 Self -propelled hanging flower basket device
CN205975353U (en) * 2016-08-24 2017-02-22 陈烨君 External device of bridge bottom plate construction unilateral
CN206233102U (en) * 2016-12-06 2017-06-09 河南省公路工程局集团有限公司 A kind of packaged type faces side operation work platform
CN106894342A (en) * 2017-01-18 2017-06-27 湖南瑞涪科技实业有限公司 Pipe installing job platform and construction method
CN206328678U (en) * 2016-12-21 2017-07-14 中建三局安装工程有限公司 Steel box-girder chooses arm and steel guard rail installs dual-purpose type Mobile operating platform
CN207108308U (en) * 2017-08-25 2018-03-16 黄河科技学院 Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203475323U (en) * 2013-08-21 2014-03-12 中交二公局第一工程有限公司 Half-range open type movable working trolley
CN204780624U (en) * 2015-07-08 2015-11-18 中铁武汉电气化局集团第一工程有限公司 Crane span structure installation auxiliary device
CN205188839U (en) * 2015-12-02 2016-04-27 中国建筑第七工程局有限公司 Movably -assembled anti -collision bridge wall construction hanging basket
CN205474876U (en) * 2016-01-11 2016-08-17 广西交通科学研究院 A hang basket for detecting safeguard anchor head under bridge jib and suspension cable
CN205741924U (en) * 2016-05-17 2016-11-30 中国水利水电第五工程局有限公司 A kind of Collison fence for bridge is with moving dolly
CN205893930U (en) * 2016-07-19 2017-01-18 中交一航局第三工程有限公司 Self -propelled hanging flower basket device
CN205975353U (en) * 2016-08-24 2017-02-22 陈烨君 External device of bridge bottom plate construction unilateral
CN206233102U (en) * 2016-12-06 2017-06-09 河南省公路工程局集团有限公司 A kind of packaged type faces side operation work platform
CN206328678U (en) * 2016-12-21 2017-07-14 中建三局安装工程有限公司 Steel box-girder chooses arm and steel guard rail installs dual-purpose type Mobile operating platform
CN106894342A (en) * 2017-01-18 2017-06-27 湖南瑞涪科技实业有限公司 Pipe installing job platform and construction method
CN207108308U (en) * 2017-08-25 2018-03-16 黄河科技学院 Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195411A (en) * 2019-04-04 2019-09-03 中铁大桥局集团第六工程有限公司 A kind of self-propelled bridge formwork Mobile workbench
CN110550566A (en) * 2019-08-24 2019-12-10 天津大学青岛海洋技术研究院 installation equipment of reaction tower

Also Published As

Publication number Publication date
CN107298392B (en) 2019-09-13

Similar Documents

Publication Publication Date Title
CN205934716U (en) Special platform truck of bridge railing template dismouting
CN106087730A (en) A kind of formwork of bridge rail dismounting dedicated trolley
CN207108307U (en) The portable boom hoisting of urban viaduct construction in later period
CN107298392B (en) Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket
CN108002244B (en) Hoisting system and method for high pier column steel bar formwork
CN211545757U (en) Auxiliary assembly is used in switch board installation
CN107298393B (en) The mobile boom hoisting of urban viaduct construction in later period
CN111994820A (en) New energy automobile overhauls platform
CN207108308U (en) Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket
CN207434910U (en) Combination cantilevered hoisting apparatus easy to assemble
KR20040097542A (en) Carrier for curtain-wall panel establishing use and curtain-wall establishing method using the same
CN210133816U (en) Pneumatic lifting appliance for prestressed high-strength concrete pipe pile
CN105540433B (en) One kind tilts installation site overweight equipment hanging method
CN105883645B (en) The method for dismounting of tower crane attachment device
CN108237216A (en) One kind is used for the easy sandbox equipment for supporting patient with burn of sand casting industry and its manufacturing method
CN213326443U (en) Quick unloading platform
CN210416591U (en) Adjusting equipment for short-distance loading and transporting curb
CN208328696U (en) Sucker positions formula hoisting mechanism
CN107298395B (en) Combination cantilevered hoisting apparatus easy to assemble
CN210084789U (en) Small-size machine of lifting in civil engineering
CN210767897U (en) Unit type curtain wall plate construction machine
CN211255046U (en) Small crane capable of freely lifting at low floor
JP2004155538A (en) Suspension tool
CN106081913B (en) Gin-pole truck control method
JP2020097474A (en) crane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190913

Termination date: 20200825