CN107298393B - The mobile boom hoisting of urban viaduct construction in later period - Google Patents

The mobile boom hoisting of urban viaduct construction in later period Download PDF

Info

Publication number
CN107298393B
CN107298393B CN201710743704.1A CN201710743704A CN107298393B CN 107298393 B CN107298393 B CN 107298393B CN 201710743704 A CN201710743704 A CN 201710743704A CN 107298393 B CN107298393 B CN 107298393B
Authority
CN
China
Prior art keywords
boom
pulley
wirerope
plate
horizontal frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710743704.1A
Other languages
Chinese (zh)
Other versions
CN107298393A (en
Inventor
路素青
刘贝贝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huanghe Science and Technology College
Original Assignee
Huanghe Science and Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huanghe Science and Technology College filed Critical Huanghe Science and Technology College
Priority to CN201710743704.1A priority Critical patent/CN107298393B/en
Publication of CN107298393A publication Critical patent/CN107298393A/en
Application granted granted Critical
Publication of CN107298393B publication Critical patent/CN107298393B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/208Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from the side, e.g. by walls of buildings
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/68Jibs foldable or otherwise adjustable in configuration

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The mobile boom hoisting of urban viaduct construction in later period, including the upper whole braced frame in rectangular shape on the right side of the bridge floor of overpass is arranged in, left and right horizontal direction is provided with a boom at the top of braced frame, it is cantilever design on the right side of boom, one is provided in every supporting beam for fixing the manual positioning mechanism of boom, front side is provided with hoist engine at the top of braced frame;Exhaust fan, cylinder, compressed air reservoir, exhausting motor and sucker are provided in braced frame.The present invention has rational design, structure is simple, each spare and accessory parts are all made of the structure of separable assembled, with with dress, there is certain lifting capacity, fixed property is good on the bridge floor of overpass, and it can be moved along bridge floor, install it is convenient and efficient, especially for boom, for the ease of carrying and storing, it is frequently necessary to dismantle after use, it is locked and is dismantled by manual positioning mechanism, not only security reliability is strong, but also quite convenient quick.

Description

The mobile boom hoisting of urban viaduct construction in later period
Technical field
The invention belongs to road and bridge construction technical fields, and in particular to a kind of mobile lifting of urban viaduct construction in later period Device.
Background technique
Overpass has become more and more in present traffic route, because overpass generally outmatches common ground On road, some crossroads etc. are avoided, the unobstructed degree of road can be improved, overpass is in bridge floor in mixed pure land pouring construction After the completion will the upper surface to overpass mat formation and bituminous pavement and the such as construction such as stringing, plastering, bridge to be carried out to bottom surface The transport of construction appliance, construction material between under face and bridge is quite inconvenient, and current mode is that worker pushes and is loaded with construction device The cart of tool and construction raw material is transported from upper bridge mouth or lower bridge mouth, few then several hundred rice, far then several kilometers of distance, But also climb and fall is wanted, labor intensity of workers is big, and influences the raising of working efficiency.
Summary of the invention
In order to solve shortcoming in the prior art, provide one kind can reduce labor intensity of workers, improves work the present invention Make the mobile boom hoisting of the strong urban viaduct construction in later period of efficiency, security reliability.
In order to solve the above technical problems, the present invention adopts the following technical scheme: urban viaduct construction in later period is mobile Boom hoisting, including the braced frame that upper entirety on the right side of the bridge floor of overpass is in rectangular shape is arranged in, braced frame includes Lower horizontal frame, lower horizontal frame bottom are provided with support wheel, are vertically installed with column on lower horizontal frame, the upper end of the column is fixed It is provided with horizontal frame, is provided at least two supporting beams at the top of upper horizontal frame along the longitudinal direction, supporting beam top is along a left side The right side is horizontally arranged a boom, is cantilever design on the right side of boom, one is provided in every supporting beam for fixing The manual positioning mechanism of boom, upper horizontal frame top front side horizontal are provided with mounting plate, are provided with hoist engine on mounting plate, hang Arm right end is fixedly installed first pulley frame, is rotatably connected to first by horizontally disposed first pulley axis on first pulley frame Fixed pulley, boom rear lateral portion are fixedly installed wirerope locking member at neighbouring first fixed pulley, and boom front side portion is in upper level It is fixedly installed second pulley frame above frame, is rotatably connected on second pulley frame by the second pulley axis being vertically arranged Second fixed pulley, upper horizontal frame top are provided with stand on rear side of boom, wirerope are wound on hoist engine, wirerope is led Pull end is scheduled in stand after sequentially passing through the second fixed pulley, the first fixed pulley and wirerope locking member by U-shaped fixing, wirerope On hook assembly for hanging weight is provided between the first fixed pulley and wirerope locking member;
Exhaust fan, cylinder, compressed air reservoir, exhausting motor and sucker, exhausting motor are provided on lower horizontal frame Main shaft and the spindle drive of exhaust fan connect, cylinder is arranged in vertical, and sucker is located at below lower horizontal frame and sucker Opening down setting, the lower end of cylinder connect by terminal pad with sucker top, and the lower port edge of sucker is provided with wear-resisting Rubber ring is connected with the suction opening of exhaust fan at the top center of sucker, and the air outlet of exhaust fan is connected with tee tube, tee tube First discharge pipe on be provided with the first air-valve and gas pressure charging valve, the air outlet of first discharge pipe and compressed air gas storage Tank connection, compressed air reservoir are connect by tracheae and air-valve assembly with cylinder, are arranged on second discharge pipe of tee tube There is the second air-valve.
The first positioning pin that Anti-rope drop is used for above the first fixed pulley is equipped on first pulley frame.
Hook assembly includes movable pulley, third pulley yoke and suspension hook, and movable pulley is rotatably connected on by third pulley spindle On three pulley yokes, the setting of third pulley yoke lower part is used for the second positioning pin of Anti-rope drop, third there are two being located at below movable pulley Pulley yoke bottom is fixedly installed plate in the horizontal direction, is provided with circular hole in the middle part of plate, suspension hook top is protruded into and is rotatablely connected In circular hole, suspension hook upper end is fixedly installed the limited block above plate, and limited block is greater than circular hole.
Wirerope locking member includes U-shaped board, clapboard, third positioning pin and the 4th positioning pin, top, the bottom of U-shaped board It is open with left side, it is fixedly connected on rear side of the forward upper and boom of U-shaped board, third positioning pin is located above the 4th positioning pin, Third positioning pin and the 4th positioning pin are along the longitudinal direction horizontal through U-shaped board, distance of the third positioning pin apart from U-shaped board bottom Distance greater than the 4th positioning pin apart from U-shaped board bottom, clapboard structure with a narrow upper and lower width, clapboard are extend into U-shaped board And contacted with third positioning pin and the press of the 4th positioning pin on the left of clapboard, wirerope bottom along U-shaped board is worn from bottom to top U-shaped board is crossed, the rear side of clapboard is contacted by wirerope with the press of U-shaped board bottom, the trailing flank of clapboard and the inner wall of U-shaped board It is provided with the anti-skidding form friction pattern that wirerope closely crimps.
Manual positioning mechanism includes front vertical plate, back vertical plate, locking screw, handlebar, U-shaped washer, lower bearing pin and upper pin, Front vertical plate and back vertical plate are vertically set on support top surface of the beam, and front vertical plate and back vertical plate are located at front side and the rear side of boom, Back vertical plate is rotatably connected to pressing plate by hinge;
The open lower mounting groove in front side, rear side and top is offered among front vertical plate upper end, middle part is opened on front side of pressing plate Equipped with the guide groove that top, bottom and front side are open, lower bearing pin passes through lower mounting groove along the longitudinal direction and is rotatably connected on pressure On plate, the outer diameter of lower bearing pin is greater than the outer diameter of locking screw, locking screw along the radial direction of lower bearing pin pass through lower bearing pin and with Lower bearing pin is threadedly coupled, and the centre of handlebar front end offers the open upper mounting groove in bottom and front side, in locking screw End is located in upper mounting groove, and upper pin passes through locking screw in left-right direction and is rotatably connected on handlebar right part, upper pin Outer diameter be less than locking screw outer diameter, U-shaped washer bottom be fixedly connected on pressing plate upper surface and be located at guide groove right above, U Type washer is transparent and front side is open, and upper mounting groove, the inner hole of U-shaped washer, guide groove and lower mounting groove are corresponding in turn to up and down; When locking screw is in plumbness, locking screw is sequentially located at mounting groove, U-shaped washer, guide groove and lower peace from top to bottom The inside of tankage, the outer profile of the front end of handlebar from front side surface top to bottom are in gradually around the center line of upper pin The variable diameter globoidal structure of increase, U-shaped bead top are provided with identical and press fit arc corresponding with variable diameter globoidal structure Slot.
Pressing plate lower surface is provided with several for compressing the rubber block of boom upper surface;Handle rod rear end is folded upward at shape At the portion that upwarps, pressing plate upper surface is provided with the elastic pressuring plate that can be horizontally rotated by fastening bolt, and elastic pressuring plate front end is provided with The location hook of press fit is pressed with the portion of upwarping, and is provided with hand-held part on elastic pressuring plate.
It is provided between the front side and upper surface of support beam of front vertical plate, between the rear side and upper surface of support beam of back vertical plate Stiffener plate.
Lower horizontal frame lower right side is provided with wheel carrier, is rotatably connected on wheel carrier and pushes up with the left side of bridge floor guardrail base Press contacts and the position-limited wheel moved along the medial surface of bridge floor guardrail base;
One support wheel of lower horizontal frame bottom left is coaxial to be provided with driven sprocket, is provided on lower horizontal frame Motor reducer, drive sprocket is provided on the power output shaft of motor reducer, and drive sprocket and driven sprocket pass through chain Transmission connection.
By adopting the above technical scheme, the present invention is in work in use, since bridge floor is very smooth after casting concrete , compressed air reservoir is cylinders providing power, and cylinder driving sucker is pressed on bridge floor, thus can be steady by braced frame It is quietly fixed on bridge floor, so that the gravity for the weight for avoiding the suspension hook of boom right end from being lifted by crane is too big and tilts braced frame To influence safe construction.The right side that overpass is reached on the right side of boom, if the left side of overpass bridge floor is arranged in the present invention, direction Corresponding adjustment.Boom can be used square steel tube and be made, and square steel tube avoids rotating, and suspension hook is mounted weight (construction appliance Or construction raw material), weight can be transported downwards from overpass or be lifted into weight on overpass from ground by manipulation hoist engine. During weight transports upwards, when weight maintains an equal level with overpass bridge floor fastly, the worker on overpass holds one end and is provided with drawing The stock of hook hooks suspension hook to Zola, and after weight is drawn to above the bridge floor of overpass, several workers take weight from suspension hook It is lower.When weight transports downwards beginning, the weight on bridge floor is first suspended on suspension hook, hooks suspension hook using the stock with drag hook, First weight is lifted up by manipulation hoist engine, after so that weight is left bridge floor, then manipulates hoist engine for weight slowly to whereabouts, stock Suspension hook is slowly moved to the left to stable state, in this process, weight can be stablized slowly using the stock with drag hook It falls, avoids weight from fiercely shaking and greater impact influence safety work is generated on boom.
Every a period of time, the air pressure in sucker can be increased, and start exhausting motor, close the first air-valve, open the second air-valve, Exhaust fan in sucker to being evacuated, so that making the adsorption capacity of sucker enhances, it is ensured that the safety of construction.
After the completion of one of bridge floor place lifting weight, when needing the place of mobile lifting weight, cylinder is by sucker It is lifted up, motor reducer starting, driving support wheel moves on bridge floor, and position-limited wheel is also along the left side of bridge floor guardrail base Face, after movement in place, motor reducer stops, and cylinder is pressed onto sucker on bridge floor positions the present invention again.
In lifting weight operation process, position-limited wheel also functions to stronger supporting role, and braced frame is avoided to be tilted to the right. The gravity of each equipment itself on lower horizontal frame also functions to the effect of balance crane arm sling arm lifting operation.
When air pressure is inadequate in compressed air reservoir, causes the driveability of cylinder to weaken, sucker can be prevented from firmly Ground is adsorbed on bridge floor, needs to close the second air hose at this time, opens the first air-valve, and exhaust fan is empty to compression by gas boosting valve Gas storage in gas air accumulator.
One end of wirerope is pulled by hoist engine in the present invention, and the other end of wirerope passes through U-shaped board, with one One end that U-shaped card passes through the wirerope of U-shaped board is stuck in stand, prevents looseness of steel wire ropes, plays the role of ultimate insurance, so Third positioning pin and the 4th positioning pin are installed in insertion in U-shaped board afterwards, and clapboard is from top to bottom inserted into U-shaped board, are used Hammer pounds downwards the upper end of clapboard, contacts with third positioning pin and the press of the 4th positioning pin on the left of clapboard, clapboard Rear side is contacted by wirerope with the press of U-shaped board bottom.Since the trailing flank of clapboard and the inner wall of U-shaped board are provided with steel wire The anti-skidding form friction pattern that rope closely crimps, wirerope stress pull down clapboard, wirerope can be made firmly to lock in this way.
Boom in the present invention can carry out the adjusting of length according to actual position, and when adjusting can operate manual localization machine Structure unclamps boom, then moves boom in left-right direction.The movable length of boom in place after, then manipulate manual positioning mechanism lock Tight boom, specifically manipulates process are as follows: hand-held handlebar is rotated up by shaft of lower bearing pin, when locking screw turns to vertical configuration When state, handlebar right part is located above U-shaped washer, and another hand presses down on pressing plate, make the rubber block of pressing plate lower surface to Under press handlebar, then rotating handle bar drive locking screw rotation, since locking screw is threadedly coupled with lower bearing pin, lock The rotation of screw rod just moves down the right part of handlebar, when handlebar right part and U-shaped washer contacts and rotate manually When handlebar is relatively elaborate, the hand of pressing pressing plate is unclamped, pressing handlebar turns handlebar to left down with upper pin center line It is dynamic, contact handlebar left end bottom with pressing plate upper surface, since the outer profile of the right part of handlebar surrounds in upper pin Heart line is from right upper portion to left lower in the variable diameter globoidal structure being gradually increased, as handlebar turns left, handlebar The outer profile of right part will be by U-shaped washer gradually clamping platen, and several rubber blocks of pressing plate lower surface setting will be into One step presses the upper surface of boom, so that boom is fixed.The hand-held part on elastic pressuring plate finally is pulled with hand again, is driven Elastic pressuring plate horizontally rotates by center line of fastening bolt, when touching when upwarping portion of handlebar left end, proposes elastic pressure upwards Piece makes the location hook of elastic pressuring plate tightly suppress the portion that upwarps of handlebar downwards, can ensure that handlebar positioning is motionless in this way.
Since U-shaped bead top is provided with identical and press fit arc groove corresponding on variable diameter globoidal structure, this One structure really will not can move forward the U-shaped washer of disengaging by handlebar lock stud in the case where motionless, to keep pressing plate firm Ground presses boom, so that boom and braced frame is kept integral structure, to play good security reliability.
Stiffener plate plays the role of enhancing bonding strength between front vertical plate, back vertical plate and supporting beam, it is ensured that positioning boom Reliability.In addition, two square steel tube side-by-sides can be welded as a whole in order to increase the intensity of boom, i.e. lifting capacity.Certainly, Need the distance between appropriate adjustment front vertical plate and back vertical plate in this way to place two square steel tubes.
In conclusion the present invention has rational design, structure is simple, each spare and accessory parts are all made of the structure of separable assembled, with With dress, there is certain lifting capacity, fixed property is good on the bridge floor of overpass, and can move along bridge floor, the side of installing Just quick, it is frequently necessary to dismantle after use, passes through manual positioning mechanism for the ease of carrying and storing especially for boom It is locked and is dismantled, not only security reliability is strong, but also quite convenient quick.It is applied in short, the present invention sufficiently lowers road The labor intensity of worker, improves work efficiency in work, and safer and more reliable.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the enlarged drawing of braced frame in Fig. 1;
Fig. 3 is the top view of boom in Fig. 1;
Fig. 4 is the enlarged drawing in Fig. 1 at A;
Fig. 5 is the enlarged drawing in Fig. 3 at B
Fig. 6 is the left view of manual positioning mechanism in Fig. 1;
Fig. 7 is C direction view in Fig. 6.
Specific embodiment
As shown in Fig. 1-Fig. 7, the mobile boom hoisting of urban viaduct construction in later period of the invention, including be arranged in height The upper whole braced frame 1 in rectangular shape, braced frame 1 include lower horizontal frame 47, are lauched on the right side of the bridge floor of bridge formation 68 47 bottom of flat frame is provided with support wheel 2, and column 48 is vertically installed on lower horizontal frame 47, and 48 upper end of column is fixedly installed Upper horizontal frame 53, upper 53 top of horizontal frame are provided at least two supporting beams 3 along the longitudinal direction, and 3 top of supporting beam is along a left side It is right it is horizontally arranged have a boom 4, be cantilever design on the right side of boom 4, one be provided in every supporting beam 3 for solid Determine the manual positioning mechanism 5 of boom 4, upper 53 top front side horizontal of horizontal frame is provided with mounting plate 6, is provided on mounting plate 6 Hoist engine 7,4 right end of boom are fixedly installed first pulley frame 8, pass through horizontally disposed first pulley axis on first pulley frame 8 It is rotatably connected to the first fixed pulley 9,4 rear lateral portion of boom is fixedly installed wirerope locking member 10 at neighbouring first fixed pulley 9, 4 front side portion of boom is fixedly installed second pulley frame 11 above upper horizontal frame 53, passes through vertically on second pulley frame 11 The second pulley axis of setting is rotatably connected to the second fixed pulley 12, and upper 53 top of horizontal frame is provided with stand on rear side of boom 4 13, wirerope 14 is wound on hoist engine 7, and the drawing end of wirerope 14 sequentially passes through the second fixed pulley 12,9 and of the first fixed pulley It is fixed in stand 13 after 14 locking member 10 of wirerope by U-shaped card 15, in the first fixed pulley 9 and wirerope 14 on wirerope 14 The hook assembly for hanging weight is provided between locking member 10;
Exhaust fan 50, cylinder 51, compressed air reservoir 52, exhausting motor 54 and sucker are provided on lower horizontal frame 47 55, the main shaft of exhausting motor 54 is connect with the spindle drive of exhaust fan 50, and cylinder 51 is arranged in vertical, under sucker 55 is located at The opening down setting of 47 lower section of horizontal frame and sucker 55, the lower end of cylinder 51 at the top of terminal pad 56 and sucker 55 by connecting It connects, the lower port edge of sucker 55 is provided with abrasive rubber ring, connects at the top center of sucker 55 with the suction opening of exhaust fan 50 It connects, the air outlet of exhaust fan 50 is connected with tee tube 57, is provided with 58 He of the first air-valve on first discharge pipe of tee tube 57 The air outlet of gas boosting valve 59, first discharge pipe is connect with compressed air reservoir 52, compressed air reservoir 52 and gas Cylinder 51 is connected by tracheae and air-valve assembly, is provided with the second air-valve 60 on second discharge pipe of tee tube 57.
The first positioning pin 16 that Anti-rope drop is used for above the first fixed pulley 9 is equipped on first pulley frame 8.
Hook assembly includes movable pulley 17, third pulley yoke 18 and suspension hook 19, and movable pulley 17 is rotated by third pulley spindle Be connected on third pulley yoke 18, the setting of 18 lower part of third pulley yoke there are two be located at below movable pulley 17 for Anti-rope drop the Two positioning pins 20,18 bottom of third pulley yoke are fixedly installed plate 21 in the horizontal direction, are provided with circular hole in the middle part of plate 21, hang 19 top of hook is protruded into and is rotatably connected in circular hole, and 19 upper end of suspension hook is fixedly installed the limited block 22 above plate 21, Limited block 22 is greater than circular hole.
14 locking member 10 of wirerope includes U-shaped board 23, clapboard 24, third positioning pin 25 and the 4th positioning pin 26, U-shaped board 23 top, bottom and left side are open, are fixedly connected on rear side of the forward upper and boom 4 of U-shaped board 23, third positioning pin 25 Above the 4th positioning pin 26, third positioning pin 25 and the 4th positioning pin 26 are along the longitudinal direction horizontal through U-shaped board 23, third Distance of the positioning pin 25 apart from 23 bottom of U-shaped board is greater than distance of the 4th positioning pin 26 apart from 23 bottom of U-shaped board, and clapboard 24 is in Structure wide at the top and narrow at the bottom, clapboard 24 is extend into U-shaped board 23 and 24 left side of clapboard is fixed with third positioning pin 25 and the 4th The position press contact of pin 26, the bottom along U-shaped board 23 of wirerope 14 pass through U-shaped board 23 from bottom to top, and the rear side of clapboard 24 passes through Wirerope 14 is contacted with the press of 23 bottom of U-shaped board, and the trailing flank of clapboard 24 and the inner wall of U-shaped board 23 are provided with wirerope 14 The anti-skidding form friction pattern closely crimped.
Manual positioning mechanism 5 includes front vertical plate 27, back vertical plate 28, locking screw 29, handlebar 30, U-shaped washer 31, lower pin Axis 32 and upper pin 33, front vertical plate 27 and back vertical plate 28 are vertically set on 3 top surface of supporting beam, and front vertical plate 27 and back vertical plate 28 divide Not Wei Yu boom 4 front side and rear side, back vertical plate 28 pressing plate 35 is rotatably connected to by hinge 34;
The open lower mounting groove 36 in front side, rear side and top, 35 front side of pressing plate are offered among 27 upper end of front vertical plate Middle part offers the open guide groove 37 in top, bottom and front side, and lower bearing pin 32 passes through lower mounting groove 36 simultaneously along the longitudinal direction It is rotatably connected on pressing plate 35, the outer diameter of lower bearing pin 32 is greater than the outer diameter of locking screw 29, and locking screw 29 is along lower bearing pin 32 Radial direction passes through lower bearing pin 32 and is threadedly coupled with lower bearing pin 32, and the centre of 30 front end of handlebar offers bottom and front side Open upper mounting groove 38,29 upper end of locking screw are located in upper mounting groove 38, and upper pin 33 passes through locking in left-right direction Screw rod 29 is simultaneously rotatably connected on 30 right part of handlebar, and the outer diameter of upper pin 33 is less than the outer diameter of locking screw 29, U-shaped washer 31 Bottom is fixedly connected on 35 upper surface of pressing plate and is located at right above guide groove 37, and U-shaped washer 31 is transparent and front side is open, on Mounting groove 38, the inner hole of U-shaped washer 31, guide groove 37 and about 36 lower mounting groove are corresponding in turn to;Locking screw 29 is in vertical When state, locking screw 29 is sequentially located at mounting groove 38, U-shaped washer 31, guide groove 37 and lower mounting groove 36 from top to bottom Inside, the outer profile of the front end of handlebar 30 are in gradually to increase from front side surface top to bottom around the center line of upper pin 33 Big variable diameter globoidal structure 39 is provided with coincide and press fit corresponding with variable diameter globoidal structure 39 at the top of U-shaped washer 31 Arc groove 40.
35 lower surface of pressing plate is provided with several for compressing the rubber block 41 of 4 upper surface of boom;30 rear end of handlebar to On be bent to form the portion of upwarping 42,35 upper surface of pressing plate is provided with the elastic pressuring plate 43 that can be horizontally rotated, bullet by fastening bolt 49 Property 43 front end of tabletting be provided with and upwarp the location hook 44 that portion 42 presses press fit, be provided with hand-held part on elastic pressuring plate 43 45。
Between 3 upper surface of front side and supporting beam of front vertical plate 27, between 3 upper surface of the rear side of back vertical plate 28 and supporting beam It is provided with stiffener plate 46.
It is provided with wheel carrier 61 on the right side of lower 47 lower part of horizontal frame, is rotatably connected on wheel carrier 61 and bridge floor guardrail base 62 The position-limited wheel 63 that left side press is contacted and moved along the medial surface of bridge floor guardrail base 62;
One support wheel 2 of lower 47 bottom left of horizontal frame is coaxial to be provided with driven sprocket 64, lower horizontal frame 47 On be provided with motor reducer 65, be provided with drive sprocket 66 on the power output shaft of motor reducer 65, drive sprocket 66 with Driven sprocket 64 is sequentially connected by chain 67.
The present invention is in work in use, since bridge floor is very smooth, compressed air reservoir after casting concrete 52 provide power for cylinder 51, and cylinder 51 drives sucker 55 to be pressed on bridge floor, thus can be steadily fixed by braced frame 1 On bridge floor, so that the gravity for the weight for avoiding the suspension hook 19 of 4 right end of boom from being lifted by crane is too big and braced frame 1 is made to stick up shadow Ring safe construction.The right side of overpass 68 is reached on the right side of boom 4, if the left side of 68 bridge floor of overpass is arranged in the present invention, side It is adjusted to corresponding.Boom 4 can be used square steel tube and be made, and square steel tube avoids rotating, and suspension hook 19 is mounted weight (construction Utensil or construction raw material), weight can be transported downwards from overpass 68 or weight is lifted into height from ground by manipulation hoist engine 7 On bridge formation 68.During weight transports upwards, when weight maintains an equal level with 68 bridge floor of overpass fastly, the worker on overpass 68 is hand-held The stock that one end is provided with drag hook hooks suspension hook 19 to Zola, after weight is drawn to above the bridge floor of overpass 68, several workers Weight is removed from suspension hook 19.When weight transports downwards beginning, the weight on bridge floor is first suspended on suspension hook 19, uses band The stock of drag hook hooks suspension hook 19, first manipulates hoist engine 7 and is lifted up weight, after so that weight is left bridge floor, then manipulates elevator For machine 7 by weight slowly to whereabouts, suspension hook 19 is slowly moved to the left to stable state by stock, in this process, uses band The stock of drag hook can stablize weight and slowly fall, and avoid weight from fiercely shaking and generate greater impact influence safety work to boom 4 Industry.
Every a period of time, the air pressure in sucker 55 can be increased, and start exhausting motor 54, close the first air-valve 58, open the Two air-valves 60, exhaust fan 50 in sucker 55 to being evacuated, so that making the adsorption capacity of sucker 55 enhances, it is ensured that the safety of construction Property.
After the completion of lifting weight in a place of bridge floor, when needing the place of mobile lifting weight, cylinder 51 will be inhaled Disk 55 is lifted up, and motor reducer 65 starts, and driving support wheel 2 moves on bridge floor, and position-limited wheel 63 is also along bridge floor guardrail bottom The left side of seat 62, after movement in place, motor reducer 65 stops, and cylinder 51 is pressed onto sucker 55 on bridge floor again determines the present invention Position.
In lifting weight operation process, position-limited wheel 63 also functions to stronger supporting role, avoids braced frame 1 to Right deviation Tiltedly.The gravity of each equipment itself on lower horizontal frame 47 also functions to the effect of balance 4 cantilever lifting operation of boom.
When air pressure is inadequate in compressed air reservoir 52, causes the driveability of cylinder 51 to weaken, sucker 55 can be made not It can firmly be adsorbed on bridge floor, need to close the second air hose at this time, open the first air-valve 58, exhaust fan 50 passes through gas boosting The gas storage into compressed air reservoir 52 of valve 59.
One end of wirerope 14 is pulled by hoist engine 7 in the present invention, and the other end of wirerope 14 passes through U-shaped board 23, it is stuck in stand 13 with one end that a U-shaped card 15 passes through the wirerope 14 of U-shaped board 23, prevents wirerope 14 from loosening, risen To the effect of ultimate insurance, then third positioning pin 25 and the 4th positioning pin 26, clapboard 24 are installed in insertion in U-shaped board 23 It is from top to bottom inserted into U-shaped board 23, pounds the upper end of clapboard 24 downwards using hammer, 24 left side of clapboard is positioned with third The rear side of pin 25 and the press contact of the 4th positioning pin 26, clapboard 24 is contacted by wirerope 14 with the press of 23 bottom of U-shaped board.By The anti-skidding form friction pattern that wirerope 14 closely crimps, wirerope are provided in the trailing flank of clapboard 24 and the inner wall of U-shaped board 23 14 stress pull down clapboard 24, wirerope 14 can be made firmly to lock in this way.
Boom 4 in the present invention can carry out the adjusting of length according to actual position, and when adjusting can operate manual positioning Mechanism 5 unclamps boom 4, then moves boom 4 in left-right direction.The movable length of boom 4 in place after, then manipulate manual positioning Mechanism 5 locks boom 4, specifically manipulates process are as follows: hand-held handlebar 30 is rotated up with lower bearing pin 32 for shaft, works as locking screw 29 when turning to plumbness, and 30 right part of handlebar is located at U-shaped 31 top of washer, and another hand presses down on pressing plate 35, makes The rubber block 41 of 35 lower surface of pressing plate presses downwards handlebar 30, and then rotating handle bar 30 drives locking screw 29 to rotate, by It being threadedly coupled in locking screw 29 with lower bearing pin 32, the rotation of locking screw 29 just moves down the right part of handlebar 30, When the right part of handlebar 30 is contacted with U-shaped washer 31 and manual rotational handle bar 30 is relatively elaborate, pressing pressing plate 35 is unclamped Hand, pressing handlebar 30 rotate handlebar 30 to left down with 33 center line of upper pin, make 30 left end bottom of handlebar and 35 upper surface of pressing plate contact, due to handlebar 30 right part outer profile around upper pin 33 center line from right upper portion to Left lower is in the variable diameter globoidal structure 39 being gradually increased, as handlebar 30 turns left, outside the right part of handlebar 30 Profile will be by U-shaped washer 31 gradually clamping platen 35, several rubber blocks 41 of 35 lower surface of pressing plate setting will be into one Step presses the upper surface of boom 4, so that boom 4 is fixed.The hand-held part 45 on elastic pressuring plate 43 finally is pulled with hand again, Driving elastic pressuring plate 43 is that center line horizontally rotates with fastening bolt 49, when touching when upwarping portion 42 of 30 left end of handlebar, Elastic pressuring plate 43 is mentioned upwards, makes what the location hook 44 of elastic pressuring plate 43 tightly suppressed downwards handlebar 30 to upwarp portion 42, it in this way can be true Guarantor's handlebar 30 positions motionless.
Due to being provided with identical and press fit arc groove corresponding on variable diameter globoidal structure 39 at the top of U-shaped washer 31 40, this structure really will not can move forward the U-shaped washer 31 of disengaging by lock stud in the case where motionless of handlebar 30, to make Pressing plate 35 securely presses boom 4, so that boom 4 and braced frame 1 is kept integral structure, to play good security reliability.
Stiffener plate 46 plays the role of enhancing bonding strength between front vertical plate 27, back vertical plate 28 and supporting beam 3, it is ensured that fixed The reliability of position boom 4.In addition, two square steel tube side-by-sides can be welded as one to increase the intensity of boom 4, i.e. lifting capacity Body.Certainly, the distance between appropriate adjustment front vertical plate 27 and back vertical plate 28 are needed in this way to place two square steel tubes.
The present embodiment not makes any form of restriction shape of the invention, material, structure etc., all according to this hair Bright technical spirit any simple modification, equivalent change and modification to the above embodiments, belong to the technology of the present invention side The protection scope of case.

Claims (6)

1. the mobile boom hoisting of urban viaduct construction in later period, it is characterised in that: the bridge floor including overpass is arranged in is right It is integrally in the braced frame of rectangular shape on side, braced frame includes lower horizontal frame, and lower horizontal frame bottom is provided with branch Support is taken turns, and column is vertically installed on lower horizontal frame, and the upper end of the column is fixedly installed horizontal frame, edge at the top of upper horizontal frame Front-rear direction is provided at least two supporting beams, and supporting beam top is provided with a boom, boom right side along left and right horizontal direction For cantilever design, one is provided in every supporting beam for fixing the manual positioning mechanism of boom, at the top of upper horizontal frame Front side horizontal is provided with mounting plate, and hoist engine is provided on mounting plate, and boom right end is fixedly installed first pulley frame, and first is sliding The first fixed pulley is rotatably connected to by horizontally disposed first pulley axis on wheel carrier, boom rear lateral portion is in neighbouring first fixed pulley Place is fixedly installed wirerope locking member, and boom front side portion is fixedly installed second pulley frame above upper horizontal frame, and second The second fixed pulley is rotatably connected to by the second pulley axis being vertically arranged on pulley yoke, upper horizontal frame top is after boom Side is provided with stand, and wirerope is wound on hoist engine, and the drawing end of wirerope sequentially passes through the second fixed pulley, the first fixed pulley It is scheduled in stand with after wirerope locking member by U-shaped fixing, on wirerope between the first fixed pulley and wirerope locking member It is provided with the hook assembly for hanging weight;
Exhaust fan, cylinder, compressed air reservoir, exhausting motor and sucker, the master of exhausting motor are provided on lower horizontal frame The connection of the spindle drive of axis and exhaust fan, cylinder is arranged in vertical, and sucker is located at below lower horizontal frame and sucker is opened Mouth down setting, by connecting at the top of terminal pad and sucker, the lower port edge of sucker is provided with abrasive rubber for the lower end of cylinder Ring is connected with the suction opening of exhaust fan at the top center of sucker, and the air outlet of exhaust fan is connected with tee tube, and the of tee tube The first air-valve and gas pressure charging valve are provided on one discharge pipe, the air outlet and compressed air reservoir of first discharge pipe connect It connects, compressed air reservoir is connect with cylinder by tracheae and air-valve assembly, and is provided on second discharge pipe of tee tube Two air-valves;
The first positioning pin that Anti-rope drop is used for above the first fixed pulley is equipped on first pulley frame;
Hook assembly includes movable pulley, third pulley yoke and suspension hook, and movable pulley is rotatably connected on third by third pulley spindle and slides On wheel carrier, the setting of third pulley yoke lower part is used for the second positioning pin of Anti-rope drop, third pulley there are two being located at below movable pulley Frame bottom is fixedly installed plate in the horizontal direction, is provided with circular hole in the middle part of plate, suspension hook top is protruded into and is rotatably connected on circle In hole, suspension hook upper end is fixedly installed the limited block above plate, and limited block is greater than circular hole.
2. the mobile boom hoisting of urban viaduct construction in later period according to claim 1, it is characterised in that: wirerope Locking member includes U-shaped board, clapboard, third positioning pin and the 4th positioning pin, and the top of U-shaped board, bottom and left side are open, U It is fixedly connected on rear side of the forward upper of template and boom, third positioning pin is located at the 4th positioning pin top, third positioning pin and the For four positioning pins along the longitudinal direction horizontal through U-shaped board, distance of the third positioning pin apart from U-shaped board bottom is greater than the 4th positioning pin Distance apart from U-shaped board bottom, clapboard structure with a narrow upper and lower width, clapboard is extend into U-shaped board and clapboard left side is equal It is contacted with third positioning pin and the press of the 4th positioning pin, wirerope bottom along U-shaped board passes through U-shaped board, clapboard from bottom to top Rear side pressed and contact by wirerope and U-shaped board bottom, the trailing flank of clapboard and the inner wall of U-shaped board are provided with wirerope The anti-skidding form friction pattern closely crimped.
3. the mobile boom hoisting of urban viaduct construction in later period according to claim 1, it is characterised in that: fixed manually Position mechanism includes front vertical plate, back vertical plate, locking screw, handlebar, U-shaped washer, lower bearing pin and upper pin, front vertical plate and back vertical plate It is vertically set on support top surface of the beam, front vertical plate and back vertical plate are located at front side and the rear side of boom, and back vertical plate passes through hinge It is rotatably connected to pressing plate;
The open lower mounting groove in front side, rear side and top is offered among front vertical plate upper end, middle part offers on front side of pressing plate The open guide groove in top, bottom and front side, lower bearing pin pass through lower mounting groove along the longitudinal direction and are rotatably connected on pressing plate, The outer diameter of lower bearing pin is greater than the outer diameter of locking screw, and locking screw passes through lower bearing pin and and lower bearing pin along the radial direction of lower bearing pin It is threadedly coupled, the centre of handlebar front end offers the open upper mounting groove in bottom and front side, and locking screw upper end is located at In upper mounting groove, upper pin passes through locking screw in left-right direction and is rotatably connected on handlebar right part, the outer diameter of upper pin Less than the outer diameter of locking screw, U-shaped washer bottom is fixedly connected on pressing plate upper surface and is located at right above guide groove, U-shaped washer Transparent and front side is open, and upper mounting groove, the inner hole of U-shaped washer, guide groove and lower mounting groove are corresponding in turn to up and down;Lock spiral shell When bar is in plumbness, locking screw is sequentially located at mounting groove, U-shaped washer, guide groove and lower mounting groove from top to bottom Inside, the outer profile of the front end of handlebar are in be gradually increased from front side surface top to bottom around the center line of upper pin Variable diameter globoidal structure, U-shaped bead top are provided with identical and press fit arc groove corresponding with variable diameter globoidal structure.
4. the mobile boom hoisting of urban viaduct construction in later period according to claim 3, it is characterised in that: under pressing plate Surface is provided with several for compressing the rubber block of boom upper surface;Handle rod rear end is folded upward to form the portion of upwarping, pressing plate Upper surface is provided with the elastic pressuring plate that can be horizontally rotated by fastening bolt, and elastic pressuring plate front end is provided with and the portion's of upwarping press is pressed The location hook of cooperation is connect, is provided with hand-held part on elastic pressuring plate.
5. the mobile boom hoisting of urban viaduct construction in later period according to claim 4, it is characterised in that: front vertical plate Front side and upper surface of support beam between, between the rear side and upper surface of support beam of back vertical plate be provided with stiffener plate.
6. the mobile boom hoisting of urban viaduct construction in later period according to claim 1, it is characterised in that: lower level It is provided with wheel carrier on the right side of lower frame, is rotatably connected on wheel carrier and contacts and with the press of the left side of bridge floor guardrail base along bridge floor The mobile position-limited wheel of the medial surface of guardrail base;
One support wheel of lower horizontal frame bottom left is coaxial to be provided with driven sprocket, is provided with motor on lower horizontal frame Speed reducer, drive sprocket is provided on the power output shaft of motor reducer, and drive sprocket and driven sprocket pass through chain drive Connection.
CN201710743704.1A 2017-08-25 2017-08-25 The mobile boom hoisting of urban viaduct construction in later period Expired - Fee Related CN107298393B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710743704.1A CN107298393B (en) 2017-08-25 2017-08-25 The mobile boom hoisting of urban viaduct construction in later period

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710743704.1A CN107298393B (en) 2017-08-25 2017-08-25 The mobile boom hoisting of urban viaduct construction in later period

Publications (2)

Publication Number Publication Date
CN107298393A CN107298393A (en) 2017-10-27
CN107298393B true CN107298393B (en) 2019-10-29

Family

ID=60132320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710743704.1A Expired - Fee Related CN107298393B (en) 2017-08-25 2017-08-25 The mobile boom hoisting of urban viaduct construction in later period

Country Status (1)

Country Link
CN (1) CN107298393B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108100894A (en) * 2018-01-25 2018-06-01 中交第三航务工程局有限公司宁波分公司 The short tower crane equipment of low speed and system
CN111847275B (en) * 2020-08-03 2022-04-15 武汉华中宏宇科技有限公司 Intelligent lock for lifting arm of crane

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006056640A (en) * 2004-08-18 2006-03-02 Kenji Kusano Rough terrain crane
US8875829B2 (en) * 2012-07-09 2014-11-04 Kobelco Cranes Co., Ltd. Construction machine
CN205442364U (en) * 2015-12-09 2016-08-10 天津万通包装有限公司 Hang and inhale device
CN206088814U (en) * 2016-09-09 2017-04-12 浙江海洋大学 Port crane
CN106957016A (en) * 2017-05-18 2017-07-18 赵钊 A kind of roller chain wheel dual-purpose type hoisting apparatus
CN207108307U (en) * 2017-08-25 2018-03-16 黄河科技学院 The portable boom hoisting of urban viaduct construction in later period

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006056640A (en) * 2004-08-18 2006-03-02 Kenji Kusano Rough terrain crane
US8875829B2 (en) * 2012-07-09 2014-11-04 Kobelco Cranes Co., Ltd. Construction machine
CN205442364U (en) * 2015-12-09 2016-08-10 天津万通包装有限公司 Hang and inhale device
CN206088814U (en) * 2016-09-09 2017-04-12 浙江海洋大学 Port crane
CN106957016A (en) * 2017-05-18 2017-07-18 赵钊 A kind of roller chain wheel dual-purpose type hoisting apparatus
CN207108307U (en) * 2017-08-25 2018-03-16 黄河科技学院 The portable boom hoisting of urban viaduct construction in later period

Also Published As

Publication number Publication date
CN107298393A (en) 2017-10-27

Similar Documents

Publication Publication Date Title
CN207108307U (en) The portable boom hoisting of urban viaduct construction in later period
CN107298393B (en) The mobile boom hoisting of urban viaduct construction in later period
CN109110616A (en) Telescopic building hoist day beam and its installation and application are set in elevator traction
CN107298392B (en) Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket
CN211545757U (en) Auxiliary assembly is used in switch board installation
CN207434910U (en) Combination cantilevered hoisting apparatus easy to assemble
CN107298395B (en) Combination cantilevered hoisting apparatus easy to assemble
CN207108308U (en) Urban viaduct construction in later period is combined the unit with multi-functional lifting and hanging basket
CN110065884A (en) A kind of pile press machine hello stake hanging method and lifting device
CN106986267B (en) A kind of four hook blocks fortune tipping bucket crane
CN210133816U (en) Pneumatic lifting appliance for prestressed high-strength concrete pipe pile
CN210084790U (en) Hoisting mechanism for assembly construction engineering
CN207524808U (en) A kind of mechanical fitting hanging apparatus
CN107337110B (en) The interim simple lifting appliance of road construction
CN208328696U (en) Sucker positions formula hoisting mechanism
CN213085125U (en) Elevator shaft traction rotary telescopic construction elevator
CN210012558U (en) Curb hoist and mount handling tool car
CN211419478U (en) A multi-functional instrument car for curb hoist and mount
CN108237216A (en) One kind is used for the easy sandbox equipment for supporting patient with burn of sand casting industry and its manufacturing method
CN210898299U (en) Ground corner pulley fixing device
CN210084789U (en) Small-size machine of lifting in civil engineering
CN208980209U (en) The outer lifting device of transformer of household portable
CN211255046U (en) Small crane capable of freely lifting at low floor
CN110797794A (en) Ground corner pulley fixing device
CN205771109U (en) A kind of Collapsible container door elevating mechanism

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lu Suqing

Inventor after: Liu Beibei

Inventor before: Lu Su Qing

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191029

Termination date: 20200825