JP2004155538A - Suspension tool - Google Patents

Suspension tool Download PDF

Info

Publication number
JP2004155538A
JP2004155538A JP2002321685A JP2002321685A JP2004155538A JP 2004155538 A JP2004155538 A JP 2004155538A JP 2002321685 A JP2002321685 A JP 2002321685A JP 2002321685 A JP2002321685 A JP 2002321685A JP 2004155538 A JP2004155538 A JP 2004155538A
Authority
JP
Japan
Prior art keywords
suspension
hanging
traversing
jig
trolley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002321685A
Other languages
Japanese (ja)
Inventor
Yoshiharu Miyoshi
良玄 三好
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2002321685A priority Critical patent/JP2004155538A/en
Publication of JP2004155538A publication Critical patent/JP2004155538A/en
Pending legal-status Critical Current

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide a suspension tool for a crane used to carry in and out construction materials or the like at a construction site or the like and capable of eliminating a possibility that a suspension wire comes into contact with an overhang part even if there is the overhang part at an upper story of a skeleton and a possibility that a suspended cargo moves when suspending the cargo. <P>SOLUTION: A hanger fitting 22 is provided from above in a central part of a suspension beam 21 to the front. A wire suspension ring is provided above a rear part from the hanger fitting 22 of the suspension beam 21. The wire suspension ring is suspended by the suspension wire 12 to move a traversing trolley 30 after putting the hanger fitting 22 on the upper story 3 of the skeleton 1. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、建設現場等で資材の搬出入、およびカーテンウォール等の取り付けに使用するクレーンの吊り治具に関する。
【0002】
【従来の技術】
【特許文献1】実公平4−37168号公報
【0003】
建設資材を躯体の各階に搬入する場合、躯体の上階などに張出部分があるとそれが障害となり、各階に搬入することが困難である。また、カーテンウォール等を躯体壁際に取り付ける場合、クレーンブームの先端部およびクレーンフック又は吊りワイヤーが躯体に接触し、危険である。
【0004】
そこで、図13に示すように、天秤方式の吊り治具60の中央部を吊りワイヤー12で吊り、吊り治具60の前端に吊り荷42を、後端に吊り荷42の重さに釣り合うカウンターウェイト61を配置し、躯体の各階に搬入する方法が一般的に知られている。
【0005】
この天秤方式の吊り治具60では、図14に示すように、空荷のときにカウンターウェイト61の重さにより吊り治具60が傾き、作業性が悪い。また、重さの異なる吊り荷42毎にカウンターウェイト61の載せ替えが必要で、作業効率が悪い。また、吊り荷42を搬入し吊り治具60から外すと、吊り治具60が急にカウンターウェイト61側に傾き、建物の壁や躯体に接触する恐れがあり、危険である。
【0006】
そこで、このカウンターウェイト61を自動的に横行させて、吊り荷42の重さに釣り合うようにする方法も提案されている。
【0007】
しかし、天秤方式は吊り荷42に見合うだけのカウンターウェイト61を取り付けているために、吊り治具60自体も大きく丈夫でなければならず、クレーンは吊り荷42のほかにほぼ同じ重さのカウンターウェイト61と重い吊り治具60を吊り上げなくてはならず、使用クレーンの吊り能力に大きな影響を与える。
【0008】
このことから、カウンターウェイト61を使用せず、吊り治具の一端を躯体に載せてから、吊り荷を移動させて搬入する方法が提案されている。
【0009】
吊り治具の一端を躯体に載せるものとして、搬入する階に吊り治具の前端からスタンドを立てるものでは、一対のスタンドの間を吊り荷が通ることになるため、スタンドの高さと巾により吊り荷の大きさが制限されてしまう。
【0010】
また、搬入する階の天井から吊り治具の前端を吊るものでは、躯体の各階の天井に吊り治具を吊るための吊り具を装備しなければならず、資材の搬入のためだけにそのような装備をすることは現実的でない。
【0011】
そこで、搬入する階の上階に吊り治具を載せるものが、実公平4−37168号として提案されている。
【0012】
この吊り治具は、側面視でコの字形を成すフレームの重心位置となる上辺部を吊りワイヤーで吊り、下辺部をレールとする滑動体を吊りワイヤーの直下に位置させて滑動体に吊り荷を吊るものである。そして、吊り荷を躯体の各階に搬入するとき、上辺部を躯体の上階に載せてから滑動体を移動させ、吊り荷を取り込むようにしたものである。
【0013】
そのため、吊り荷を移動してもその荷重は躯体の上階が受け、吊り治具がバランスを失って傾くことがなく、吊り荷を吊り治具から外しても重心位置を吊りワイヤーが吊っているから傾くことがないものである。
【0014】
【発明が解決しようとする課題】
上記の搬入する階の上階に吊り治具を載せるコの字形フレームによる従来技術においては、吊りワイヤーが重心位置となる上辺部を吊るため、上辺部を躯体の上階に載せたとき吊りワイヤーが躯体に接近する。そのため、躯体の上階などに張出部分があるとそれが障害となり搬入することができない。
【0015】
また、滑動体が自由に移動するため、吊り荷を吊っているときにバランスを失うと吊り治具が傾き、滑動体が急に移動しストッパに衝突する恐れがあり、危険である。
【0016】
また、吊り荷を取り込むときに、躯体外に位置する吊り荷に対して身をのり出して人手で引き込まなくてはならず、危険である。
【0017】
そこで本発明では、躯体の上階などに張出部分があっても吊りワイヤーなどが接触する恐れがなく、吊り荷を吊っているときに吊り荷が移動する恐れがなく、躯体内からの操作で吊り荷を躯体内に搬入できる吊り治具を提供する事を目的とする。
【0018】
【課題を解決するための手段】
請求項1の発明の吊り治具は、水平状態に吊り持ちされる吊りビーム21と、吊りビーム21を走行レールとして横行し建設資材等の荷42を吊る横行トロリー30と、横行トロリー30を横行させる横行チェーン31とからなる吊り治具20において、吊りビーム21の中央部上方から前方にハンガー金具22を設け、吊りビーム21のハンガー金具22より後方の上方にワイヤー吊環24,24を設け、ワイヤー吊環24,24を吊りワイヤー12で吊り、ハンガー金具22を躯体1の上階に載せてから横行トロリー30を横行させるようにしたものである。
【0019】
請求項2の発明の吊り治具は、横行チェーン31を回行させる横行ウィンチ32を吊りビーム21の前方に設け、横行ウィンチ32の横行ロープ車33又は横行ハンドル34を回すことにより横行トロリー30が吊りビーム21を横行するものである。
【0020】
請求項3の発明の吊り治具は、吊り治具20が空荷状態で、吊りビーム21を水平状態に保つバランスウェイト23を吊りビーム21の後端に設け、ワイヤー吊環24,24を空荷状態の吊り治具20の重心位置に設けたものである。
【0021】
【発明の実施の形態】
請求項1の発明では、吊りビーム21の中央部上方から前方にハンガー金具22を設け、吊りビーム21のハンガー金具22より後方の上方にワイヤー吊環24,24を設けたから、ハンガー金具22を躯体1の上階に載せたとき、吊りワイヤー12等が躯体1に接近しない。
【0022】
また、横行トロリー30を横行させる横行チェーン31により、横行トロリー30は所定位置に固定される。
【0023】
また、ハンガー金具22を躯体1の上階に載せてから横行トロリー30を横行させるようにしたから、吊り治具20が傾くことがない。
【0024】
請求項2の発明では、横行チェーン31を回行させる横行ウィンチ32を吊りビーム21の前方に設け、横行ウィンチ32の横行ロープ車33又は横行ハンドル34を回すことにより横行トロリー30が吊りビーム21を横行するから、吊りビーム21の前方の横行ロープ車33又は横行ハンドル34を回すと吊り荷42が移動する。
【0025】
請求項3の発明では、吊り治具20が空荷状態で、吊りビーム21を水平状態に保つバランスウェイト23を吊りビーム21の後端に設け、ワイヤー吊環24,24を空荷状態の吊り治具20の重心位置に設けたから、更に吊りワイヤー12等が躯体1から離れ、吊り荷42を吊り治具20から外しても重心位置を吊りワイヤー12が吊っているため傾くことがない。
【0026】
【実施例】
以下、本発明の一実施例につき図面を参照して説明する。
【0027】
図1に示すのは建築中の躯体1に建設資材等の吊り荷42を搬入する場合であり、クレーンブーム10の先端から垂下されたクレーンフック11に吊り治具20を吊りワイヤー12で吊り持ちする。
【0028】
吊り治具20には、水平状態に吊り持ちされる吊りビーム21と、吊りビーム21を走行レールとして横行し建設資材等の吊り荷42を吊る横行トロリー30と、横行トロリー30を横行させる横行チェーン31とを設ける。
【0029】
吊りビーム21は断面H形の細長い形状で、その平滑な面を上下として配置し、躯体1内に挿入される側を前方、反対側を後方とする。
【0030】
吊りビーム21の中央部上方から前方にハンガー金具22を設ける。ハンガー金具22は角鋼管で構成され、その垂直部22aと水平部22bとにより側面視が倒立Lの字形に形成され、吊りビーム21に一体に溶着され、その全体の側面視か略ユの字形を成している。
【0031】
ハンガー金具22の水平部22bは上階の床梁3aに載せられ、その垂直部22aは吊りビーム21が必要以上に躯体1内に挿入されないようにするストッパーとなり、それらが上階の床梁3aに接触するため、その内方にはゴム板のような弾性体を貼着して床梁3aの傷付きを防止する。
【0032】
吊りビーム21の後端にバランスウェイト23を固定して設ける。バランスウェイト23は、吊り治具20が空荷状態で吊りビーム21を水平状態に保つためのもので、ハンガー金具22を吊りビーム21の前方に設けたことにより、重心位置が吊りビーム21の中心より前方となるのを、後方寄りとする。
【0033】
吊りビーム21のハンガー金具22より後方の上方に一対のワイヤー吊環24,24を設ける。一対のワイヤー吊環24,24は、空荷状態の吊り治具20の重心位置を挟んで対称に設け、ワイヤー吊環24,24を吊りワイヤー12で吊ると、吊りワイヤー12は重心位置の直上となる。
【0034】
なお、バランスウェイト23を軽量化又は省略して、一対のワイヤー吊環24,24を空荷状態の吊り治具20の重心位置より後方とし、空荷状態の吊り治具20を前方下がりとし、吊り荷42の位置を後方寄りに調節して吊り治具20を水平状態とすることも可能である。しかし、吊り荷42を外すと吊り治具20が前方下がりに傾いてハンガー金具22が床梁3aから離れがたくなり、作業性が悪くなる。
【0035】
吊りビーム21を走行レールとして横行する横行トロリー30は、吊りビーム21の下面を挟んで設けられ、横行トロリー30の上部内方に自由に回転する横行ローラー30aを設け、横行ローラー30aは吊りビーム21の下面の上を走行する。
【0036】
横行トロリー30の下端にはリング状の吊り環36を設け、吊り環36にチェーンブロック41を介して吊り荷42を吊る。
【0037】
吊りビーム21の前方に横行ウィンチ32を、吊りビーム21の後方側面にスプロケット支持金物38を設ける。横行ウィンチ32の側方の出力軸にスプロケット37をはめ込んで固定し、スプロケット支持金物38に自由に回転するスプロケット39を設け、両スプロケット37,39の間に一本の横行チェーン31を掛け渡し、横行チェーン31の両端を横行トロリー30の上部両端に止着する。
【0038】
横行ウィンチ32はウォーム減速機のように出力軸が外力によっては回転しないもので、通常は横行チェーン31を回行させずに横行トロリー30を固定する。横行ウィンチ32が回転すると、横行チェーン31が回行し、横行トロリー30が横行する。
【0039】
スプロケット支持金物38はそのネジにより両スプロケット37,39間の距離を調節し、横行チェーン31を緊張状態に保つ。
【0040】
横行ウィンチ32の前方の入力軸に横行ロープ車33および横行ハンドル34をはめ込んで固定する。横行ロープ車33又は横行ハンドル34を回すことにより横行ウィンチ32が回転し、横行トロリー30が吊りビーム21を横行する。
【0041】
横行ロープ車33にはリング状の横行ロープ35を掛け下げ、横行ロープ35の片側を引き下げると横行ロープ車33が回転し、横行トロリー30が横行する。
【0042】
次に、吊り治具20を使用して建築中の躯体1に建設資材等の吊り荷42を搬入する方法について説明する。
【0043】
吊り荷42を吊り上げるには、図2に示すように、横行ロープ35を引き下げるか横行ハンドル34を回して、吊り治具20の横行トロリー30を吊りワイヤー12の直下の重心位置である所定位置とし、横行トロリー30にチェーンブロック41を介して吊り荷42を吊る。
【0044】
この、吊り荷42を吊っているときに、横行トロリー30を横行させる横行チェーン31により、横行トロリー30は所定位置に固定されるから、吊り荷42が移動する恐れがなく、安全である。
【0045】
図1に示すように、吊り上げた吊り治具20の吊りビーム21の前方を搬入階に挿入し、ハンガー金具22の水平部22bは上階に挿入する。その際、搬入階の作業者が横行ロープ35を引いて導くと、容易に安全に挿入できる。
【0046】
ハンガー金具22の水平部22bを所定深さまで挿入し、少しクレーンフック11を下ろし、水平部22bを上階の床梁3aに載せる。
【0047】
この、吊りビーム21の中央部上方から前方にハンガー金具22を設け、吊りビーム21のハンガー金具22より後方の上方にワイヤー吊環24,24を設け、ハンガー金具22を躯体1の上階に載せたとき、吊りワイヤー12等が躯体1に接近しないから、安全に作業できる。
【0048】
また、吊り治具20が空荷状態で、吊りビーム21を水平状態に保つバランスウェイト23を吊りビーム21の後端に設け、ワイヤー吊環24,24を空荷状態の吊り治具20の重心位置に設け、更にクレーンブーム10の先端やクレーンフック11および吊りワイヤー12が躯体1から離れるから、躯体1の上階にベランダ4等の張出部分があっても接触する恐れがなく、安全に作業できる。
【0049】
横行ロープ35を引き下げて横行トロリー30を矢印F方向に横行させ、吊り荷42を搬入階に搬入する。
【0050】
このとき、ハンガー金具22を躯体1の上階に載せてから横行トロリー30を横行させるようにし、吊り治具20が傾くことがないから、安全に作業できる。
【0051】
また、横行チェーン31を回行させる横行ウィンチ32を吊りビーム21の前方に設け、横行ウィンチ32の横行ロープ車33を回すことにより横行トロリー30が吊りビーム21を横行し、吊りビーム21の前方の横行ロープ車33を回すと吊り荷42が移動するから、作業者が躯体1内の搬入階に居たまま操作して吊り荷42を引き入れることができ、安全である。
【0052】
搬入位置まで横行トロリー30が来たら、チェーンブロック41を矢印D方向に下げて吊り荷42を搬入階の床梁2aに降ろす。
【0053】
このとき、吊り治具20が空荷状態で、吊りビーム21を水平状態に保つバランスウェイト23を吊りビーム21の後端に設け、ワイヤー吊環24,24を空荷状態の吊り治具20の重心位置に設け、吊り荷42を吊り治具20から外しても重心位置を吊りワイヤー12が吊っているため傾くことがないから、安全である。なお、チェーンブロック41を吊り荷42から外すのも容易となる。
【0054】
横行トロリー30を所定位置に戻し、同様の作業を繰り返すことにより、各階に建設資材を搬入できる。
【0055】
また、逆の手順により、建設資材を搬出できる。
【0056】
次に、図11に示す、建設中の躯体1の壁際にカーテンウォール43を取り付ける場合について説明する。
【0057】
この場合、吊り治具20は、横行ロープ35は使用しないので取り外す以外、同じものを使用する。
【0058】
吊り治具20を使用して建設中の躯体1の壁際にカーテンウォール43を取り付ける方法は、大略前記吊り荷42を搬入する方法と同じであるので、異なる部分を主に説明する。
【0059】
図11に示すように、吊り上げた吊り治具20の吊りビーム21の前方を上階に挿入し、吊りビーム21の前端を上階の床梁3aに載せる。
【0060】
上階の作業者が横行ハンドル34を回して横行トロリー30を矢印F方向に横行させ、カーテンウォール43を搬入階に引き寄せる。
【0061】
このとき、横行チェーン31を回行させる横行ウィンチ32を吊りビーム21の前方に設け、横行ウィンチ32の横行ハンドル34を回すことにより横行トロリー30が吊りビーム21を横行し、吊りビーム21の前方の横行ハンドル34を回すとカーテンウォール43が移動するから、作業者が躯体1内の上階に居たまま操作してカーテンウォール43を引き寄せることができ、安全である。
【0062】
取り付け位置までカーテンウォール43が来たら、チェーンブロック41を矢印D方向に下げて取り付ける。
【0063】
このとき、吊り治具20が空荷状態で、吊りビーム21を水平状態に保つバランスウェイト23を吊りビーム21の後端に設け、ワイヤー吊環24,24を空荷状態の吊り治具20の重心位置に設け、カーテンウォール43を吊り治具20から外しても重心位置を吊りワイヤー12が吊っているため傾くことがないから、安全である。なお、チェーンブロック41をカーテンウォール43から外すのも容易となる。
【0064】
横行トロリー30を所定位置に戻し、同様の作業を繰り返すことにより、各階にカーテンウォール43を取り付けできる。
【0065】
次に、図12に示す、クライミングクレーン50に水平材44を取り付ける場合について説明する。
【0066】
この場合、吊り治具20は、横行ロープ35は使用しないので取り外す以外、同じものを使用する。
【0067】
吊り治具20を使用してクライミングクレーン50に水平材44を取り付ける方法は、大略前記吊り荷42を搬入する方法と同じであるので、異なる部分を主に説明する。
【0068】
図12に示すように、吊り上げた吊り治具20の吊りビーム21の前方をクライミングクレーン50に挿入し、吊りビーム21の前端をクライミングクレーン50のポスト横桟51に載せる。
【0069】
ポスト横桟51の作業者が横行ハンドル34を回して横行トロリー30を矢印F方向に横行させ、水平材44をクライミングクレーン50に引き寄せる。
【0070】
このとき、横行チェーン31を回行させる横行ウィンチ32を吊りビーム21の前方に設け、横行ウィンチ32の横行ハンドル34を回すことにより横行トロリー30が吊りビーム21を横行し、吊りビーム21の前方の横行ハンドル34を回すと水平材44が移動するから、作業者がクライミングクレーン50のポスト横桟51に居たまま操作して水平材44を引き寄せることができ、安全である。
【0071】
取り付け位置まで水平材44が来たら、チェーンブロック41を矢印D方向に下げて取り付ける。
【0072】
このとき、吊り治具20が空荷状態で、吊りビーム21を水平状態に保つバランスウェイト23を吊りビーム21の後端に設け、ワイヤー吊環24,24を空荷状態の吊り治具20の重心位置に設け、水平材44を吊り治具20から外しても重心位置を吊りワイヤー12が吊っているため傾くことがないから、安全である。なお、チェーンブロック41を水平材44から外すのも容易となる。
【0073】
横行トロリー30を所定位置に戻し、同様の作業を繰り返すことにより、各階に水平材44を取り付けできる。
【0074】
また、逆の手順により、水平材44を取り外すことができる。
【0075】
以上の実施例では、ハンガー金具22と吊りビーム21とが一体な例を示したが、ハンガー金具22が吊りビーム21にボルト止めされ、取り外し可能としたり、位置を変更可能としても良い。
【0076】
また、横行ウィンチ32をウォーム減速機とし人手で回す例を示したが、ブレーキ付の電動モーターと平歯車の減速機としても良い。
【0077】
【発明の効果】
請求項1の発明によれば、吊りビームの中央部上方から前方にハンガー金具を設け、吊りビームのハンガー金具より後方の上方にワイヤー吊環を設け、ハンガー金具を躯体の上階に載せたとき、吊りワイヤー等が躯体に接近しないから、安全に作業できる。
【0078】
また、吊り荷を吊っているときに、横行トロリーを横行させる横行チェーンにより、横行トロリーは所定位置に固定されるから、吊り荷が移動する恐れがなく、安全である。
【0079】
また、ハンガー金具を躯体の上階に載せてから横行トロリーを横行させるようにし、吊り治具が傾くことがないから、安全に作業できる。
【0080】
請求項2の発明によれば、横行チェーンを回行させる横行ウィンチを吊りビームの前方に設け、横行ウィンチの横行ロープ車又は横行ハンドルを回すことにより横行トロリーが吊りビームを横行し、吊りビームの前方の横行ロープ車又は横行ハンドルを回すと吊り荷が移動するから、作業者が躯体内に居たまま操作して吊り荷を引き入れたり引き寄せることができ、安全である。
【0081】
請求項3の発明によれば、吊り治具が空荷状態で、吊りビームを水平状態に保つバランスウェイトを吊りビームの後端に設け、ワイヤー吊環を空荷状態の吊り治具の重心位置に設け、更に吊りワイヤー等が躯体から離れから、躯体の上階に張出部分があっても接触する恐れがなく、安全に作業できる。
【0082】
また、吊り荷を吊り治具から外しても重心位置を吊りワイヤーが吊っているため傾くことがないから、安全である。
【図面の簡単な説明】
【図1】吊り治具の一実施例を示す側面図である。
【図2】その吊り荷を吊った状態を示す図である。
【図3】図1の要部を示す部分拡大図である。
【図4】図3の平面図である。
【図5】図3の横行ウィンチ部を示す部分拡大図である。
【図6】図4の横行ウィンチ部を示す部分拡大図である。
【図7】図5の正面図である。
【図8】図3の横行トロリー部を示す部分拡大図である。
【図9】図4のA−Aに沿う拡大断面図である。
【図10】図4のスプロケット支持金物部を示す部分拡大図である。
【図11】吊り治具の一実施例によりカーテンウォールを取り付ける例を示す側面図である。
【図12】吊り治具の一実施例によりクライミングクレーンに水平材を取り付ける例を示す側面図である。
【図13】吊り治具の従来例を示す側面図である。
【図14】図13の吊り荷を降ろした状態を示す図である。
【符号の説明】
1 躯体
上階
12 吊りワイヤー
20 吊り治具
21 吊りビーム
22 ハンガー金具
23 バランスウェイト
24 ワイヤー吊環
30 横行トロリー
31 横行チェーン
32 横行ウィンチ
33 横行ロープ車
34 横行ハンドル
42 荷としての吊り荷
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a crane hanging jig used for loading and unloading materials at a construction site or the like and mounting a curtain wall or the like.
[0002]
[Prior art]
[Patent Document 1] Japanese Utility Model Publication No. 4-37168
When carrying construction materials to each floor of the skeleton, if there is an overhang on the upper floor of the skeleton or the like, it becomes an obstacle, and it is difficult to carry to each floor. In addition, when a curtain wall or the like is attached to the wall of the skeleton, the tip of the crane boom and the crane hook or the hanging wire come into contact with the skeleton, which is dangerous.
[0004]
Therefore, as shown in FIG. 13, the central part of the balance-type hanging jig 60 is hung by the hanging wire 12, and the suspended load 42 is provided at the front end of the suspended jig 60 and the counterbalanced to the weight of the suspended load 42 at the rear end. A method of arranging the weights 61 and carrying the weights to each floor of the skeleton is generally known.
[0005]
In the lifting jig 60 of the balance type, as shown in FIG. 14, the hanging jig 60 is tilted by the weight of the counterweight 61 when there is no load, and the workability is poor. In addition, it is necessary to change the counterweight 61 for each of the suspended loads 42 having different weights, and the work efficiency is low. Also, if the suspended load 42 is carried in and removed from the suspending jig 60, the suspending jig 60 may suddenly tilt to the counterweight 61 side and may come into contact with the wall or the building of the building, which is dangerous.
[0006]
Therefore, a method has been proposed in which the counterweight 61 is automatically traversed so as to balance the weight of the suspended load 42.
[0007]
However, in the balance method, since the counterweight 61 enough to match the suspended load 42 is attached, the suspending jig 60 itself must be large and durable. The weight 61 and the heavy lifting jig 60 must be lifted, which greatly affects the lifting capacity of the crane used.
[0008]
For this reason, a method has been proposed in which one end of a hanging jig is placed on a frame without using the counterweight 61, and then the suspended load is moved and carried in.
[0009]
If one end of the hanging jig is placed on the skeleton and the stand is set up from the front end of the hanging jig on the loading floor, the suspended load will pass between a pair of stands. The size of the load is limited.
[0010]
In the case of hanging the front end of the hanging jig from the ceiling of the loading floor, it is necessary to equip the ceiling of each floor of the building with a hanging jig for hanging the hanging jig. It is not realistic to equip with proper equipment.
[0011]
Then, what mounts a hanging jig on the upper floor of the loading floor is proposed as Japanese Utility Model Publication No. 4-37168.
[0012]
This hanging jig suspends the upper side, which is the position of the center of gravity of the U-shaped frame in a side view, with a suspending wire, and the sliding body with the lower side as a rail is positioned directly below the suspending wire, and the load is placed on the sliding body. Is suspended. When carrying the suspended load to each floor of the frame, the upper side is placed on the upper floor of the frame, and then the sliding body is moved to take in the suspended load.
[0013]
Therefore, even if the suspended load is moved, the load is received by the upper floor of the skeleton, and the lifting jig does not lose its balance and tilts, and even if the suspended load is removed from the hanging jig, the hanging wire suspends the center of gravity position. It does not lean because it is.
[0014]
[Problems to be solved by the invention]
In the prior art using a U-shaped frame in which a hanging jig is placed on the upper floor of the above-mentioned loading floor, the hanging wire is suspended when the upper side is placed on the upper floor of the frame to suspend the upper side where the center of gravity is located. Approaches the frame. For this reason, if there is an overhang on the upper floor of the building or the like, it becomes an obstacle and cannot be carried in.
[0015]
In addition, since the sliding body moves freely, if the balance is lost while hanging the suspended load, the hanging jig may tilt, and the sliding body may move suddenly and collide with the stopper, which is dangerous.
[0016]
In addition, when taking in a suspended load, the suspended load located outside the skeleton must be lifted out and manually pulled in, which is dangerous.
[0017]
Therefore, in the present invention, even if there is an overhanging part on the upper floor of the skeleton, there is no possibility that the hanging wire etc. will come into contact, and there is no possibility that the suspended load will move when the suspended load is suspended, and operation from the skeleton. It is an object of the present invention to provide a hanging jig which can carry a suspended load into a body.
[0018]
[Means for Solving the Problems]
The hanging jig according to the first aspect of the present invention includes a hanging beam 21 suspended in a horizontal state, a trolley 30 traversing the hanging beam 21 as a running rail, and a load 42 such as a construction material, and a traversing trolley 30. In a hanging jig 20 including a traversing chain 31 to be hung, a hanger fitting 22 is provided forward from above the center of the hanging beam 21, and wire hanging rings 24, 24 are provided above the hanger fitting 22 of the hanging beam 21. The suspension rings 24 are suspended by the suspension wires 12, and the hanger fittings 22 are placed on the upper floor 3 of the skeleton 1 before the trolley 30 is traversed.
[0019]
In the lifting jig according to the second aspect of the present invention, a traversing winch 32 for rotating the traversing chain 31 is provided in front of the hanging beam 21, and the traversing trolley 30 is turned by turning a traversing rope wheel 33 or a traversing handle 34 of the traversing winch 32. The suspension beam 21 is traversed.
[0020]
In the hanging jig according to the third aspect of the present invention, when the hanging jig 20 is empty, a balance weight 23 for keeping the hanging beam 21 horizontal is provided at the rear end of the hanging beam 21, and the wire hanging rings 24, 24 are unloaded. It is provided at the position of the center of gravity of the hanging jig 20 in the state.
[0021]
BEST MODE FOR CARRYING OUT THE INVENTION
According to the first aspect of the present invention, the hanger fitting 22 is provided forward from above the center of the suspension beam 21, and the wire suspension rings 24, 24 are provided above the hanger fitting 22 of the suspension beam 21. When placed on the upper floor 3 , the hanging wires 12 and the like do not approach the frame 1.
[0022]
The trolley 30 is fixed at a predetermined position by the traversing chain 31 that traverses the trolley 30.
[0023]
In addition, since the hanger bracket 22 is placed on the upper floor 3 of the frame 1 and then the trolley 30 is traversed, the hanging jig 20 does not tilt.
[0024]
According to the second aspect of the invention, a traverse winch 32 for rotating the traverse chain 31 is provided in front of the suspension beam 21, and the trolley 30 turns the suspension beam 21 by rotating the traverse rope wheel 33 or the traverse handle 34 of the traverse winch 32. Since the vehicle is traversing, turning the traversing rope wheel 33 or the traversing handle 34 in front of the suspension beam 21 moves the suspended load 42.
[0025]
According to the third aspect of the present invention, when the hanging jig 20 is in the unloaded state, the balance weight 23 for keeping the hanging beam 21 in the horizontal state is provided at the rear end of the hanging beam 21, and the wire hanging rings 24, 24 are held in the unloaded state. Since the hanging wire 12 and the like are further provided at the position of the center of gravity of the jig 20, the hanging wire 12 and the like are further separated from the frame 1, and even if the hanging load 42 is removed from the jig 20, the position of the center of gravity is hung because the hanging wire 12 is hung.
[0026]
【Example】
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0027]
FIG. 1 shows a case in which a suspended load 42 such as construction material is carried into the building 1 under construction, and a suspending jig 20 is suspended by a suspending wire 12 on a crane hook 11 suspended from the tip of a crane boom 10. I do.
[0028]
The suspension jig 20 includes a suspension beam 21 that is suspended and held in a horizontal state, a traverse trolley 30 that traverses the suspension beam 21 as a traveling rail, and hangs a suspended load 42 such as construction materials, and a traverse chain that traverses the traverse trolley 30. 31 are provided.
[0029]
The suspension beam 21 has an elongated shape with an H-shaped cross section, and its smooth surface is arranged up and down. The side inserted into the frame 1 is defined as the front side, and the opposite side is defined as the rear side.
[0030]
A hanger bracket 22 is provided forward from above the central portion of the suspension beam 21. The hanger bracket 22 is formed of a square steel pipe, and its vertical portion 22a and horizontal portion 22b are formed into an inverted L-shape in side view, and are integrally welded to the suspension beam 21, and the entire side view or substantially U-shape is used. Has formed.
[0031]
Horizontal portion 22b of the hanger bracket 22 is mounted to the floor beam 3a of upper floor 3, the vertical portion 22a becomes a stopper to prevent being inserted into the hanging beam 21 is building frame 1 than necessary, they are upstairs 3 bed An elastic body such as a rubber plate is adhered to the inside of the beam 3a to prevent the floor beam 3a from being damaged.
[0032]
A balance weight 23 is fixedly provided at the rear end of the suspension beam 21. The balance weight 23 is for maintaining the suspension beam 21 in a horizontal state when the suspension jig 20 is empty, and the center of gravity of the suspension beam 21 is provided by providing the hanger bracket 22 in front of the suspension beam 21. The part that is more forward is closer to the rear.
[0033]
A pair of wire suspension rings 24 are provided above the suspension beam 21 behind the hanger bracket 22. The pair of wire suspension rings 24, 24 are provided symmetrically with respect to the position of the center of gravity of the hanging jig 20 in an empty state, and when the wire suspension rings 24, 24 are suspended by the suspension wires 12, the suspension wires 12 are immediately above the position of the center of gravity. .
[0034]
In addition, the balance weight 23 is reduced in weight or omitted, and the pair of wire suspension rings 24, 24 is positioned rearward from the center of gravity of the unloaded suspension jig 20, and the unloaded suspension jig 20 is lowered forward. It is also possible to adjust the position of the load 42 toward the rear so that the hanging jig 20 is in a horizontal state. However, when the suspended load 42 is removed, the suspending jig 20 is inclined downward and the hanger bracket 22 is difficult to separate from the floor beam 3a, and the workability is deteriorated.
[0035]
The trolley 30 traversing the suspension beam 21 as a traveling rail is provided with the lower surface of the suspension beam 21 interposed therebetween, and a traversing roller 30a that freely rotates inside the upper part of the traversing trolley 30 is provided. Run on the underside of the.
[0036]
A ring-shaped suspension ring 36 is provided at the lower end of the traverse trolley 30, and a suspended load 42 is suspended on the suspension ring 36 via a chain block 41.
[0037]
A transverse winch 32 is provided in front of the suspension beam 21, and a sprocket support 38 is provided on a rear side surface of the suspension beam 21. A sprocket 37 is fitted into and fixed to the output shaft on the side of the traverse winch 32, a sprocket 39 that freely rotates is provided on a sprocket support 38, and one traverse chain 31 is bridged between the sprockets 37, 39. Both ends of the traversing chain 31 are fastened to upper ends of the traversing trolley 30.
[0038]
The traverse winch 32 has an output shaft that does not rotate due to an external force like a worm speed reducer, and normally fixes the trolley 30 without rotating the traverse chain 31. When the traverse winch 32 rotates, the traverse chain 31 rotates and the traverse trolley 30 traverses.
[0039]
The sprocket support 38 adjusts the distance between the two sprockets 37 and 39 by its screws, and keeps the traversing chain 31 in a tight state.
[0040]
The traversing rope wheel 33 and the traversing handle 34 are fitted and fixed to the input shaft in front of the traversing winch 32. Turning the traversing rope wheel 33 or the traversing handle 34 rotates the traversing winch 32, and the traversing trolley 30 traverses the suspension beam 21.
[0041]
When a ring-shaped traversing rope 35 is hung on the traversing rope wheel 33 and one side of the traversing rope 35 is pulled down, the traversing rope wheel 33 rotates and the trolley 30 traverses.
[0042]
Next, a method of carrying a suspended load 42 such as a construction material into the building 1 under construction using the suspension jig 20 will be described.
[0043]
To lift the suspended load 42, as shown in FIG. 2, the traversing rope 35 is pulled down or the traversing handle 34 is turned to set the traversing trolley 30 of the hanging jig 20 to a predetermined position which is the position of the center of gravity immediately below the suspending wire 12. The suspended load 42 is suspended from the trolley 30 via the chain block 41.
[0044]
The trolley 30 is fixed at a predetermined position by the traversing chain 31 for traversing the trolley 30 when the suspended load 42 is suspended, so that the suspended load 42 does not move and is safe.
[0045]
As shown in FIG. 1, the front of the suspension beam 21 of the suspended jig 20 is inserted into the loading floor 2, and the horizontal portion 22 b of the hanger bracket 22 is inserted into the upper floor 3 . At this time, if the worker on the loading floor 2 pulls and guides the traversing rope 35, it can be easily and safely inserted.
[0046]
The horizontal portion 22b of the hanger bracket 22 is inserted to a predetermined depth, the crane hook 11 is slightly lowered, and the horizontal portion 22b is placed on the floor beam 3a of the upper floor 3 .
[0047]
A hanger bracket 22 is provided forward from above the center of the suspension beam 21, and wire suspension rings 24, 24 are provided above the hanger bracket 22 of the suspension beam 21, and the hanger bracket 22 is placed on the upper floor 3 of the frame 1. In this case, the suspension wire 12 and the like do not approach the skeleton 1, so that the work can be performed safely.
[0048]
When the hanging jig 20 is empty, a balance weight 23 for keeping the hanging beam 21 horizontal is provided at the rear end of the hanging beam 21, and the wire hanging rings 24, 24 are positioned at the center of gravity of the hanging jig 20 in the empty state. In addition, since the tip of the crane boom 10 and the crane hook 11 and the hanging wire 12 are separated from the skeleton 1, there is no danger of contact even if there is a protruding part such as the veranda 4 on the upper floor of the skeleton 1, so that work can be performed safely. it can.
[0049]
The traversing rope 35 is pulled down, the trolley 30 is traversed in the direction of arrow F, and the suspended load 42 is carried into the carry-in floor 2 .
[0050]
At this time, the hanger metal fitting 22 is placed on the upper floor 3 of the skeleton 1 and then the traversing trolley 30 is traversed, and the hanging jig 20 does not tilt, so that the work can be performed safely.
[0051]
Further, a traverse winch 32 for rotating the traverse chain 31 is provided in front of the suspension beam 21, and the trolley 30 traverses the suspension beam 21 by rotating the traverse rope wheel 33 of the traverse winch 32, and the trolley 30 moves in front of the suspension beam 21. Since the suspended load 42 moves when the traversing rope car 33 is turned, the worker can operate and pull in the suspended load 42 while staying at the carry-in floor 2 in the frame 1, which is safe.
[0052]
When the trolley 30 arrives at the carry-in position, the chain block 41 is lowered in the direction of arrow D, and the suspended load 42 is dropped on the floor beam 2 a of the carry-in floor 2 .
[0053]
At this time, when the suspending jig 20 is in an empty state, a balance weight 23 for keeping the suspending beam 21 in a horizontal state is provided at the rear end of the suspending beam 21, and the wire suspending rings 24, 24 are positioned at the center of gravity of the suspended state of the suspending jig 20. Even if it is provided at the position and the hanging load 42 is removed from the hanging jig 20, it is safe because the hanging wire 12 is hung at the center of gravity and thus does not tilt. It is easy to remove the chain block 41 from the suspended load 42.
[0054]
By returning the traversing trolley 30 to a predetermined position and repeating the same operation, construction materials can be carried into each floor.
[0055]
Also, construction materials can be carried out in the reverse order.
[0056]
Next, a case where the curtain wall 43 is attached to the wall of the frame 1 under construction shown in FIG. 11 will be described.
[0057]
In this case, the same suspending jig 20 is used except that the transverse rope 35 is not used because it is not used.
[0058]
The method of attaching the curtain wall 43 to the wall of the skeleton 1 under construction using the suspending jig 20 is substantially the same as the method of carrying in the suspended load 42, and thus different portions will be mainly described.
[0059]
As shown in FIG. 11, the front of the suspension beam 21 of the suspended jig 20 is inserted into the upper floor 3, and the front end of the suspension beam 21 is placed on the floor beam 3 a of the upper floor 3 .
[0060]
The worker on the upper floor 3 turns the traversing handle 34 to traverse the trolley 30 in the direction of arrow F, and draws the curtain wall 43 to the loading floor 2 .
[0061]
At this time, a traverse winch 32 for rotating the traverse chain 31 is provided in front of the suspension beam 21, and the trolley 30 traverses the suspension beam 21 by turning the traversing handle 34 of the traverse winch 32, and the trolley 30 moves in front of the suspension beam 21. Since the curtain wall 43 moves when the traversing handle 34 is turned, the operator can pull the curtain wall 43 by operating while staying on the upper floor 3 in the frame 1, which is safe.
[0062]
When the curtain wall 43 comes to the mounting position, the chain block 41 is lowered in the direction of arrow D and mounted.
[0063]
At this time, when the suspending jig 20 is in an empty state, a balance weight 23 for keeping the suspending beam 21 in a horizontal state is provided at the rear end of the suspending beam 21, and the wire suspending rings 24, 24 are positioned at the center of gravity of the suspended state of the suspending jig 20. Even if the curtain wall 43 is detached from the hanging jig 20, it is safe because the hanging wire 12 is suspended from the position of the center of gravity so that the curtain wire 43 is not tilted. In addition, it becomes easy to remove the chain block 41 from the curtain wall 43.
[0064]
The curtain wall 43 can be attached to each floor by returning the traversing trolley 30 to a predetermined position and repeating the same operation.
[0065]
Next, a case where the horizontal member 44 is attached to the climbing crane 50 shown in FIG. 12 will be described.
[0066]
In this case, the same suspending jig 20 is used except that the transverse rope 35 is not used because it is not used.
[0067]
The method of attaching the horizontal member 44 to the climbing crane 50 using the suspending jig 20 is substantially the same as the method of carrying the suspended load 42, and thus different portions will be mainly described.
[0068]
As shown in FIG. 12, the front of the suspension beam 21 of the suspended lifting jig 20 is inserted into the climbing crane 50, and the front end of the suspension beam 21 is placed on the post horizontal rail 51 of the climbing crane 50.
[0069]
The worker of the post horizontal rail 51 turns the horizontal handle 34 to move the horizontal trolley 30 in the direction of arrow F, and draws the horizontal member 44 to the climbing crane 50.
[0070]
At this time, a traverse winch 32 for rotating the traverse chain 31 is provided in front of the suspension beam 21, and the trolley 30 traverses the suspension beam 21 by turning the traversing handle 34 of the traverse winch 32, and the trolley 30 moves in front of the suspension beam 21. Since the horizontal member 44 is moved by turning the traversing handle 34, the worker can operate and pull the horizontal member 44 while staying at the post horizontal rail 51 of the climbing crane 50, which is safe.
[0071]
When the horizontal member 44 reaches the mounting position, the chain block 41 is lowered in the direction of arrow D and mounted.
[0072]
At this time, when the suspending jig 20 is in an empty state, a balance weight 23 for keeping the suspending beam 21 in a horizontal state is provided at the rear end of the suspending beam 21, and the wire suspending rings 24, 24 are positioned at the center of gravity of the suspended state of the suspending jig 20. Even if the horizontal member 44 is detached from the hanging jig 20, since the hanging wire 12 is suspended at the center of gravity, the horizontal member 44 is not tilted, so that it is safe. It is easy to remove the chain block 41 from the horizontal member 44.
[0073]
The horizontal member 44 can be attached to each floor by returning the traverse trolley 30 to a predetermined position and repeating the same operation.
[0074]
Further, the horizontal member 44 can be removed by the reverse procedure.
[0075]
In the above embodiment, the example in which the hanger bracket 22 and the suspension beam 21 are integrated is shown. However, the hanger bracket 22 may be bolted to the suspension beam 21 so as to be removable or changeable in position.
[0076]
Also, an example has been shown in which the traverse winch 32 is manually turned and used as a worm reduction gear, but an electric motor with a brake and a spur gear reduction gear may be used.
[0077]
【The invention's effect】
According to the invention of claim 1, when the hanger bracket is provided forward from above the central portion of the suspension beam, the wire suspension ring is provided above the hanger bracket of the suspension beam, and the hanger bracket is placed on the upper floor of the frame. Since the hanging wires do not approach the skeleton, it can be safely operated.
[0078]
In addition, the trolley is fixed at a predetermined position by the traversing chain that traverses the trolley when the suspended load is suspended, so that there is no danger of the suspended load moving and the trolley is safe.
[0079]
In addition, the hanging trolley is made to traverse after the hanger bracket is placed on the upper floor of the frame, and the hanging jig does not tilt, so that the work can be performed safely.
[0080]
According to the invention of claim 2, a traversing winch for rotating the traversing chain is provided in front of the suspension beam, and the trolley traverses the suspension beam by turning the traversing rope car or the traversing handle of the traversing winch. The suspended load is moved by turning the traversing rope car or the traversing handle in front, so that the worker can operate and pull the suspended load while staying in the skeleton to be safe.
[0081]
According to the third aspect of the invention, when the hanging jig is empty, the balance weight for keeping the hanging beam horizontal is provided at the rear end of the hanging beam, and the wire hanging ring is provided at the center of gravity of the empty hanging jig. In addition, since the hanging wire and the like are separated from the skeleton, even if there is an overhanging portion on the upper floor of the skeleton, there is no danger of contact and work can be performed safely.
[0082]
Further, even if the suspended load is removed from the suspending jig, the suspension wire is suspended at the position of the center of gravity and does not tilt, so that it is safe.
[Brief description of the drawings]
FIG. 1 is a side view showing an embodiment of a hanging jig.
FIG. 2 is a diagram showing a state where the suspended load is suspended.
FIG. 3 is a partially enlarged view showing a main part of FIG. 1;
FIG. 4 is a plan view of FIG. 3;
FIG. 5 is a partially enlarged view showing a traversing winch section of FIG. 3;
FIG. 6 is a partially enlarged view showing the traversing winch section of FIG. 4;
FIG. 7 is a front view of FIG. 5;
FIG. 8 is a partially enlarged view showing the trolley unit shown in FIG. 3;
FIG. 9 is an enlarged sectional view taken along AA of FIG. 4;
FIG. 10 is a partially enlarged view showing a sprocket support metal part of FIG. 4;
FIG. 11 is a side view showing an example of attaching a curtain wall by one embodiment of a hanging jig.
FIG. 12 is a side view showing an example of attaching a horizontal member to a climbing crane according to an embodiment of a hanging jig.
FIG. 13 is a side view showing a conventional example of a hanging jig.
14 is a view showing a state where the suspended load of FIG. 13 is lowered.
[Explanation of symbols]
1 frame
3 upper floor 12 hanging wire 20 hanging jig 21 hanging beam 22 hanger bracket 23 balance weight 24 wire hanging ring 30 traversing trolley 31 traversing chain 32 traversing winch 33 traversing rope car 34 traversing handle 42 suspended load as load

Claims (3)

水平状態に吊り持ちされる吊りビームと、吊りビームを走行レールとして横行し建設資材等の荷を吊る横行トロリーと、横行トロリーを横行させる横行チェーンとからなる吊り治具において、吊りビームの中央部上方から前方にハンガー金具を設け、吊りビームのハンガー金具より後方の上方にワイヤー吊環を設け、ワイヤー吊環を吊りワイヤーで吊り、ハンガー金具を躯体の上階に載せてから横行トロリーを横行させるようにした吊り治具。In the hanging jig comprising a hanging beam suspended in a horizontal state, a trolley that traverses the hanging beam as a traveling rail and hangs loads of construction materials, and a traversing chain that traverses the trolley, a central part of the hanging beam. Provide a hanger bracket from the top forward, provide a wire suspension ring above the hanger bracket of the suspension beam, suspend the wire suspension ring with the suspension wire, place the hanger bracket on the upper floor of the frame, and then traverse the trolley. Hanging jig. 横行チェーンを回行させる横行ウィンチを吊りビームの前方に設け、横行ウィンチの横行ロープ車又は横行ハンドルを回すことにより横行トロリーが吊りビームを横行する請求項1記載の吊り治具。The lifting jig according to claim 1, wherein a traversing winch for rotating the traversing chain is provided in front of the suspension beam, and the trolley traverses the suspension beam by rotating a traversing rope wheel or a traversing handle of the traversing winch. 吊り治具が空荷状態で、吊りビームを水平状態に保つバランスウェイトを吊りビームの後端に設け、ワイヤー吊環を空荷状態の吊り治具の重心位置に設けた請求項1又は2記載の吊り治具。3. The suspension jig according to claim 1, wherein a balance weight for keeping the suspension beam in a horizontal state is provided at a rear end of the suspension beam when the suspension jig is in an empty state, and a wire suspension ring is provided at a center of gravity of the empty jig. Hanging jig.
JP2002321685A 2002-11-05 2002-11-05 Suspension tool Pending JP2004155538A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002321685A JP2004155538A (en) 2002-11-05 2002-11-05 Suspension tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002321685A JP2004155538A (en) 2002-11-05 2002-11-05 Suspension tool

Publications (1)

Publication Number Publication Date
JP2004155538A true JP2004155538A (en) 2004-06-03

Family

ID=32802143

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002321685A Pending JP2004155538A (en) 2002-11-05 2002-11-05 Suspension tool

Country Status (1)

Country Link
JP (1) JP2004155538A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160022159A (en) * 2014-08-19 2016-02-29 김호 Hook connection device for extended range operation of crane and crane having the same
CN105502142A (en) * 2015-07-13 2016-04-20 中国工程物理研究院激光聚变研究中心 Precise positioning and flexible butt joint system
JP2018031236A (en) * 2016-08-26 2018-03-01 三井住友建設株式会社 Heavy-weight article carry-in device
CN113060645A (en) * 2021-03-10 2021-07-02 北京东方泰洋幕墙股份有限公司 High-rise curtain wall hoisting anti-shaking system and using method thereof
CN113602966A (en) * 2021-08-06 2021-11-05 中建二局第一建筑工程有限公司 Rail type hoisting tool for high-rise building curtain wall construction
CN113979315A (en) * 2021-10-28 2022-01-28 承德石油高等专科学校 Crown block positioning deviation compensation device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5493577A (en) * 1977-12-29 1979-07-24 Niigata Eng Co Ltd Transportation work method of apparatuses
JPH0437168Y2 (en) * 1987-04-07 1992-09-01
JPH0761774A (en) * 1993-08-27 1995-03-07 Fujita Corp Method for taking in carried-in goods by crane
JPH09227067A (en) * 1996-02-28 1997-09-02 Kumagai Gumi Co Ltd Weight lifting device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5493577A (en) * 1977-12-29 1979-07-24 Niigata Eng Co Ltd Transportation work method of apparatuses
JPH0437168Y2 (en) * 1987-04-07 1992-09-01
JPH0761774A (en) * 1993-08-27 1995-03-07 Fujita Corp Method for taking in carried-in goods by crane
JPH09227067A (en) * 1996-02-28 1997-09-02 Kumagai Gumi Co Ltd Weight lifting device

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20160022159A (en) * 2014-08-19 2016-02-29 김호 Hook connection device for extended range operation of crane and crane having the same
KR101692014B1 (en) * 2014-08-19 2017-01-03 김호 Hook connection device for extended range operation of crane and crane having the same
CN105502142A (en) * 2015-07-13 2016-04-20 中国工程物理研究院激光聚变研究中心 Precise positioning and flexible butt joint system
CN105502142B (en) * 2015-07-13 2017-07-14 中国工程物理研究院激光聚变研究中心 Precision positioning and flexible docking system
JP2018031236A (en) * 2016-08-26 2018-03-01 三井住友建設株式会社 Heavy-weight article carry-in device
CN113060645A (en) * 2021-03-10 2021-07-02 北京东方泰洋幕墙股份有限公司 High-rise curtain wall hoisting anti-shaking system and using method thereof
CN113602966A (en) * 2021-08-06 2021-11-05 中建二局第一建筑工程有限公司 Rail type hoisting tool for high-rise building curtain wall construction
CN113979315A (en) * 2021-10-28 2022-01-28 承德石油高等专科学校 Crown block positioning deviation compensation device
CN113979315B (en) * 2021-10-28 2023-10-31 承德石油高等专科学校 Crown block positioning deviation compensation device

Similar Documents

Publication Publication Date Title
JP2004155538A (en) Suspension tool
JP2008222382A (en) Method for moving lifting device for installation
TWI649251B (en) Lifting and loading method of elevator balance weight
KR100723643B1 (en) Turning device for hoist
JP2000351548A (en) Passenger rescue operation device and passenger rescue operation method for elevator
JPH06305683A (en) Load hoisting device for crane
JP2000143139A (en) Hoisting jig for crane
JP2004059216A (en) Car position holding structure in inspection of elevator
CN207078901U (en) Gravity motion hanging beam
JPH07144573A (en) Jig for covering truck loading space with sheet
JPH0628548Y2 (en) Lifting device for self-propelled work platform
JPH08259177A (en) Handling device of pipe
JP2014133604A (en) Devanning equipment
CN211998537U (en) MG type double-beam door type lifting device
JP2001199674A (en) Lifting down device for long material
CN108889934B (en) Portable steel slag tank lifting and tipping device
JPH08231161A (en) Down type working elevator and method of extending elevator mast in downward direction
JP2004331348A (en) Installing method for elevator
JP3002221U (en) Trolley with a gondola suspension arm
JP4286971B2 (en) Tower crane removal method
JPH0630588Y2 (en) Rail Mobile Monorail
JPH11228049A (en) Elevator car holder
JP2008303052A (en) Hanging device of self-propelled vehicle for high lift work
JP2670947B2 (en) Piping method and device in a tunnel
JPH11157777A (en) Container crane

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040615

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060925

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061003

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070227